Evolve SMP Confirmation Statement

Page 1

Evolve SMP Confirmation Statement

Public

SMP Confirmation Statement October 2016

Page 1

19 October 2016


Evolve SMP Confirmation Statement

Public

To: All Users 1.

This SMP Confirmation Statement (Statement) is effective from 1st November 2016.

2.

For the purposes of Section L8.16 of the Distribution Code the: a.

Aggregate SMP Daily Limit is fifty two (52);

b.

Applicable SMP Daily Limit is, in the case of a Supply Meter Point Confirmation in relation to a Supply Meter Point at which the Supply Meter Point Premises comprise:

c. 3.

i

domestic premises, forty seven (47);

ii

non-domestic premises, five (5);

SMP Validation Time is 12:00.

This Statement shall remain in effect until such time as Evolve Network Limited revises this Statement with the written consent of the Authority in accordance with Section L8.18 of the Distribution Network Code.

Evolve

Page 2

19 October 2016


Evolve SMP Confirmation Statement

Public

In an era characterised by increasing environmental concerns and the pressing need for sustainable energy solutions, the injection of biomethane into the Northern Ireland gas grid at Dungannon in October 2023 stands as a ground-breaking milestone. At Evolve, we are proud to spearhead this transformative journey for the industry in Northern Ireland. This is not a token connection, it is just the start of a journey to fully decarbonise our entire network.

0800 975 7774 evolvenetwork.co.uk info@evolvenetwork.co.uk

Page 3

19 October 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.