Sejal Architecture portfolio_(undergraduate)_SPA delhi

Page 1

S E J A L SPADELHI

Contact-8851168629

BachelorofArchitectureSchoolofplanningand architecture,NewDelhi. (2019-Present)

DelhiPublicSchool,Ranchi,Jharkhand (2008-2016)

XII CBSE I 89.9 % DelhiPublicSchool,Ranchi,Jharkhand (2017-2018)

X CBSE I 10 CGPA

EDUCATION
ACHIEVEMENTS
……………………………………….1st Place winner ( 2021)
…….………………………….. ……..2nd Place winner (2022)
…….………………………………….( Top 10 entries) (2022) SPANDAN(thedramasociety)Coordinator…..(2022) ArchmelloTheBrewedBar Competitions…….(2020) CommunityCentre,Vancouver……………..…(2022)
1.BusshelterdesignconductedbySwachhta pakhwada (Time problem)
2.BITMesraconducted,LIGcompetitioninitiatedby Ministryofhousingandurbanaffairs (Time problem)
3.InternationalTinyhousecompetitionByArcace, Europe
Jharkhand
Email -sejalshreya0000@gmail.com Address-AshramMarg,Ranchi

PROJECT EXPERIENCE

Pod design ………………………….. 1st Sem

Non Contextual

Measured Drawing …………….…… 1st Sem

Mandu, Madhya Pradesh

Visitor’s Center ……………….…….2nd Sem

Dhanyakuria, Kolkata

Measured Drawing 2 ……………… 2nd Sem

Dhanyakuria, Kolkata

Lawyer’s Residence Design………...3nd Sem

MaharaniBagh,Delhi

Craft Center ………………………...4nd Sem

Indraprastha,NewDelhi

Vernacular Cafe …………………….…4nd Sem

Dhanyakuria, Kolkata

Urban Excellence Centre……………5th Sem

Hyderabad

Mixed Use High rise…………………6th Sem

Gurgaon, Haryana

Pilot Residence ………………..…….7th Sem

East of Kailash, Delhi

Holiday homes ………………..……..7th Sem

Cavelossim, Goa

SKILLS WORKFLOW SET

Autocad - Sketchup - Photoshop

Autocad - Rhino - Photoshop

PRESENTATION SOFTWARE

AUTOCAD………………..Drafting

PHOTOSHOP…………….Presentation

ENSCAPE………………...Rendering

MODELLING SOFTWARE

SKETCHUP

RHINO

GRASSHOPPER

REVIT

EXTRA CURRICULAR

Been a part of drama society and Spakriti in 2019 Fest.

Coordinated And conducted

Spandan Society in 2021

A Kathak Dancer , Harmonica player

Hobbies-

Writing / reading books (fiction

mostly) . Acting , Listening

winner

A Cultural Oasis In The Middle Of The City

SHILPA KALA KENDRA

( 4th sem project )_INDIVIDUAL

CRAFT CENTER I Indraprastha, New Delhi

A corner plot of 30000 sqm situated in Delhi, Indraprastha. An escape from the urban rush for the people, a space for craftsmen from different parts of India is planned with a vernacular approach of a lost construction technique wattle and daub. An interacting freestanding climbers screen wall is made as the design usp, which acts as a natural fence with increasing privacy cohesion.

SITE PLAN
EXPLODED

CLUSTER PLANNING

Dhokra, Madhubani and Bamboo Craft were each given their own central court, with a common entry court shared between them. This was placed between the public spaces of the museum and auditorium, and the private spaces of the dormitory and studio apartments. The rear ends were leftfortheutilityservicezone.

