Industrial projects .………...…………………………………………… 5 – 21
Logistic terminals ………….…………………………………………. 22 – 29
Business centers ……………………………………………………. 30 – 44
Shopping malls ……………………………………………………….. 45 – 55
Hotels …………………………………………………………………. 56 – 65
Residential projects …………………………………………………. 66 – 77
2
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
group Today TSN Group includes 7 companies; five of them are located in Saint Petersburg: 1) “TSN” Ltd (established in 1995) – M&E contractor, also performs construction and modernization of power plants, voltage ranging from (6) 10 kV up to 500 kV; 2) Electrical Center “TSN”, performing design and production of electrical boards; 3) “TSN Technologies and Materials” – company, supplying materials and equipment; 4) “TSN Mechanical” – company, performing design and installation of ventilation, air conditioning and sanitary systems; 5) “VATECH TSN”– company, performing design of all engineering systems; 6) “Electrical Installation Company TSN”, Moscow - successfully realizes complete electrification of the industrial, residential and commercial projects since 2000; 7) Sevenfort Engineering Company - M&E contractor in Lisbon, Portugal. TSN’ core business is MEP contracting for design and installation works for internal and intra-site engineering systems and networks. Being the professional and highly experienced Mechanical, Electrical & Plumbing designer and contractor TSN Group provides the integrated multi-service solution covering the full range of Engineering, Procurement / MEP contracting including conceptual and detailed design, installation, testing and commissioning (depending on the project scope and structure): • • • • • • • •
power supply (10kV and 0.4kV); internal power supply and electric lighting; HVAC (heating, ventilation and air conditioning); water supply and wastewater systems; automatic fire extinguishing systems. very low voltage systems, including fire and intrusion alarm, public address, CCTV and telecommunication systems; building management systems (BMS); Process/technology equipment installations. (Besides, TSN European Subsidiary –SevenFort would carry out the used equipment dismantling in EEC (for further installations on a project )
3
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Contacts: 1) TSN Ltd. 61, Vyborgskaya emb., Saint Petersburg Phone: +7 (812) 718-3585 2) Electrical Installation Company TSN 23, Profsoyuznaya str., Moscow Phone: +7 (495) 411-6194 3) Electrical Center TSN 44, Polevaya Sabirovskaya str., Saint Petersburg Phone: +7 (812) 430-4313 4) TSN Technologies and Materials 61, Vyborgskaya emb., Saint Petersburg Phone: +7 (812) 448-9974 5) TSN Mechanical 8, Beloostrovskaya str., Saint Petersburg Phone: +7 (812) 655-09-76 6) VATECH TSN 15, Novolitovskaya str., 194100, Saint Petersburg, Russia tel: +7 (812) 321-6501 fax: +7 (812) 321-6503 7) Sevenfort Engineering Company Rua do poeta Bocage 2 -3ºB, 1600-233 Lisboa, Portugal tel. +351 21 75 73 990 fax. +351 21 75 73 992
4
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Industrial projects, realized in contract with TSN Group
5
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Toyota factory Shushary, Leningrad region.
Total area: 60 000 sq.m. Project realized: 2006-2007. Performed works: design of mechanical systems: heating, ventilation and air conditioning, compressed air, water supply and sewerage systems; and electrical systems: power supply and electric lighting, fire-fighting and fire alarm systems, automation of engineering systems. Customer: RAMBOLL
Ford factory Vsevolozhsk, Leningrad region.
Project realized: 1999-2000, 2004, 2009. Performed works: electrical works at construction and reconstruction of the factory, electrical installations in workshops. General contractors: YIT, Genix.
6
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
General Motors factory Shushary, Leningrad region.
Total area: 94 Hectare Project realized: 2007 - 2008. Performed works: design of power supply system for technological equipment (painting conveyor), installation of 6 substations in workshops (with 1250 kVA transformers), 2500 А bus-bar system, and electrification of technological processes.
Volkswagen factory Kaluga
Total area: 220 000 sq.m. Project realized: 2008 Performed works: design and installation of fire alarm system. Customer: Volkswagen Rus.
7
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Hyundai factory St. Petersburg
Project realized: 2009 - currently on-going Performed works: part of scope. General contractor: STEP
Nissan factory (finished products warehouse) St. Petersburg
Project realized: 2009 Performed works: part of scope. General contractor: EtalonPromStroy
8
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Stadco factory (Gestamp) Leningrad region.
