Sergi Asensio Arjona
“CHOSE A JOB YOU LIKE, AND YOU WILL NEVER HAVE TO WORK A DAY IN YOUR LIFE”
As a Building Engineering student
“OFICINA T
“OFICINA T
As a Civil Engineering student
Sergi Asensio Arjona
Adress: Passeig de les Masies, 52 G. 08780 Barcelona, Spain.
TN (+34) 627 038 137
E-mail: asensio.arjona@gmail.com
FINAL DEG nes de una
PASSIVE HO
ENERGY RE
PROJECT &
Linkedin profile: www.linkedin.com/pub/sergi-asensio-arjona/67/62a/b03/en
Sergi Asensio Arjona
Adress: Passeig de les Masies, 52 G. 08780 Barcelona, Spain.
TN (+34) 627 038 137
E-mail: asensio.arjona@gmail.com
TÈCNICA 1” SUBJECT
4
TÈCNICA 2” SUBJECT
6
GREE PROJECT (Proyecto técnico de instalacioa nave industrial)
8
OUSE IN BRYRUP, DENMARK
10
EFURBISHMENT OF STUDENT VILLAGE 30
12
& INTERIORISM OF SINGLE FAMILY HOUSE
14
Linkedin profile: www.linkedin.com/pub/sergi-asensio-arjona/67/62a/b03/en
PROJECTE EXECUTIU DE FORJAT UNIDIRECCIONAL D’UN EDIFICI D’HABITATGES Realització del projecte de forjat unidireccional d’un edifici destinat a habitatges. Les dades inicials son les següents. Jàsseres de HA (60 x 30 cm). Pilars perimetral de HA de 40 x 25 cm, interiors de 30 x 30 cm. Riostres i bigues de vora de 40 x 30 cm. Cantell forjat 30 cm, revoltons ceràmics, intereix 70 cm. FormigóHA-25-B-12-IIa, Acer B-500-S. Cèrcol perimetral 4∅10 –estreps ∅6/ 20 cm. Armat i longitud de negatius en funció de la forma de càlcul utilitzada. ( 2∅10 L= ¼llum tram). Per aquest projecte es va realitzar; Anàlisi de l’estructura de l’edifici quantificant les seves càrregues, disseny dels elements constructius a utilitzar en el forjat unidireccional així com el dimensionament d’aquests elements, representació gràfica del procés constructiu y detalls constructius sobre trobades de diferents elements.
CALIFICACIÓN 9
PROJECTE EXECUTIU D’ESTRUCTURES D’UN EDI
PROJECTE EXECUTIU DE FONAMENTACIÓ D’UN EDIFICI D’HABITATGES
IFICI D’HABITATGES Realització del projecte executiu d’estructures d’un edifici destinat a habitatges. Per aquest projecte es va realitzar; càlcul de l’estat de càrregues de tres pòrtics diferents, resolució gràfica de les diferents hipòtesis possibles sobre el càlcul de cada pòrtic, càlcul de l’armat de l’escala i resolució gràfica, càlcul de l’armat de la jàssera i resolució gràfica, detalls dels diferents punts de trobada entre elements estructurals.
CALIFICACIÓN 7
Realització del projecte executiu de fonamentació d’un edifici destinat a habitatges. Per aquest projecte es va realitzar; càlcul de la cimentació i resolució gràfica, solució de drenatge perimetral de mur estructural, seccions de mur i plantes i seccions de sabates aïllades.
CALIFICACIÓN 9
PROJECTE EXECUTIU DE REFORMA ESTRUCTURAL D’UN LOCAL.
CALIFICACIÓN 9
PROJECTE EXECUTIU DE TANCAMENTS
Reforma estructural d’un local, canvi d’us. El objecte del projecte es basa en l’adquisició d’aquest local per un client que necessita una planta diàfana en planta baixa, tenint dues plantes més. Això comporta la necessitat d’eliminar una paret de càrrega central existent. Aquest projecte tracta del redisseny i càlcul de la nova estructura en aquesta zona, realitzant així, un estintolament a base de perfils metàl·lics com a solució constructiva. Així doncs, la solució adoptada fou resumir l’estructura en dos pilars metàl·lics HEB-100 i una jàssera, formada per dos IPN-260 rigiditzades per dues platines. A més, es va realitzar un recalç de la fonamentació existent per suportar les noves càrregues puntuals.
