SHANE CUENCA
INTERIOR DESIGN PORTFOLIO
19 39 57 75 81
S p a ce + Emerge n c e
C U E NC A RE S I D EN C E L i ve
FAU M E X . FAU M a t t h e M ar ke tla n d s
UNVE ILING THE N OSTA LGI A Co - wo rki n g S p ac e
LINK M ed i a A r t s Cen tre
THE LIBRARY C o n st r u c t io n Dra wi n g s C R E AT I VE WORK
CONTENTS
TABLE OF
01 13
H E AVE N
1
HEAVEN Space + Emergence Heaven is an installation intended to create a heavenly experience, where one could get away from the stresses and problems experienced within everyday life. It emphasizes the idea of comfort that a person would feel within the space—the bedroom. The installation is focused mainly on the bed as a place where one rests, finds peace, and can unwind. The goal of the installation was to create the illusion that the bed is floating in air within the clouds as a way of examining life from a higher perspective. Instructor: Kim Wiese Duration: November 10 - December 18, 2017
2
FOR M D E V E LO P M E N T To better understand the spatiality and nature of the existing space, a photo joiner and draft of the room had to be done. From research, heaven is seen as a place where all things are new—there are no tears of pain and there is perfect peace. By taking inspiration from artists such as Tomas Saraceno, Charles Patillion, Kohei Nawa and Caitlind Brown, clouds became the main feature of the installation as it symbolizes clear thinking, emotional purity, and the gateways to heaven. Clouds are also ephemeral, it is constantly moving, short-lived, and leave no trace; a metaphor for problem’s to disappear.
PLAN
Diagram
3
0’
1’
8’
4
MOD EL STUD I E S
Tissue Paper
Batting
The crumpled tissue paper helped to define textures and provide a design quality. The problem with this material was that it ripped easily.
First experimented with batting to try to create realisticlooking clouds. It could not hold the cloud’s form and did not have a design quality to it.
Final Model 5
PR O C E SS
To make the clouds, a wire frame first had to be constructed. This helped shape and hold the cloud’s form. After, the frame was wrapped with interfacing and white kraft paper and was stapled inside to create the crumpled effect. Warm string lights were then wrapped around the wire so that the lighting would be distributed inside the clouds. When lit, the crumpled effect creates shadows and emphasizes different textures that are similar to real clouds.
6
S E T T I N G UP T HE IN STA LLAT IO N Cumulus and stratus clouds were the chosen clouds to be in the installation as cumulus clouds only appear during sunny days and stratus clouds appear in the sky like blankets of clouds. The warm lighting in the installation promotes relaxation, helping to achieve a comfortable atmosphere. In the installation, the size and number of clouds were at random as clouds in real life do not have a definite size or number. However, the clouds were carefully placed within the space to achieve the ethereal-like quality with some on the ground, at head-level and on the ceiling. Lights were also placed surrounding the bed to achieve the illusion that it is floating high in the air.
7
8
EX PER I EN CE
The installation generates a calming atmosphere after a long day. Waking up, the clouds above the bed makes the viewer stare at the installation and contemplate on life. As the heater turns on, the clouds produce a movement that are similar to real clouds.
9
The flipbook provides viewers an immersive cinematic experience. Comprised of 60 images, the flipbook moves the viewer through the space, showings its context and the view of the installation from below.
10
HEAVEN FINAL INSTALLATION
11
12
B BURNE L
LL
2 58 BU RN E
L
ST
.
relaxing
warm 13
squa
re
CUENCA RESIDENCE Live The second level of 258 Burnell St. will be a living space that enables the chef, Shane, to focus on her hobbies, unwind from work, and relax with family, friends, and her dog, Kiki. The open concept first level will act as a semi-private space where Shane will entertain guests. The second level will serve as a private space for Shane and Kiki. Intended to have a relaxed industrial atmosphere, the space will use natural colours with black accent metals and rustic wood floors throughout the space. Furthermore, light oak beams on the ceiling will add warmth to the space, and other features like reclaimed wood surfaces, exposed brick, barn doors, black steel pipes, concrete tiles, and ship lap will also achieve the intended look. Instructor: Cynthia Karpan Duration: October 25 - November 20, 2018
14
FINAL SUBMISSION The window sill in the living room will be utilized as a specific space for the dog to look out into and sleep on. The space will also feature a loft-style bedroom which is visible from the living space.
15
MAIN LEVEL PLAN
SECOND LEVEL PLAN
NTS.
NTS.
S1
S2
SECTION 1 NTS.
SECTION 2 NTS.
16
E1
E2
17
ENTRY ELEVATION NTS.
ENSUITE & LAUNDRY ELEVATION NTS.
CUENCA RESIDENCE
18
19
FAUM EX . FAUM at the Market Lands Located in the heart of the Exchange District, the Market Lands construction in 2020 will be a unique place where creativity and making connections with people will prosper. The Market Lands will “draw experience from the diverse communities that surround the site” and will include a residential building, a cultural center, a public square, and an entirely glass-covered market positioned on the Old Market Square location enlivening the area that it is in. Inhabiting the Market Lands, FAUM EX is a design centre that intends on showcasing student FAUM works and bringing international design to Manitoba. The facility will be an inviting space designed to promote exploration— a journey of exploration throughout the facility, exploring the potential of digital technology to learn about design, and exploring the potential of new connections and relationships with local and international designers. Instructor: Nancy Maruca, Jac Comeau & Kelli Johnson Duration: September - December 2019
20
WINNIPEG CITY HALL
NEW MARKET SQUARE
COMMERCIAL
Using mainly digital methods in hosting exhibitions, lectures, workshops, and events, FAUM EX. serves as the missing link in showing Manitoba that local design can meet with evolving international designs and technology. This will stimulate new conversations and will provide the public with a new experience in approaching cultural issues and design solutions. Light finishes with earth-toned colour accents will be used, taking users through a playful exploration activity. It will utilize circulation as a tool for users to think and take an adventure, interactive walls to stimulate creativity, manipulation of scale and the use of sensorial devices to generate shared to intimate immerse experiences, and the integration of surroundings and different settings to foster ideas, inspirations, and connections. Furthermore, the space will express loose forms, conveying the harmony of local and international design as well as the freedom in design and exploration.