MADHUBANI
TRANSITION PLAZA FROM SEMI PUBLIC TO PRIVATE
FREE STANDING SCREEN WALL SCREEN
SCREEN WALL SCREEN FREE STANDING
VISTA CONNECTING PUBLIC SPACE TO SEMI PRIVATE
WALL
SCREEN WALL SCREEN WALL

SCREEN WALL MERGING WITH THE WINDOW

CRAFT WORKSPACE

TRAINER’S ROOM

MADHUBANI STORE SPACE

FINISHING SPACE

FURNACE FOR BIGGER SCULPTURES

FURNACE FOR SMALL SCULPTURES

DHOKRA CRAFT WORKSPACE

DRYING SPACE

BRONZE STRIP MAKER

COMMON COURT FOR THREE CRAFTS

BAMBOO CRAFT WORKSPACE

BAMBOO STORAGE SPACE

TRAINER’S ROOM

PICHKI PARNI

UTILITY SPACE FOR BAMBOO CRAFT

TRAINER’S ROOM

BAMBOO SOAKING TANK

SCREEN WALL SCREEN WALL MERGING WITH THE WINDOW

FREE STANDING SCREEN WALL SCREEN WALL

Look It’s the sandwiched Duplexes!

FAMILY APARTMENT

(2 WEEK TIME PROBLEM)

Individual

Pilot Residence I (East of Kailash, Delhi)

A sandwiched Plot in East of kailash with a restriction in height of 15M (excluding the stilts) , A residence apartment is designed for 3 brothers and their families, with an interlocking concept in order to make duplex units with such height restriction . The sides of the plot is not provided with the openings due to buildings on the either side . Spatial arrangement and configuration is explored in the design.

LIFT 1500 X 1500 COMMON LOBBY 2000 X 2000 TREAD = 1200 RISER = 150 HALL 3200 X 4500 DINING 3200 X 3500 KITCHEN 2400 X 3600 BEDROOM 3 3200 X 3500 BEDROOM 2 3200 X 3500 BEDROOM 2 3200 X 3500 WC 1 WC 2 WC 3 COMMON BALCONY 6600 X 1500 LIFT 1500 X 1500 COMMON LOBBY 2000 X 2000 TREAD = 1200 RISER = 150 A’ B’ A B A B A’ B’ 21000 10000 3000
RECREATIONAL SPACE FOR FAMILY 2 GAME ROOM MINI STUDIO STUDY ROOM RECREATIONAL SPACE FOR FAMILY 3 LIFT 1500 X 1500 COMMON LOBBY 2000 X 2000 TREAD = 1200 RISER = 150 LIFT 1500 X 1500 COMMON LOBBY 2000 X 2000 TREAD = 1200 RISER = 150 COMMON TERRACE MEDITATION ROOM BAR AREA VINE STORE WC1 WC1 A B
A B A’
RECREATIONAL SPACE FOR FAMILY 1
A’ B’
B’
footover Slopedroadtobasement Private Dropoff RetailDropoff ROOF PLAN GROUND FLOOR PLAN +1200
FIRST FLOOR PLAN +5700 FOOD COURT PLAN +14700

OFFICE TYPE A

OFFICE TYPE B

OFFICE TYPE C

FLOOR PLAN
RESIDENCE

OPEN BAR GIVEN AT FOOD ZONE TO ENHANCE SPACE EXPERIENCE AND VENTILATIONFORABOVEFLOORS

OAT PROVIDED AT THE BACK TO ENGAGE THE VISITORS FROM THE COMMERCIALBELTONTHESOUTH

SEMI-OPEN SEATING PROVIDED FOR THE FOOD STALLS,ACTINGASANATTRACTINGELEMENTFOR PEOPLEONSTREET

PEDESTRIAN CROSSOVER PROVIDED TO INCREASE THE VISITOR INFLUX FROM THE ADJACENTCOMMERCIALZONES

PEDESTRIANRAMPPROVIDEDFORDIRECTACCESSFOR PEOPLEFROMBASEMENT

SUNKINGTHEROADTOALLOWENTRY FORBASEMENTPARKING DROPOFFFORRETAIL

PROVIDINGSEPARATEDROPOFFSFOR RETAILSANDOFFICE-RESIDENCETO CUTTRAFFIC

DROPOFFFOROFFICEANDRESIDENCE

CORES DESIGNED AT THE WEST MINIMIZE WASTAGE OF FRONTAGE

ENTRYPLAZAPROVIDINGDIRECT
ACCESSTOTHELINEOFRETAIL
SECTION AA’

