Architecture portfolio

Page 1



CONTENTS 1

Master Planning

2

Affordable Social Housing

3

Joint Project - Master Planning

4

Master Planning

5

CDP Project

EDU VILLAGE

EVERTON HEIGHTS

UPCYCLING THE IN-BETWEEN

GENOA GATEWAY

GENOA HEALTH AND WELLNESS CENTRE



Master Planning

EDU VILLAGE















Affordable Social Housing

EVERTON HEIGHTS












The rendered image shows the circulation space view towards the entrance of the lift lobby which proposed to overcome the problem of often feel invasive to privacy as people pass by. A semi-public concept where the circulation space through spatial organization can perform as both circulation and informal areas to the apartments. The semi-public space performs as a greenhouse, a separate climatic zone, which makes the spaces comfortable throughout the year. The semi-public space becomes a setting that encourages social communities within the housing complex.


INTERIOR STUDY Top left rendered image shows the interior of living space. Bare finish concrete wall forms the interior partition of space while ceiling and certain walls are white plaster painted wall to soften the rawness of the interior and give a sense of volume. Hardwood flooring helps to keep the floor warm. Double glazed sliding door and windows keep the indoor heat circulating and prevent heat loss. Lower left shows the rendered image of kitchen and dining space. Most of the wall surface are bare concrete while the ceiling is painted in white. The flooring material is the same in the whole unit which is hardwood as to efficiently keep the space warm. A curtain is installed to increase privacy and shading purpose.




STRUCTURAL AND FABRIC FACADE STUDY This housing scheme located at Everton park aims to house the young professionals and families and various facilities are provided to serve community living at Everton. The primary material for this scheme is concrete as it acts as structures and exterior facade. Main reason is because of its durability and scale of this project. Double glazed glass is placed at every blocks unit and circulation area as it can prevent heat loss and allow natural daylight to enter the spaces. Concrete materials are used for building blocks that are sitting on the ground whereas building blocks that are designed to be ‘floating’ in the mid-air are using steel structure system which composed of Vierendeel trusses. As shown in the structural diagram, the ‘floating’ blocks are mainly supported by two lift core that extends from the ground floor. The units and circulation bridges are supported by using Vierendeel trusses that are strong enough to support the whole blocks itself. As this trusses are rigidly-jointed, having only vertical members between the top and bottom chords. The chords are normally parallel or near parallel. Elements in Vierendeel trusses are subjected to bending, axial force and shear , unlike conventional trusses with diagonal web members where the members are primarily designed for axial loads. Vierendeel trusses are usually more expensive than conventional trusses and their use limited to instances where diagonal web members are either obtrusive or undesirable. Through the compositional study, the elevations of the building are formed through the consistency of arrangement of three different types units for every floor. Grid system is used to enable faster and convenience way of building construction.


SECTIONAL DETAIL



Joint Project - Master Planning

UPCYCLING THE IN-BETWEEN























Master Planning

GENOA GATEWAY









SECTIONAL PERSPECTIVE X-X

SECTIONAL PERSPECTIVE Y-Y

SECTIONAL PERSPECTIVE Z-Z



RELATIONSHIP BETWEEN CAFE, RESIDENCE, FLOATING WETLAND PROMENADE AND THE SEA. REFURBISHMENT OF SILO BUILDING


FLOATING POOL WITH A VIEW OF PORTO ANTICO AND INDUSTRIAL SITE.




DEFINED PLAZA AS A THOROUGHFARE BETWEEN WATER FRONT AND TRAIN STATIONS


PROPOSED TUNNEL AS A THOROUGHFARE BETWEEN THE CITY AND THE WATERFRONT


FRONTAGE OF GROUND LEVEL AT VILLA DEL PRINCIPE RESTORED



CDP Project

GENOA HEALTH AND WELLNESS CENTRE


Genoa Leisure and Wellness Centre which offers a wide range of sports facilities and recreational activities aims to enchance he community health quality and encourage a healthy lifestyle in their everyday routines. The leisure and wellness centre sits at the edge of the Genoa’s waterfront overlooking the view of the seaports. With Genoa being one of the significant port, thousands of visitors come to the city every day through the cruises, result in blooming of economics especially in the tourism. The proposed scheme sits on a strategic location which can provide a proper wellness centre that can attract crowds from the city centre and reclaim the once dilapidated land. The idea for this scheme is to bring the flow by utilising the proposed landscape feature which is the floating platform walkway surrounding the masterplan into the programs. In order to expand public edges and draw in adjacent water edges, several new landscape features have been proposed such as the artificial beach and the pockets of pool that incorporated as a continuity of the language from the proposed scheme hence creating ambiguities, blurring the interior and exterior with the surrounding landscape.









