Bin Qurayah Construction Work Experience CONTRACT # 6600023950

NAME OF PROJECT Khafji NGL Pipelines

HPT PROJECT Hitachi Water Injection Pump Project NO. FX11-1431

LOCATION

START COMPLETED PROJECT PROJECT

Khafji/Safaniyah

2/3/2010

2/1/2013

Harradh

Apr. 16, 2012

Nov. 14, 2012

Abqaiq/Dhahran/Ras Tanura/Jubail/ Khursaniyah

20 Oct. 2008

19-Jul-12

6600021297

Pipeline Rehabilitation Phase VI

6600026645

Onshore Maintain Potential Project, Tie-In of PWI Wells 514, 649, 662 & 664

Juaymah/ Qatif

Onshore Maintain Potential Project, Lakos De-Sander

Qatif

06 Dec. 2010

Riyadh

24-Jul-10

BI/JO: 10030089147/8184 W10/Bin Quraya

Power Plant 10

6600012729

Khuff Gas Project

6600019231

Ras As Zawr Sales Gas Pipeline

08-1185-PA211

EPC Contract for Gas Pipeline OGI at Raz As Zawr

706/2007

Natural Gas Distribution System for Dammam 2nd Industrial City (DIC-2)

41.01/032-2005 Yamama Crude Oil Storage Tank

Jul. 27, 2011 Mar. 1, 2012

26-May-11

SCOPE OF WORK Construction & Installation of facilities including 4” Ø Khafji, Safaniyah NGL-1 (KFSNGL-1) Installation of Hitachi Water Injection Pump in Saudi Aramco-GOSP2

Rehabilitation of existing pipeline QA-4, QRT-6, SK-4, KRT-4 Pipeline size 40", 42" 46" & 48" Process Mechanical/Piping, Electrical, Instrumentation & Civil/Structural Works for Qatif 514, 649, 662 & 664 Tie-In Qatif 656 @ W-09 & Installation of Lakos Desander @ W-50

27 Dec. 2010 Construction of Fuel Oil Pipelines

Uthmaniyah/Hawiyah/S 26 Mar. 2005 25 Mar. 2010 Construction of Well Heads, Flowlines & Trunklines for Khuff Gas hedgum/Abqaiq Abu Hadriyah / Khursaniyah Abu Hadriyah

03 Nov. 2007

30 Sept. 2010

04 Jan. 2009 07 Nov. 2009

Dammam

9-Jan-07

28-Feb-09

Riyadh

7-Jul-06

30-Jun-07

Page 1 of 5

Lump Sum Turnkey Project for the Construction of Gas Pipeline for Ma'aden Construction of 24" dia Gas Pipeline for MPL Phosphate Co. (Ma'aden) Installation OF Natural Gas Distribution System Pipeline, 36 Units of Metering Skids for Dammam 2nd Industrial City. Provide a detail design package to upgrade the existing YSCC Crude Oil Storage System.


Bin Qurayah Construction Work Experience CONTRACT #

NAME OF PROJECT

LOCATION

START COMPLETED PROJECT PROJECT

SCOPE OF WORK

Dammam

1-Feb-06

30-Jun-07

Construction of 16" dia X 18 km Fuel Gas Line, Metering Station of SCADA System for Al Tuwarqi.

Pipeline Rehabilitation Phase - IV ( QRT-6/QRT-8 Offshore Pipeline )

QATIF

13 Dec. 05

28 April. 07

Rehabilitation/Replacement of 3 km. 40" dia. Pipeline offshore at QRT-6 / QRT-8 Offshore pipeline.

SHIP SLOP OIL RECEPTION OIL FACILITY AT YANBU COT

YANBU

05-Jan.-05

28 Aug. 06

Installation of 10" internally cement lined coated pipe along the trestle area at loading berths in Yanbu COT ( OFFSHORE PROJECT)

BI-21-00014

Al Tuwarqi Fuel Gas Line

6600015067

6600012201

TIE-IN BERRI 336/337 TO BERRI GOSP-4 66000008420 AND BERRI 259 TO BERRI-815

TIE-IN UTMN-1520 & 1537 F/L's TO 66000006552 UTMN GOSP-12 AND UTMN 1328 LATERAL (PWI) TO WIP-4

ABU ALI

12-Jan-00

31-Mar-04

Installation of Wellhead Piping and Flowline, const. 10" Trunkline header positive seal coupling, including 4" (cement lined) disposal line and 8" (cement lined) Water Injection Line, cathodic protection and varoius electrical and instrumentation works

UTHMANIYAH

18-Mar-03

17-Jul-03

Installation of Wellhead Piping and Flowline, const. drain pit appr. 8 KM including Water Injection Line and cathodic protection.