Total area: 15 500 sq.m. Project realized: 2008 Performed works: design and installation of electrical, low-voltage and mechanical systems (water supply and sewerage, ventilation of administration building and technical block, compressed air system). General contractor: STEP
Atria factory and logistic complex Gorelovo, Leningrad region. Total area: 44 000 sq.m. Project realized: 2007- 2008 Performed works: installation of electrical systems at construction of the I stage (logistic complex, car wash, technical premises) and II stage (factory, workshops). General contractor: YIT
9
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Ahlstrom factory Tver region.
Total area: 14 500 sq.m. Project realized: 2007- 2008 Performed works: installation of power supply and electric lighting systems, phone and data network. General contractor: SRV
Finndisp Ramenskoye, Moscow region.
Total area: 3200 sq.m. Project is currently in work: 2007. Performed works: installation of M&E systems: power supply and electric lighting, ventilation, heating, water supply and sewerage systems. Customer: QUATTRO GEMINI
"Alcan Packaging" Saint Petersburg, Krasnoye Selo Total area: 9 500 sq.m. Project realized: 2007.
10
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Performed works: design and installation of power supply and electric lighting, installation of transformer substation. Customer: ALCAN PACKAGING
Elcoteq factory Saint Petersburg
Total area: 15 000 кв.м. Project realized: 2005г. Performed works: installation of power supply and electric lighting systems, installation of bus-bar system for feeding of technological processes. Customer: LEMCON Rus
11
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Rockwool factory Vyborg
Total area: 24 000 sq.m. Project realized: 2005. Performed works: supply and installation of three 10 kV transformer substations and 0,4 distribution boards. Installation of technological equipment Customer: ROCKWOOL
12
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Wrigley chewing gum factory Saint Petersburg
Total area: 22 000 sq.m. Project realized: 1998-99, 2005-2007 Performed works: design and installation of electrical systems, installation of technological equipment at construction and expansion of the factory Customer: WRIGLEY
13
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
JTI tobacco factory Yeletz, Moscow region
Total area: 22 000 sq.m. Project realized: 2004-2007 Performed works: three lines of reconstruction of transformer substations and 6 kV network, as well as 0,4 kV power supply system. Customer: JTI
14
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Amcor Flexible packaging factory Velikiy Novgorod
Project realized: 2006. Performed works: installation of M&E systems. Customer: AMCOR
15
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Amcor Rentsch packaging factory Velikiy Novgorod
Project realized: 2000. Performed works: all electrical installation works, including installation of TS, electric lighting and power supply system, control of ventilation. Customer: AMCOR
16
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
SERDIX pharmaceutical plant Moscow region
Total area: 6000 sq.m. Project realized: 2006-2007. Performed works: design and installation of electrical systems Customer: SERVIER
17
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
House-building factory Sertolovo, Leningrad region
Total area: 26 hectares Project realized: 1995. Performed works: full scope of electrical installation works, including electrification of technological processes Customer: ABB Installaatiot OY
18
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
«Russian Standard» distillery Saint Petersburg
Total area: 10 000 sq.m. Project realized: 2006. Performed works: installation and set-up of technological equipment. Work in explosive areas. Customer: YIT
"ASSI-DOMAN" (KAPPA since 2001) Vsevolozhsk, Leningrad region Project realized: 1997. Performed works: full scope of electrical works, including: installation of transformer substation and diesel-generator set, burglar and fire alarm, video monitoring system, phone network and dispatching, electric lighting, smoke extinguishing system, automation of engineering systems of the building. Customer: "ES-Projektit OY"
19
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
BREWERIES
Since 2000 up to 2004 "TSN" participated in construction, expansion and modernization of several breweries in Saint Petersburg, Klin, Yaroslavl, Tula, Samara, Habarovsk, Voronezh and has fulfilled works on installation of power supply, electric lighting, safety and communications systems. Construction of the 2nd line and modernization of the existing production of Sun Interbrew brewery was realized in Klin in 2001. At the same period modernization of “Baltica” brewery was realized in Tula. At the 3d line of construction of “Vena” brewery in Saint Petersburg TSN fulfilled a full scope of electrical installation works 20
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
in 2002. In the same 2002 TSN performed works at construction of new administrative and storage premises of “Yarpivo” brewery in Yarostavl. In 2003 TSN supplied distribution boards, produced by “Electrical Center TSN” for the new plants of “Baltica” in Samara and Habarovsk. And at the same year electrical installation works were fulfilled at brewery in Voronezh.