PROGRAMS


STRUCTURAL FRAMEWORK DIAGRAM














WORK EXAMPLES



ION DELEMEN, GENTING HIGHLAND, PAHANG - COMPLETED

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PELAN INI MENGANDUNGI HAKCIPTA KONTRAKTOR HENDAKLAH MENGIKUT DIMENSI YANG ADA DI DALAM RAJAH. SEGALA DIMENSI HENDAKLAH DIPERIKSA DI TEMPAT ITU JUGA. SEBARANG SELISIHAN YANG TERDAPAT HENDAKLAH DIBERITAHU KEPADA AKITEK SEBELUM KERJA PEMBANGUNAN DIMULAKAN.

GENERAL NOTES

1

2

3

4

5

6

7

8

9

10

11

12

13

45200 3600

3800

3800

3800

3800

3800

3800

3800

3800

3800

3800

3600

UNTUK KEGUNAAN PIHAK BERKUASA TEMPATAN

1.

REFER TO STRUCTURAL ENGINEERS DRAWINGS FOR CONFIRMATION OF ALL SLAB/BEAM AND DOWNTURN SIZES

2.

REFER TO CONSULTANT DOCUMENTS FOR COORDINATION OF HYDRAULIC, MECHANICAL, FIRE, ELECTRICAL AND SPECIALIST ITEMS

3.

REFER TO ID CONSULTANT DRAWINGS FOR UNIT INTERNAL FINISHES AND FIXTURES

PELAN INI M

KONTRAKTOR HEN HENDAKLAH DIPER HENDAKLAH DIBE

UNTUK KEGUNAA

FIXTURES & FINISHES AL-01 ALUMINIUM SANDWICH PANEL - COLOUR 1 WHITE AL-02 ALUMINIUM SANDWICH PANEL - COLOUR 2 NEUTRAL AL-03 ALUMINIUM SANDWICH PANEL - COLOUR 3 GREY BA-01 BALUSTRADING TYPE 1 GLASS S/STEEL FRAME BA-02 BALUSTRADING TYPE 2 GLASS S/STEEL FRAME END UPSTAND BA-03 BALUSTRADING TYPE 3 GLASS S/STEEL FRAME 300 UPSTAND BR-01 BREEZE - VENTILATION BLOCK WITH MESH BEHIND (PAINT FINISH)

3750

REFUSE

TILES

+FL 1675.925

REVISIONS AND ISSUE

NOTE : REFER ARCHITECTURAL SCHEDULE + RELEVANT ARCHITECTURAL DETAILS

2205

PT-01 PAINT / COATING SYSTEM TYPE 1 - WHITE PT-02 PAINT/ COATING SYSTEM TYPE 2 - MID GREY PT-03 PAINT / COATING SYSTEM TYPE 1 - GREY

3930

2150

L5

WINDOW SLIDING DOOR FRAME ALUM. POWDER COAT MATT GREY TO MATCH PT-03 LIGHT GREY FLOAT GLASS MIN. 6MM THICKNESS

6000

cut off drain

LOUVRES GREY POWDER COAT TO MATCH PT-03

+RL 1677.900

PORTE COCHERE

00

12

ROAD

230 900

+FL 1675.775

17

60

CEMENT

ROOF LINE ABOVE

DN 4

5

6

7

8

DN

DN

4 3

3 2

D9

RAMP 1:4.75

STAIR 1 UP

18 1 2

CEMENT

14

5

13

6

12

7

11

8

10

1000KVA TX

ELECTRICAL ROOM

REFUSE CHAMBER

CEMENT

TILES

UP

CEMENT

16

3

15

BOMBA LOBBY

12

7

11

8

10

B

CEMENT

+FL 1674.200

9

ROOF LINE ABOVE

CEMENT

13

6

GUSSB TX ROOM

LV SWITCH ROOM

14

5

CEMENT

+FL 1674.660

17

2 4

+FL 1675.250

1000KVA TX

CEMENT

18 1

STONE

9

SDF ROOM

C

RAMP 1:10

RAMP 1:10

CEMENT

SERVICE CORRIDOR

L3

TILES

+FL 1674.200

DN

1

2

3

4

5

+FL 1674.200

DN

S4

6

6

5

4

3

2

S1

1

1150 1500

350

2500

ROOF LINE ABOVE

+FL 1674.660

GENSET ROOM

WATER METER

LIFT LOBBY

16 15

4

WALKWAY STONE

D

+FL 1674.200

S1

D12

1

TILES

+FL 1674.150

HOTEL OPERATOR OFFICE TILES

+FL 1674.150

WALKWAY

RESTAURANT - DINING

4

5

6

7

8

9

+RL 1675.600

NAMA, ALAMAT DAN TANDATANGAN PEMILIK DAN PEMAJU:

