Bin Qurayah Construction Work Experience CONTRACT # 6600023950
NAME OF PROJECT Khafji NGL Pipelines
HPT PROJECT Hitachi Water Injection Pump Project NO. FX11-1431
LOCATION
START COMPLETED PROJECT PROJECT
Khafji/Safaniyah
2/3/2010
2/1/2013
Harradh
Apr. 16, 2012
Nov. 14, 2012
Abqaiq/Dhahran/Ras Tanura/Jubail/ Khursaniyah
20 Oct. 2008
19-Jul-12
6600021297
Pipeline Rehabilitation Phase VI
6600026645
Onshore Maintain Potential Project, Tie-In of PWI Wells 514, 649, 662 & 664
Juaymah/ Qatif
Onshore Maintain Potential Project, Lakos De-Sander
Qatif
06 Dec. 2010
Riyadh
24-Jul-10
BI/JO: 10030089147/8184 W10/Bin Quraya
Power Plant 10
6600012729
Khuff Gas Project
6600019231
Ras As Zawr Sales Gas Pipeline
08-1185-PA211
EPC Contract for Gas Pipeline OGI at Raz As Zawr
706/2007
Natural Gas Distribution System for Dammam 2nd Industrial City (DIC-2)
41.01/032-2005 Yamama Crude Oil Storage Tank
Jul. 27, 2011 Mar. 1, 2012
26-May-11
SCOPE OF WORK Construction & Installation of facilities including 4” Ø Khafji, Safaniyah NGL-1 (KFSNGL-1) Installation of Hitachi Water Injection Pump in Saudi Aramco-GOSP2
Rehabilitation of existing pipeline QA-4, QRT-6, SK-4, KRT-4 Pipeline size 40", 42" 46" & 48" Process Mechanical/Piping, Electrical, Instrumentation & Civil/Structural Works for Qatif 514, 649, 662 & 664 Tie-In Qatif 656 @ W-09 & Installation of Lakos Desander @ W-50
27 Dec. 2010 Construction of Fuel Oil Pipelines
Uthmaniyah/Hawiyah/S 26 Mar. 2005 25 Mar. 2010 Construction of Well Heads, Flowlines & Trunklines for Khuff Gas hedgum/Abqaiq Abu Hadriyah / Khursaniyah Abu Hadriyah
03 Nov. 2007
30 Sept. 2010
04 Jan. 2009 07 Nov. 2009
Dammam
9-Jan-07
28-Feb-09
Riyadh
7-Jul-06
30-Jun-07
Page 1 of 5
Lump Sum Turnkey Project for the Construction of Gas Pipeline for Ma'aden Construction of 24" dia Gas Pipeline for MPL Phosphate Co. (Ma'aden) Installation OF Natural Gas Distribution System Pipeline, 36 Units of Metering Skids for Dammam 2nd Industrial City. Provide a detail design package to upgrade the existing YSCC Crude Oil Storage System.
Bin Qurayah Construction Work Experience CONTRACT #
NAME OF PROJECT
LOCATION
START COMPLETED PROJECT PROJECT
SCOPE OF WORK
Dammam
1-Feb-06
30-Jun-07
Construction of 16" dia X 18 km Fuel Gas Line, Metering Station of SCADA System for Al Tuwarqi.
Pipeline Rehabilitation Phase - IV ( QRT-6/QRT-8 Offshore Pipeline )
QATIF
13 Dec. 05
28 April. 07
Rehabilitation/Replacement of 3 km. 40" dia. Pipeline offshore at QRT-6 / QRT-8 Offshore pipeline.
SHIP SLOP OIL RECEPTION OIL FACILITY AT YANBU COT
YANBU
05-Jan.-05
28 Aug. 06
Installation of 10" internally cement lined coated pipe along the trestle area at loading berths in Yanbu COT ( OFFSHORE PROJECT)
BI-21-00014
Al Tuwarqi Fuel Gas Line
6600015067
6600012201
TIE-IN BERRI 336/337 TO BERRI GOSP-4 66000008420 AND BERRI 259 TO BERRI-815
TIE-IN UTMN-1520 & 1537 F/L's TO 66000006552 UTMN GOSP-12 AND UTMN 1328 LATERAL (PWI) TO WIP-4
ABU ALI
12-Jan-00
31-Mar-04
Installation of Wellhead Piping and Flowline, const. 10" Trunkline header positive seal coupling, including 4" (cement lined) disposal line and 8" (cement lined) Water Injection Line, cathodic protection and varoius electrical and instrumentation works
UTHMANIYAH
18-Mar-03
17-Jul-03
Installation of Wellhead Piping and Flowline, const. drain pit appr. 8 KM including Water Injection Line and cathodic protection.