21
PROCESS Design through function
BU BB L E DI AGR AM S
ZON I N G DI AG R A M S MAIN LEVEL
MEZANNINE LEVEL
22
PROCESS Design through image COLOUR
GATHERING SPACE
INTERIOR CIRCULATION
INTERIOR WALLS
KITCHENETTE
FURNITURE
PRELIMINARY EXHIBITION SYSTEMS
23
DOUBLE VOLUME SPACE
PROP OSED EXHIBITION SYSTEMS
FLEXIBLE SOUND DISPLAY
VR EXPERIENCE BOOTHS
• •
• • •
LED Screen & Headphones Gypsum wall board
LED Screen & VR Headset Custom Bench Gypsum wall board
INTERACTIVE WALL
IMMERSIVE CANOPY
MODEL AND PROJECTOR DISPLAY
•
• •
• • •
LED Screen
LED Screen Glass
Projector Screen Glass Custom bench
24
INTERMEDIATE PROP OSAL
STAIRS
-
-
---
---
MENS WASHROOM
---
JANITORIAL STORAGE -
-
-
---
---
---
ELEVATORS GATHERING SPACE
MEZZANINE ABOVE WOMENS WASHROOM STAIRS
WEST WING
LEVEL MENS ABOVE WASHROOM
JANITORIAL STORAGE
STAIRS
WORKSHOP MEETING ROOM
COAT RACK
LOBBY MECHANICAL ROOM & STORAGE GATHERING SPACE
ELEVATORS
ELEVATORS
WOMENS WASHROOM
PROPOSED BUILDING FOR URBAN SHAMAN
LEVEL ABOVE
SOCIAL HUB
19R at 7" H -
EAST WING
COAT RACK
LOBBY
WEST WING
LOBBY
1 MECHANICAL ROOM & STORAGE
VESTIBULE
A04
ARRIVAL/FACILITY ORIENTATION AREA
19R AT 7" H UNIVERSAL WASHROOM
2 EXHIBITION SPACE OPEN TO BELOW
19R at 7" H
OPEN TO BELOW
1
VESTIBULE
ARRIVAL/FACILITY ORIENTATION AREA
A04
VESTIBULE
OPEN TO BELOW
OPEN TO BELOW
2 EXHIBITION SPACE
MAIN LEVEL PLAN
MEZZANINE LEVEL PLAN
NTS.
NTS.
Level 3 21' - 2"
Level 2 11' - 2"
Level 1 0' - 0"
EAST SECTION NTS. Level 3 21' - 2"
Level 2 11' - 2"
Level 1 0' - 0"
WEST SECTION NTS. 25
Facility Orientation view
Gathering Space
Social Hub
Digital Workshop
Exhibition Space view
26
FINAL SUBMISSION B
A
GATHERING SPACE/ SECOND EXHIBITION SPACE
C
C
D
D
B
A
MAIN LEVEL PLAN SCALE: NTS.
B
A
MEETING ROOM
C
C
D
D
A
MEZZANINE LEVEL PLAN SCALE: NTS. 27
B
MAIN LEVEL RCP
MEZZANINE LEVEL RCP
SCALE: NTS.
SCALE: NTS.
LIGHT ST U DY The space utilizes many curvature luminaires and forms to depict the idea of exploration—constantly moving. 28
2'-6" 2'-6"
2'-6" 2'-6"
1'-0" 1'-0"
1'-0"
1'-0"
121" 121"
FRONT ELEVATION/SECTION
SIDE SECTION
2'-6" NTS.
NTS.
1'-11" 2'-6"
2'-6" 2'-6" 1'-11" 1'-11"
1'-11" 4"
1" 1"
GLASS SCREEN FIT INTO ALUMINUM TOP CAP GLASS SCREEN FIT INTO ALUMINUM TOP CAP
4" 4"
6'-4"
5" 5"
HEADPHONES HUNG FROSTED FINISH GLASS ON PEG MOUNT 2'-3" 2'-3"
HEADPHONES HUNG ON PEG MOUNT HEADPHONES HUNG ON PEG MOUNT FROSTED FINISH GLASS FROSTED FINISH GLASS
1'-0"
6"
PEG MOUNTED WITH SILICONE TEMPERED GLASS RECESSED INTO BASE TEMPERED GLASS RECESSED INTO BASE 2"
1'-0"
1'-0" 6" 1'-0" 1'-0" 6" 1'-0"
VELCRO TO HOLD REMOVABLE WOOD
2" 621" 2" 621"
2"
3 4" WOOD FRAME BASE CLAD IN CHEMETAL FINISH
VELCRO TO HOLD YWOOD STRUCTURE REMOVABLE WOOD
3 SANDBAGS TO ADD WEIGHT 4" WOOD FRAME BASE CLAD IN CHEMETAL FINISH
VELCRO TO HOLD REMOVABLE WOOD VELCRO TO HOLD REMOVABLE WOOD 1 2" PLYWOOD STRUCTURE 1 2" PLYWOOD STRUCTURE
LYWOOD STRUCTURE
SANDBAGS TO ADD WEIGHT
TEMPERED GLASS RECESSED INTO BASE TEMPERED GLASS RECESSED INTO BASE
2" 2" 1" 2" 622" 621" RUBBER GASKET
SCALE: 1/2” = 1’-0”
SCALE: 1/2” = 1’-0”
PEG MOUNTED WITH SILICONE PEG MOUNTED WITH SILICONE
521"51" 2
1'-0"
PEG MOUNTED WITH SILICONE
521"
3" 3 74 74"
6"
6'-4" 6'-4"
6'-4"
3 3 6'-11 6'-11 4" 4"
5" 3" 74 2'-3" 2'-3" 5"
HEADPHONES HUNG ON PEG MOUNT
FROSTED FINISH GLASS
1'-0"
GLASS SCREEN FIT INTO ALUMINUM TOPINTO CAP GLASS SCREEN FIT ALUMINUM TOP CAP
OLED SCREEN OLED SCREEN
3'-3" 3'-3"
3'-3"
3'-3"
OLED SCREEN
521"
4"
1" OLED SCREEN 1"
3" 74
3 3"6'-114" 6'-114
121" 121"
ELECTRICAL COMPONENT TO POWERGASKET SCREEN RUBBER
3 4" WOOD FRAME BASE 3CLAD IN CHEMETAL FINISH 4" WOOD FRAME BASE
RUBBER GASKET RUBBER GASKET ELECTRICAL COMPONEN TO POWER SCREEN ELECTRICAL COMPONENT TO 3 POWER SCREEN " RECESSED CASTER
3 ELECTRICAL COMPONENT 4" RECESSED CASTER
CLAD IN CHEMETAL SANDBAGS TO ADD FINISH WEIGHT SANDBAGS TO ADD WEIGHT
TO POWER SCREEN 3
4"
RECESSED CASTER
4
3
4"
RECESSED CASTER
PLAN NTS. 2'-6"
1'-0"
121"
2'-6" 1'-11" 1" 4"
GLASS SCREEN FIT INTO ALUMINUM TOP CAP
6'-4" 5"
3" 6'-114
3'-3"
OLED SCREEN
PEG MOUNTED WITH SILICONE
2'-3"
HEADPHONES HUNG ON PEG MOUNT FROSTED FINISH GLASS
521"
3" 74
1'-0"
6"
1'-0" 2"
E XHI B I T I ON EL EM EN T The exhibition element is a moveable glass screen technology "headphones WOOD FRAME BASE showcasing designs of FAUM student works. The CLAD IN CHEMETAL FINISH allow users to listen to student presentations. SANDBAGS TO ADD WEIGHT " PLYWOOD STRUCTURE VELCRO TO HOLD REMOVABLE WOOD
1 2
29
TEMPERED GLASS RECESSED INTO BASE
3
4
2" 621"
RUBBER GASKET ELECTRICAL COMPONENT TO POWER SCREEN 3
4"
RECESSED CASTER
MAT E RI A LS
FF-2
FU R N I T U R E
30
S1
S2
31
SECTION A-A NTS.
