SHIVAM GARG ARCHITECTURAL PORTFOLIO

Page 1

Shivam Garg

ARCHITECTURE
Works _ 2016 -
P
Architecture I Urbanism I Academic I Professional
Selected
2021
ortfolio

SHIVAM GARG

Curious and Enthusiastic young Architecture student with experience in all phases of project development, from concept design through construction. I am a flexible, positive and social person that works in a team. I adapt easily to new environments and can handle different work tasks too, which has improved my organizational and team-working skills, making me able to manage and co-ordinate work tasks within the group members.

Also, the intensity of the workload at the university programme and the close deadlines at the curricular assignments have enabled me to handle working under pressure and to meet my goals in a fast-paced surroundings.

The moment I realized how difficult architecture school is, I also realised it was only one of the best moment of my life.

S G S .G
Ai Id Ps
NOTES :-ALL DIMENSIONS ARE IN FEET INCHES.
NOTES :-ALL DIMENSIONS ARE IN FEET INCHES.

ELEVATION CC'

6'-4" 4" 1" 2" 1" 4" 1'-8" 4" 4" 3'-1" 6'-2" 3'-1" 1'-6" 10'
DETAIL -A 1" 1" DETAIL -A ELEVATION AA' xo 1" 4'-6" 1" 6" 6" 6" 6" 6" 51 2 " 1" 4" 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 81 2 " 101 2 1" 1'-5" 1" 1'-111 2 " 1" 1" 1'-6" 1'-51 2 " 1'-51 2 1'-51 2 1'-6" 8' 4'-7" E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com NOTES -ALL DIMENSIONS ARE FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:10 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 6-08-20 SHIVAM GARG HOME THEATRE WARDROBE DETAIL DET-001 3'-81 2 1" 1'-41 2 " 1" 91 2 1" 6'-101 2 " 1" 9" 1" 1'-41 2 1" 4" 1" 9'-61 2 1" 1" 51 2 1" 10" 1" 91 2 1" 31 2 1" 81 2 1" 81 2 1" 41 2 1" 81 2 " 1" 81 2 1" 81 2 " 1" 81 2 1" 81 2 1" 51 2 " 1" 9" 1" 10" 1" 51 2 " 1" 6" 6" 90° 45° 135° 135° 45° 11 2 " 2'-2" 4'-81 2 1'-41 2 " 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-41 2 4'-6" 5'-01 2 10'
1"61 2 " 1" 81 2 " 1" 81 2 " 1" 81 2 " 1" 81 2 " 1" 1'-4" 1" 81 2 " 1" 81 2 " 1" 81 2 " 1" 81 2 " 1" 81 2 1" 3" 1" 4" 9'-11" ELEVATION BB' E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :SHIVAM GARG BAR ELEVATION DETAIL DET-001 DATE :- 06-08-20 ELEVATION BB' 6" 5" 1'-9" 4" 1'-9" 4" 1'-9" 4" 1'-9" 41 2 " 1'-7" 1'-7" 1'-7" 1'-7" 4" 6'-8" 4" 1"1"2" 4" 1'-8" 4" 4" 6'-2" 1'-6" 1'-7" 1'-7" 1'-7" 1'-7"
DETAIL -A 1" 1" DETAIL -A E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :SHIVAM GARG BAR ELEVATION DETAIL DET-002 DATE :- 06-08-20 ELEVATION BB' 3'-111 2 4" 6'-4" 4" 1" 2" 1" 4" 1'-8" 4" 4" 3'-1" 6'-2" 3'-1" 1'-6" 10'
DETAIL -A 1" 1" DETAIL -A E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 06-08-20 SHIVAM GARG BAR ELEVATION DETAIL DET-003 ELEVATION BB' 1'-10" 3'-51 2 1'-10" 1" 1'-4" 1" 1' 4" 1" 3'-11 2 1" 3'-2" 1" 3'-2" 1" 3'-11 2 " 1" 10' 13'-9" ELEVATION AA' E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE 1:15 PROJECT :REVISION :DEALT BY CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH SUBJECT :DATE :- 6-08-20 SHIVAM GARG HOME THEATRE ELEVATION DETAIL DET-002 1 2 4" 1 2 91 2 1 2 7" 1 1 2 1 2 101 2 1 1 2 1 2 11" 2 5" 2 11" 2 1 2 2 1 2 4" 1 2 1 2 3" 2 9" 8" 1 2 1'-31 2 1 2 7 8" 11" 1 3" 6" 1'-1" 1 2 5" 7" 101 2 1 2 5" 1 2 101 2 1 2 81 1 2 10" 2 7" 1 2 9" 1 2 1 2 1 2 10' 4" 1 2 2'-8 3' 3'-7" 9'-2 3'-22 9" 1 2 ELEVATION
8' 23'-3" ELEVATION AA' ELEVATION BB' NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:25 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 6-08-20 SHIVAM GARG HOME THEATRE ELEVATION DETAIL DET-001
ELEVATION AA'
ELEVATION BB'
ELEVATION CC'
AA'