66000006481
TIE-IN OF UTMN-1516 F/L, TR/L, TST/L TO UTMN GOSP-11
UTHMANIYAH
4-Mar-03
31-Oct-03
Installation of Wellhead Piping and Flowline, const. Of drain pit appr. 18 KM including Manifol and production Header Jumpover, Test Line and Trunkline and cathodic protection
BI. 2031
FUEL GAS PIPELINE AND GAS METERING STATION FOR YAMAMA CEMENT FACTORY
RIYADH
22-Aug-01
3-Sep-02
Installation of 18.5 KM of 20" dia. Fuel Gas Line and Gas metering station, control room and associated piping, instrumentation, electrical and civil works.
3000005198
Construction of additional Fuel Gas Line Abqaiq Plant
ABQAIQ
22-Apr-02
30-Jun-03
Installation of 12" dia RTR pipe & 10" dia off-plot and in-plant piping for Abqaiq Plant and associated electrical,civil, instrumentation & mechanical works.
600044719
Pipeline Laterals & Crossover Daylighting - UTMN
UTHMANIYAH
25-Mar-02
30-Jun-03
Installation of 20",24",28",30" & 40" above ground piping that includes hot tapping & stopple.
Page 2 of 5
Bin Qurayah Construction Work Experience CONTRACT #
NAME OF PROJECT
LOCATION
START COMPLETED PROJECT PROJECT
SCOPE OF WORK
RIYADH
21-Aug-01
30-Jun-03
Installation of 9 KM 16" Gas Line to Riyadh Refinery (On-Plot & OffPlot) and associated RTR piping, electrical, instrumentation, and civil works.
TIE-IN 1454, 1455, 1492 & 1493 F/L's TO UTMN GOSPS # 10 & 11
UTHMANIYAH
6-Jun-01
10-Nov-01
Installation 16" dia. TR/L, 8" dia. TST/L & 8" dia. F/L
44619/00
TIE-IN HWYH 396,399 F/L's TO HWYH GOSP #3 & HARDH 250 F/L TO HWYH GOSP # 4
HAWIYAH
22-Apr-01
21-Sep-01
Installation of 16" dia. TR/L, 10" dia. TST/L & 8" dia.F/L.
44468/00
TIE-IN UTMN-1300,1304, 1306, 1307 F/L's TO UTMN GOSP-13
UTHMANIYAH
18-Apr-00
10-Dec-00
Installation of 8" dia. F/L's & Well Head.
44469/00
TIE-IN UTMN-1462 F/L TO UTMN GOSP12 AND UTMN - 1468 F/L TO UTMN GOSP-11
UTHMANIYAH
18-Apr-00
25-Aug-00
Installation of 8" dia. F/L's & Well Head.
44470/00
TIE-IN HWYH-343,344, 345, 346, 347, 348 & 12" DIA. TR/L HWYH-3, 346, 347 TO HWYH GOSP-2
HAWIYAH
19-Apr-00
30-Oct-00
Installation of 8" dia. F/L's & 12" dia. TR/L, Manifold and Well Head.
47252/00
TIE-IN EIGHT (8") OIL F/LS & INSTALLATION OF TWO TEST SKIT FACILITIES AT SHAYBAH FIELDS.
SHAYBAH
15-Aug-99
31-Jul-00
44425/00
TIE-IN UTMN-1281, 1282, 1285, 1288 & 1291 F/Ls TO UTMN GOSP-4
UTHMANIYAH
2-Jan-00
31-Aug-00
Installation of 8" dia. F/L's & 16" dia TR/L's & J/O & Well Head to UTMN Gosp-4.
44443/00
TIE-IN UTMN-1284, 1286, 1287 & 1289 F/LS AND T/L TO UTMN GOSP-4
UTHMANIYAH
25-Jan-00
24-May-00
Installation of 8" dia. F/L's & 16" dia. TR/L's & J/O, Well Head to UTMN Gosp-4.
44416/00
Tie-in UTMN-1447 & 1448 F/L's to UGosp # 12
Uthmaniyah
29-Dec-99
8-Jun-00
Installation of 5 KM of 16" dia. Trunkline and 3 KM of 8" dia. U/G Pipelines.
47250/00
Tie-in HWYH-276,277,278 & 279 F/L'S to HWYH Gosp-3
ABQ.