Tobacco factory BAT Rothmans Olgino, Leningrad region
Project realized: 2001-2002. Performed works: installation of power supply, safety and communication systems, supply of distribution boards, produced by Electrical Center TSN. Customer: BAT
21
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Logistic terminal projects, realized in contract with TSN Group
22
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“A” class logistic complex Shushary, Leningrad region. Total area: 160 000 sq.m. Project is currently under construction Performed works: installation of power supply system Customer: RAVEN Avalon Logistics General Contractor: Vilia
Logistic complex in Krekshino. Moscow region. Total area: 300 000 sq.m. Project is currently under construction Performed works: full scope of electrical installation works Customer: Roseurodevelopment General contractor: TRASKO
23
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Cargo terminal "FM-Logistic" Moscow region, international airport Московская область, международный аэропорт "Шереметьево-2" Total area: 38 000 sq.m. Project realized: 2004. Performed works: full scope of works on installation of electrical and low voltage systems General contractor: Lemcon Rus Contractor: "ES-Projektit OY"
.
24
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Logistic center «FM Logistic» Chekhov. Moscow region Total area: Project realized: 2003. Performed works: installation of electrical systems
25
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Logistic park "Diamond" Khimky, Moscow region. Total area: 80 000 sq.m. Project realized: 2002. Performed works: design and installation of electrical systems Customer: NLC General Contractor: TRASKO INVEST
26
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Cargo terminal Pulkovo Saint Petersburg, Pulkovskoye shosse Total area: 14 000 sq.m. Project realized: 2002. Performed works: Installation of electric lighting and power supply systems at check-points 1, 2 and inside terminal building. Supply of materials and equipment. Electrical Center TSN produced more than 100 distributional boards and MDB for the project. 27
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Oil terminal "Neste" Leningrad region, Bronka. Total area: about 9 hectares Project realized: 1998. Performed works: All electrical installation works, including electrification of technological processes. 2000-2007 – expansion of the terminal, service maintenance.
28
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
BOHMANS storage facilities Khimky, Moscow region Total area: 4500 sq.m. Project realized: 2002 Performed works: Design and installation of power supply, electric lighting systems, burglar and fire alarm, access control, phone and data network. Customer: " Skanska East Europe OY"
29
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
30
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center projects realized in contract with TSN Group
31
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center “Two Captains”. Moscow. "А" class business center. Total area – 100 000 sq.m. Project realized: currently in realization Performed works: installation of power supply and electric lighting, safety and communications systems, water supply and sewerage, water and gas fire fighting, BMS General contractor: Strabag
32
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center “Citydel”. Moscow.
"А" class business center. Total area: 96 000 sq. m. Office premises: 60 000 sq.m. Project realized: 2006-2007г. Performed works: installation of power supply and electric lighting systems, shell&core scope. Customer: TEMA General contractor: Bouygues Contractor: INEO Vostok
33
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Krugozor". Moscow.
"А" class business center. Total area of the 1st line: 30 000 sq. m., Total area of the 2nd line: 14 000 sq.m. Project realized: 2006-2007. Performed works: design and installation of electrical systems and safety and communications systems. Customer: Horus Capital General contractor: STEP
34
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Krylatskie Hills". Buildings B, C. Moscow.
"А" class business center. Building B: 20 000 sq. m., Building C: 20 000 sq.m. Project realized: 2006. Performed works: design and installation of electrical systems and safety and communications systems. Customer: CMI General contractor: CODEST Contractor: RC Impianti.
35
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Gorky Park Tower ". Moscow.
"А" class business center. Total area: 30 000 sq. m. Project realized: 2006. Performed works: installation of power supply and electric lighting systems, shell&core scope. Customer: STIMUL GROUP 36
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Balchug Plaza". Moscow.
"А" class business center. Total area: 31 000 sq.m. Project realized: 2005. Performed works: full scope of works on electrification of the project, supply of DBs, installation of fire alarm and notification system, including supply of necessary equipment. Maintenance of fire alarm and notification systems. Customer: CMI General contractor: CODEST
37
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center Ducat Place III. Moscow.
"А" class business center. Total area: 60 000 sq.m. Office premises: 32 800 sq.m. Project realized: 2005 – 2006. Performed works: installation of power supply and electric lighting systems, 10 kV transformer substation, installation of safety and communications systems. General contractor: CODEST
38
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business complex «Novinskiy Passage» Moscow.
"А" class business center. Total area: 78 000 sq. m. Project realized: 2003-2004. Performed works: installation of power supply and electric lighting systems. General contractor: SKANSKA Contractor: VATECH ELIN EBG (SIEMENS ELIN)
39
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Smolensky Passage", Moscow
"А" class business center. Total area: 70 000 sq. m. Project realized: 1997-1998. Performed works: installation of power supply and electric lighting systems. General contractor: SKANSKA Contractor: ABB Installatiot OY
40
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center "Veda House", Saint Petersburg. "А" class business center. Total area: 22 000 sq. m., Project realized: 2004-2007. Performed works: installation of power supply and electric lighting systems. Customer: Veda-system
Business center «Jensen Group». Saint Petersburg.