E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com

ELEVATION BB'

ELEVATION CC'

ELEVATION AA' ELEVATION BB' ELEVATION CC'
CHECKED & SIGNED BY :AR. SUMIT VERMA CLIENT : MR. CHABRA DEALT BY AR SHIVAM CHECKED BY: AR SUM T VERMA TITLE : KITCHEN SECTION A A’ G.F.C. DRAW NG ELEVATION AA' ELEVATION CC' LVL +4" LVL +4" 9" 1'-1112 4" 1'-1112 4" 1'-1112 1'-1112 9" 3" 1 3'-8" 1'-41 1'-412 2'-4" 9" 7' 111 11 2 4" 6'-7" 4" 1" 2" 1" 4" 2' 4" 3" 4" 2' 4" 10'-6" 21'-412 " 11 2 11 2 2'-5 2 11 2 11 6'-5" 1'-10" 1'-10" 1'-10" 1'-9" 1'-91 1'-9" 1'-912 1'-9" 1'-912 1'-9" 1'-912 112 1 2
4" 1' 11" NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:25 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 20-08-20 SHIVAM GARG MR.SAGAR ROOM ELEVATION DETAIL DET-001 10'-6" 10'-6"
ELEVATION AA'
412 4" 2' 4" 5'-7" 4" 2' 4" 3'-01 412 6'-5" 1'-10" 6'-5" 5'-5" 1'-10" 5'-5" 1'-10" 1'-10" 4" 6'-7" 4" 1" 2" 1" 4" 2' 4" 3" 14'-4" ELEVATION AA' ELEVATION BB' ELEVATION CC' E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:25 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 20-08-20 SHIVAM GARG MR.SAGAR ROOM ELEVATION DETAIL DET-002 LVL +4" LVL +4" 2' 2'-6" 6" 1112" 1'-41 2 " 7' 1'-412" 111 2 " 3'-8" 412" 10'-6" 2" 1'-10" 8'-6" 6'-3" 3'
20'-3"
 

3'-6" 2'-8"

