1 minute read
PBM&LC Journey December 2019
December started with the beginning of our construction work. The bamboo team, civil team and metal team were invited to the construction site to have a general brief and introduction of the work. The design were beyond the conventional construction system. So it was necessary to know the strength and the limitation of each other.
Advertisement
Social mapping event
The youths and peace volunteer prepared a thematic map of the Nawalpur in the end of the programme. Programme incharge Govinda Acharya facilitated the programme.