Professional Studies 1 - Elements and Urban Oasis

Page 1

Elements & Urban Oasis

PS1 - CPU

Interactive Portfilio Nadeem Hanna Shambhavi Joshi Lour Roberta


A

Contents

A 03 04 05 06 07 08 09 10 11 12 13 14 15

2

B The Office (Atelier Specific) Intensive Week 1 Intensive Week 2 Theory Site Photos Infrastructure Interactive

Manchester Research Design Drivers Interactive

Housing Typoloy Massing Conditions Interactive

Vertical Massing Project Narrative

16 17 18 19 20 21 22 23 24 25 26 27

Floor Plans

Interactive

Site Strategy

Interactive

Floor Plans

Interactive

House Types Sections

Interactive

Elevations

Interactive

Courtyard Visual (Atelier Specific) Module Structure Connection Details

28 29 30 31 32 33 34 35

Construction Sequence Interactive

Building Regulations Services Interactive

Environmental Analysis Interactive

Costing Flythough (Atelier Specific) Interactive

Individual Reflection (Atelier Specific) Bibliography

Details 1 Details 2 Plan of Construction

Road Visual (Atelier Specific)

Part A Interactive Click Button

Part B Interactive Click Button

Please view in Adobe Acrobat with Adobe Flash player installed


A

Part A -

The Office

Nadeem Hanna BIM Manager Nadeem’s role within the project is developing the BIM model, he is best suited to this role because his wealth of Revit knowledge. Nadeem has already experience in BIM management from earlier on in his career and teaches Revit at the Manchester School of Architecture.

Shambhavi Joshi Creative Designer Shambhavi’s main focus within the project is landscaping and bespoke aspect of the scheme. Being a registered architect in India Shambhavi understands the importance of good design within the public realm, having worked several large multi use developments within India.

Lour Roberta Technical Desinger Lour’s reasonability lies in ensuring the scheme can be delivered. Having experience in designing modular housing Lour has a wealth of knowledge of how modular systems perform, in addition to her vast knowledge of structures.

Brief The brief outlined to us is to develop a housing scheme within a site in central Manchester constructed using DfMA construction methods and off-site manufacturing. The site we have been assigned is situated on Booth Street West adjacent to Oxford Road. For us to design under the blanket of DfMA we have been asked to coordinate the project using BIM. We will be using Autodesk Revit 2019. We have been appointed by the client under a design and build contract. Our scope of work is to take the project though planning and until the tender phase of stage 4. Once a contractor has been appointed to deliver the project we have an intention to bid to the contractor to be novated and oversee the project to completion

3


A

Part A -

DfMA as Construction Methord

Intensive Week - DfMA, BIM and Housing Stanrds Housing Standards

The brief for our intensive week was to research design for manufacture assembly (DfMA) as a construction method and the current state of the UK housing market. DfMA as a method of uses off site manufacturing of building components and modules for onsite assembly. The process attempts to reduce time within the construction phase of a scheme.

Housing standards are the minimum standards of living that dwellings should meet according to the local government. The Manchester Residential Quality Guidance (March 2017) states that good residential design is not just about what happens inside the home. The guidance is broken down into 3 levels to accommodate a balance of residential mix and the younger population who are increasingly choosing to live and work in Manchester. The city’s density is growing quickly and there is a need for sustainable, affordable homes with the Manchester’s character and sense of community. Neighbourhood: how it should respond to, and influence the wider neighbourhood. Block: contribute to creating or improving the immediate block and street network. Building: implications of design. Since 2015, Manchester has adopted the London Housing Design Guide space standards as Manchester has the fastest growing population outside London.

DfMA is already heavily featured throughout the automotive industry Design of Automated Parts

Material Handling and Parts Manufacture

Car Body Manufacture and Engine Block Assembly Assembly

Final Assembly

Final Tests and Clearance

DfMA vs Traditional Construction Traditional construction Feasibility

Funding

Site Preparation

Design & Engineering

Construction

Fit-out & Finishing

Testing & Commissioning

With Manchester’s population growing, moving the working population back into the city will require a significant increase in housing density. With the highest population density per square kilometer, Tokyo in Japan is leading testing ground for high density urban housing since the post war boom in the 1960s where supply exceeded demand.

Design for Manufacture and Assembly Feasibility

4

Funding

Design & Engineering TIME SAVED

Site Preparation Manufacture Assembly Fit-out & Finishing Testing & Commissioning Time Material

Sou Fujimoto’s prototype for House Vision exhibition

Cost Waste Management Labour SAVING

The project aims to redefine rental housing by introducing large shared living spaces and incorporating ageing cultural communities.


A

Part A -

Intensive Week - Supply vs Demand

83%

210,000 New Homes Each Year Expected Between 2014-2039

55% People aged over 45 within rural areas

240-250,000 New Homes Each Year Required to Cope with House Formulations Within the UK more than 4 in 5 people live within an urban setting.

300,000 New Homes Each Year Required to Prevent Average of First Time Buyers Rising Resarchers Own from (Wilson & Barton, 2018; HOUSE OF LORDS, 2016)

House Prices to Earnings

People aged over 45 within urban areas

Resarchers Own from (Department for Environment, Food & Rural Affairs, 2016)

House Supply vs Housing Demand

8

40%

Population Change Index

Demand

300

Urban

6 200

England

4

Supply

Rural

100

2

Rural urban migration is a phenomenon affecting all countries around the world. With more people populating cities pressure is being put upon developers and planners to house the influx of people. Within Urban areas in the UK house prices reach in excess of 14 times the median earnings (Department for Communities and Local Government, 2017).

5

16

20

11

20

16

20

06

15

97

11

20

20

20

19


A

Part A -

Thoery

6

Modern Urban Planning Theory The theory can be nterpreted as, ‘A generally, systematically rational cognition on the development of cities and urban planning process; an intellectual configuration used to comprehend urban development and planning process.

Philosophical

Technological

Project Specific

Scientific

Theories on Urban Development

Urban component and its development Theories on Cities

Our approach towards the project runs on a similar ideology as of the Urban Planning Theory, where we have rationally attempted to analyze the sociophilosophical aspects of the city of Manchester, narrowing them down to the site specific requirements. We have then investigated the factors affecting site decisions, its surrounding development and its effect on its immediate neighbourhood and users. These inferences have further been detailed into a social housing project using DfMA technology as a means of construction to establish the connection of the user and the urban fabric.

Cao, K. (2007) ‘Modern urban planning theories Beijing: China Architecture and Building Press, 2007.’ Sage Pub, 12(3) p. 321-328.


A Semi Open Courtyard

Road Side

Part A -

Site Photos

7


A

Part A -

Infrastructure

8

Interactive Site Location

Housing

Education Food

Shops

Road Network

Green Spaces

Other

Conclusion

Site Area 3477m² 0.86 Acre 0.35 Hectare Address Hopton Court Booth Street West MANCHESTER M15 6EP


A

Part A -

City Center Growth

Manchester Research

Year on Year House Price Tends - Manchester

200%

Population Growth in City Center Manchester 6.8%

Job Growth in City Center 10%

150%

UK 3.6%

100%

18 20

16 20

0%

50%

0%

-15%

09

20

1st for City Centre Job Growth. City of Opportunities?