PARENTS ROOM GUEST ROOM

HOME THEATRE

PARENTS ROOM GUEST ROOM

SAGAR ROOM

4' 1ST ROOM
6" 8" 2" 1' 8" 2" 1" 101 2 1" 11" 1" 11" 1" 101 2 " 1" WOOD WOOD MARBLE (BLACK) DRAWER LVL+22" DRAWER LVL+22" 8" 7" 7" 7" 7" 2" 1'-10 5'-1"
DRAWER LVL+22" DRAWER LVL+22" DRAWER LVL+22" MARBLE (BLACK) WOOD 8" 2" 1' 1' 2" 7' 3'-6" 1'-81 2 1'-8" 1'-81 2
3'-6" 2'-8"
4" 8" 8" 10" 2" 1'-6" 2" 61 2 " 3'-10" DRAWER LVL+22" DRAWER LVL+22" MARBLE (BLACK) MARBLE (BLACK) MARBLE (BLACK) WOOD MARBLE (BLACK) METAL FRAME 8" 2" 1' 1' 2" 1" 1'-21 2 " 1" 1'-21 2 " 1" E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 C:\Users\dell\Desktop\office\Format\logo arena refinement.jpg NOTES :-ALL DIMENSIONS ARE IN FEET INCHES. -COLUMN SIZES ARE AS PER STRUCTURAL DRAWINGS -BEAM SIZES ARE AS PER STRUCTURAL DRAWINGS -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 26-09-20 SHIVAM GARG VANITY DETAIL DET-001
4" 8" 8" 2" 10" 2" 1'-6" 2" 62" 3'-10" DRAWER LVL+22" DRAWER LVL+22" MARBLE (BLACK) MARBLE (BLACK) MARBLE (BLACK) WOOD MARBLE (BLACK) METAL FRAME 8" 2" 1' 1' 2" 1" 1'-21 2 " 1" 1'-21 2 1" E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com C:\Users\dell\Desktop\office\Format\logo arena refinement.jpg -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :CHECKED & SIGNED BY :AR. SUMIT VERMA F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 26-09-20 SHIVAM GARG VANITY DETAIL DET-001 NOTE; RAIN WATER HARVESTING Rain Water Harvesting shall be provided at site as per prevailing norms
3'-9" FLOOR GUEST " E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 C:\Users\dell\Desktop\office\Format\logo arena refinement.jpg -ANY DISCREPANCIES ARE TO BE CLARIFIED BEFORE COMENCEMENT OF WORK. -FOR INTERNAL LAYOUT OF TOILET REFER TO THE DRAWING NUMBER - ALL CILL AND LINTEL ARE W.R.T. RESPECTIVE FINISH FLOOR LEVEL. KEY PLAN :SCALE :- 1:15 PROJECT :REVISION :DEALT BY :F-2524 MR. MOHINDER CHABRA NORTH :SUBJECT :DATE :- 26-09-20 VANITY DETAIL DET-003 Proposed Ext. Bed 3'-3" 4'-5" 2'-6" 2'-8" 3'-3" 9'-7" 1'-1" 1'-6" 1'-1" 1'-2" 1'-2" 1'-5" 1'-5" 11" 1'-3" 1'-3" 2' 2'-1" 1'-11" 5'-7" 3'-3" 7'-4" 6" G G O.D.U. O.D.U. O.D.U. ARCHITECTURE URBANISM INTERIORS CONSULTING 192 SUSHANT LOK GURUGRAM, 122009, INDIA +91 124 4049048 info@architrongroup.com www.architrongroup.com 09.07.21 REVISION DATE R1 Dealt Paper Size Date A.G Check A4 R2 R3 Scale Sheet No. Project Client Akhil Gupta NTS Electrical (Looping) 405, Pacific Apartments, Sector 10, Dwarka Proposed Ext. Bed 1'-11" 3'-3" 4'-5" 2'-6" 2'-8" 3'-3" 9'-7" 1'-1" 1'-6" 1'-1" 1'-2" 1'-2" 1'-5" 1'-5" 11" 1'-3" 1'-3" 2' 2'-1" 1'-11" 5'-7" 3'-3" 7'-4" 6" 18" 3" 0" 18" 0" 0" 6" 2" 2" 3" 12" POP WOOD ARCHITECTURE URBANISM INTERIORS CONSULTING B 192 SUSHANT LOK GURUGRAM, 122009, INDIA P +91 124 4049048 E info@architrongroup.com www.architrongroup.com REVISION DATE R1 Paper Size Plot Date A.G Check By R2 R3 Scale Sheet No. Project Client Akhil Gupta NTS RCP 405, Pacific Apartments, Sector 10, Dwarka 09/07/21 11" 1'-3" 1'-3" 7'-4" 2'-9" 6" 1'-4" 3'-6" D 