SECTION B-B NTS.
S3
S4
SECTION C-C NTS.
SECTION D-D NTS.
32
33 FACILITY ORIENTATION VIEW
GATHERING SPACE VIEW
34
MEZZANINE VIEW
SOCIAL HUB VIEW
35
MEETING ROOM VIEW
DIGITAL WORKSHOP VIEW
36
DIGITAL EXHIBITION SPACE VIEW - DAY CONDITION
37
DIGITAL EXHIBITION SPACE VIEW - NIGHT CONDITION 38
39
UNVEILING THE NOSTALGIA Co-working space 226 Main will be a co-working space for creative individuals in the film industry that aims to encourage users to unveil the nostalgia and reflect on the character of the past; the building, the site, and the reflection of the individual. Users will embark on the layering of the past and the narrative to reflect on their growth as an individual in the film industry with the intent of facilitating collaborations, new connections, and exchange of ideas to help one another reach their full potential. Instructor: Nicolette Layne & Kelli Johnson Duration: September - December 2019
40
SIT E ANA LYS I S Inspired by the history and telling the narrative of the site, the site analysis plates convey a vintage and film-like atmosphere. The image plates were captured through a video with members in the film industry as the chosen users for the space.
41
P O ST ER The poster is a series of image transparencies layered to portray the layering of the past and the narrative.
42
FO R M D E V E LO P M E N T The form was developed through the transparencies. The layering of the narrative and history allowed for the creation of an image. With this, the transparencies can be utilized as a spatial organization tool with the intent of encouraging users to unveil the nostalgia and reflect on the character of the past.
DESIGN PROPOSAL PROPOSAL DESIGN 43
44
I NT ER M E D I ATE P RO P O SA L
45 EXTERIOR VIEW
2
3
4
5
6
49' - 4 7/8"
67' - 4"
7
1
1
A15
A14
8
1
2
3
4
5
6
7
1
1
A15
A14
67' - 2 3/4"
8
A
A
B
B
A6
1
1
1
A13
A13
C
48' - 9 3/16"
1
1
1
A9
A9
A13
2
1
D
D
2 1
1
1
1
A16
A16
A16
A16
1
A7
E
18' - 4 9/16"
18' - 4 9/16"
E
1
1
1
1
1
A15
A14
A15
A14
GROUND FLOOR PLAN 3/32" = 1'-0"
1
2ND FLOOR PLAN 3/32" = 1'-0"
MAIN LEVEL PLAN
SECOND LEVEL PLAN
NTS.
NTS.
VIEW UPON ENTRY
1
ENTRY AND SCREENING SPACE ELEVATION SCREENING AND RECEPTION AREA ELEVATION 1/4" = 1'-0"
C
A13
LOUNGE VIEW
LOUNGE ELEVATION
46
K I P S E TS 1
2
3
4
5
6
91' - 7" 21' - 11"
69' - 8"
1
1' - 10" 1
2
A4
A4
STAIR A
UP MEN'S WC
WOMEN'S WC
113
114
116
8' - 6"
DN
CORRIDOR
RECYCLING & GARBAGE
29' - 2"
A
4' - 4"
20' - 1"
B
115
LOADING PAD
A7
2
111
8' - 0"
112
13'-11" AFF TYP.
PRODUCTION SET ROOM
BEVERAGE SPACE
110
103
8' - 4"
A5
109
17' - 8"
STAIR B
4
UP
A5
108 DRESSING RM.
DN
159°
3' - 2"
2
OC
A5
A7
8' - 6"
3
106 UP
2
C
D
CORRIDOR
DN
104 SCREENING/CLASS ROOM
DESIGN STUDIO
102
154' - 4"
F T.O ROOF TOP TERRACE
T.O ROOF TOP TERRACE T.O ROOF TOP TERRACE 144'144' - 10"- 10"
- 1"
6' - 2"
107
20'
18' - 5"
STAIRWELL 11 - 11 T.O- T.O STAIRWELL 11 - T.O STAIRWELL 154'154' - 4" - 4"
11 1°
105 STORAGE
C
E
12' - 7"
68' - 5"
1
LOADING ZONE
C 64' - 6"
1 A5
CONC.
8' - 0"
101
58' - 4"
50' - 0"
ENTRY/RECEPTION AREA
144' - 10"
H 1
2
A4
A4
12'
17'
0"
" - 10
FLOOR T.O T.O 3RD3RD FLOOR T.O 3RD 128' FLOOR 128' - 4" - 4" 128' - 4"
GROUND FLOOR CEILIN 2 43'
9"
FLOOR T.O T.O 2ND2ND FLOOR 115' T.O 2ND 115' FLOOR - 2" - 2"
1/8" = 1'-0"
115' - 2"
7' - 2"
45' - 5"
15' - 10" GROUND FLOOR GROUND FLOOR 100' GROUND 100' FLOOR - 0" - 0"
WEST BUILDING ELEVATION WEST BUILDING ELEVATION ELEVATION 1 1WEST 1/8" =BUILDING 1'-0" FLOOR GROUND PLAN 1/8" = 1'-0" 1 1/8" = 1'-0"
0'
20'
BACKLIT BACKLIT BACKLIT
SCREENING AND RECEPTION AREA ELEVATION SCREENING AND RECEPTION AREA ELEVATION 2 2SCREENING = 1'-0" AND RECEPTION AREA ELEVATION 1/4"1/4" = 1'-0" 2
3
10'
CONCRETE CONCRETE CONCRETE
SCREENING AND RECEPTION AREA ELEVATION
1/4" = 1'-0"
NTS.
METAL METAL METAL
13'13' - 2"- 2"
CONCRETE CONCRETE CONCRETE
13'13' - 2"- 2"
METAL METAL METAL
5'
13' - 2"
NTS. 1/8" = 1'-0"
13' - 2"
11
100' - 0"
GROUND FLOOR PLAN
MOVIE POSTER HALLWAY ELEVATION MOVIE POSTER HALLWAY ELEVATION HALLWAY ELEVATION 3 3MOVIE =POSTER 1'-0" 1/4"1/4" = 1'-0" 3 1/4" = 1'-0"
MAGNETIC BOARD MAGNETIC BOARD MAGNETIC BOARD
DESIGN STUDIO ELEVATION DESIGN STUDIO ELEVATION STUDIO ELEVATION 4 4DESIGN = 1'-0" 1/4"1/4" = 1'-0" 4 NTS.
5
47
DESIGN STUDIO ELEVATION
1/4" = 1'-0"
ELEVATION 3 LOUNGE ELEVATION 3 LOUNGE 5 5ELEVATION = 1'-0" 3 LOUNGE 1/4"1/4" = 1'-0" 5 NTS.