2016 - First time Manchester YOY% incress overtook the UK avarage. City on the Rise?

Resarchers Own from (Elliott, 2018)

Resarchers Own from (Home Track, 2018)

Age Distribution

80%

Year on Year House Price Tends

8.0%

90+

60%

85-89

Female

75-79

4.0%

70-74

2.0%

60-64 55-59

45-49

-2.0%

40-44 35-39 30-34

Current Year on Year House Price Growth

25-29

Pervious Year on Year House Price Growth

Resarchers Own from (Home Track, 2018)

15-19 10-14 5-9

UK Average

0

2

% of Total Population

4

6

8

18% of population aged between 20-34, City for the Youth? Resarchers Own from (Manchester City Council, 2011)

18%

Since 2007.

0-4 2

-4.0%

Manchester has 4th highest year on year house price increase

20-24

4

40%

20%

0.0%

50-54

6

UK Average

3.6% UK Avarage

65-69

8

Manchester

6.0%

80-84

Male

Tenure of Households

13 in

Rise in House Prices

20%

Houses bought in National Avarage manchester are by Manchester house prices have only very first time buyers. recently began to increase.

Resarchers Own from (Countrywide, 2014)

Resarchers Own from (Countrywide, 2014)

-6.0%

0%

Owner Occupied

Social Rented

Privet Rented or Rent Free

Less than half of all home owners live in there homes.

Resarchers Own from (Manchester City Council, 2011)

This research has informed us that Manchester is a city popular with the younger generations. The city is developing in a rapid rate therefore very popular with first time buyers. Despite this less than 40% of home owners live in their properties. This shows indicates to still a very strong rental market.

9


A

Character Profiles

Part A -

Design Drivers

10

Interactive

Space Standards 1B 2P - GIA 50m² ~ 25m² 2B 3P - GIA 61-70m²

1

Bedroom

2

~ 25m²

3

Bedroom

Bedroom

3B 5P - GIA 86-99m²

Easy Access to City

Pre School Access

Middle School Access

Affordable

Small Outdoor Spaces

Larger Outdoor Spaces

Resarchers Own from (Department for Communities and Local Government, 2015)

Transportation

Site/ User Design Drivers

Proposed Module STGO - Cat1

Site Avarage Age

4m 6.1m

< 2.9m

Site Population Density

Housing Typology

Normal load

Abnormal Load

Special movements order

Less than 2.9m Less than 44,000m weight

Cat 1 not exceeding 50,00kg 2 working days’ notice Cat 2 not exceeding 80,000kg 2 working days’ notice Cat 3 not exceeding 150,000kg 5 working days’ notice

Excess of 6.1m wide Excess of 150,000kg

First Time Buyers Age Distribution First Time Buyer Mortgage Lending The site has a very young average age. Partly due to its proximity to universities and city centre.

45

y/25

2.5m to 5m y

Site Statistics Site Average Age - 26.6 - Average age for somone living in an urban setting UK - 38 - Manchester average age - 36.3

x

25m²

25

Resarchers Own from (Carter & Swinney, 2018; Plumplot, 2016 )

> 6.1m

1.618

Module Development

y/x = Golden Ratio

4m

6.25m


A

House Typology Development

Part A -

Housing Typology

Cluster Development

Condition 1 - All formations need to have the same footprint

Consistent module Module consistant thoughout all house types, connecting services into the core.

4x

=

Housing Units

Housing Cluster

Condition 2 - All formations conforms to the golden ratio. The same ratio governing the module.

Core

Condition 3 - All service modules to be facing the core.

12

50

0m

m

1

m

0m

0 60

11


Part A -

Massing Conditions

12

Interactive

Condition 1 All Clusters should have a minimum of 2 and maximum of 5 open spaces

Condition 2 All 3 Bed duplexes must have either zero or one open space on there short end.

Condition 3 All Clusters should have only one double open space or non at all.

Condition 4 A Cluster with 4 Clubbed double spaces is not vaild.

Condition 5 All 3 Bed duplexes must have one open space on their longitudinal end.

Quality of Space - Maintaining an appropriate ratio of open and closed spaces.

Structural Stability – No support below the above unit would impact the structure.

Quality of Space – Avoiding having too many unoccupied plot spaces, waste of space.

Structural Stability – No support below the above unit would impact the structure.

Quality of Space – Required to provide the 3-bed duplex with privet garden space.

Final Iterations

Type A

Type B

Type C

Type D

Type E

Type F

Type G

Type H

Type I


A

Part A -

Site massing as a whole

Space for Pedestrian walkway

CAT 01 Clusters

Space for Courtyard/Open Space

Creating grids for units placement

CAT 01 Cluster

CAT 02 Clusters

CAT 02 Cluster CAT 03 Cluster

Vertical Condition 1 CAT 01 Cluster

Vertical Condition 2 CAT 03 Cluster Type I

Double open spaces never feature on the same corner within the same tower.

CAT 02 Cluster

Quantities 13 - 1 Bed

51 - 2 Bed

8 - 3 Bed

Tower 1

Tower 2

Tower 3

Tower 4

Tower 5

Merging grids with Courtyard space, leaving open access on ground floor

CAT 03 Cluster Type I

Vertical Massing

Unit stacking with height hierarchy with open ground layout

13


A

Part A -

Project Narrative

Within a world where urbanism is affecting all major cities around the world the construction industry needs to respond with new innovative solutions to speed up the fabrication of our cities. DfMA attempts to respond to this phenomenon, with off-site manufacturing and standardisation. Manchester is one of the fastest progressing cities within the UK. Its rapidly increasing city centre job growth is enticing many young professionals to emigrate to the north west. Manchesters housing market is popular with first time buyers, 1 in 3 homes bought by first time buyers. Published in 2017 “fixing our broken housing market� is a report outlining was is required to cope with the demand of the UK housing market. Stated within this report are four fundamentals that would need to be addressed: affordable homes, quicker construction of homes, diversity within the housing market and right homes in right places. These four points capture the essence of this project. Though our extensive research into the site and city we can propose housing designed for the current demographics, combining characterising from the two most popular housing typologies within the city, all constructed using the blanket of DfMA and standardisation. The result is a quicker and cheaper construction specifically designed for a current city demographic and popularity trends.