Project realized: 2000 . Performed works: design and installation of power supply and electric lighting systems
41
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center Phoenix. Saint Petersburg.
Total area: 4500 sq.m. Project realized: 2004 Performed works: installation of power supply and electric lighting systems Customer: STEP.
42
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Business center «Neptune». Third line of construction. Saint Petersburg.
Area of the 3d line: 15000 sq.m. Project realized: 1999 Performed works: full scope of electrical installation works. Customer: Rubin.
43
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
"Swedish House" ("Andersson House"), including Swedish consulate
Total area: 4000 sq.m. Project realized: 1999 Performed works: full scope of electrical installation works. General contractor: SKANSKA Contractor: ABB Installaatiot OY
44
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Representative office of Chukotskiy autonomous region in Saint Petersburg.
Total area: 10 000 sq.m. Project realized: 2002-2005 Performed works: design and installation of power supply and electric lighting systems. Customer: Chukotskiy autonomous region.
45
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Shopping malls, realized in contract with TSN Group
46
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“Atlantic City” shopping mall Savushkina str., St. Petersburg
Total area – 46 000 sq.m. Project is realized: 2008 Performed works: electrical installation (full scope, shell&core).
City Mall «Belgorodskiy» Belgorod
Total area: 63 000 sq.m. Project is realized: currently under construction. Performed works: installation of mechanical systems: HVAC, water supply and sewerage.
47
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
MEGA shopping malls (6) Moscow, Saint Petersburg, Novosibirsk, Nizhniy Novgorod Total area of each: 150 000 – 240 000 sq.m. Projects realized: 2002-2007. Performed works: design and/or installation of electrical, low-voltage systems
48
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“Sennaya” shopping mall Saint Petersburg, Sennaya sq.
Total area: 60 000 sq.m. Project realized: 2003. Performed works: installation of power supply and electric lighting systems, shell&core scope.
49
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
AUCHAN hypermarkets(12) Moscow, Saint Petersburg, Yekaterinburg Total area: 14 000 sq.m. each Projects realized: 2002-2007. Performed works: full scope of electrical installation works.
50
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Mosmart hypermarket Moscow Total area: 26 000 sq.m. Project realized: 2003. Performed works: installation of interior lighting Customer: Bouygues Batiment
51
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
METRO Cash&Carry hypermarkets (15) Total area: 13 000 sq.m. each Projects realized: 2003-2007. Performed works: installation of power supply and electric lighting systems Customer: Klampfer
52
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
IKEA (3) Saint Petersburg Total area: 30 000 sq.m. each Projects realized: 2003-2007. Performed works: installation of power supply, electric lighting and safety and communications systems.
53
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Atrium shopping mall Moscow Total area: 100 000 sq.m. Project realized: 2001. Performed works: installation of 10 kV distribution boards, transformers, power supply and electric lighting systems, burglar alarm, access control, BMS.
54
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Zanevskiy Kaskad Saint Petersburg Total area: 34 000 sq.m. Project realized: 2006. Performed works: design and installation of power supply and electric lighting systems in public areas and tenants, including cinemas
55
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Piter-Raduga Saint Petersburg Total area: 100 000 sq.m. Project realized: 2007. Performed works: installation of power supply and electric lighting systems, shell&core scope, supply of distribution boards and necessary equipment.
Piter shopping mall Saint Petersburg Total area: 47 000 sq.m. Project realized: 2006. Performed works: full scope of electrical installation works.
56
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Hotels realized in contract with TSN Group
57
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Crown Plaza Hotel 4* Saint Petersburg, Pulkovo-III area
Rooms: 300 Project realized: on-going now Performed works: design and installation of power supply and electric lighting systems. General contractor: TOR
58
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“Lion Palace” deluxe Saint Petersburg, Voznesenskiy ave.
Total area: 26 600 sq.m. Project realized: on-going now Performed works: design and installation of power supply and electric lighting systems, ventilation and air conditioning systems, heating, BMS. General contractor: Tristar Investmet Holdings Hotel operator: Four Seasons
Phoenix Hotel Saint Petersburg
Total area: 13 000 sq.m., 268 rooms Project realized: on-going now Performed works: installation of power supply and electric lighting systems General contractor: Kompakt Hotel operator: Park Inn
59
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Neptune Hotel (Best Western) 4* Saint Petersburg.