REPEATINGTHERETAILFLOORSALONGTHE CORRIDOR,INCREASINGTHEVISIBILITYOF SHOPS

CORE RETAIL
FOOD ZONE
WEST AND SOUTH SIDE TO FRONTAGE
SECTION BB’
10900 5500 5500 8300 8300 8300 10900 10900 10900 7100 11500 5200 10900 7300 9400 7300 10900 5500 900 900 9800 S10 S1 175 S1 175 S2 175 S3 175 S4 175 S5 175 S5 175 S5 175 S5 175 S5 175 S5 175 S5 175 S5 175 S5 175 S5 175 S6 175 S6 175 S5 175 S5 175 S6 175 S4 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 S10 S10 S10 S10 175 S10 S10 S11 S11 S10 175 S9 S12 175 S13 175 S12 175 S14 175 S15 175 S16 175 S16 175 S16 175 S16 175 S16 175 S16 175 S16 175 S16 175 S16 175 S16 175 S17 175 S17 175 S16 175 S16 175 S17 175 S15 175 S18 175 S18 175 S19 175 S20 175 S21 175 S22 175 S22 175 S22 175 S22 175 S22 175 S22 175 S22 175 S22 175 S22 175 S22 175 S23 175 S23 175 S22 175 S22 175 S23 175 S21 175 BX1(450 1000) BY1 (450 750) C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 by1 (300 X 600) BY2 (450 750) BY3 (300 750) BY7(450 X 750) S24 175 S25 175 bX1(300 X 600) bX2(300 X 600) by8(300 X 600) bX3(300 600) by9 (300 600) S26 175 bX1(300 X 600) BY15(300 X 600) 175 bX4(300 X 600) by10(300 600) BY19(300 600) by11(300 600) 175 BX2 (450 X 1000) BX3 (450 X 1000) BX4(450 X 1000) BX5(450 X 1000) BX6(450 1000) BX6(450 1000) BX5(450 X 1000) BX6(450 X 1000) B7(450 X 1000) BX5d(450 1000) BX5(450 1000) BX5(450 X 1000) BX5(450 X 1000) BX5(450 X 1000) BX8(450 X 1000) BX9(450 1000) BX10(450 1000) BX11(450 1000) BX12(450 X 1000) BX13(450 X 1000) BX13(450 X 1000) BX12(450 1000) BX13(450 1000) B14(450 1000) BX12(450 X 1000) BX12(450 1000) BX12(450 1000) BX12(450 X 1000) BX8(450 X 1000) BX9(450 1000) BX10(450 1000) BX11(450 1000) BX12(450 X 1000) BX13(450 1000) BX13(450 X 1000) BX12(450 1000) BX13(450 X 1000) B14(450 1000) BX12(450 X 1000) BX12(450 1000) BX12(450 X 1000) BX12(450 X 1000) BX8(450 1000) BX9(450 1000) BX10(450 X 1000) BX11(450 1000) BX12(450 X 1000) BX13(450 X 1000) BX13(450 X 1000) BX12(450 1000) BX13(450 1000) B14(450 1000) BX12(450 X 1000) BX12(450 1000) BX12(450 1000) BX12(450 X 1000) BX8(450 1000) BX9(450 1000) BX10(450 X 1000) BX11(450 1000) BX12(450 X 1000) BX13(450 X 1000) BX13(450 X 1000) BX12(450 X 1000) BX13(450 X 1000) B14(450 1000) BX12(450 X 1000) BX12(450 1000) BX12(450 X 1000) BX1(450 1000) BX3 (450 X 1000) BX4(450 X 1000) BX5(450 X 1000) BX6(450 1000) BX6(450 1000) BX5(450 X 1000) BX6(450 X 1000) B7(450 X 1000) BX5(450 1000) BX5(450 X 1000) BX5(450 X 1000) BX5(450 X 1000) BY3 (300 750) BY2 (450 750) BY2 (450 750) by1 (300 X 600) by1 (300 X 600) by1 (300 X 600) BY2 (450 750) BY2 (450 750) BY2 (450 750) BY2 (450 750) BY2 (450 750) BY3 (300 750) BY3 (300 750) BY2 (450 750) BY2 (450 750) BY1 (450 750) by1 (300 X 600) by1 (300 X 600) by1 (300 X 600) BY4 (450 X 750) by2 (300 600) BY5 (450 X 750) BY6(300 750) BY5(450 750) BY6 (300 X 750) BY5 (450 X 750) BY2 (450 X 750) by2 (300 600) by2 (300 600) by2 (300 600) BY5(450 750) BY5 (450 X 750) BY5(450 750) BY5 (450 X 750) BY5 (450 X 750) BY6 (300 X 750) BY6(300 750) BY5(450 750) BY5 (450 X 750) BY4 (450 X 750) by2 (300 600) by2 (300 600) by2 (300 600) BY7 (450 750) by3 (300 600) BY8 (450 750) BY9(300 750) BY8(450 750) BY9 (300 750) BY8 (450 750) BY8 (450 750) by3(300 X 600) by3 (300 600) by3(300 X 600) BY8(450 750) BY8 (450 750) BY8(450 750) BY8 (450 750) BY8 (450 750) BY9(300 750) BY9(300 750) BY8(450 750) BY8 (450 750) BY7 (450 750) by3 (300 600) by3 (300 600) by3 (300 600) BY10 (450 750) by4 (300 X 600) BY11 (450 750) BY12(300 750) BY12 (300 750) BY11(450 750) by4(300 600) by4(300 600) by4(300 600) by4(300 600) by4(300 600) by4(300 600) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY11(450 750) BY12(300 750) BY12(300 750) BY10(300 750) BY13 (450 750) by5 (300 600) by5 (300 600) by5 (300 600) by5 (300 600) by5 (300 600) by5 (300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY14(300 600) BY13(300 600) BY15(300 600) BY15(300 600) UP (1800 2400) 20 PASSENGER UP 6M ONE WAY 6M ONE WAY 5500 8M TWO WAY 5500 8500 8300 8300 10900 10900 10900 10900 7100 5200 11500 10900 10100 OFFICE LIFT (1800 2400) 20 PASSENGER 7300 9400 7200 ELECTRIC ROOM (3600X3500) PANEL CHILLER ROOM 200sqm BMS ROOM Service truck UNLOADING AREA ROOM 200,000 UNLOADING AREA FIRE TANK ROOM ROOM ROOM 5500 GROUND TO B1 1:8 SLOPE B1 TO GROUND 1:8 SLOPE B2 TO B1 1:8 SLOPE B1 TO B2 1:8 SLOPE WATER ROOM STORAGE 2M ONE WAY 2M ONE WAY UP UP 2M ONE WAY 2M ONE WAY 6M ONE WAY STORE 900 D2 D1 900 L.V H.V 6M ONE WAY 3300 2000 200 300 200 1200 1200 4800 900 D1 4300 1700 3100 2500 800 9900 12900 7900 -3800 -3800 27 61 60 59 58 57 63 62 68 67 69 72 71 70 74 73 77 76 75 78 81 80 79 84 83 82 88 64 65 66 9800 GROUND TO B1 RETAIL 1 RETAIL RETAIL RETAIL 7 RETAIL RETAIL 11 RETAIL 13 CAFE 3 CAFE 1 STEPS DROP OFF FOR RESIDENCE AND OFFICE DROP OFF FOR RETAIL 12M WIDE ROAD 12M WIDE ROAD WALKWAY WALKWAY 20 PASSENGER OFFICE LIFT (1800 x 2400) 20 PASSENGER 900 200 1100 4600 UP UP OFFICE LIFT (1800 2400) ELECTRIC (3600X3500) UP UP D2 H.V 7900 12900 +600 +00 +150 +1200 8600 6200 3000 AHU D3 5500 5500 12700 CAFE 2 6600 6000 6600 2700 400 B1 TO GROUND D3 D3 D3 D3 D3 D3 RETAIL 14 1400 5500 8900 8400 8400 1300 600 8400 1600 7800 +1200 BOUNDARY LINE SETBACK LINE BOUNDARY LINE SETBACK LINE 12900 BOUNDARY LINE SETBACK LINE BOUNDARY LINE SETBACK LINE 5500 7300 9400 7200 9800 W1 W1 W1 W1 W1 5500 8500 8300 8300 10900 10900 10900 10900 7100 5200 11500 10900 10100 5500 900 900 1000 800 1000 3000 1100 1200 600 300 1600 300 300 300 6700 3700 4300 R1970 5200 800 12100 600 300 1200 300 500 800 3200 3300 140 300 1300 800 1900 300 500 R17300 2300 17° 8° 14° 12° 3° 6° 1179 480 FRESH AIR OUT SHAFT FRESH AIR IN SHAFT FRESH AIR OUT SHAFT FRESH AIR IN SHAFT FRESH AIR OUT SHAFT 1400 2200 1500 1100 1200 1700 9700 3100 SLOPE 1:8 SLOPE 1:8 1 2 3 4 5 6 7 +1200 +00 15800 3300 Ref dwg AR16 Ref AR16 Ref AR16 Tread 300 Width 2000 Riser 150 Tread 300 Riser 150 Width 2000 VALLEY VALLEY VALLEY VALLEY RIDGE 7300 10500 7200 8700 11500 400 X 400 PCC KHURRA 400 400 PCC KHURRA X400 PIPE SHAFT 6200 7300 9400 7200 9800 8800 11500 Ref AR16