LOUNGE ELEVATION 61/4" = 1'-0"
11' - 3"
11'11' - 3"- 3"
13' - 2"
13'13' - 2"- 2"
SPACE DIVIDERS SPACE DIVIDERS SPACE DIVIDERS
OPEN MEETING SPACE ELEVATION OPEN MEETING SPACE ELEVATION MEETING SPACE ELEVATION 6 6OPEN = 1'-0" 1/4"1/4" = 1'-0" 6 1/4" = 1'-0"
DN C
OC
13'-11" AFF TYP. CONC. C
1
2
3
4
5
6
A
A C
UP
C
DN C
OC
B
B
D
C
OC
UP
10'-10" < 11'-4" AFF FABRIC
OC
13'-11" AFF TYP. CONC.
C
C
C
DN
C
C
C
D
D
C
D
OC
UP OC
10'-3" < 12'-1" AFF FABRIC
DN
E
C
E
11 - T.O STAIRWELL 154' - 4"
11 - T.O STAIRWELL 154' - 4"
F
F
T.O ROOF TOP TERRACE 144' - 10"
T.O ROOF TOP TERRACE 144' - 10"
H
H T.O 3RD FLOOR 128' - 4"
T.O 3RD FLOOR 128' - 4"
22 T.O 2ND FLOOR
GROUND FLOOR CEILING PLANPLAN GROUND FLOOR CEILING NTS. 1/8" = 1'-0"
115' - 2"
0'
5'
10'
20'
T.O 2ND FLOOR
GROUND FLOOR CEILING PLAN 115' - 2"
2
1/8" = 1'-0"
0'
NOSTALGIA.
GROUND FLOOR 100' - 0"
5'
10'
LEGEND
GROUND FLOOR 100' - 0"
LIGHT FIXTURES
LIFE SAFETY SYSTEMS CEILING MOUNT SPRINKLER
4.5" CEILING MOUNTED DOWNLIGHT
EMERGENCY LIGHT WALL MOUNT CHANDELIER EMERGENCY LIGHT CEILING MOUNT EXIT LIGHT
PENDANT LIGHT
EXIT LIGHT WITH DIRECTION OF TRAVEL
SWITCHES
CEILING FINISHES
METAL LIGHT SWITCH (INDICATED BY AMOUNT OF POLES REQUIRED) CONCRETE OC
D
FABRIC
FLOOR FINISHES
LEGEND
ELECTRICAL
Drawn by
CONCRETE DUPLEX RECEPTACLE OUTLET
SECURITY & ACCESS
ABBREVIATIONS
13' - 2"
13' - 2"
13' - 2"
FLOOR MOUNT OUTLET
AFF
TYP.
SECURITY CAMERA
CONC.
SHANE CUENCA
LIGHT FIXTURES Checked by 4.5" CEILING MOUNTED DOWNLIGHT
CARPET
C
2019 11 07
Date
DIMMER SWITCH
DATA/PHONE
SEG3
Project number
CONCRETE
METAL
OCCUPANCY SENSOR (MOTION ACTIVATED)
ABOVE FINISH FLOOR TYPICAL
A2
CONCRETE
CHANDELIER
1/8" = 1'-0"
Scale WALL SCONCE
OSTER HALLWAY ELEVATION MOVIE POSTER HALLWAY ELEVATION 3
4
NTS.
SWITCHES
NOSTALGIA.
METAL SPACE DIVIDERS
METAL OC
D
CEILING MOUNT SPRINKLER EMERGENCY LIGHT WALL MOUNT EMERGENCY LIGHT CEILING MOUNT
G
EXIT LIGHT EXIT LIGHT WITH DIRECTION OF TRAVEL
PENDANT LIGHT
MOVIE POSTER HALLWAY ELEVATION 1/4" = 1'-0" SPACE DIVIDERS
LIFE SAFETY SYSTEMS
N. LAYNE
2020-06-30 4:05:45 PM
CONCRETE
GROUND FLOOR PLANS
WALL SCONCE
CEILING FINISHES
LIGHT SWITCH (INDICATED BY AMOUNT OF POLES REQUIRED)
P
CONCRETE
NOSTALGIA. OCCUPANCY SENSOR (MOTION ACTIVATED)
FABRIC
D
DIMMER SWITCH
FLOOR FINISHES
11' - 3"
ELECTRICAL EXT. & INT. Project number
ELEVATIONS
2019 11 07
Date DATA/PHONE
6
7
SHANE CUENCA
OPEN MEETING SPACE ELEVATION Checked by OPEN MEETING SPACE ELEVATION 1/4" = 1'-0" 6
MEETING SPACE ELEVATION NTS.
1/4" = 1'-0"
N. LAYNE C
A7 Scale
SHANE SECURITY & ACCESS Drawn by
2020-06-30 4:09:33 PM
Drawn by
A7 Scale
As indicated
C
ABBREVIATIONS
CUENCA
N. LAYNE
Checked by
SECURITY CAMERA
As indicated
CARPET
SEG3
Project number
FLOOR MOUNT OUTLET
2019 11 07
Date
D
CONCRETE
DUPLEX RECEPTACLE OUTLET
SEG3
AFF 2020-06-30 4:09:33 PM
11' - 3"
11' - 3"
11' - 3"
EXT. & INT. ELEVATIONS
TYP. CONC.
ABOVE FINISH FLOOR TYPICAL CONCRETE
48
S
FIN AL S UBM I S S I O N
EXTERIOR VIEW
E XT E R I OR E L EVATI O N S
EAST ELEVATION
49
SOUTH ELEVATION
SITE PLAN
D E SIGN INT E NT The design intent for the interior was to create a warm, rustic, but professional co-working space. As members of the film industry tend to be away from home, users will get a sense of the coziness and warmth that they long from a home environment. This is done by using the existing elements of the building, such as brick, in combination with wood, concrete, and metal to add a welcoming, futuristic, and industrial edge to the space; a layering of the past, the narrative, and the future. WEST ELEVATION
50
MAIN LEVEL PLAN NTS.
S1 51
LONGITUDINAL SECTION NTS.
S2
CROSS SECTION NTS.
SECOND LEVEL PLAN NTS.
SECTION PERSPECTIVE 1
SECTION PERSPECTIVE 2
52
VIEW UPON ENTRY
The co-working space will be divided into two main areas - the production space and private working space. The production space will occupy the main level and will include a design studio for costume and set designers, a production set area, and a screening/class room to showcase the industryâ&#x20AC;&#x2122;s films and hold film classes for individuals interested in the field. On the second level, the private working space includes private and open offices, meeting spaces, a kitchenette and a lounge.
53
DESIGN STUDIO VIEW
SCREENING/CLASS ROOM VIEW
E1
E3
ENTRY AND SCREENING ELEVATION
E2
NTS.
MEETING SPACE ELEVATION NTS.
E4
DESIGN STUDIO ELEVATION NTS.
LOUNGE ELEVATION NTS.