Rooms: 150 rooms Project realized: 2001 Performed works: installation of power supply and electric lighting systems. Customer: Rubin.
60
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Sokos Hotel Vasilevsky - 4* Saint Petersburg
Total area: 15 800 sq.m., 255 rooms Project realized: 2007-2008 Performed works: design and installation of power supply and electric lighting systems, snow melting and de-icing systems. Investor: “Hotel Plus” Ltd.
61
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Park Inn Pulkovskaya Hotel 4* Saint Petersburg
Rooms: 840 Project realized: 2007 Performed works: installation of power supply and electric lighting systems at reconstruction of the hotel lobby premises.
62
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Olympic Park Hotel Saint Petersburg
Total area: 16 000 sq.m., 342 rooms Project realized: 2007 Performed works: design of electrical, low-voltage and mechanical systems (stage P and tender documentation) Customer: JGB Development
63
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Severnaya Korona Hotel Saint Petersburg
Total area: 40 000 sq.m. Project realized: 2006-2008 Performed works: design of electrical and low-voltage systems (stage P)
64
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Hayatt Hotel Ekaterinburg
Project realized: 2005 Performed works: installation of electrical and low-voltage systems (part of scope)
65
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Sheraton Palace Hotel Moscow
Rooms: 212 Project realized: 2008 Performed works: design and installation of power supply and electric lighting systems, ventilation and cooling systems at modernization of the hotel General contractor: Strabag AG
66
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Residential projects, realized in contract with TSN Group
67
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Papula residential complex Vyborg, Leningrad region
Project realized: 2007 – 2009 Performed works: installation of indoor electrical systems: power supply and electric lighting; low voltage: fire fighting, video monitoring, TV, phone and data, door interlocutor; mechanical: ventilation, heating, water supply and sewerage; BMS system. General contractor: SRV
68
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Paradniy Kvartal Reconstruction and new development of Block 1210, Central district, St. Petersburg
Total area: 270 000 m2 Project realized: 2007 – 2008 Performed works: design of HVAC, water supply, sewerage and extinguishing systems - design of electrical lighting, 0.4kV power systems and low voltage systems (full scope). Developer: JV Peter the Great.
69
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
De luxe residential complex Olympic village Krestovskiy Island, St. Petersburg
Total area: 68 400 m2 Project realized: 2006 – 2008 Performed works: design and installation of electrical lighting and 0.4kV power systems Developer: Evrovent
70
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
De luxe residential building 42 Shpalernaya str., St. Petersburg
Project realized: 2001 Performed works: installation of electrical systems: lighting and 0.4kV power systems, low voltage: video monitoring, door interlocutor, phone and data, TV, fire fighting system. Developer: JV Peter the Great.
71
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“Monolith Plaza” Kosygina str., Moscow
Project realized: 2003-2004 Total area: 26 500 m2 Performed works: installation of electrical systems: power supply and electric lighting, low voltage: phone and data network, I-net, radio, TV, video monitoring, door interlocutor system, fire-fighting, fire notification. General contractor: Strabag AG.
72
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Residential building with underground parking 7 Molochniy lane, Moscow
Project realized: 2007 Performed works: design and installation of low-voltage systems: door interlocutor, access control, TV, fire fighting and notification, automation and BMS. General contractor: Gelar.
73
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
“Venskiy Dom” Neapolimovskiy lane, Moscow
Project realized: 2002-2003 Performed works: installation of electrical systems: power supply and electric lighting, including installation of distribution panels, produced by TSN. General contractor: Strabag AG.
74
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
De luxe residential Complex “Blizhnaya Dacha” 11 Starovolynskaya str., Moscow
Total area: 90 000 m2 Project realized: 2006-2007 Performed works: installation and set up of electrical equipment, interior lighting system, earth connection system, performing all necessary tests, supplying all materials General contractor: Strabag AG
75
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
De luxe residential complex "Stolnik" 5 Mal.Levshinsky lane, Moscow
Project realized: 2002-2003 Performed works: design and installation of electrical systems: transformer substation, power supply, electric lighting. General contractor: Codest
76
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Residential complex Klochkov lane, St. Petersburg
Project realized: 2002 Performed works: installation of power supply and electric lighting, including installation of distribution panels, produced by TSN. General contractor: Profit
77
Группа компаний ТСН TSN Group
web: www.tsn-group.com mail: tsn@tsn-group.com
Residential building Vishnevskogo str., St. Petersburg
Project realized: 1997-1998 Performed works: installation of power supply and electric lighting systems. General contractor: Profit