FAÇANA VENTILADA METÀLICA NORD-OEST
FAÇANA SOSTENIBLE AMB BLOCS DE TERMOAR
S SUPERFICIALS D’UN EDIFICI DESTINAT A VIVENDES
Especejament façana NORD-OEST
CALIFICACIÓN 8
FAÇANA VENTILADA CERÀMICA SUD-EST
Especejament façana SUD-EST
PLÀNOL PLANTA BASE
RGILA SUD-OEST FAÇANA OBRA VISTA I VENTANAL NORD-EST
PROYECTO DE INSTALACIÓN ELÉCTRICA Y DE ILUMINACIÓN
Este trabajo consiste en el desarrollo de un proyecto ejecutivo de instalaciones para un edificio industrial destinado a la fabricación de cuerdas con el objetivo de dotar completamente el edificio de instalaciones, utilizar energías renovables, tener en cuenta el medioambiente y reutilización de aguas pluviales. A la hora de decidir las instalaciones que se realizarán es importante entender el tipo de edificio y su finalidad, ya que no es lo mismo un edificio destinado a viviendas que uno destinado a ser una nave industrial donde se lleve a cabo unos trabajos industriales concretos. La nave industrial esta compuesta por 1800 m2 en total entre la planta baja y la planta piso. Su geometría es rectangular. A su alrededor no existen edificios colindantes, esto hace que exista una gran libertad y facilidad a la hora de trazar las instalaciones. La finalidad del edificio es la de la fabricación, confección y venda de cuerdas a todo tipo de clientes interesados en este producto. El objetivo planteado a la hora de hacer este proyecto, es realizar la proyección de todas las instalaciones del edificio, siempre intentando seguir una línea que colabore con el medio ambiente, utilizando energías renovables como es la energía solar térmica, controlando un bien escaso como es el agua a partir de la reutilización de aguas pluviales y ahorrando energía eléctrica a partir de la buena selección del tipo de lámparas y el estudio de iluminación artificial con DIALux de los diferentes espacios iluminados. Además la instalación de climatización mediante bomba de calor para su utilización tanto para calefacción como aire acondicionado contribuye al ahorro energético y económico. El proyecto se divide en 10 puntos, pertenecientes a las instalaciones desarrolladas. Las instalaciones que requiere nuestro proyecto son las siguientes: Instalación de evacuación Instalación eléctrica. Instalación de contra incendios. Instalación de climatización. Instalación de fontanería y reutilización de aguas pluviales. Instalación de agua caliente sanitaria. Instalación de telecomunicaciones. Instalación de gas. Instalación de contra incendios. De las cuales solamente se enseñan las tres primeras.
PROYECTO DE INSTALACIÓN DE EVACUACIÓN DE AGUAS RESIDUALES
N
PROYECTO DE INSTALACIÓN CONTRA INCENDIOS
PROYECTO DE INSTALACIÓN DE CLIMATIZACIÓN
FIRST FLOOR
GROUND FLOOR
ROOF FLOOR
1. EXTERNAL WALL
2. WINDOWS
3. MONOPITCH ROOF STRICTURE
TYPOLOGY OF CONSTRUCTION
OTHER SUSTAINABLE CONCEPTS
ORIENTATION & DISTRIBUTION
CERTI
LEED = 6
4. INTERMEDIATE CEILING
BREEAM
U-VALUE = 0,09 W/m2K
U-VALUE= 0,05 W/m2K G-VALUE= 0,05
AIRTIGHNESS 5. TERRACE DOOR
Airtightness of the building envelope is an important requirement for the Passive House. This is tested by means of the blower door test in which the pressure difference may not exceed 0.61/h at 50Pa. This necessary to ensure that the major part of the air exchange in the Passive House takes place via the ventilation system through the heat recovery system, and to prevent building damage due to air and moisture transport.
A/V Ratio = 0,73.
Living rooms, bedrooms oriented to the south part or east part and then stairs, storage rooms, bathrooms and kitchen to the north.
The windows were projected in the whole building according to the passive house standards, with the highest concentration on the South part of the building.
The overheating was eliminated with overhangs and automatic external roller blinds
AQUS Greywater System installed. Which is a small scale grey water recycling system.
House placed in a suitable spot to reduce the CO2 transport emissions, and make the live of the family more healthy and comfortable.