Right home in the Right Places

Diversify the Housing Market

Build Faster Homes

Affordable Housing

14


A

Road Visual

15


A

Floor Plans

Part B -

16

Interactive

1

2

3

5

4

6

7

8

9

10

11

12

1

2

4

3

5

6

7

8

9

10

11

12

A

4

C

D

F

I

L

3

P

O

5

K

3

3

AA

U

X Z

4

AA

1

DD

2

1

Basement Plan 1:500 Regular Parking Spaces - 41 Disabled Parking Spaces - 4

1:500 @ A3

O

T

5

BB

CC

Site/ Roof Plan

N

R

Y

Z

Ground Floor Plan Render

L

2

W

X

Ground Floor Plan/ Basement Plan

H

5

V

W

1

F

1

S

U

BB

E

Q

T

Y

C

P

R

V

6

B

I

M

N

Q S

4

J

K M

7

G

H J

5

D

E G

A

7

B

Ground Floor Plan 1:500 1 2 3 4 5

Large Shopping Unit Standard Shopping Unit Plaza Activity Space Cafe

6 7 8

Public Seating Bike Store Waste Collection Point

2

2

CC DD


A

Part B -

Site Strategy

Site Layers Residential Towers

Vehicle Access

Building Access

Urban Community Space

Basement Level Parking

Public Nodes

17


A

Floor Plans

Part B -

18

Interactive

Unit Level 01 Floor 01 - 02

Unit Level 02 Floor 03 - 04

Unit Level 03 Floor 05 - 06

Unit Level 04 Floor 07 - 08

Unit Level 05 Floor 09 - 10

1:500 @ A3


A

House Types

Part B -

1 Bedroom Flat

Kitchen

Bedroom

Bathroom

2x 25m² module = 1B2P Flat

Living Room

2 Bedroom Duplex

3x 25m² module = 2B3P Duplex

4x 25m² module = 3B5P Duplex

3 Bedroom Duplex

Kitchen

Kitchen Bedroom

Living Room Bathroom

Bathroom Living Room

Bathroom Bedroom

Bedroom

Bedroom Bedroom

Bathroom

1:100 @ A3

19


A

Sections

20

Part B -

Interactive 12 A DD

B CC

1

11

BBC AAD

2 E Z

3

10 YF

XG

4

9 H W

VI

UJ

5

8 K T

6

7 SL

RM

7

6 N Q

PO

OP

5 Q N

8 MR

4 LS

9 T K

10

3 JU

IV

11

2

W H

GX

FY

12

1 Z E

DAA CBB

CC B

DD A

FFL 33.101 m FFL 33.101 m Unit_5 01 Unit_5 01 FFL 30.128 m FFL 30.128 m Unit_5 00 Unit_5 00 FFL 27.155 m FFL 27.155 m Unit_4 01 Unit_4 01 FFL 24.182 m FFL 24.182 m Unit_4 00 Unit_4 00 FFL 21.209 m FFL 21.209 m Unit_3 01 Unit_3 01 FFL 18.236 m FFL 18.236 m Unit_3 00 Unit_3 00 FFL 15.263 m FFL 15.263 m Unit_2 01 Unit_2 01 FFL 12.290 m FFL 12.290 m Unit_2 00 Unit_2 00 FFL 9.317 m FFL 9.317 m Unit_1 01 Unit_1 01 FFL 6.344 m FFL 6.344 m Unit_1 00 Unit_1 00

FFL 0.000 m FFL 0.000 m Ground Floor Ground Floor FFL -3.200 m FFL -3.200 m Basement Basement

1:200 @ A3

Section 01 1:200

Section 02 1:200

Section 03 1:200

FFL 33.101 FFL 33.101 mm Unit_5 Unit_5 0101 FFL 30.128 FFL 30.128 mm Unit_5 00 Unit_5 00 FFL 27.155 FFL 27.155 mm Unit_4 Unit_4 0101 FFL 24.182 FFL 24.182 mm Unit_4 00 Unit_4 00 FFL 21.209 FFL 21.209 mm Unit_3 Unit_3 0101 FFL 18.236 FFL 18.236 mm Unit_3 00 Unit_3 00 FFL 15.263 FFL 15.263 mm Unit_2 Unit_2 0101 FFL 12.290 FFL 12.290 mm Unit_2 00 Unit_2 00 FFL 9.317 FFL 9.317 mm Unit_1 Unit_1 0101 FFL 6.344 FFL 6.344 mm Unit_1 Unit_1 0000

FFL 0.000 FFL 0.000 mm Ground Floor Ground Floor FFL -3.200 FFL -3.200 mm Basement Basement

Section 04 1:200


A

Elevations

21

Part B -

Interactive

DD

CC

BB

AA

Z

12 Y

X

11W

V

10 U

T

S

9R

Q 8

P

O

7

N

M

L

6

K

5J

I

4 H

G

F

3

E

D 2 C

B1

A

FFL 33.101 m Unit_5 01

FFL 33.101 m Unit_5 01

FFL 30.128 m Unit_5 00

FFL 30.128 m Unit_5 00

FFL 27.155 m Unit_4 01

FFL 27.155 m Unit_4 01

FFL 24.182 m Unit_4 00

FFL 24.182 m Unit_4 00

FFL 21.209 m Unit_3 01

FFL 21.209 m Unit_3 01

FFL 18.236 m Unit_3 00

FFL 18.236 m Unit_3 00

FFL 15.263 m Unit_2 01

FFL 15.263 m Unit_2 01

FFL 12.290 m Unit_2 00

FFL 12.290 m Unit_2 00

FFL 9.317 m Unit_1 01

FFL 9.317 m Unit_1 01

FFL 6.344 m Unit_1 00

FFL 6.344 m Unit_1 00

FFL 0.000 m Ground Floor

FFL 0.000 m Ground Floor

Timber Cladding system Vulcan WeatherTone® pre-finished weatherboard - Barista White Cladding system Vulcan VulcaTuf® rainscreen cladding panels - Pure White RAL9010

1:200 @ A3

North Elevation 1:200

East Elevation 1:200


A

Courtyard Visual

22


A

Part B -

Module Structure

23

Vulcan WeatherToneÂŽ pre-finished weatherboard - Barista / Vulcan VulcaTufÂŽ rainscreen cladding panels - Pure White RAL9010 OSB Board Insulation mechanically fixed to subsrate Breather Membrane Light gauge steel frame structure, with insualtion between studs if required Vapour Control Layer Plaster Board

1 Bed Assembly

2 Bed Assembly

3 Bed Assembly

Component Schedule Base and Gusset Plates

Nuts and Bolts

Nuts and Bolts system: 1. 12mm Bolts 2. 15mm Bolts 3. 20mm Bolts 4. 24mm anchor fasteners

Nos. 64 440 32 18

Base and Gusset plates: 1. Rectangular 2. Trapezoidal 3. Bracing plate All plates of 6, 8 and 10mm thicknesses

Beams

Nos. 106 8 2

Structural Steel Beams: 1. Box Sections 2. I-section beam 3. Subordinate I-beam 4. Structural C-beam

Angle Cleat

Nos. 2 2 40 9

Angle cleats: 1. L-angle cleat (2X2 dia) 2. L-angle cleat (3X3 dia) 3. T-shape compound cleat (derived by joining two 3X3 L-angle cleats)

Columns

Nos. 96 8 4

Structural Steel Columns: Nos. 1. C-shaped compound stanchion 4 2. L-angle column 4 3. Structural I-shaped column 2 4. Subordinate I-shaped column 24