66000006481

TIE-IN OF UTMN-1516 F/L, TR/L, TST/L TO UTMN GOSP-11

UTHMANIYAH

4-Mar-03

31-Oct-03

Installation of Wellhead Piping and Flowline, const. Of drain pit appr. 18 KM including Manifol and production Header Jumpover, Test Line and Trunkline and cathodic protection

BI. 2031

FUEL GAS PIPELINE AND GAS METERING STATION FOR YAMAMA CEMENT FACTORY

RIYADH

22-Aug-01

3-Sep-02

Installation of 18.5 KM of 20" dia. Fuel Gas Line and Gas metering station, control room and associated piping, instrumentation, electrical and civil works.

3000005198

Construction of additional Fuel Gas Line Abqaiq Plant

ABQAIQ

22-Apr-02

30-Jun-03

Installation of 12" dia RTR pipe & 10" dia off-plot and in-plant piping for Abqaiq Plant and associated electrical,civil, instrumentation & mechanical works.

600044719

Pipeline Laterals & Crossover Daylighting - UTMN

UTHMANIYAH

25-Mar-02

30-Jun-03

Installation of 20",24",28",30" & 40" above ground piping that includes hot tapping & stopple.

Page 2 of 5


Bin Qurayah Construction Work Experience CONTRACT #

NAME OF PROJECT

LOCATION

START COMPLETED PROJECT PROJECT

SCOPE OF WORK

RIYADH

21-Aug-01

30-Jun-03

Installation of 9 KM 16" Gas Line to Riyadh Refinery (On-Plot & OffPlot) and associated RTR piping, electrical, instrumentation, and civil works.

TIE-IN 1454, 1455, 1492 & 1493 F/L's TO UTMN GOSPS # 10 & 11

UTHMANIYAH

6-Jun-01

10-Nov-01

Installation 16" dia. TR/L, 8" dia. TST/L & 8" dia. F/L

44619/00

TIE-IN HWYH 396,399 F/L's TO HWYH GOSP #3 & HARDH 250 F/L TO HWYH GOSP # 4

HAWIYAH

22-Apr-01

21-Sep-01

Installation of 16" dia. TR/L, 10" dia. TST/L & 8" dia.F/L.

44468/00

TIE-IN UTMN-1300,1304, 1306, 1307 F/L's TO UTMN GOSP-13

UTHMANIYAH

18-Apr-00

10-Dec-00

Installation of 8" dia. F/L's & Well Head.

44469/00

TIE-IN UTMN-1462 F/L TO UTMN GOSP12 AND UTMN - 1468 F/L TO UTMN GOSP-11

UTHMANIYAH

18-Apr-00

25-Aug-00

Installation of 8" dia. F/L's & Well Head.

44470/00

TIE-IN HWYH-343,344, 345, 346, 347, 348 & 12" DIA. TR/L HWYH-3, 346, 347 TO HWYH GOSP-2

HAWIYAH

19-Apr-00

30-Oct-00

Installation of 8" dia. F/L's & 12" dia. TR/L, Manifold and Well Head.

47252/00

TIE-IN EIGHT (8") OIL F/LS & INSTALLATION OF TWO TEST SKIT FACILITIES AT SHAYBAH FIELDS.

SHAYBAH

15-Aug-99

31-Jul-00

44425/00

TIE-IN UTMN-1281, 1282, 1285, 1288 & 1291 F/Ls TO UTMN GOSP-4

UTHMANIYAH

2-Jan-00

31-Aug-00

Installation of 8" dia. F/L's & 16" dia TR/L's & J/O & Well Head to UTMN Gosp-4.

44443/00

TIE-IN UTMN-1284, 1286, 1287 & 1289 F/LS AND T/L TO UTMN GOSP-4

UTHMANIYAH

25-Jan-00

24-May-00

Installation of 8" dia. F/L's & 16" dia. TR/L's & J/O, Well Head to UTMN Gosp-4.

44416/00

Tie-in UTMN-1447 & 1448 F/L's to UGosp # 12

Uthmaniyah

29-Dec-99

8-Jun-00

Installation of 5 KM of 16" dia. Trunkline and 3 KM of 8" dia. U/G Pipelines.

47250/00

Tie-in HWYH-276,277,278 & 279 F/L'S to HWYH Gosp-3

ABQ.