54
2ND FLOOR VIEW
MEETING SPACE VIEW
55
LOUNGE VIEW 56
57
LINK Media Arts Centre 310 Ross Avenue will be a media arts centre that aims to foster connectivity, catered towards emerging adolescent artists ranging from age 12 to 22. A hub for collaboration and creativity, the space will aid in oneâ&#x20AC;&#x2122;s transitional phase by helping to form oneâ&#x20AC;&#x2122;s identity through the connections they will make and the centreâ&#x20AC;&#x2122;s explorative design. A mix of analog and digital amenities are available to allow artists to gain more knowledge from one another and reach a broader audience. . Instructor: Jason Shields & Andrea Sosa Fontaine Duration: January - April 2020
58
CO NC E P T UA L WORK The project began with answering the question of â&#x20AC;&#x153;what is considered to be the cultural significance of media arts?â&#x20AC;? With that, the cultural significance of media arts is that it allows for a reflection of the self done through experiences and collaboration. This kind of art helps with the formation of new connections with diverse disciplines to reach a broader audience.box create a lively and fun experience to distort how people will see others. From there, students were required to develop an installation using a combination of digital and analog methods that answers the question. The developed installation allows for a new and artistic means of communication online. Mirrors were chosen to represent oneâ&#x20AC;&#x2122;s self reflection and were shattered to represent a new dimension of reflecting oneself, much like how technology can distort the way people see themselves and others. In combination with the use of mirrors, the use of a webcam and projection creates a collaborative experience to form a connection with a broader audience. Pull-buttons attached to lines at the top of the box create a lively and fun experience to distort how people will see others.
Installation being pulled to distort the projection 59
Skype vdeo call using the installation 60
PROCESS Zoning Diagrams and Perspective7 Sketches
6
5
3
4
2
1
1A8 ---
30305
STAIR # 2
COAT
EL.
4183
4385
STAIR #1
SERVER
FREIGHT EL.
WOMEN'S W/C
RECEPTION EQUIPMENT RENTAL
2
A10
2285
MENS W/C
703 1030
7761
LIFT
1932
EXHIBITION/GALLERY/ EVENT SPACE
1-
A10
MAKER SPACE
CAFE/ COMMON SPACE
1
3732
4357
LOADING
1932
A9 ---
SPRAY ROOM STORAGE
MECHANICAL
705
WASTE
FLOOR PLANS
MAIN LEVEL PLAN 1 1 : 100 MAIN LEVEL ZONING DIAGRAM 7
1
Project number Date
6
5
3
4
A2
03. 24. 20
Drawn by
S. CUENCA
2
Checked by SHIELDS & S-FONTAINE
1
Scale
1A8 ---
30305
STAIR # 2
COAT
EL.
4183
4385
STAIR #1
SERVER
FREIGHT EL.
WOMEN'S W/C
RECEPTION EQUIPMENT RENTAL
2
A10
2285
MENS W/C
703 1030
7761
LIFT
1932
EXHIBITION/GALLERY/ EVENT SPACE
1-
A10
MAKER SPACE
1
CAFE/ COMMON SPACE
3732
4357
LOADING
1932
A9 ---
SPRAY ROOM STORAGE
MECHANICAL
705
WASTE
MAIN LEVEL PLAN 1 1 : 100 SECOND LEVEL ZONING DIAGRAM
FLOOR PLANS Project number Date Drawn by
1
Checked by SHIELDS & S-FONTAINE
61
A2
03. 24. 20 S. CUENCA Scale
RECEPTION & EXHIBITION
CAFE
CLASSROOM/MEETING SPACE
62
7
6
5
3
4
2
1A8 ---
IN T ER M E D I AT E P ROP OSA L COAT
4385
RECEPTION 2
MENS W/C
A10
EQUIPMENT RENTAL
3
4
2
1
7
6
EXHIBITION/GALLERY/ EVENT SPACE 1-
WOMEN'S W/C
STAIR #1
STAIR # 2
EQUIPMENT RENTAL
MAKER SPACE
A10 2285
RECEPTION
LOADING
LOADING
1
1 : 100
Date Drawn by
1
03. 24. 20
S. CUENCA
Checked by SHIELDS & S-FONTAINE
NTS.
A10
SPRAY ROOM
Scale
1 : 100
CAFE/ COMMON SPACE
1
LOUNGE KITCHENETTE
FASHION & ART STUDIO
D RECORDING STUDIO
C
A10
AUDIO
PRIVATE OFFICE
PRIVATE OFFICE
COPY 2
D
1 FLOOR PLAN PLANS A2 LEVEL MAIN SECOND LEVEL PLAN 1
Project number
1 : 100
STORAGE
D
FLOOR PLANS
MAIN LEVEL PLAN
1 MAIN LEVEL PLAN MAIN LEVEL PLAN
EL. GREEN SCREEN/PHOTO/ VR/SCREENING ROOM
MECHANICALEDITING SUITE
CLASSROOM/ MEETING SPACE
MECHANICAL
705
STORAGE
STORAGE
3732
4357
CAFE/ COMMON SPACE
SPRAY ROOM WASTE
C
WOMEN'S W/C
705
MECHANICAL
A STAIR #1 MECHANICAL
JANITORIAL
1
WASTE C
A10
LOADING
1
B
A9
1932
MAKER SPACE
STORAGE
4357
EXHIBITION/GALLERY/ EVENT SPACE
1
2
A8 EXHIBITION/GALLERY/ EVENT SPACE
MEN'S W/C
CAFE/ MAKER SPACE COMMON SPACE
1932
7761
SPRAY ROOM
1 A9
B
4
703 1030
LIFT
WASTE
FREIGHT EL.
EL.
A9 ---
2020-03-23 11:17:21 PM
4385
MENS W/C
COAT
3
1
1932
SERVER
4183
STAIR # 2 FREIGHT EL.
A
A10
LIFT 5
3732
30305
7761
1 A8
703 1030
5
2
B
1932
6
EL.
RECEPTION
WOMEN'S W/C
LIFT 7
COAT
1 : 100
Project number Date Drawn by
SECOND LEVEL PLAN 1 : 100
1
NTS.
03. 24. 20
S. CUENCA
Checked by SHIELDS & S-FONTAINE
Scale
A2
1 : 100
FLOOR PLANS Project number Date Drawn by
1
A4
03. 24. 20 S. CUENCA
Checked by SHIELDS & S-FONTAINE
Scale
2020-03-23 11:18:27 PM
EQUIPMENT RENTAL
2020-04-03 10:24:02 AM
WOMEN'S W/C
STAIR #1
SERVER
EL.
2285
MENS W/C
A
STAIR #1 FREIGHT EL.
STAIR # 2
SERVER
FREIGHT EL.
A8 ---
30305
4183
30305
STAIR # 2
1-
FLOOR PLANS 1 : 100
Project number Date Drawn by
03. 24.
S. CUENC
Checked by SHIELDS & S-FONTAIN
CAFE ELEVATION NTS.
1
CAFE ELEVATION 1 : 50
ART STUDIO ELEVATION NTS.
2 63
ART STUDIO ELEVATION 1 : 50
2
ART STU 1 : 50
Cafe view
Art & Fashion Studio view
Kitchenette & Lounge view
64
FI NA L S UB M I S S I O N
3
4
5
2
3
1
4
1A8 ---
30305
MENS W/C EQUIPMENT RENTAL
COAT
WOMEN'S W/C
EL.
