000-N13 IBM IBM Intelligent Operations Center Technical Mastery Test v1 5 Q&A
Version demo
http://www.testchief.com/000-n13.htm
Important Note, Please Read Carefully Other prep2pass products A) Offline Testing engine Use the offline Testing engine product topractice the questions in an exam environment. Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is revised. Free updates are available for 90 days after the purchase. You should check your member zone at prep2pass and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.prep2pass.com 2.Click on Log in 3.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@prep2pass.com. You should include the following: Exam number, version, page number, question number, and your login Email. Our experts will answer your mail promptly. Copyright Each iPAD file is a green exe file. if we find out that a particular iPAD Viewer file is being distributed by you, prep2pass reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@prep2pass.com.
Leading the way in IT testing and certification tools, www.SelfExamPrep.com
-2-
www.prep2pass.com Q: 1 Which of the following is not a part of creating a KPI (Key Performance Indicator)? A. B. C. D.
Formatting data input for the KPI metrics to be provided Business Monitor Configuration for Inbound Event and KPI Model Defining KPI Context Structure Definition Write a custom portlet for each KPI
Answer: D www.prep2pass.com Q: 2 Which Hardware Deployment Kit should you use for basic Intelligent Operations Center Pilot program? A. B. C. D.
IBM System x3500 M3 IBM BladeCenter S IBM BaldeCenter H IBM zBX
Answer: A www.prep2pass.com Q: 3 How many integration points are currently defined for the Intelligent Operations Center? A. B. C. D.
4 7 11 20
Answer: C www.prep2pass.com Q: 4 Standard Operating Procedures are created through a Design Tool, which is: A. B. C. D.
an Eclipse-based IDE for diagramming the procedure a graphical authoring tool where you can connect different types of nodes and actions an XML definition tool for work flow definitions None of the above Leading the way in IT testing and certification tools, www.SelfExamPrep.com
-3-
Answer: B www.prep2pass.com Q: 5 The Time to Value Measurement is the time between customer agreement and deployment test complete, with the goal of reducing the overall calendar time for completion. Which of the following issues are NOT included in that deployment? A. B. C. D.
Root User not configured prior to installation. Virtual Machine to Virtual Machine connectivity issues. Feature complexity issues. Database portability issues.
Answer: D
Leading the way in IT testing and certification tools, www.SelfExamPrep.com
-4-