Evolve SMP Confirmation Statement
Public
SMP Confirmation Statement October 2016
Page 1
19 October 2016
Evolve SMP Confirmation Statement
Public
To: All Users 1.
This SMP Confirmation Statement (Statement) is effective from 1st November 2016.
2.
For the purposes of Section L8.16 of the Distribution Code the: a.
Aggregate SMP Daily Limit is fifty two (52);
b.
Applicable SMP Daily Limit is, in the case of a Supply Meter Point Confirmation in relation to a Supply Meter Point at which the Supply Meter Point Premises comprise:
c. 3.
i
domestic premises, forty seven (47);
ii
non-domestic premises, five (5);
SMP Validation Time is 12:00.
This Statement shall remain in effect until such time as Evolve Network Limited revises this Statement with the written consent of the Authority in accordance with Section L8.18 of the Distribution Network Code.
Evolve
Page 2
19 October 2016
Evolve SMP Confirmation Statement
Public
In an era characterised by increasing environmental concerns and the pressing need for sustainable energy solutions, the injection of biomethane into the Northern Ireland gas grid at Dungannon in October 2023 stands as a ground-breaking milestone. At Evolve, we are proud to spearhead this transformative journey for the industry in Northern Ireland. This is not a token connection, it is just the start of a journey to fully decarbonise our entire network.
0800 975 7774 evolvenetwork.co.uk info@evolvenetwork.co.uk
Page 3
19 October 2016