RECEPTION
RECEPTION 2
EQUIPMENT A10 RENTAL
2
A10
MECHANICAL
1
SPRAY ROOM STORAGE
A10
1
MAIN LEVEL PLAN MAIN LEVEL PLAN MAIN LEVEL PLAN 1 1 : 100
NTS.
1 : 100
C
MECHANICAL
Date Drawn by
D
D
FLOOR PLANS EXHIBITION SPACE CONFIG. #2
FLOOR PLANS Project number
Project number
1
Date
1
Drawn by
S. CUENCA
Checked by SHIELDS & S-FONTAINE
Scale
A2
03. 24. 20
A2
03. 24. 20 S. CUENCA
Checked by SHIELDS & S-FONTAINE
65
C
CAFE/ COMMON SPACE
3732
SPRAY ROOM
CAFE/ COMMON SPACE
705
STORAGE
WASTE
1
3732
LOADING
4357
4357
WASTE
A10
MAKER SPACE
MAKER SPACE LOADING
1932
A9 ---
B
1932
EXHIBITION/GALLERY/ EVENT SPACE
1-
A9 ---
LIFT
703 1030
EXHIBITION/GALLERY/ EVENT SPACE
B
1932
7761
7761
LIFT
1-
A
STAIR #1
EL.
1 : 100
MAIN FLOOR CEILING PLAN
SECOND FLOOR CEILING PLAN
NTS.
NTS.
Scale
1 : 100
2020-04-03 10:24:02 AM
WOMEN'S W/C
A
STAIR #1
SERVER COAT
2285
MENS W/C
A8 ---
30305
4183
4385
4385
FREIGHT SERVER EL.
EVENT SPACE CONFIG.
2285
STAIR # 2
FREIGHT EL.
1
4183
STAIR # 2
2
1-
703 1030
6
1932
5
7
705
6
2020-04-03 10:24:02 AM
7
6
5
7
3
6
4
5
2
3
1
4
1
2
FASHION STUDIO CONFIG. #2
1
1-
A8
A8 ---
30305
A
MEN'S W/C
WOMEN'S W/C
STORAGE
SERVER
EL.
GREEN SCREEN/PHOTO/ VR/SCREENING ROOM
MENS W/C
WOMEN'S W/C
A
STAIR #1 COAT
EL.
4183
4385
MECHANICAL FREIGHT EL.
RECEPTION EQUIPMENT RENTAL
2
A10
STAIR #1
2285
STAIR # 2
FREIGHT EL.
B
STAIR # 2
1A9 ---
LOUNGE KITCHENETTE A10
2 SPACE MAKER
EDITING SUITE
LOADING
1
A11
C
1932
1 A9
1932
7761
FASHION & ART STUDIO EXHIBITION/GALLERY/ EVENT SPACE
JANITORIAL
CAFE/ COMMON SPACE
RECORDING STUDIO
WASTE
AUDIO STORAGE
PRIVATE MECHANICAL OFFICE
1
D
MAIN LEVEL PLAN SECOND LEVEL PLAN
SECOND LEVEL PLAN 1
NTS.
1 : 100
1 : 100
FLOOR PLANS Project number Date Drawn by
FLOOR PLANS
1
Project number
A4
Date
03. 24. 20
Drawn by
S. CUENCA
Checked by SHIELDS & S-FONTAINE
Scale
2020-04-03 7:07:20 PM
1
C
3732
COPY
705
CLASSROOM/ MEETING SPACE
4357
A11 SPRAY PRIVATE ROOM OFFICE
B
703 1030
LIFT
MEETING SPACE CONFIG.
1
A2
03. 24. 20 S. CUENCA
Checked by SHIELDS & S-FONTAINE 1 : 100
D
2020-04-03 10:24:02 AM
7
Scale
1 : 100
DE S I G N I N TEN T The design intent for the interior was to provide a comfortable and interactive environment where the space will merge boundaries between educators, emerging artists, and professionals. This will allow for opportunities of interaction to encourage discussion and dissemination of ideas. With this, amenities are placed close to public activities such as the café and lounge. The main level is mainly for assembly, and public amenities. The second level, on the other hand, is where the production and offices take place. The space will portray a raw yet refined aesthetic utilizing raw materials, symbolizing one’s raw quality while searching for their identity. Throughout the whole facility, the floor, wall, and ceiling detail link together acting as a wayfinding tool to encourage exploration.
66
MAT E RI A LS , F UR N I TUR E & L I GH TING The space mainly uses wood such as oak along with light finishes and wooden furniture to provide a warm and welcoming atmosphere. The use of wood throughout also expresses the usersâ&#x20AC;&#x2122; raw quality. In addition, 6500k colour temperature of lighting was used to achieve a bright working space.
67
68
RECEPTION & EXHIBITION VIEW
E1
E4 69
RECEPTION ELEVATION NTS.
E2
CAFE ELEVATION NTS.
KITCHENETTE, LOUNGE, & FASHION STUDIO ELEVATION NTS.
E3
ART STUDIO ELEVATION NTS.
CAFE VIEW
D
C
B
A
1
2
4
3
1
1 : 200
6
7
ROOF
ROOF
119511
119511
5TH FLOOR
5TH FLOOR
115409
115409
4TH FLOOR
4TH FLOOR
112005
112005
3RD FLOOR
3RD FLOOR
108300
108300
2ND FLOOR
2ND FLOOR
104318
104318
1ST FLOOR ENTRY 100000
1ST FLOOR ENTRY 100000
98787 BASEMENT
98787 BASEMENT
97257
NORTH-SOUTH SECTION S1NORTH-SOUTH NTS. SECTION
5
97257
EAST-WEST SECTION S2 EAST-WEST SECTION 1 1NTS. : 200 70
MAKER SPACE VIEW The maker space will be used for set production and other sorts of assemblies. There are 3D printers, laser cutters, storage for tools, and work tables with task lighting. Wall openings and windows in the space encourage users to peek what is happening inside
71
KITCHENETTE & LOUNGE VIEW The kitchenette and lounge is located beside the studios and is an area where staffs and artists can mingle and eat in. The flooring transition helps to indicate that it is an area of relxation. As well, there is an inspiration wall for artists to share their ideas and concepts that is visible on the elevation.