E

S6

MALE

S1

S1

S1

TILES

+FL 1674.150

RESTAURANT - TERRACE TILES

+FL 1674.100

RESTAURANT TERRACE TILES

+FL 1674.100

S2

S1

RESTAURANT - TERRACE TILES

S1

TERRACE TILES

S2

S3

F 2000

S1

+FL 1674.100

17 L O R O N G B U K I T 5 0490 K T : 6 0 3 F : 6 0 3 E : lychee d W:w w w . ly

TANDATANGAN

SAYA MEMPERAKUI BAHAWA BUTIRAN-BUTIRAN DALAM PELAN-PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

G OFFICE - TERRACE TILES

B-02-09 GATEWAY CORPORATE SUITES 1, JALAN DESA KIARA, MONT KIARA 50480 KUALA LUMPUR, MALAYSIA T : 6 0 3 6 2 0 1 0 4 8 4 F : 6 0 3 6 2 0 1 0 4 8 0 E : lychee d e s i g n@gmail.com W: w w w . lychee design . net

TANDATANGAN ARKITEK

H

+RL 1674.307

-

Ar. Khalid Ahmad ARKITEK PROFESIONAL No. Pendaftaran LAM : A/K 40

NO. KERJA

PELAN LANTAI TINGKAT BAWAH (BLOK 1) SCALE -1 : 100

NO. 17, LORONG SETIABISTARI 2, BUKIT DAMANSARA 50490,KUALA LUMPUR TEL: 03 20938132 FAX: 03 20938324 kaalrsb2@gmail.com kaalrsb2@yahoo.com

LEMBAGA MALAYSIA

-

SAYA MEMPERA MENURUT KEHEN DAN SAYA SETU

KHALID AHMAD ARCHITECTS INTERIOR DESIGNERS PROJECT MANAGERS

2300

S3

NAMA, ALAMAT D

10

W6

+FL 1674.200

+FL 1674.200

3

+FL 1674.200

STONE

CEMENT

2

W6

5100

W6

+FL 1674.100

DN

FEMALE RESTAURANT - KITCHEN

4300

W7

CEMENT

DISABLED ACCESS

RAMP 1:10

S5

W6

BLOK 2 PELAN TINGKA

+FL 1675.200

17

3

GENTIN

BLOCK 1 - PELAN LANTAI TINGKAT BAWAH

A

+FL 1675.200

CADANGA CADANGA (916 UNIT) PANGSAPU 10562, GEN MAKMUR U TAJUK LUKISAN

GENTING VILLA

STONE

STONE

RAMP 1:10

PUMPS ROOM

TAJUK LUKISAN

MAIL ROOM

PLANTER

1

FOYER

PLANTER

WATER RISER & DOMESTIC WATER TANKS

24kV SWITCHGEAR

4

RAMP 1:10

2 1

CEMENT

+FL 1674.560

cut off drain

9

A1

0

30

PROJEK:

CADANGAN MENYAMBUNG SEMULA PROJEK TERBENGKALAI BAGI CADANGAN PEMBANGUNAN 4 BLOK PANGSAPURI 28 TINGKAT (916 UNIT), 1 BLOK PANGSAPURI 9 TINGKAT (72 UNIT) DAN 1 BLOK PANGSAPURI 8 TINGKAT (34 UNIT) DI ATAS LOT PT 11385 HS (0) 10562, GENTING HIGHLANDS, DAERAH BENTONG, PAHANG DARUL MAKMUR UNTUK TETUAN GALERI TROPIKA SDN. BHD.

3600

3

PROJEK:

3800

2

+FL 1674.660

GUSSB GEAR ROOM CEMENT

23600

1

NOTE: ALL DIMENSIONS ARE SUBJECT TO SITE MEASUREMENT & VERIFICATION

A2

75

3755

cut off drain

4180

cut off drain

+FL 1674.660

DISABLED ACCESS

SERVICE LANE

W9

2305

CONTROL RM

17

SKALA TARIKH

KAA/C12C1/3

DIREKA

VAUGHN

1 : 100

DILUKIS

CY

DISEMAK

NS

15 DEC 2013

NO. LUKISAN

KAA/C12C1/3

BIL.

