1 minute read
DESIGN STRATEGY SITE-SPECIFIC APPROACH
9m
The 9m height difference reduces the accessibility of the two open spaces.
Advertisement
Functions
The central square was occupied by parking spaces and in front of the Palazzo Callori had only a simple path and lawns,with very few activities.
Drainage
When it rains, the water flowing down from high places will transport some dirty soil.
Coherence
Reorganize the topography, break the 9-meter height difference, and design a coherent step to connect the two open spaces.
New square with a big tree as main view which also create shadow for people to gather. And the long new stairs link the center square with the new open theater in front of piazza callori, together with multifunctional stage and lawn for tourists and residents.
Drainage
Two drainage ditches are designed to purify rainwater. The central square is designed some permeable pavement, while continuous space makes rainwater flow better to the green space below.