17-Aug-99
20-Nov-99
44617/00
SALES GAS, RIYADH REFINERY YIELD IMPROVEWMENT PROGRAM
44620/00
Page 3 of 5
Installation of F/L's, Trunk Line & Test Skids at Shaybah Filed, Sabkah17, 38 & 92.
Installation of 8" dia F/L's & Well Head Piping
Bin Qurayah Construction Work Experience CONTRACT #
NAME OF PROJECT
LOCATION
START COMPLETED PROJECT PROJECT
SCOPE OF WORK
47232/00
Tie-in UTMN F/LS 1241, 1269 & 1270 and J/O 1255 & J.O. 310/324 to UTMN
ABQ.
19-Jun-99
11-Oct-99
Installation of 3.5 KM of 8" underground pipelines.
47223/00
Tie-in ABQ F/LS 411, 419, 421 & 422 to ABQ GOSP-3
ABQ.
17-May-99
14-Aug-99
Installation of 1.5 KM of 8" underground pipelines.
47169/00
Tie-in HRDH 328 & 332 (DW) to HRDH East Header
Udhaliyah
16-Feb-99
2-May-99
Installation of 10" dia Well Head & Flow line
47176/00
Tie-in HRDH-162 & 163 to HRDH Gosp1
Haradh
9-Jan-99
9-Apr-99
Installation of 8" dia F/L's & Well Head piping
47175/00
Tie-in ANDR-458 to ANDR Gosp-6
Aindar
15-Dec-98
14-Apr-99
Installation of 10" dia F/L Well Head & Test line & 16" dia Trunk line & J.O.
47122/00
Tie-in HRDH-158,159 & 160 F/L's, 10" TST/L & 16" T/L to HRDH Gosp-1
HARADH
13-Jul-98
8-Feb-99
Installation of 10" T/L, 10" TST/L & 8" F/L's 186 KL.
47127/00
Tie-in UTMN-1248 & 1251 F/L's to UTMN Gosp-4
Udhaliyah
12-Jul-98
16-Feb-99
Install 605KL of 10" flowline
47098/00
Tie-in HWYH-268,269,270 & 271 P/L'S to HWYH Gosp-3
Hawiyah
12-May-98
20-Oct-98
Installation of 8" dia wellhead and underground flow line 3.0kl.
29547/00
U-WIPS-5, South Header and Lateral Replacement
47082/00
Tie-in ANDR-444 &SDGM-383 TO SDGM WIP-3W
40552/014
Replacement of 36" dia Pipeline at Abqaiq Plants
47081/00
Tie-in ANDR-447 & 448 to ANDR Gosp6 and ANDR-455 to ANDR Gosp-4
U-Wips-5 Uthmaniyah
12-Apr-88
15-Apr-89
Replace existing 24",20",18",16' and 12" dia header to a new internally and externally FBE coated pipe. Replace 10",8" and 6" diameter lateral using positive seal coupling. The work also include site preparation,construction of foundation and anchors and
Shedgum
23-Apr-98
12-Jul-98
Construction of 8" dia wellhead flowline & 10" dia test line 4.5kl.
Abqaiq Plant
17-Mar-98
17-Oct-98
Aindar
17-Mar-98
26-Jul-98
Page 4 of 5
Replace 36" & 24" dia piping at Abqaiq Tank Farm.
Construct 8"dia wellhead and flowline,6.0KL
Bin Qurayah Construction Work Experience START COMPLETED PROJECT PROJECT
CONTRACT #
NAME OF PROJECT
LOCATION
47059/00
Tie-in HWYH-266 & 267 to HWYH Gosp3 & HWYH-249 to HWYH Gosp-2
Hawiyah
17-Jan-98
17-Apr-98
Construct 8"dia Wellhead and Underground Flowline 3.2 KL.
47024/00
Tie-in 33kv Laterals at Wellsites Transformer HWTH-139,141,143 & 144
Hawtah
17-Sep-97
31-May-98
Installation of 33kv overhead transmission line and other associated electrical and instrumentation works.
47093/00
Tie-in HWYH-245,246,248 Flowlines HWYH-246 10"dia Test Line and HWYH111 Jumpover to HWYH-Gosp-2
Hawiyah
31-Mar-98
1-Nov-98
Miscelleneous civil,electrical, mech., piping & instrumentation works. Construct 8"dia Wellhead and Aboveground Underground Flowline 5.7KL.
SCOPE OF WORK
Tie-in HWYH-264 & 265 to HWYH Gosp3 and HWYH-298 & 299 to HWYH Gosp-4 Tie-in UTMN-993,1238 and 1239 to UTMN Gosp-13 and UTMN-1184 & 1188 to UTMN Gosp-9 Tie-in UTMN-1218 & 1219 to U-Gosp13 and UTMN-1029 & 1226 to U-Gosp4
Hawiyah
20-Aug-97
9-Jan-98
Uthmaniyah
15-Jul-97
12-Nov-97
Construction of 8" x 10"dia Wellhead and Flowlines 5.0 KL.