A

Part B -

Subordinate I Beam

Connection Details

24

Main I-Beam 20mm dia nuts and bolts system

15mm dia nut and bolt system L - angle cleat

Base Plates

Main C Beam

Main I-Beam Subordinate C Beam

Joinary at Structural Beam to Light Steel Frame

Corner Detail at Structural Column and Sructural Beams

Subordinate C Beam welded to main beam

15mm dia nut and bolt system 8mm Thick Base Plate L-Angle Cleat

Fire resistant Plasterboard 12mm dia nut and bolt system 150mm dia round steel pipe used for bracing

Structural I-section column 8mm thk gusset plate

Gusset plate Base Plate

20mm dia nut and bolt system 18mm dia nut and bolt system T-Angle Cleat

Corner Detail at Structural Column to Structural Beams

Mineral wool insulation I-shaped Stanchion Sheathing Board Breather Membrane Rigid Insulation board Cladding

Ground Floor I-shaped stanchion 20mm dia nut and bolt (anchor fasteners) 450x600mm rectangular concrete column

Central Bracing Junction

C shaped compound steel stanchion 8mm thk gusset plate

20mm dia nut and bolt system Base plate

Subordinate I-Beam

Base plate

Vertical Support

Gusset plate

15mm dia nut and bolt system

Subordinate C Beam welded to main beam

L - angle cleat

Joinary at Vertical Support and Structural Beam

I-Section Beam

Detail showing Structural C beam joining Compound Stanchion

Detail of joinery between basement column - ground floor column - structural column of module

2

1


Foundation to Parapet Section 1:100 @A2

Part B -

1

Details

25

PR

Basement to Ground Detail - 1:20 @A3

Access ramp compliant with Part M of Building Regulations

floor panel set out in 600mm grid

1

3

DUCED BY AN AUTODESK STUDENT VERSION

2

PRODUCED BY AN AUTODESK STUDENT VERSION

chipboard panel with steel casing 150mm dpc

cable tray, service pipes and ventilation ducts can all be located under the raised access floor

Ground level

height adjustable pedestal up to 600mm

PRODUCED BY AN AUTODESK

angled mortar fillet to eliminate pooling

cast in situ reinforced concrete floor

reinforced concrete according to structural engineer design

waterproof membrane

2 coats elasticized tanking slurry closed cell insulation to achieve required thermal performance studded membrane with geo textile layer to prevent blockage rubber water bar running through the construction joint

angled mortar fillet to eliminate pooling

reinforced concrete according to structural engineer design 2 coats elasticized tanking slurry internal wall finish

closed cell insulation to achieve required thermal performance studded membrane with geo textile layer to prevent blockage

internal floor finish on concrete screed

rubber water bar running through the construction joint

reinforced concrete slab

filter membrane to shingle to prevent blockage

rigid insulation over concrete slab

shingle to allow suitable drainage

ground beam

perforated drain concrete blinding waterproof tanking membrane

pile cluster to suitable loadbearing stratum

0m 20 scale

0.4m

0.8m

1.2m

1.6m

2m

N

A


A

Part B -

PRODUCED AN AUTODESK STUDENT VERSIONPRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN BY AUTODESK STUDENT VERSION

2

Modular Roof Terrace Detail - 1:20 @A3

3

Light steel module to concrete Detail - 1:20 @A3

2 x fire resistant plaster board

18mm tongue and 18mm tongue and groove flooring board groove flooring board

Vapour control Vapour control layer layer

light steel modular frame light steel modular frame mineral wool insulation with mineral woolwith insulation between studs between studs Breather Breather membrane membrane mineral wool insulation mineral wool insulation mechanically fixed to mechanically fixed to substrate substrate

Flush skirting board Flush skirting board

substrate - blockwork infill / concrete wall etc. insulation mechanically fixed to substrate

Insulation between Insulation between battens with resilient battens with resilient layer if required for layer if required for acoustic purposes acoustic purposes

concrete cladding panel

floor screed finishfloor screed finish to structure to structure below below

stainless steel support bracket fixed to substrate

150mm precast concrete planks with grout between

26

Window Connection Details - 1:20 @A3 Vapour control layer

Sheathing boardSheathing board

Details

150mm precast concrete planks with grout between

insulated cavity closer insulated flashing with sealant to cladding panel window head

timber cladding timber panel cladding panel

el g

PRODUCED BY AN AUTODESK STUDENT VERSION

ced

2 x fireboard resistant plaster board 2 x fire resistant plaster

structural steel beam structural steel beam with insulation packing with insulation packing to prevent thermal to prevent thermal bridging bridging

mbrane

sealant strip insulation under sill insulated cavity closer

stainless steel support bracket fixed to substrate insulation mechanically fixed to substrate

concrete cladding panel

Vapour control layer

2 x fire resistant plaster board

Sheathing board light steel modular frame with mineral wool insulation Breather between studs membrane mineral wool insulation mechanically fixed to substrate

PRODUCED BY AN AUTODESK STUDENT VERSIO

concrete screed

sill overhang

timber cladding panel stainless steel support bracket fixed to substrate insulated cavity closer

PRODUCED BY AN AUTODESK STUDENT VERSION

flashing with insulated flashinginsulated with sealant to cladding panel sealant to cladding panel

p to

PRODUCED BY AN AUTODESK STUDENT VERSION

gypsum based board gypsum based board fixed to counter battens fixed to counter battens fixed to timber battens fixed to timber battens

insulated cavity closer insulated cavity closer

PRODUCED BY AN AUTODESK STUDENT VERSION

pes on and ventilation ted under the raised ised

Concrete Core

insulated flashing with sealant to cladding panel window head

flashing lining flashing lining insulated gutter insulated gutter vapour control layer vapour control layer

Space for services Space for services and insulation and insulation Space for services Space for services and insulation and insulation stainless steel support stainless steel support bracket fixed to substrate bracket fixed to substrate

sill overhang sealant strip insulation under sill insulated cavity closer

table tum

stainless steel support bracket fixed to steel frame insulation mechanically fixed to steel frame

PRODUCED BY AN AUTODESK STUDENT VERSIONPRODUCED PRODUCED AN AUTODESK STUDENT VERSION BY AN BY AUTODESK STUDENT VERSION 0m

20 scale

0.4m

0.8m

1.2m

1.6m

2m

concrete cladding panel

Module


A

Part B -

Plan of Construction

27

Prep and Brief Construction of Tower 1,2 and 3 Construction of the larger towers will happen first. This is so people can begin to move into the apartments sooner.

Building Program Planning Application BIM Model Building Regulations Tender Preliminary Design Excavation

Construction of Tower 4 and 5 These are the smaller towers, therefore require less site storage space.

Foundation Concreting Plumbing Services Module Stacking Staircase Elevator

Overall Tasks Design process and site works

Cladding Electricals Landscaping Finishing works In Use Weeks

60

0

0 - Strategic Development Site appraisals to identify if DfMA is an appropriate method of constructi on.

2 - Concept Design Building design, identification of manufactures and early involvement. Construction sequence identified, assessment of value DfMA would have on the project. Building structure system identified.

4 - Technical Design Involvement of other disciplines collaborating to develop the design. Main and subcontractors heavily involved.