6. FOUNDATION
NORTH-WEST
NORTH-EAST
SOUTH-EAST
SOUTH-WEST
SOUTH CORNER
IFICATIONS
SECTION
THERMAL SOLAR SYSTEM
DHW GROUND FLOOR
HIBRID SYSTEM WITH SEASONAL ENERGY STORAGE
62 points = GOLD STATUS
M = 51 points = VERY GOOD
R
Hibrid system combining geothermal and solar thermal energy to fulfill domestic bot water, heating and cooling demand. HEATING SEASON
Vacuum solar collectors are composed by evacuated heat pipe tubes (EHPTs) are composed of multiple evacuated glass tubes each containing an absorber plate fused to a heat pipe. Higher performance than conventional solar panels.
A hot water tank will be heated by the Solar Panel’s brine using a heat exchanger.
In summer, when the temperature (60ºC) is already achieved in the hot water tank, the solar panel’s brine is directed to a 150m Borehole Heat Exchanger, in This makes storage heat in the ground during spring/summer time.
If the 60ºC is not reached by Solar Panels’ brine, it is heated by a Ground Source Heat Pump.
COOLING SEASON In summer time, heat from the sun inserted in the ground helps to improve the heat pump
DHW FIRST FLOOR
SHALLOW GEOTHERMAL SYSTEM
SECTION UNIQUE
An energy refurbishment consists in the interconnection of different concepts. First of all the construction properties have to be analyzed to minimize the heat loss of the building. Then, the ventilation system is important to be well dimensioned and thought. After that, would be better if the appliances were analyzed to try to minimize them electricity consumption. And lastly, but not less important, an energy system has to be designed to supply electricity, domestic hot water and heating demand of the building.
6 WIND TURBINES SYSTEM TO FULFILL ELECTRICITY DEMAND
When talking about the materials that are going to compose the building of the project it is important to choose the most sustainable materials found. A wood insulation layer has been added to the different enclosures to make the construction elements airtight. This is not only insuring a perfect U-value but also keeping the carbon footprint as small as possible.
This U-value has been acquired and calculated which means a heat loss about 23kW.
Due to the Danish regulation, the ventilation, meaning the extraction but also the input of air in the building, was not a choice but a requirement. The ventilation unit was chosen from NILAN numerous choice: VPL 31 with an air volume of between 900m3/h and 1800m3/h, which fit perfectly the demand of 1400m3/h. This unit provides an 80% of heat recovery for a temperature of -12°C and inside temperature of 22°C with a decrease of the humidity contained in the input air. This is not counted as a heating device in the project but it is important to consider it as a great help to the floor heating, as if the floor heating is turned off, the ventilation is a 24/7 working device that will provide a certain continuity of heat to the building. An analyze of the installed appliances of the apartments and the illumination elements has to be done, because, after the heating, cooling and water heating, the electric devices and the illumination of a building suppose the highest energy consumption elements. Replacing the old type of appliances and incandescent bulbs with new, environmentally friendly, ones will suppose a reduction of the generation of greenhouse gases and a reduction in the electricity expenses. Electricity Annual consumption Savings for lighting Savings for appliances
18.450,36 3.433,92 6.804,00 8.212,44 Kwh
The last requirement is to install renewable and self-independent source of energy to supply the domestic demand. These are the installations chosen. Six Wind turbines for the production of electricity. Two ground source heat pumps for the production of hot water and heating.
6 wind turbines, model “Viking 25” by Randers Company, have been installed to generate electricity to supply one block of the student village. The extra electricity produced will be sold to the grid, and the non-windy periods the electricity will be extracted from the grid.
The amount of money that is earned by selling electricity is higher that what it will cost to buy the necessary extra electricity.
GROUND SOURCE HEAT PUMP SY
GROUND FLOOR
FIRST FLOOR AXONOMETRIC 1
AXONOMETRIC 2
YSTEM TO FULFILL DOMESTIC HOT WATER AND HEATING DEMAND QUICK FACTS
DESIGN DATA
4 U-pipe boreholes connected to a heat pump each two boreholes to produce domestic hot water and heating demand. This two heat pumps are connected to a water storage tank to store the hot water produced. Through this water tank is fulfilled hot water to the different water points.
AXONOMETRIC 3
MEAN FLUID CARRIER TEMPERATURES
FACADE SOUTH-EAST
FACADE SOUTH-WEAST