Uthmaniyah
18-Mar-97
10-Jul-97
Installation of 8" & 10" dia Wellhead and Flowlines 3.2 KL.
45999/00
Refinery Water Disposal to Wells RSTR602 and 603 Ras Tanura
Ras Tanura
8-Mar-97
13-Dec-97
Installation of 10" Cement lined Wellhead & lateral and 12"dia Header to Ras Tanura Refinery 2.0KL.
44078/00
Tie-in HRDH-128,149 & 150 F/L'S to Haradh Gosp-1
Haradh
11-Jan-97
11-Apr-97
Installation of 8" dia Wellhead & Flowline and 10" dia Trunkline to Haradh Gosp-1 6.5KL
44019/00
Tie-in ANDR-422,423 & 424 Wells to ANDR WIP-1
Aindar
27-Nov-96
15-Apr-97
Installation of 10" internally coated wellhead and lateral for water injection line.
45715/00
Khuff Condensate to RT-Refinery Off- Ras Tanura, Qatif, ABQ., Plot Work Pipeline and Dead Legs. Aidar & Shedgum
13-Apr-96
30-Oct-96
Relocation of scrape trap, Installation of drop- out spools, dead legs removal on jumpover spools of 30 & 24 16" & 12"dia pipe and associated civil & instrumentation work.
45743/00
Tie-in UTMN-28 and 1157 to UTMN WIP4S
12-Mar-96
3-Nov-96
Installation of 8" & 10"dia wellhead and lateral for water injection 4.0kl.
47010/00
47002/00
44146/00
Uthmaniyah
Page 5 of 5
Bin Qurayah Construction Work Experience CONTRACT #
NAME OF PROJECT
LOCATION
START COMPLETED PROJECT PROJECT
45564/00
Constructions of Flowline 1137,1138,1139 & 1140 and 20" Trunkline & 10" Test Line to U-Gosp-12
Uthmaniyah
27-Aug-95
25-Feb-96
Construction and installation of 6.5km of 20" trunkline,4.5km of 10"dia test line and 4.0kl 8"dia well head and flowlines.
45181/00
Re-route and Construct New Flowline to the South Corridor of the New Header Gosp-1
Haradh
22-Mar-95
4-May-96
Installation of 23km of 16" dia, 5km of 20" underground trunkline and instillation of 20kl 8" & 10" flowlines.
37984/00
UTMN-202 to SWD of U-Gosp-11
Uthmaniyah
28-Sep-94
10-Feb-95
Installation of 12" dia underground water disposal internally coated pipe(3.0kl) and 10" dia water disposal flowline.
37862/00
Install Shipping,Pumps, Valves and Lines for Aindar Gosp-1,4 & 6
Aindar
26-Jun-94
6-Jun-95
38511/00
Maitenance of Under Ground UtilitiesDhahran
Dhahran
1-Jun-94
31-May-99
Maintenance of drinking water, raw water, miscellaneous RTR pipelines 4"-12" dia), AC, sewer,telephone and electrical line.
47025/00
Miscellaneous Works for Nuayyim to Hawtah Projects
Hawtah
13-Sep-97
31-Jan-98
Installation of 20" inlet line to HWTH FCC, upgrade RTR fire water pipelines & test skids at Nuayyim fields.
-
Hofuf Cement,4th Extension Project
Hofuf
1-Mar-94
10-Sep-96
The work includes installation of piping structural and electrical works for mixed beds,silos, cement mill, ball mill, conveyors, kiln, covered reclaimer etc.
Uthmaniyah, Qurrayah & Hufuf
11-Oct-92
23-Oct-93
Installation of internally coated heavy wall pipe at Qurraya seawater plant,UTH. Water supply system & UTMN WIP-4 60"dia,56"dia 38"dia,36"dia,42"dia,24"dia & 18" dia total piping of 3kl.
60006/00 SubIn-Plant Piping at Plant 423 Con.# Uthmaniyah Water Supply System. 6950001-M
(Note: More Projects with Saudi Aramco were Completed Since 1975 to 1985)
Page 6 of 5
SCOPE OF WORK
Installation of Three 150 H.P. horizontal shipping pumps, PLC, UPS, Modification of In-plant piping, 12" RTR oil/water pipelines and associated electrical and instrumentation works.