6 - Handover and Close Out Post construction drawings outputted, reflection on project outcomes set in stage 1.

1 - Preparation and Brief Project brief received outlining DfMA as a method for construction. Client outline criteria that assist design team, design for DfMA construction.

3 - Developed Design Planning application submitted, development of BIM model. Digital prototyping of module, output of schedules to avoid duplication and reduce costs.

5 - Construction Manufacturing and assembly of building. Kit of parts manufactured off site for onsite assembly.

7 - In Use Real time assessment of building performance, allowing client and the design team further knowledge to implement in future projects.


Part B -

Construction Sequence

28

Interactive

Phase 1

Excavate Site – Install foundations at basement level

Site Preparation - Demolition of existing building

Phase 1 Phase 2 Site Plan

Phase 2

Phase 3

Ground Level - Raft slab at ground level

Phase 4 Phase 3 Site Plan

Off Site Manufacture


A

Circulation Core Regulations

Part B -

Building Regulations

29

House Type Regulations - 1 Bed

Approved Document B Enclosure of common stairs

Every stair should discharge directly to final exit.

UP 1000

Approved Document B Appendix A Table A1 Protected Lobby REI 30 Fire Rating

Approved Document M

Habitable Rooms Living, kitchen, and eating areas 2.24

Approved Document M

b) 2425 x 2702 Clear spaces provided in front of and between kitchen units

Habitable Rooms Bedrooms 2.25

Approved Document B

b) 832 Clear width provided around both sides and foot of bed.

Inner Rooms 2.3

Kitchen Located within inner room 8000

Approved Document B 832

Table 6

Escape stair clear width 1000mm

2425

Approved Document B

Appendix B Table B1 Provisions of fire doors

GF

2702

832

Protected Stairway - FD 30S Protected Enclosure - Flat - FD20S

Approved Document B 1200

870

Provision of refuges 4.9

6250

790

Area provided minimum 900x1400mm

Diagram 7

1180

1100

Approved Document B

700

Single common stair within apartment block - 7.5m max travel distance

500

500

1.5m²

1000 1200

Approved Document M

1200 1400

Ciculation areas, internal doorways and storage. Minimum clear width of hallway 1050mm

7m

Approved Document M

Circulation areas and internal doorways Door and hall widths 2.22 Doorway: 870 Hallway: 1200

01

Approved Document M

Sanitary Facilities WC facilities on the entrace storey d) Door opens outwards 500mm either side of WC 700x1000mm around bath

Technical Housing Guide 1.5² Internal Storage GIA - 50m²


A

Part B -

Services

30

Interactive

Water

Drainage

Lighting

Inputs

Radiators

Fire Safty

Hot/ Cold Water Supply from Centre of the Core.


Environmental Design Interventions

Part B -

Environmental Analysis

31

Interactive

Lighting Analysis

Level 01

Top cluster type I, incressing the serface area for PV cells. 75% Roof Coverage PV Energy Production - 89,925KWh/Year - £13,489 energy saving 581 m² PV panel area - 30.1 year payback.

Flats are clustered in groups of 4 to ensure all flats receive two sides of ventilation.

Insight - Green Building Studios Level 02

Analysis Current shows the building is generating more energy than it is using.

Steeping the building towards the north elevation would quantities of south sun able to penetrate into the building.

Unit Level 01 Floor 01 & 02

Unit Level 03 Floor 05 & 06

Unit Level 02 Floor 03 & 04

Unit Level 04 Floor 07 & 08

Unit Level 05 Floor 09 & 10


PROJECT COST SPLIT UP

MATERIAL ESTIMATE

A

UNIT Sr.No.

RATE/UNIT (£)

QUANTITY

DESCRIPTION

TOTAL VALUE (£) UNIT

MATERIAL ESTIMATE RATE/UNIT (£) QUANTITY

3 2260.05 m Site Works22.30 £50,399.12 3 18.75 768.22 £14,401.2022.30 m 1.1 Demolitions m3 3 594.07 2952.00 3 £1,753,695.63 m 18.75 1.2 Excavating & filling m 2 3 £2,247.44 4.88 460.54 m 594.07 1.3 Insitu Concrete works m ATERIAL ESTIMATE 2 2 £9,749.90 3.82 2552.33 m 4.88 1.4 Masonry m QUANTITY TOTAL VALUE (£) 2 £186,601.80 R.m 346.20 539 3.82 1.5 Landscaping m £2,017,095.08 L OF SITE WORKS 1.6 Drainage R.m 346.20 TOTAL OF SITE WORKS

1. SITE WORKS

TOTAL VALUE (£)

Part B -

1

2260.05

£50,399.12

2260.05

32

£50,399.12

768.22

£14,401.20

2952.00

£1,753,695.63

460.54

£2,247.44

2552.33 539

£9,749.90 £186,601.80 £2,017,095.08

£69,959.47 Tonne 18.7 2 Building3741.15 Works 2 768.22 £14,401.20 9.35 81.64 2.1 Structural Metalwork Tonne £763.53 3741.15 18.7 m MATERIAL ESTIMATE 2 81.64 2.2 Carpentry16.20 m2 £1,322.799.35 81.64 m RATE/UNIT (£) QUANTITY TOTAL VALUE (£) 2952.00 £1,753,695.63 2 PROJECT COST SPLIT UP 16.20 81.64 2.3 General Joinery m2£25,487.24 45.04 565.88 m 2 2 45.04 565.88 2.4 Floor, wall, ceiling and roof finishings m 460.54 26.24 81.64 £2,247.44 22.30 m 2260.05 £50,399.12 2 £2,142.23 26.24 81.64 2.5 Insulation m £1,460.48 Lump Sum 1460.48 1 18.75 768.22 £14,401.20 2552.33 £9,749.90 Fire stopping and fire protection Lump£101,135.74 Sum 1460.48 1 F BUILDING 2.6 WORKS 9.12 594.07 2952.00 TOTAL OF BUILDING WORKS £1,753,695.63 1.20 £186,601.80 539

Costing

£69,959.47 £763.53 £1,322.79 £25,487.24 £2,142.23 £1,460.48 £101,135.74

PROJECT COST SPLIT UP TOTAL OF SITE WORKS TOTAL COST OF MODULES TOTAL OF ADDITIONAL EXPENSES Other Consultation Fees

TOTAL OF BUILDING WORKS TOTAL OF SERVICES Architectural Fees

PROJECT COST SPLIT UP

TOTAL OF SITE WORKS

1. SITE WORKS

TOTAL OF BUILDING WORKS TOTAL COST OF MODULES TOTAL OF SERVICES TOTAL OF ADDITIONAL EXPENSES Architectural Fees Other Consultation Fees

1.1 Demolitions

1.2 Excavating & filling

1.3 Insitu Concrete works

1.4 Masonry

1.5 Landscaping

1.6 Drainage

1. SITE WORKS 2. BUILDING WORKS

£2,017,095.08 £101,135.74 £4,692,814.45 £1,611,148.67 £1,689,317.65 £202,230.23 £202,230.23