VALLEY VALLEY VALLEY RIDGE RIDGE +85631 +83144 VALLEY +30000 +21600 +17530 RIDGE VALLEY VALLEY RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE VALLEY VALLEY VALLEY +39500 RIDGE VALLEY RIDGE RIDGE VALLEY VALLEY +35160 VALLEY VALLEY RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE VALLEY RIDGE RIDGE RIDGE RIDGE RIDGE RIDGE VALLEY VALLEY VALLEY 8500 8300 8300 10900 10900 10900 10900 7100 5200 10900 10100 5500 900 900 400 X 400 PCC KHURRA SHAFT 400 X 400 PCC KHURRA 650 X400 PIPE SHAFT 400 X 400 PCC KHURRA 650 X400 PIPE SHAFT 400 400 PCC KHURRA 650 X400 PIPE SHAFT 400 400 PCC KHURRA 650 X400 400 400 PCC KHURRA 650 X400 650 X400 PIPE SHAFT 400 X 400 PCC KHURRA 650 650 X400 PIPE SHAFT 400 X 400 PCC KHURRA VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY VALLEY PIPE SHAFT STORAGE OFFICE LIFT (1800 2400) 20 PASSENGER OFFICE LIFT 20 PASSENGER (1800 2400) UP UP D1 12900 6600 D5 D5 TERRACE 2800 D2 D2 D2 D2 COMMON SPACE G1 3600 00 3900 3000 4100 3300 3400 3600 4500 500 3000 6900 6600 1800 2700 1800 6200 5800 5900 3100 1800 1800 2900 2000 2100 2400 5100 4500 2200 6600 6100 5500 2200 2100 220 380 3700 3900 R29400 R29400 R39200 4400 26300 12900 3800 5200 12100 5600 D2 Tread 300 5200 7100 5500 10100 9000 8900 1100 G1 AR16 23000 2000 D1 2300 UP ELECTRIC ROOM D2 D1 L.V H.V 1600 1000 AHU 5300 2700 1200 500 400 D3 Riser 150 Tread - 300 Width - 2000 PS Lvl +1350 Lvl +2850 Lvl +4500 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3100 900 900 1200 3000 1500 400 2600 1400 300 2500 4400 400 1400 400 1300 300 2800 2800 1600 700 300 1200 300 3500 1800 2400 1800 LIFT LOBBY K L FHC W2 W2 11000 300 600 900 3600 900 600 DOWN 3900 4500 4500 4500 3600 900 800 3700 900 3900 300 4300 2900 1700 2800 1800 3900 7000 Lvl +1350 Lvl +2850 Lvl +4500 Lvl +00 Lvl +18000 MUMTY B B' 900 300 200 1100 4700 200 UP D1 D1 1800 800 1800 7200 6200 6600 5000 V V Riser 150 Tread 300 Width2000 LADIES WASHROOM UNI. ACC. WC 690 740 740 400 1900 2000 1900 DN LIFT LOBBY 2200 1800 2200 1800 2200 1000 1500 300 1800 500 B 17900 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 D4 360 360 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 17 20 21 22 23 24 25 26 27 28 29 30 3600 2600 400 C 5200 7400 5200 7900 2400 2800 2700 MEN'S WASHROOM Lvl +1350 Lvl +3000 Lvl +4500 2100 1260 640 370 750 250 870 900 330 750 370 750 370 750 370 750 260 1500 330 1640 1050 770 620 WATER FOUNTAIN SPACE 430 490 880 380 490 570 150 940 270 360 360 360 250 1870 1450 600 750 920 190 1460 A A'