72
73
ART & FASHION STUDIO VIEW 74
75
THE LIBRARY Construction Drawings Instructor: Rick Hiebert Duration: January - April 2020
76
30000
7500
3000
15000
20000
10000
7500
6000
EXISTING PUBLIC SIDEWALK
SHANE CUENCA LIBRARY
EXISTING ROADWAY
SITE PLAN EVIE 4014
Project number
1 : 200
2019 10 22
Date Drawn by
SC
Checked by
RH
A1 1 : 200
Scale
1
6
8
2019-11-19 12:58:18 PM
1
SITE PLAN
9
2 A7
A
A WOMEN'S WC 2
2
2
2
2
UWC
W2
211
B
212
211B
MEN'S WC W3 213
UP STAIRS
W2
201
214
STUDY RM 1 STUDY RM 2 STUDY RM 3 STUDY RM 4
C
3
2 6
207
A3
208 207
4
209 208
210 209
B
213B DN
211A
214
213A
210
C
W3
5
D
CONFERENCE RM 2
205
206
GRP STUDY 2
2
GRP STUDY 1
2
217
LIBRARY BOOK COLLECTION
QUIET AREA
204 2
D
LIBRARIAN OFFICE
205
217
215
204
ADMIN/LOAN DESK
1
2
218
A7
3 A7
203 STUDENT PC
W3 203
216
W4
E 3
PRINTING AREA
CIRCULATION
A7
2
219
201 W4
F
F
UP DN
STAIRS
G
202
202
H
H 2
2
2
2
2 A7
1
1
2
3
4
5
6
7
8
9
2ND FLOOR PLAN (3RD SIMILAR)
2
1 : 100
2ND FLOOR REFLECTED CEILING PLAN (3RD SIMILAR) 1 : 100
SHANE CUENCA LIBRARY
2ND & 3RD FLOOR PLANS AND INTERIOR ELEVATIONS
EVIE 4014
Project number
NORTH ELEV 205 (3RD SIMILAR) 1 : 50
4
EAST ELEV 205 (3RD SIMILAR) 1 : 50
5
SOUTH ELEV 205 (3RD SIMILAR) 1 : 50
6
WEST ELEV 205 (3RD SIMILAR) 1 : 50
2019 10 22
Date Drawn by
SC
Checked by
RH
A3 Scale
77
As indicated
2019-11-19 4:07:07 PM
3
1
6
8
14000
9
9800
10154
3846
2308
6200
2150
11542
4 A7
2
600
A7
106
C
4600
106 2400
UWC
MECH/ELEC
107
108
BEVERAGE BAR
UP
W3
W2
107
A B
109
108
STORAGE
104
STAIRS 4 109
W2
5100
2000
UWC
1600
B
1000
A
C
W3
105
D
D 1500
3
SEATING
NATURAL FOODS
STORAGE
103
110
111
9408
1
3
1
A7
A7
20000
A2
18400
7465 18000
1200 1200 1200 1200 1200
105 1
1 1213
W4
W3
3154
E CIRCULATION
W6
1
UP
F
ATRIUM 112
1233 FF
102
FF
102
1233
STAIRS
H
5492
33 12 FF
FF
2535
7400
W4 2
1465
H
3 1
1
1
1
2 A7
6001000 1200 1200 3000
2400
1200
2407
1400 1200 1200 1200 1200
3093
2015
3485
2750
7050
6200
30000
1
2
3
4
5
6
7
8
9
1ST FLOOR PLAN
2
1 : 100
1ST FLOOR REFLECTED CEILING PLAN 1 : 100
WALL TYPE LEGEND - INTERIOR WALLS
SHANE CUENCA LIBRARY
ALL INTERIOR WALLS ARE TYPE W1 UNLESS NOTED OTHERWISE W1
TYPICAL INTERIOR PARTITION 16 GWB 92 STL STUDS @ 400 OC 16 GWB
W2
PLUMBING WALL 16 GWB 150 STL STUDS @ 400 OC 16 GWB
W3
STAIRWELL WALLS 16 GWB 16 METAL FURRING @ 600 OC VERTICAL 200 CMU 16 METAL FURRING @ 600 OC VERTICAL 16 GWB
W4
3
BEVERAGE BAR 1 : 50
1ST FLOOR PLANS AND INTERIOR ELEVATIONS
ELEVATOR SHAFT WALLS 16 GWB 16 METAL FURRING @ 600 OC 200 CMU
Date
W5
ELEVATOR SEPARATION 200 CMU
Drawn by
SC
W6
PLANTER PRECAST CONC CAP OVER 100 FACE BRICK AIR SPACE 200 CMU 16 PT PLYWOOD
Checked by
RH
2019 10 22
A2 As indicated
Scale
1
6
8
EVIE 4014
Project number
2019-11-19 12:37:06 AM
1
9
2 A7
A
A UWC
WOMEN'S WC 2
2
2
2
2
B
411B
STUDY RM 1 STUDY RM 2 STUDY RM 3 STUDY RM 4
C
407
2
408 407
CONFERENCE RM
409 408
W2
UP
STAIRS
W3
413
401
B
414
413B DN
410 409
MEN'S WC
412
W2
411
411A
414
413A
410
C
W3
405 417
D QUIET AREA
LIBRARY BOOK COLLECTION
406
415
405 3
404 GRP STUDY 2 6
2
2
417
4
A4
404 5
1
ADMIN/LOAD DESK
A7
2
3 A7
418
403 2
D
READING ROOM
2
STUDENT PC
GRP STUDY 1 W3403
416
W4
E 3
PRINTING AREA
CIRCULATION
A7
2
419
401 W4
F UP
F
DN
STAIRS
G
402
LOUNGE
STUDY NOOKS
421
420
402
H
H 2
2
2
2
2
2
2
2
2
2 A7
1
1
2
3
4
5
6
7
8
9
4TH FLOOR PLAN
2
1 : 100
4TH FLOOR REFLECTED CEILING PLAN 1 : 100
SHANE CUENCA LIBRARY
4TH FLOOR PLANS AND INTERIOR ELEVATIONS
3
NORTH ELEV 404 1 : 50
4
EAST ELEV 404 1 : 50
5
SOUTH ELEV 404 1 : 50
6
WEST ELEV 404 1 : 50
EVIE 4014
Project number
2019 10 22
Date Drawn by
SC
Checked by
RH
A4 Scale
As indicated
2019-11-19 4:07:51 PM
G
111
101 W5
F
2260
2535
3 A7
78
1
6
8
9
2 A7
A
A 1
1
WOMEN'S WC
UWC
506
507
1
B
W2
506B
MEN'S WC W2
501
508
STAIRS
W3 DN
505 STORAGE
C
B
509
508B
506A
509
508A
505
C
W3
D
D 3
3
1
3
3
3
1 6
4
A5
SEATING AREA
5
1
504
CAFE 503
1
3
A7
A7
5 1 W4
W3
E
1 3
CIRCULATION
A7
1
501
F
F
W4 DN
1
STAIRS
G
502
1
502
H
H 1
1 2 A7
1
1
3
2
3
4
5
6
7
8
9
5TH FLOOR PLAN
2
1 : 100
NORTH ELEV 503
4
1 : 50
5TH FLOOR REFLECTED CEILING PLAN 1 : 100
SHANE CUENCA LIBRARY
EAST ELEV 503 1 : 50
5TH FLOOR PLANS AND INTERIOR ELEVATIONS EVIE 4014
Project number
5
SOUTH ELEV 503
6
1 : 50
Drawn by
SC
Checked by
RH
WEST ELEV 503
A5
1 : 50
As indicated
Scale
H
F
D
C
B
2019-11-19 4:08:27 PM
2019 10 22
Date
A
ROOF 119200
1 PRECAST CONC PARAPET CAP
5TH FLOOR INSULATED ROOF DECK 5 GRAVEL MEMBRANE 200 RIGID INSUL METAL DECK OWS JOISTS SUSPENDED CLG
115000
8
9 1050
3025 11 EQ TREADS
A
4TH FLOOR
ROOF
A
111400
3RD FLOOR 107800
1100
TYPICAL EXT WALL 100 FACE BRICK 25 AIR SPACE 50 RIGID INSUL MEMBRANE 200 CMU 92 STL STUDS BATT INSUL 6MIL VB 16 GWB