17-Aug-99

20-Nov-99

44617/00

SALES GAS, RIYADH REFINERY YIELD IMPROVEWMENT PROGRAM

44620/00

Page 3 of 5

Installation of F/L's, Trunk Line & Test Skids at Shaybah Filed, Sabkah17, 38 & 92.

Installation of 8" dia F/L's & Well Head Piping


Bin Qurayah Construction Work Experience CONTRACT #

NAME OF PROJECT

LOCATION

START COMPLETED PROJECT PROJECT

SCOPE OF WORK

47232/00

Tie-in UTMN F/LS 1241, 1269 & 1270 and J/O 1255 & J.O. 310/324 to UTMN

ABQ.

19-Jun-99

11-Oct-99

Installation of 3.5 KM of 8" underground pipelines.

47223/00

Tie-in ABQ F/LS 411, 419, 421 & 422 to ABQ GOSP-3

ABQ.

17-May-99

14-Aug-99

Installation of 1.5 KM of 8" underground pipelines.

47169/00

Tie-in HRDH 328 & 332 (DW) to HRDH East Header

Udhaliyah

16-Feb-99

2-May-99

Installation of 10" dia Well Head & Flow line

47176/00

Tie-in HRDH-162 & 163 to HRDH Gosp1

Haradh

9-Jan-99

9-Apr-99

Installation of 8" dia F/L's & Well Head piping

47175/00

Tie-in ANDR-458 to ANDR Gosp-6

Aindar

15-Dec-98

14-Apr-99

Installation of 10" dia F/L Well Head & Test line & 16" dia Trunk line & J.O.

47122/00

Tie-in HRDH-158,159 & 160 F/L's, 10" TST/L & 16" T/L to HRDH Gosp-1

HARADH

13-Jul-98

8-Feb-99

Installation of 10" T/L, 10" TST/L & 8" F/L's 186 KL.

47127/00

Tie-in UTMN-1248 & 1251 F/L's to UTMN Gosp-4

Udhaliyah

12-Jul-98

16-Feb-99

Install 605KL of 10" flowline

47098/00

Tie-in HWYH-268,269,270 & 271 P/L'S to HWYH Gosp-3

Hawiyah

12-May-98

20-Oct-98

Installation of 8" dia wellhead and underground flow line 3.0kl.

29547/00

U-WIPS-5, South Header and Lateral Replacement

47082/00

Tie-in ANDR-444 &SDGM-383 TO SDGM WIP-3W

40552/014

Replacement of 36" dia Pipeline at Abqaiq Plants

47081/00

Tie-in ANDR-447 & 448 to ANDR Gosp6 and ANDR-455 to ANDR Gosp-4

U-Wips-5 Uthmaniyah

12-Apr-88

15-Apr-89

Replace existing 24",20",18",16' and 12" dia header to a new internally and externally FBE coated pipe. Replace 10",8" and 6" diameter lateral using positive seal coupling. The work also include site preparation,construction of foundation and anchors and

Shedgum

23-Apr-98

12-Jul-98

Construction of 8" dia wellhead flowline & 10" dia test line 4.5kl.

Abqaiq Plant

17-Mar-98

17-Oct-98

Aindar

17-Mar-98

26-Jul-98

Page 4 of 5

Replace 36" & 24" dia piping at Abqaiq Tank Farm.

Construct 8"dia wellhead and flowline,6.0KL


Bin Qurayah Construction Work Experience START COMPLETED PROJECT PROJECT

CONTRACT #

NAME OF PROJECT

LOCATION

47059/00

Tie-in HWYH-266 & 267 to HWYH Gosp3 & HWYH-249 to HWYH Gosp-2

Hawiyah

17-Jan-98

17-Apr-98

Construct 8"dia Wellhead and Underground Flowline 3.2 KL.

47024/00

Tie-in 33kv Laterals at Wellsites Transformer HWTH-139,141,143 & 144

Hawtah

17-Sep-97

31-May-98

Installation of 33kv overhead transmission line and other associated electrical and instrumentation works.

47093/00

Tie-in HWYH-245,246,248 Flowlines HWYH-246 10"dia Test Line and HWYH111 Jumpover to HWYH-Gosp-2

Hawiyah

31-Mar-98

1-Nov-98

Miscelleneous civil,electrical, mech., piping & instrumentation works. Construct 8"dia Wellhead and Aboveground Underground Flowline 5.7KL.

SCOPE OF WORK

Tie-in HWYH-264 & 265 to HWYH Gosp3 and HWYH-298 & 299 to HWYH Gosp-4 Tie-in UTMN-993,1238 and 1239 to UTMN Gosp-13 and UTMN-1184 & 1188 to UTMN Gosp-9 Tie-in UTMN-1218 & 1219 to U-Gosp13 and UTMN-1029 & 1226 to U-Gosp4

Hawiyah

20-Aug-97

9-Jan-98

Uthmaniyah

15-Jul-97

12-Nov-97

Construction of 8" x 10"dia Wellhead and Flowlines 5.0 KL.