Sustainability

VERNACULAR CAFE

2 WEEK TIME PROBLEM

4thSem_Individual

I Dhanyakuria , Kolkata

The cafe was built with the traditional materials of Kolkata - hay thatch roof with bamboo framing (roof) and brick wall construction. A foldable bamboo window was made in a traditional style and the pergola was made out of bamboo as well, with much smaller units to give a buffer effect of flowing roof from the front.

!
GROUND FLOOR PLAN UPPER FLOOR PLAN
ENTRY
KITCHEN

TYING BAMBOO SURFACE

INVERTED THATCH ROOFING

EXPLODED OF CAFE

HAY THATCH ROOF BAMBOO FRAMEWORK TRUSSING

TINY SLICE

Competition (top 10 shortlisted entries)

One of the most recent trends in architecture is the modular house, which can be found in forests or other isolated areas across the globe. The Tiny Slice is a competition-based design of a short-duration 32 sqm house. The flexible module of the tiny house is designed by combining many smaller strategies. A modified trombe wall is used to passively heat the space, which was inspired by a house module in North Carolina. The planning of the module is done in square grids to use the maximum amount of space possible. The lower and upper parts of the wet areas are used for harvesting water that melts from the heater at the centre (i.e. above the kitchen, sauna, and pantry). The sloped roofs not only provide a volume for snow collection but also slice up the blocky module.

Minima scalpere !
3600 3600 3600 3600 CAFE TINY HOUSE WORKING SPACE SAUNA 9000 Metal Sheet Roof Framing Wood Cover

Rectangular facade extruded from the plan

The sloped down layout for ice to be excluded from spaces most frequent to use,(eg-bedroom)

The division of form in two geometries having space for water storage and shifting the blocks to accumulate the ice at top where the heater could easel melt and make the use of water , (these include the warmer blocks i,e kitchen,sauna)

Modified Trombe wall

The trombe wall consists of rectangular metal plates , these rectangle can swivel so that it can absorb more or less heat. This action can also adjust the amount of light that enters the room.

It has been painted black and filled with a plant-based oil mixture. The mixture is a phase change material (PCM) that becomes liquefied when it warms and slowly releases the heat through the cooler evening and night as it returns to a waxy solid material.

Metal Sheet Roof Framing Wood Cover

Other works

WINNING ENTRY

Concepting bus stop design

Centralising all the spaces in the site for plan so that the usable spaces have a clear head height , pedestrian path is curved outside towardsthefrontoflane

Acontinuousbridgeforpeopleto travel via the cycle is provided thatbreakstheloopofcycletrack andmakesanewpathofitsown.

A space for seating above the lower one is made in order to provide a waiting pavilion for longer waiting passengers or a space for homeless people to sleepatnight

Cycletrack

Cycletrack

Waiting area
ATM E-Bike
A biomimic canopy resembling leaf with framework structure made out ofColdformsteelwithpolycarbonate sheets
Cycletrack Cycletrack
Upper PLAN ATM
PLAN
Waitingpavilion Ground
Contact-8851168629 Emailsejalshreya0000@gmail.com Address-AshramMarg,Ranchi Jharkhand.834009

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.