860
1100
119200
5 A7
TYPICAL FLOOR SYSTEM 100 CONCRETE METAL DECK OWS JOISTS SUSPENDED CLG
5 A7
C
2ND FLOOR
C
104200
5TH FLOOR
8
115000
9
1ST FLOOR 100000 U/S GRADE BEAM 98800
2
BUILDING SECTION 1
4
1 : 100
STAIR PLAN DETAIL 1 : 50
4TH FLOOR 111400
1
2
3
4
5
6
7
8
9
8
9
ROOF
ROOF
119200
119200
5TH FLOOR
5TH FLOOR
115000
115000
3RD FLOOR
1800
10R 10R
1800
10R
1800
10R
2100
104200
107800
SECTIONS AND DETAILS 2ND FLOOR 104200
EVIE 4014
Project number
2019 10 22
2100
100000
U/S GRADE BEAM 98800
1
79
WALL SECTION 1 : 50
3
BUILDING SECTION 2 1 : 100
12R
Date 1ST FLOOR 1ST FLOOR
1ST FLOOR
100000 U/S GRADE BEAM
100000 U/S GRADE BEAM
98800
98800
5
Drawn by
SC
Checked by
RH
A7
STAIR SECTION 1 : 100
Scale
As indicated
2019-11-19 12:49:59 AM
2ND FLOOR
SHANE CUENCA LIBRARY
111400
3RD FLOOR 10R
107800
1800
3RD FLOOR
10R
104200
4TH FLOOR
1800
111400
12R
4TH FLOOR
2ND FLOOR
1800
107800
3
1
1
1
2
2
2
1
3
3
3
1
2
1
2
2
2
2
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
SOUTH ELEVATION
2
1 : 100
1
1
EAST ELEVATION 1 : 100
1
1
1
WINDOW SCHEDULE MARK
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1 2 3
QTY WIDTH HEIGHT REMARKS 20 53 4
1200 1200 1200
2600 2000 800
SHANE CUENCA LIBRARY
BUILDING ELEVATIONS EVIE 4014
Project number
NORTH ELEVATION
4
1 : 100
WEST ELEVATION
1 Drawn by
SC
Checked by
RH
A6
1 : 100
1 : 100
Scale
ROOM FINISH SCHEDULE ROOM 101 102 103 104 105 106 107 108 109 110 111 112 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 501 502 503 504 505 506 507 508 509
NAME CIRCULATION STAIRS SEATING BEVERAGE BAR STORAGE UWC UWC MECH/ELEC STAIRS NATURAL FOODS STORAGE ATRIUM CIRCULATION STAIRS GRP STUDY 1 GRP STUDY 2 CONFERENCE RM QUIET AREA STUDY RM 1 STUDY RM 2 STUDY RM 3 STUDY RM 4 WOMEN'S WC UWC MEN'S WC STAIRS LIBRARY BOOK COLLECTION STUDENT PC LIBRARIAN OFFICE ADMIN/LOAN DESK PRINTING AREA CIRCULATION STAIRS GRP STUDY 1 GRP STUDY 2 CONFERENCE RM QUIET AREA STUDY RM 1 STUDY RM 2 STUDY RM 3 STUDY RM 4 WOMEN'S WC UWC MEN'S WC STAIRS LIBRARY BOOK COLLECTION STUDENT PC LIBRARIAN OFFICE ADMIN/LOAN DESK PRINTING AREA CIRCULATION STAIRS GRP STUDY 1 GRP STUDY 2 CONFERENCE RM QUIET AREA STUDY RM 1 STUDY RM 2 STUDY RM 3 STUDY RM 4 WOMEN'S WC UWC MEN'S WC STAIRS LIBRARY BOOK COLLECTION STUDENT PC READING ROOM ADMIN/LOAD DESK PRINTING AREA STUDY NOOKS LOUNGE CIRCULATION STAIRS CAFE SEATING AREA STORAGE WOMEN'S WC UWC MEN'S WC STAIRS
FLOOR FINISH CT VCT CT SVF VCT SVF SVF VCT VCT SVF VCT CT SVF VCT CPT CPT CPT CPT CPT CPT CPT CPT SVF SVF SVF VCT CPT CPT SVF SVF SVF SVF VCT CPT CPT CPT CPT CPT CPT CPT CPT SVF SVF SVF VCT CPT CPT SVF SVF SVF SVF VCT CPT CPT CPT CPT CPT CPT CPT CPT SVF SVF SVF VCT CPT CPT SVF SVF SVF CPT CPT CT VCT SVF CT VCT SVF SVF SVF VCT
BASE FINISH
DOOR SCHEDULE
WALL FINISHES EAST SOUTH
NORTH
CT RCB CT RCB RCB RCB RCB RCB RCB RCB RCB CT RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
WEST PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT
RCB RCB RCB RCB RCB CT RCB RCB
PT PT PT PT PT PT PT
PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT
PT PT PT PT PT PT PT PT
RCB RCB RCB RCB RCB
PT PT PT PT PT
PT PT PT PT PT
PT PT PT PT PT
PT PT PT PT PT
CEILING FINISH ACT ACT PT ACT PT PT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT PT PT PT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT PT PT PT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT ACT PT PT PT ACT ACT ACT ACT ACT ACT ACT ACT ACT PT ACT ACT PT PT PT ACT
REMARKS
NUMBER 1 2 3 4 5 102 105 106 107 108 109 111 201 202 202 203 204 205 207 208 209 210 211A 211B 213A 213B 214 217 301 302 303 304 305 307 308 309 310 311A 311B 313A 313B 314 317 401 402 403 404 405 407 408 409 410 411A 411B 413A 413B 414 417 501 502 505 506A 506B 508A 508B 509
WIDTH 950 950 1000 1000 2000 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915 915
HEIGHT 2375 2375 2200 2200 2200 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134 2134
THICKNESS
FINISH
FRAME MATERIAL
FIRE RATING
REMARKS
51 51 50 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 OPENING ONLY OPENING ONLY OPENING ONLY OPENING ONLY 51 51 51 51 51 51 51 51 51 51 51 OPENING ONLY OPENING ONLY OPENING ONLY OPENING ONLY 51 51 51 51 51 51 51 51 51 51 51 OPENING ONLY OPENING ONLY OPENING ONLY OPENING ONLY 51 51 51 51 51
SHANE CUENCA LIBRARY
OPENING ONLY OPENING ONLY OPENING ONLY OPENING ONLY 51
SCHEDULES EVIE 4014
Project number
2019 10 22
Date Drawn by
SC
Checked by
RH
A8 Scale
2019-11-19 12:50:39 AM
3
1
2019-11-19 12:46:37 AM
2019 10 22
Date 1
80
81
CREATIVE WORK
82
83
84
85
86
THANK YOU.
87
88