460.54 £2,247.44 5.63 4.88 3 DfMA Modules £2,017,095.08 £4,036,541.72 Tonne 3741.15 1078.958 2552.33 £9,749.90Tonne 7.44 3.82 3.1 Structural £4,036,541.72 Metalwork 3741.15 1078.958 £186,601.80 539 3.2 Windows490.00 and Screens 9.90 346.20Nos. £74,480.00 152.00 TOTAL OF SITE WORKS £2,017,095.08 Nos. £74,480.00 490.00 152.00 1.80 £75,548.00 Nos. W1 (1500X2400mm) 374.00 202.00 W2 (1200X910mm) £75,548.00 Nos. 374.00 202.00 TOTAL COST OF MODULES .08 £19,500.00 Nos. 325.00 60.00 TOTAL OF BUILDING WORKS £19,500.00 TOTAL OF SITE WORKS 325.00 60.00 £69,959.47Nos. 18.7 W3 (910X910mm) TOTAL OFOFADDITIONAL EXPENSES Demolitions 1.1 1.1 Demolitions &£50,399.12 filling TOTAL COST OF MODULES TOTAL SERVICES1.2 Excavating TOTAL OF SITE WORKS TOTAL OF BUILDING WORKS 3.3 Doors, Shutters £69,959.47TOTAL COST 3741.15Nos. 18.7 and Hatches 2.00 £396.88 Excavating & filling 198.44 1.2 £14,401.20 TOTAL OF ADDITIONAL EXPENSES Architectural Fees 1.3 Insitu Concrete works 1.4 Masonry OF MODULES TOTAL OF SERVICES Other Consultation Fees 81.64 £763.53 £396.88 Nos. 198.44 2.00 9.47 9.35 Nos. D1 (750X2100mm) OF ADDITIONAL EXPENSES Architectural Fees Other Consultation Fees £10,765.05 Concrete 81.64 250.35 43.00 1.3 Insitu £763.53TOTAL 1.5works Landscaping 1.6 Drainage£1,753,695.63 D2 (910X2110mm) £10,765.05 Nos. 250.35 43.00 Other Consultation Fees 3.53 16.20 £2,960.50 Masonry Nos. 296.05 10.00 1.4 £2,247.44 81.64D3(1010X2110mm) £1,322.79 81.64 £1,322.79PROJECT £2,960.50 Nos. 296.05 SPLIT UP 10.00 COST £2,351.25 Landscaping Nos. D4(1510X2110mm) 470.25 5.00 1.5 £9,749.90 2.79 £2,351.25 470.25 5.00 1. SITE WORKS 45.04 565.88 £25,487.24 Nos. TOTAL OF SITE WORKS £2,017,095.08 565.88 £25,487.24 TOTAL OF SITEWORKS WORKS £186,601.80 £6,453.20 Nos. D5(1810X2110mm) 645.32 10.00 2. BUILDING 7.24 TOTALNos. OF SITE WORKS £2,017,095.08 £6,453.20 1.6 Drainage 645.32 10.00 26.24 Nos. 81.64 £2,142.23 TOTAL2.1 OFStructural BUILDING WORKS £101,135.74 £3,603.25 Metalwork £69,959.47 720.65 5.00 D6(2900X2110mm) £3,603.25 720.65 5.00 2.23 TOTALNos. OF BUILDING WORKS £101,135.74 81.64 £2,142.23 TOTAL OF BUILDING WORKS £1,460.48 TOTAL COST OF MODULES £4,692,814.45 1460.48 1 Carpentry £763.53 2.2 3.4 Floor, wall and ceiling finishings 0.48 TOTAL COST OF MODULES £4,692,814.45 2 2 £101,135.74 TOTAL OF SERVICES £1,611,148.67 17.40 7710.00 2.3 £134,154.00 General Joinery 7710.00 £134,154.00 5.74 TOTAL m OF SERVICES17.40 £1,611,148.67 £1,460.48 TOTAL COST OF MODULES £1,322.79 1m2 Floor TOTAL OF ADDITIONAL EXPENSES £1,689,317.65 51.40 1291.24 2.4 Floor, wall, ceiling and roof finishings £25,487.24 m Wall TOTAL m OF2£66,369.74 ADDITIONAL EXPENSES £1,689,317.65 51.40 1291.24 £66,369.74 £101,135.74 TOTAL OF SERVICES 2 2 Architectural Fees £202,230.23 Architectural Fees 35.09 £202,230.23 1291.24 £2,142.23 m Ceiling 35.09 1291.24 m £45,303.16 £45,303.16 2.5 Insulation 2 £4,036,541.72 Other Consultation Fees £202,230.23 1078.958 2 1.723741.15m Other Consultation Fees £202,230.23 TOTAL OF ADDITIONAL EXPENSES 26.24 1129.48 2.6 26.24 1129.48 Fire stopping and fire protection £1,460.48 3.5 Insulation m £29,637.56 £29,637.56

TOTAL OF BUILDING WORKS TOTAL OF SERVICES 1.1 Demolitions 2.1 Structural Metalwork Architectural 1.3 InsituFees Concrete works