A-WD-B1.1.0.01

LEMBAGA

MALAYSIA

NO. KERJA SKALA TARIKH PINDAAN

C3

NO. LUKISAN

KA


A

SEC

STAIR 1

A

STAIR 1

9 7 5 3 1 18 16 14 12 10 9 7 5 3 1

SEC

GENTING VILLA BLOK 2&3 BALCONY SUN SHADE DETAIL TYPE 1

VAUGHN NTS

VAUGHN

MAR 2013

A-WD-B1/BA.4.01


SHELL GOHTONG JAYA, GENTING HIGHLAND, PAHANG PROPOSAL STAGE



P.L 921.50

LIN

GP

T.

Ram

p

2

ed

CONFECTIONERY

1

pos

RAMP

HEALTH & BEAUTY

.80

Pro

T2

1.25

T.

STATIONERY

WRAP

D4

FIL

GP

LEAFY VEG

3.78 m.p

3.78 m.p

MALE

FEMALE

OKU

D3

D3

SURAU (gents)

SURAU (ladies)

EL

COOKING NEEDS

PASTA & INSTANT

660.5

FRUITS

SCALE

3

VEGE

MALE

3.78 m.p

OKU

4.86 m.p

16

FEMALE

ICE MAKING MACHINE

3.78 m.p

D4

SNACK WORLD

8.28 m.p ct

1 2 3DOWN 4 5 6 7 8 9 10 11 12 13 14 15

M

Dairy

.80

CANNED FOOD / DRINKS

EL

8.28 m.p ct

Dairy

3 SQ

.80

PHARMACY

4.86 m.p

WEIGHT STATION

LIN

Roll Cage

FIL

20' Anjakan Bangunan

Garisan Pecahan Sempadan Lot

CHILLED

CLEANING WORLD

4

.80

AIR PUMP FACILITIES

SEAFOOD / MEATS

BU

R.L 921.50

SS

OF

P

TO

LIMIT

RAMP

Reta refe ining deta r to en wall gr's il P

RAM

R.L 921.00

OF

P.L 921.50

FIL

LIN

Pro

pos

ed

MANAGER'S OFFICE

GP

T.

DP

DP

DP

DP

SWITCH ROOM

6.51 m.p

5.67 m.p

RUBBISH CHAMBER 4.20 m.p

gt 16

D3

D3

SURAU (gents)

Ram

CONVENIENCE STORE

p

91.14 m.p / 981 k.p.

R.L 921.50

K

EL 8.28 m.p ct

MALE

3.78 m.p

FEMALE 3.78 m.p

SURAU (ladies) EL 8.28 m.p ct

OKU

4.86 m.p

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

20' Anjakan Bangunan

Garisan Pecahan Sempadan Lot

R.L 921.50 UP

gt

D4

DP

DP

DP

DP

DP

DP

AIR PUMP FACILITIES

P.L 921.65

P.L 921.50

DP DP

BU

R.L 921.50

TO

SS

R.L 921.50

LIMIT

P

Reta refe ining deta r to en wall gr's il P

RAM OF

R.L 921.00

OF

RAMP


20' Anjakan Bangunan

TOP OF ROOF LEV.

FIRST FLOOR LEV.

CEILING LEV.

FLOOR FIN. LEV.

20' Anjakan Bangunan

TOP OF ROOF LEV.

FIRST FLOOR LEV.

CEILING LEV.

FLOOR FIN. LEV.

Premium Unleaded Diesel SUPER Unleaded


GOHTONG JAYA SERVICE APARTMENT, GENTING HIGHLAND, PAHANG - PROPOSAL STAGE PLOT RATIO 1 : 3.1

CLUBHOOUSE • • • •

POOL MPH CHANGING ROOM SURAU

TOWER B

TOWER A •

37 FLOORS (INCLUDING 8 FLOORS C.P PODIUM) 1.5 SUB-BASEMENT C.P PODIUM

37 FLOORS (INCLUDING 8 FLOORS C.P PODIUM) 1.5 SUB-BASEMENT C.P PODIUM


PORPOSED ROAD LEVEL


TOWER B • •

37 FLOORS (INCLUDING 8 FLOORS C.P PODIUM) 1.5 SUB-BASEMENT C.P PODIUM

450 SQ.FT 603 SQ.FT 827 SQ.FT

FACILITIES • • •

GYM OFFICE PLAYGROUND

FACILITIES • • •

LAUNDRY KINDERGARTEN CONVENIENCE SHOP


TOWER A • •

37 FLOORS (INCLUDING 8 FLOORS C.P PODIUM) 1.5 SUB-BASEMENT C.P PODIUM

TOWER B • •

37 FLOORS (INCLUDING 8 FLOORS C.P PODIUM) 1.5 SUB-BASEMENT C.P PODIUM

450 SQ.FT 603 SQ.FT 827 SQ.FT


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.