Table 5. Medium and Low Priority/Long-Term Improvements
Table 4. High Priority/Near-Term Improvements
Recommendation Location Potential Implementing Party Potential Construction Timeline
Close slip lane/reconfigure intersection Install signage Brotherhood Way at Lake Merced Blvd. Parkmerced development Spring/Summer 2022
Multiple locations - Curve Warning/Bike Signage SFMTA Streets Division – Lake Merced Quick-Build Spring 2022
Install or improve pedestrian refuge island Review potential for additional walk time/ Leading Pedestrian Intervals (LPIs)
(contingent on coordination with Transit Service Planning to understand impacts and feasibility) Improve transit Lake Merced Blvd at Winston Dr.
Lake Merced Blvd. at Middlefield Dr.
Lake Merced Blvd at Winston Dr.
Lake Merced Blvd at Brotherhood Way Lake Merced Blvd. at Skyline Blvd.
Reinstitute 57
Upgrade crosswalks Lake Merced Blvd. at Font Blvd. Lake Merced Blvd. at Middlefield Dr. SFMTA Transit Division
August 14, 2021 SFMTA Streets Division – Lake Merced Quick-Build Spring 2022
Lake Merced Blvd. at Winston/N. State Dr. Lake Merced Blvd. at Brotherhood Way Lake Merced Blvd. at Higuera Ave* Lake Merced Blvd. at John Muir Dr.
Review vehicle travel lane widths and striping to optimize safe speeds Lake Merced Blvd. between John Muir Dr. and Skyline Blvd. where feasible SFMTA Streets Division – Lake Merced Quick-Build Spring 2022
(contingent on coordination with Transit Service Planning to understand impacts and feasibility)
Widen or add sidewalk Add sidewalk on east side of Lake Merced Blvd., between Brotherhood Way and Winston Dr. To Be Determined- Based on future funding opportunities
*Higuera Avenue may be upgraded by the Parkmerced development. This is dependent on the Parkmerced construction timeline and coordination with the Lake Merced Quick-Build Project.