1.2 Excavating & filling

2.2 Carpentry

1.4 Masonry

2.3 General Joinery

2.4 Floor, wall, ceiling and roof finishings

2.5 Insulation

2.6 Fire stopping and fire protection

1.5 Landscaping

1.6 Drainage

2.3.BUILDING WORKS DfMA MODULES £2,017,095.08

£101,135.74 £4,692,814.45 £1,611,148.67 £1,689,317.65 £202,230.23 £202,230.23

3.6 Fire stopping and fire protection £836.10 3.1 Structural Metalwork Lump Sum£836.10 836.10 1 £4,036,541.72 Lump Sum 836.10 1 Architectural Fees 0.00 490.00Nos. £74,480.00 Nos. 152.00 3.7 Electrical Fittings and Equipment £175,728.30 3.2 Windows and Screens 145.23 1210.00 £175,728.30 £169,528.00 145.23 1210.00 8.00 374.00 3.8 Plumbing and Drainage £8,185.75 3.3 Doors, Shutters andOther 657.49 £75,548.00 R.M £8,185.7512.45 202.00 Hatches Consultation Fees £26,530.13 £4,036,541.72 R.M 12.45 657.49 1078.958 3.1 Structural Metalwork 3.2 Windows and Screens 0.00 TOTAL COST OF MODULES £4,692,814.45 £4,692,814.45 Floor, wall and ceiling finishings £245,826.89 COST325.00 OF MODULES 3.4 £19,500.00 60.00 2.1 Structural Metalwork 2.2 Carpentry 3.3 Doors, Shutters and Hatches 3.4 Floor, wall and ceiling finishings 1.1 Demolitions £50,399.12 2.1 Structural Metalwork 2.2 Carpentry £29,637.56 3.5 Insulation1.1 Demolitions 1.1 Demolitions £50,399.12 1.2 Excavating & filling TOTAL OF SITE WORKS TOTAL OF BUILDING WORKS 2.3 General Joinery 2.4 Floor, wall, ceiling and roof finishings 6.88 Excavating & filling 1.2 £14,401.20 4 Services 3.5 Insulation 3.6 Fire stopping and fireand protection 2.3 General Joinery 2.4 Floor, wall, ceiling roof finishings stopping and Concrete fire protection £836.10 3.6 Fire £74,480.00 152.00 £396.88 & filling 198.44 2.00 1.2 Excavating £14,401.20 1.3 Insitu works 1.4 Masonry TOTAL COST OF MODULES TOTAL OF SERVICES 2.5 Insulation 2.6 Fire stopping and fire protection Stairs £82,080.00 5.05 Insitu Concrete works Nos. 2160.00 38 1.3 £1,753,695.63 3.7 Electrical Fittings and Equipment 3.8 Plumbing and Drainage £82,080.00 Electrical Fittings and Equipment £175,728.30 Nos. 2160.00 38 3.7 2.5 Insulation 2.6 Fire stopping and fire protection TOTAL£10,765.05 OF ADDITIONAL EXPENSES Architectural Fees 250.35 43.00 1.3 Insitu Concrete worksLandscaping £1,753,695.63 1.6 Drainage and balustrades 1652.45 £75,548.00 £1,379,068.67 R.M 834.56 1652.45 0.50 202.00 1.4 Masonry £2,247.44 3.8 Plumbing1.5 £1,379,068.67 and Drainage £8,185.75 R.M Walkways 834.56 Other Consultation Fees £2,960.50 Masonry 296.05 10.00 1.4 £2,247.44 Elevators £150,000.00 Nos. 30000.00 5 1.25 1.5 Landscaping £9,749.90 4.1 Stairs £150,000.00 £82,080.00 Nos. 30000.00 5 £19,500.00 60.00 3. DfMA MODULES £2,351.25 470.25 5.00 1.5 Landscaping £9,749.90 TOTAL SERVICES £1,611,148.67 3.20 1.6OFDrainage £186,601.80 4. SERVICES £1,611,148.67 4.2 Walkways and balustrades £1,379,068.67 AL OF SERVICES 3. DfMA MODULES 2.1 Structu £6,453.20 Drainage 645.32 10.00 1.6 £186,601.80 3.25 Structural Metalwork £69,959.47 4.3 Elevators 2.1 WORKS 2. BUILDING WORKS 1.1 Demolitions £50,399.12 TOTAL OF SITE £2,017,095.08 £150,000.00 5 % criteria Additional Expenses % value £3,603.25 Structural Metalwork £69,959.47 720.65 5.00 2.1 £763.53 2.2 Carpentry % criteria 5.1 Labour £605,128.52 % value 2.3 Genera TOTAL OF BUILDING WORKS £101,135.74 £396.88 Excavating & filling 2.00 1.2 £14,401.20 2017095.08 Labour £605,128.52 30 Carpentry £763.53 2.2 2.3 General £605,128.52 4.00 Joinery £1,322.79 5.2 Transportation 2017095.08 £703,922.17 30 TOTAL COST OF MODULES £4,692,814.45 4692814.45 Transportation £703,922.17 15 2.5 Insulat 7710.00 2.3 General £10,765.05 Insitu Concrete works £1,322.79 43.004692814.45 £1,753,695.63 £134,154.00 2.4 Floor, wall, £703,922.17 5.3Joinery Wastage and 1.3 contingencies £211,823.08 15 9.74 17.40 ceiling and roof finishings £25,487.24 2118230.82 Wastage and contingencies TOTAL OF SERVICES £211,823.08 10 £1,611,148.67 £211,823.08 Water andand Electricity £168,443.88 10 1291.24 2.4 Floor, 5.4 2.5 Insulation £66,369.74 wall, ceiling roof Masonry finishings £25,487.24 3.16 51.40 £2,142.23 8422193.94 Water and Electricity £168,443.88 2 10.002118230.82 1.4 £2,247.44 TOTAL OF£2,960.50 ADDITIONAL EXPENSES £1,689,317.65 8422193.94 £168,443.88 2 2.6 Fire stopping £1,689,317.65 TOTAL OF£45,303.16 ADDITIONAL EXPENSES 7.56 35.09 and fire protection £1,460.48 1291.24 2.5 Insulation £2,142.23 Architectural Fees £1,689,317.65 £202,230.23 DDITIONAL EXPENSES £2,351.25 5.00 1.5 Landscaping £9,749.90 6.10 £4,036,541.72 3.1(1Structural Metalwork £8,422,193.94 TOTAL + 2 + 3 + 4) 26.24 1129.48 2.6 Fire stopping and fire protection £29,637.56 £1,460.48 Other Consultation Fees £202,230.23 £8,422,193.94 AL (1 + 210.00 + 3 + 4) 8.30 and Screens £169,528.00 3.2 Windows £6,453.20 £186,601.80 £836.10 £4,036,541.72 836.10 1 3.1 Structural Metalwork 1.6 Drainage NET COST OF CONSTRUCTION £10,111,511.60 5.75 Doors, Shutters and Hatches £26,530.13 3.3 OF 145.23 CONSTRUCTION 1210.00 £10,111,511.60 £175,728.30 £169,528.00 3.2 Windows and Screens 3.1 Structural 3.2 Windows and Screens £3,603.25 Structural Metalwork £69,959.47 5.00 2.1Metalwork 4.1 Stairs 4.2 Walkways and balustrades 4.3 Elevators .45 wall and ceiling finishings £245,826.89 3.4 Floor,Fees £202,230.23 Architectural £8,185.75 Doors, Shutters and Hatches £26,530.13 12.45 657.49 3.3 3.3 Doors, Shutters and Hatches 3.4 Floor, wall and ceiling finishings £202,230.23 hitectural Fees £29,637.56 3.5 Insulation £202,230.23 Other Consultation Fees 3.1 Structural Metalwork 3.2 Windows and Screens Carpentry £763.53 2.2 £4,692,814.45 Floor, wall and3.5 ceiling finishings £245,826.89 3.4 Insulation 3.6 Fire stopping and fire protection Consultation Fees £202,230.23 Fire stopping and fire protection £836.10 3.6 £10,515,972.06 TOTAL COST OF PROJECT 3.3 Doors, Shutters and5. Hatches 3.4 Floor, wall and ceiling finishings ADDITIONAL EXPENSES 3.5 Insulation 2.1 Structural Metalwork 3.7 Electrical Fittings and Equipment Plumbing and£29,637.56 Drainage 0.00 Fittings and Equipment £175,728.30 3.7 Electrical 2.3 £134,154.00 General Joinery2.23.8Carpentry £1,322.79 1.1 Demolitions £50,399.12 £10,515,972.06 OST 7710.00 OF PROJECT 3.5 Insulation 3.6 Fire stopping and fire protection andJoinery fire protection £836.10 3.6 Fire stopping 8.67 Plumbing and Drainage £8,185.75 2.3 General 2.4 Floor, wall, ceiling and roof finishings filling 1.2 Excavating &3.8 £14,401.20 3.8 Plumbing and Drainage 1291.24 2.4 Floor, wall, ceiling and roof £82,080.00 £175,728.30 38 3.7 Electrical Fittings and Equipment £66,369.74 finishings 3.7 Electrical Fittings and Equipment £25,487.24 0.002160.00 4.1 Stairs £82,080.00