1'-3" 1'-3" G ELEVATION ELEVATION ELEVATION DOOR (TOILET) ELEVATION Lights Vanity 11" 1'-6" eq. eq. 2'-7" eq. eq. 1'-3" eq. eq. 1'-6" G ARCHITECTURE URBANISM INTERIORS CONSULTING B 192 SUSHANT LOK GURUGRAM, 122009, INDIA P +91 124 4049048 E info@architrongroup.com www.architrongroup.com 03.03.21 REVISION DATE Dealt Paper Size Scale Sheet No. Project Client Interior Design Pacific Apartment Dwarka Akhil Gupta NTS Master Toilet Electrical PLan Lighting PLan Looping PLan Proposed Ext. Bed LOUNGE (9'-8"X10'-8") MASTER BED (9'-5"X9'-9") (7'-2"X4'-9") KIDS ROOM (11'-5"X9'-7") S-001 S-002 DINING (9'-5"x10'-3") S-006 KITCHEN (6'x13'-6") TOILET S-005 S-007 (7'-2"X4'-9") TOILET S-003 S-004 TERRACE (5'-8"X9'-10") LIVING (19'x10'-2") S-008 S-009 Storage 2'1" 3'6" F1.2 F1.1 F1.3 F1.4 F1.5 F1.6 F1.7 F2.1 F2.2 F2.3 F2.4 F2.5 F2.5 F2.6 F2.7 F2.8 F2.9 F3.1 F3.2 F3.3 F3.4 F4.1 F4.2 F4.3 F4.4 F4.5 F4.6 F4.7 F4.8 F5.1 F5.2 F5.3 F5.4 F5.5 F5.6 F5.7 F5.8 F5.10 F5.9 F5.9 2'-8" 3'-3" 9'-7" 1'-6" 1'-1" 1'-6" 1'-1" 1'-2" 1'-2" 1'-5" 1'-5" 11" 1'-3" 1'-3" 2'-1" F6.1 F6.2 F6.3 F6.2 F6.4 F6.1 1'-11" 5'-7" 3'-3" 2'-10" 7'-4" Reading Sit Wardrobe Table Wardrobe Studytable Bed Wardrobe S-006 S-001 Chair Dining Partition Fridge Stove Sink S-005 Mandir Bench Chair Sit F6.1 F6.2 F6.3 F6.4 S-003 Wall Panelling Furniture Layout REVISION R1 Dealt Paper Size Plot Date Check By CONSULTANT Scale Sheet No. R2 R3 R4 A B C D E G H Project Client AKHILGUPTA NTS 09/07/21 A4 AJ AG 405, Pacific Apartments, Sector 10, Dwarka Proposed Ext. of Bed 4' 2'-8" 3'-3" 9'-7" 1'-1" 1'-6" 1'-1" 1'-2" 1'-2" 1'-5" 1'-5" 11" 1'-3" 1'-3" 2'-1" 8'-8" 1'-11" 5'-7" 3'-3" 7'-4" 6'-8" 11" 1'-4" 2'-2" 1'-2" 3'-8" 2'-6" 14 1'-2" 1' 4'-7" 9'-6" 5'-2" 1'-9" 5' 4'-9" 48" 23 24A12" 24B30" 24C45" 12" 25 48" 27 48" 26 48" 17 36" 18 3'-3" 12" 29 48" 20 48" 21 12" 22 48" 15 48" 12 11A30" 36" 14 48" 11 12" 8A 30" 8B 45"8C 11 17 24" 9 24" 10 36" 12" 5 36" 12" 30" 12" 19 G Existing El. Fixture G O.D.U. O.D.U. 12" 28 48" 7 1'-2" 48" 12" 31 3'-6" 5'-5" 12" 32 12" 33 36" 34 12" 30 3'-1" 84" 13 84" 16 New El. Fixture 1'-1" O.D.U. 12" Ceiling Lights, Fan, SC ELECTRICAL SCHEDULE (LEVEL-3) TAG HEIGHT SOCKETS SWITCHES REMARKS 5A 01 15A 36" AC 02 36" 03 48" Ceiling Lights, Fan 04 12" 05 30" Covelight,Ceiling Lights, Fan, AC 06 48" Ceiling Lights 07 12" 8A 30" 8B 45" 8C 24" Covelight,Ceiling Lights, Fan, Wall Light 11 24" Ceiling Lights, Fan, Wall Light 12 48" Ceiling Lights, Fan, AC 13 48" Ceiling Lights 14 ---09 10 15 16 Ceiling Lights, Fan, AC 17 18 19 22 23 Fridge Covelight,Ceiling Lights, Fan, AC 20 21 24A 25 26 27 Ceiling Lights, Fan 30 Covelight,Ceiling Lights, Fan 28 29 48" 48" 48" 48" 48" 48" 48" 48" 12" 12" 12" 24B 24C 12" 12" 10" 30" 45" 36" 36" Ceiling Lights Ceiling Lights, Fan Ceiling Lights, Fan----------------11A 30"-31 34 32 33 12" 12" 12" 48"---Ceiling Lights, Fan, Geyser, Exhaust Ceiling Lights, Fan, Geyser, Exhaust Wall Light 84" Wall Light 84" Wall Light Wall Light at 84" Distribution Board Switch Board Ceiling Fan