Uthmaniyah

18-Mar-97

10-Jul-97

Installation of 8" & 10" dia Wellhead and Flowlines 3.2 KL.

45999/00

Refinery Water Disposal to Wells RSTR602 and 603 Ras Tanura

Ras Tanura

8-Mar-97

13-Dec-97

Installation of 10" Cement lined Wellhead & lateral and 12"dia Header to Ras Tanura Refinery 2.0KL.

44078/00

Tie-in HRDH-128,149 & 150 F/L'S to Haradh Gosp-1

Haradh

11-Jan-97

11-Apr-97

Installation of 8" dia Wellhead & Flowline and 10" dia Trunkline to Haradh Gosp-1 6.5KL

44019/00

Tie-in ANDR-422,423 & 424 Wells to ANDR WIP-1

Aindar

27-Nov-96

15-Apr-97

Installation of 10" internally coated wellhead and lateral for water injection line.

45715/00

Khuff Condensate to RT-Refinery Off- Ras Tanura, Qatif, ABQ., Plot Work Pipeline and Dead Legs. Aidar & Shedgum

13-Apr-96

30-Oct-96

Relocation of scrape trap, Installation of drop- out spools, dead legs removal on jumpover spools of 30 & 24 16" & 12"dia pipe and associated civil & instrumentation work.

45743/00

Tie-in UTMN-28 and 1157 to UTMN WIP4S

12-Mar-96

3-Nov-96

Installation of 8" & 10"dia wellhead and lateral for water injection 4.0kl.

47010/00

47002/00

44146/00

Uthmaniyah

Page 5 of 5


Bin Qurayah Construction Work Experience CONTRACT #

NAME OF PROJECT

LOCATION

START COMPLETED PROJECT PROJECT

45564/00

Constructions of Flowline 1137,1138,1139 & 1140 and 20" Trunkline & 10" Test Line to U-Gosp-12

Uthmaniyah

27-Aug-95

25-Feb-96

Construction and installation of 6.5km of 20" trunkline,4.5km of 10"dia test line and 4.0kl 8"dia well head and flowlines.

45181/00

Re-route and Construct New Flowline to the South Corridor of the New Header Gosp-1

Haradh

22-Mar-95

4-May-96

Installation of 23km of 16" dia, 5km of 20" underground trunkline and instillation of 20kl 8" & 10" flowlines.

37984/00

UTMN-202 to SWD of U-Gosp-11

Uthmaniyah

28-Sep-94

10-Feb-95

Installation of 12" dia underground water disposal internally coated pipe(3.0kl) and 10" dia water disposal flowline.

37862/00

Install Shipping,Pumps, Valves and Lines for Aindar Gosp-1,4 & 6

Aindar

26-Jun-94

6-Jun-95

38511/00

Maitenance of Under Ground UtilitiesDhahran

Dhahran

1-Jun-94

31-May-99

Maintenance of drinking water, raw water, miscellaneous RTR pipelines 4"-12" dia), AC, sewer,telephone and electrical line.

47025/00

Miscellaneous Works for Nuayyim to Hawtah Projects

Hawtah

13-Sep-97

31-Jan-98

Installation of 20" inlet line to HWTH FCC, upgrade RTR fire water pipelines & test skids at Nuayyim fields.

-

Hofuf Cement,4th Extension Project

Hofuf

1-Mar-94

10-Sep-96

The work includes installation of piping structural and electrical works for mixed beds,silos, cement mill, ball mill, conveyors, kiln, covered reclaimer etc.

Uthmaniyah, Qurrayah & Hufuf

11-Oct-92

23-Oct-93

Installation of internally coated heavy wall pipe at Qurraya seawater plant,UTH. Water supply system & UTMN WIP-4 60"dia,56"dia 38"dia,36"dia,42"dia,24"dia & 18" dia total piping of 3kl.

60006/00 SubIn-Plant Piping at Plant 423 Con.# Uthmaniyah Water Supply System. 6950001-M

(Note: More Projects with Saudi Aramco were Completed Since 1975 to 1985)

Page 6 of 5

SCOPE OF WORK

Installation of Three 150 H.P. horizontal shipping pumps, PLC, UPS, Modification of In-plant piping, 12" RTR oil/water pipelines and associated electrical and instrumentation works.