A

Flythough

https://youtu.be/4WSKG-miZkU

33


A

Bibliography Aalst, I. and Melik, R. (2012) ‘City festivals and urban development: Does place matter?’ European Urban and Regional Studies - EUR URBAN REG STUD, 19, April, pp. 195–206. Alexander, C., Ishikawa, S. and Silverstein, M. (1977) A pattern language: towns, buildings, construction. New York: Oxford University Press (Book, Whole). Building and Construction Authority (2016) ‘BIM for DfMA (Design for Manufacturing and Assembly) Essential Guide.’ Cao, K. (2007) ‘Modern urban planning theories Beijing: China Architecture and Building Press, 2007.’ Sage Pub, 12(3) p. 321-328. Carter, A. and Swinney, P. (2018) ‘Where are the UK’s youngest and oldest city populations?’ UK. [Online] 19th March. [Accessed on 13th December 2018] https://www.bbc.com/news/uk-43316697. Chadwick, G. (1971) A systems view of planning: towards a theory of the urban and regional planning process. Oxford: Pergamon (Book, Whole). civilengineeringbible (2018) Connections in Steel Structures. CivilEngineeringBible.com. [Online] [Accessed on 13th December 2018] http://civilengineeringbible.com/subtopics.php?i=96. COSTMODELLING (2018) Costmodelling - Home. [Online] [Accessed on 13th December 2018] https://www.costmodelling.com/. Country Wide (n.d.) ‘Manchester: A city of first time buyers.’ Country Wide. Deloitte Real Estate, Planit-IE: Peter Swif and CallisonRTKL (2016) ‘Manchester Residential Quality Guidance.’ Manchester City Council. Elliott, L. (2018) ‘Cities in north and Midlands dominate growth measure.’ The Guardian. Business. [Online] 21st March. [Accessed on 13th December 2018] https://www.theguardian.com/business/2018/mar/21/north-midlands-england-jobs-growth. Engineering Excellence Journal (2013) ‘The future of DfMA is the future of construction.’ Essex (England) and County Council (2007) The urban place supplement. Essex: Essex County Council. Falk, J. H. and Winkle, C. M. V. (2018) (PDF) Personal Meaning Mapping at Festivals: a Useful Tool for a Challenging Context. ResearchGate. [Online] [Accessed on 24th November 2018] https://www. researchgate.net/publication/275414781_Personal_Meaning_Mapping_at_Festivals_a_Useful_Tool_ for_a_Challenging_Context. GOV.UK (2010) ‘London Housing Design Guide.’ London Development Agency. GOV.UK (2016) ‘Building more homes.’ Authority of the House of Lords. GOV.UK (2017a) ‘Fixing our broken housing market.’ Government. GOV.UK (2017b) Rural population and migration. GOV.UK (n.d.) Special types enforcement guide. GOV.UK. [Online] [Accessed on 6th December 2018a] https://www.gov.uk/government/publications/special-types-enforcement-guide/special-types-enforcement-guide. GOV.UK (n.d.) Transporting abnormal loads. GOV.UK. [Online] [Accessed on 6th December 2018b] https://www.gov.uk/esdal-and-abnormal-loads. Greer, S. (2018) Revised plans for Manchester’s Old Granada Studios given green light. men. [Online] [Accessed on 3rd December 2018] https://www.manchestereveningnews.co.uk/business/business-news/revised-plans-manchesters-old-granada-14685326. Heward, E. (2016) 10 eerie photos of Manchester’s Old Granada Studios as you’ve never seen it before. men. [Online] [Accessed on 3rd December 2018] http://www.manchestereveningnews.co.uk/ whats-on/10-eerie-photos-manchesters-old-11306748. Home Track (n.d.) Hometrack UK Cities House Price Index - Octber 2018 edition out now. HomeTrack. [Online] [Accessed on 13th December 2018] http://www.hometrack.com/uk/insight/uk-citieshouse-price-index/. Introducing The Steel-Plate Composite Core (2018). [Online] [Accessed on 1st December 2018] http://digital.bnpmedia.com/article/Introducing+The+Steel-Plate+Composite+Core/3096158/498899/ article.html. Johansson, M. and Kociatkiewicz, J. (2011) ‘City festivals: creativity and control in staged urban ex-

35

periences.’ European Urban and Regional Studies, 18(4) pp. 392–405. lsecities (2018) ‘Media Objects Articles The Static And The Kinetic En Gb.’ 24th November. [Online] [Accessed on 24th November 2018] https://lsecities.net/media/objects/articles/the-static-and-the-kinetic/ en-gb. Mairs, J. (2016) Japanese architects propose homes of the future in House Vision exhibition. Dezeen. [Online] [Accessed on 13th December 2018] https://www.dezeen.com/2016/08/04/japanese-architects-homes-of-the-future-house-vision-exhibition-sou-fujimoto-kengo-kuma-shigeru-ban-muji-airbnb/. Manchester City Council (2011) ‘Census.’ Manchester City Council. Mehrotra, R. (n.d.) ‘Mumbai: Planning Challenges for the Compact City’ p. 12. Mishra, S. (2016) ‘Understanding the Change in Character of Courtyards.’ The Blog. 9th January. [Online] [Accessed on 12th December 2018] https://shuchimishra.wordpress.com/2016/01/09/understanding-the-change-in-character-of-courtyards/. Morrone, G. (n.d.) ‘Festival Urbanism’ p. 144. ‘Old Granada Studios - a true Manchester landmark at St. John’s, Manchester’ (2018) St. John’s, Manchester. 3rd December. [Online] [Accessed on 3rd December 2018] https://stjohnsmanchester.com/ old-granada-studios/. Plumplot (n.d.) Manchester population stats in maps and graphs. [Online] [Accessed on 13th December 2018] https://www.plumplot.co.uk/Manchester-population.html. Post, N. M. (2018) Steel Core System Could Transform Office Tower Construction. [Online] [Accessed on 1st December 2018] https://www.enr.com/articles/42852-steel-core-system-could-transform-office-tower-construction. Rochford District Council (n.d.) ‘Parking Standards Design and Good Practice’ p. 81. Seilie, I. F. (2005) ‘Practical Design and Construction’ p. 5. Siláči, I. and Vitková, L. (2017) ‘Public Spaces as the Reflection of Society and its Culture.’ IOP Conference Series: Materials Science and Engineering, 245, October, p. 042009. SipAn Hayran (08:01:58 UTC) ‘TYPES OF HOUSING AND RESIDINTIAL BLOCKS.’ The Planning Services (n.d.) ‘Parking Standards’ p. 23. Wilson, W. and Barton, C. (2018) ‘Tackling the under-supply of housing in England.’ Government. Wood, A. (n.d.) ‘Quenching and Self-Tempering (QST) process for HISTAR® steel’ p. 88.


Thank You


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.