Lr development quarterly brochure dec 13

Page 1

PLANS TAKES A LEAP TO VIVID CREATIONS


1st session of Anisha Global School has started in June 2013 from play group to 7th standard.

Actual Photo

A fully functional CBSE school – Anisha Global-Alpha Future, st India's 1 Future School.

Highlights

Unique features

CBSE Curriculum in an enhanced learning environment

Facilitate anytime, anywhere through real-time collaboration among peers and self-directed learning

28 students in each class

Digital curriculum empowered by MC online

7 acres of State of the art campus

Collaborative and investigative learning

Optional extended schooling until 7 pm for Music, dramatics, art, sports and learning

AOM (Anisha on mobile) to promote learning related to History, Heritage & National Education

Access to global learning resources and expertise

Digital Museum-outbound learning experiences on Mobiles / Tablets

Innovative Learning Through Technology


Infrastructure 타 타 타 타

Work for water management and environment engineering is 70% complete Infrastructure work for road is in progress Civil work for canal bridge, compound wall for sector level is in progress Landscape activities and water body at entrance are in progress.

AB Road CH 0 Entry gate area.

G1 Water body area Civil work complete & Finishing work is in progress.


CH. 0 to CH.35 Road side Landscape work.

CH. 0 to CH.35 Road side Landscape work.

1st Rotary.

G1 area landscape work.

Switching Station work complete.

CC1 road side landscape .


AB road side landscape CH. 330 to 600

AB road CH. 330 to 600

DE road PQC work complete.

DE Road side landscape work is in progress.

AB road CH 725 to 950 PQC work complete at RHS

AB road CH 725 to 950 Streetscape work is in progress.


II1 road WMM work is in progress.

Fire Station A Building Gr. Floor Slab complete. 1st Floor slab work is in progress.

WTP aeration fountain Super structure work is in progress.

WTP chemical House super structure work is in progress.

AB Road & FF1 Road Junction DBM work Complete.

FF1 Road BM work is in progress..


2nd Avenue Work for compound wall, drainage line network, water distribution network, storm water lines, Main gate complex are complete. Sector amenities including play court, swimming pool, amphy-theatre are complete and other amenities like club house, children's play area are 95% complete.

Planter, Water edge, Foot path &WMM,DBM Plantation, Street Light Pole Fixing Complete between Row No.1 & 2 .


Final touch up is in progress at 1st row.

Final touch up is in progress at 2nd row.

Water line, Electric lines, Storm Water, Chamber,GSB, Water edge Casting, WMM Complete, Footpath paving, street light pole Fixing, DBM Work Complete Between 3rd &4th .

AB Road & FF1 Road Junction DBM work Complete.

FF1 Road BM work is in progress..


Club House Texture Finishing Work Complete.

Play court area Belle drain fixing & concrete Tremix flooring, Kotta Fixing work Complete.

S.T.P. Civil work completed. Pump installation work Complete.

Gas Bank R.C.C Brickwork & Roofing Plastering painting Complete.

Club House Gymnasium Equipment fixing Complete.

Children's Play Equipment Fixing Complete.


3rd Avenue Recently launched 1 and 2 BHK apartments. Building A and B- Podium parking wall work complete & Slab work is in progress.

A Part I podium parking Shear wall work complete & plinth work is in progress.

A Building Part II plinth casting work complete.

Sector B Building Part I Slab work complete & Podium parking slab Shear wall work is in progress.

Sector B Building Part II S/wall work complete & Slab work is in progress.


4th Avenue RCC work for building A, B and C is complete till 22nd floor. Finishing work for mentioned buildings is in progress. RCC work for building D is complete till 19th floor and for building E is complete till 15th floor. Sector development including club house, STP and swimming pool is initiated.

A building Toilet dado work is in progress

A building gypsum work WIP and aluminum window WIP.


A Building Lobby ooring work is in progress.

A Building Kitchen dado work is in progress.

A building gypsum work WIP and aluminum window WIP.

C Building Dry balcony ooring work is in progress.

D building 20th Floor is in progress.

E building 16th slab is in progress


Podium between A & B building WaterprooďŹ ng work is in progress.

Work in progress for 4th Avenue Clubhouse

Podium between B & C pour 3 Complete & Padadii work is in progress.


6th Avenue Ÿ Ÿ Ÿ Ÿ

RCC work for building A and B is complete till 21st floor OHT and LMR work is 100% complete Finishing work is in progress Commercial Building – Brick work and plaster is 95% complete

A Bldg. False ceiling to hide the firefighting pipes

A & B Bldg. Toilet dado Work In Progress.

A & B Bldg., Kitchen dado Work in Progress.

B Bldg., Gypsum, firefighting & false ceiling work in progress.


Commercial Bldg., Brickwork & Plaster is in Progress.

UGT:- Slab work Complete & Ramp work is in Progress

S.T.P.- Slab Shuttering and reinforcement work is in progress.


7th Avenue 타 R-7 RCC Work completed 타 Finishing work is 60% Complete 타 Sub Station, club house and swimming pool RCC work initiated

A & B Building RCC Work Complete.


A & B Building Gypsum, False ceiling work in progress.

A & B Building Kitchen work in progress.

A & B Building Toilet Dado Work in Progress.

A & B Bldg. Drawing Room


C Building OHT & LMR Shuttering & reinforcement in progress

D Bldg. LMR & OHT work is in progress.

F Building- 22nd Floor RCC Complete & Terrace RCC work is in progress.

Sector Podium 1- Water ProoďŹ ng work is in progress. (STP RCC Work is Completed)

Sector Podium 2- Water ProoďŹ ng Work Is In progress. (UGT RCC Work is Completed)


C, D & F Building Gypsum, Flooring, Kitchen Dado & False Ceiling work is in progress.

D & F Bldg. terrace railing & Sliding door work is in progress

Kolte-Patil I-Ven Township (Pune) Ltd. Survey No.74, Marunji, Hinjewadi-Marunji-Karsarsai Road, Taluka Mulshi, Pune 411057, Maharashtra. INDIA. Tel.: +91 (20) 6677 8899 | +91 99238 90000 | +91 99236 90000 Email : info@liferepublic.in | www.liferepublic.in


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.