Archiprix TUD B5 work through scales

Page 1



HUMAN DOMINATION

NATURAL PROCESS Sea Erosion Natural land

Cultivated land (polder)

Dikes and dams

River (Ijssel) delta Natural gredient under the lake

Ditches for marine traffic and take soil Metropolis (Amsterdam)


Nature domination in the Ijsselmeer

5500 BC

3850 BC

3750 BC

50 AD

800 AD


Design with natural process •

Wind setup and waves

Sediment resuspension

Seasonal water level change and drifting ice

+0.50m NAP

Summer

+wave 1.1- 1.8m

-0.2 (-0.1)m NAP -0.4 (-0.3)m NAP -0.50m NAP

+1.1m NAP

Winter

Draft Standard 2015 maximum drainage system Ijssel

2400m2/s

+1.1m NAP

+1.4m NAP

+1.4 m NAP

WINTER

+1.6m NAP

+1.6m NAP

+1.6 to +1.7m NAP

+1.6 to +1.7m NAP

+0.50m NAP

Winter

+wave 1.2-1.7m

-0.3m NAP -0.5m NAP -0.50m NAP

Summer

SUMMER









Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.