Concealed Ceiling Light Wall Light @ 84" Gate Light Exhaust Fan Wall Light @ 36" Fan Box Hanging Light G Security Camera Door Phone WiFi Router AC Switch 15A Socket 5A Socket Telephone Point TV Point Door Chime Geyser Cove Light Wiring Meter Box AC Socket Light Point Touch Panel ELECTRICAL FIXTURES & POINTS SYMBOL DESCRIPTION SYMBOL DESCRIPTION Ceiling Light-1 Linear Ceiling Light Uplighter Downlighter Tubelight Blinds Ceiling Light-2 ARCHITECTURE URBANISM INTERIORS CONSULTING B 192 SUSHANT LOK GURUGRAM, 122009, INDIA P +91 124 4049048 E info@architrongroup.com www.architrongroup.com REVISION DATE Check By CONSULTANT Scale 10 11 12 A B C D E F G H Project Electrical Wall Fixture AG
Code Code F1.1 F1.2 F1.4 F1.3 F1.5 F1.6 F1.7 F3.1 F3.2 F3.3 F3.4 Code F4.1 F4.2 F4.3 F4.4 F4.5 F4.6 F4.7 F4.8 S-007 NAME Shower Fixture W.C W.B W.B S-004 ARCHITECTURE URBANISM INTERIORS CONSULTING www.architrongroup.com DATE 8 TYPICAL DETAIL OF RAIN WATER HARVESTING PIT TYPICAL DETAIL OF RAIN WATER HARVESTING PIT
E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com        23'-2" 25'-6" 6'-2"                     ENTRANCE 60' 11'-4"        4'            79'-5" ROAD SECONDARY ENTRANCE V1 V1 V1 V2 V1 V1 V1 V1 V1 V1 V2 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 D1 W1 W1 W1 2' W1 12'-3" W1 1'-6" 13'-6" W1 13'-6" 1'-6" W1 2' W1 12'-5" W1 1' D1 1' 11'-11" 1' D2 11'-11" 1' D3 11'-11" 1' D3 11'-11" D2 11'-11" D3 12' D3 12' 1' D2 12' D3 11'-11" 1' D3 D2 6' D3 D3 6' 6' 6' 1'-6" 12'-3" 1' 11'-11" 1' 1' 1' 6' 1' 6' 6' 6' 6' 6' 6' 6' 12'-2" 6' 6' 6' 6' OFFICE PART BACK SIDE ELEVATION WILL BE PROVIDED SOON ELEVATION DD'   6" 14' 14' 14' 14'      8' DOOR WINDOW & VENTILATOR DETAIL TYPE CILL LINTEL WIDTH HEIGHT D1 D2 D3 W1 1" 1" 1" 8' 8' 4' 3' 8' 3' 8' 6' 5' V1 V2 10'6" 12'6" 6' 2' 8' 2' 10'6" 12'6" 8' 8' 8' ELEVATION PROJECT DEALT BY CHECKED AR. SUMIT PLOT P.P. INTERNATIONAL DATE :- 23-07-20 SHIVAM GARG SCALE :SUBJECT KEY PLAN NOTES :-ALL DIMENSIONS -COLUMN SIZES DRAWINGS -BEAM SIZES ARE -ANY DISCREPANCIES BEFORE COMENCEMENT -FOR INTERNAL DRAWING NUMBER - ALL CILL AND FINISH FLOOR LEVEL. ROAD ROAD ROAD ROAD PLOTADJACENT MAIN ENTRANCE SECONDARY ENTRANCE 60' 20' 20' SHED 1 14362 SQ.FT. SHED 2 7113 SQ.FT. TOTAL PLOT AREA 49271 SQ.FT. SHED 1 ENTRANCE SHED ENTRANCE N 155'-4" 60' 21' 21' DOUBLE HT. 342' 339'-1" UP TOILET GOODS LIFT plantation area 118'-6" OFFICE AREA 4763 SQ.FT. 40'-8" 41'-11" 31'-1" 21'1" 37'-1" BALCONY 5'3" WIDTH PROJECTION 3'3" WIDTH PROJECTION 3'3" WIDTH PROJECTION 3'3" WIDTH GROUND FLOOR PLAN plantation area SHED ENTRANCE SHED 1 ENTRANCE 15' 15' 15' 15' 99' 16'-11"  23'-2" 25'-6" GROUND FLOOR PLAN                 60' 11'-4"   
Arenainteriors2016@gmail.com ROAD ROAD ELEVATION DD ELEVATION AA DD E-004 SIGNED BY :SUMIT VERMA PLOT NO. 43 INTERNATIONAL NORTH :23-07-20 GARG 1:50 ARE IN FEET INCHES. AS PER STRUCTURAL PER STRUCTURAL DRAWINGS ARE TO BE CLARIFIED COMENCEMENT OF WORK. LAYOUT OF TOILET REFER TO THE LINTEL ARE W.R.T. RESPECTIVE

PROJECT

PRAYAAS INTERNATIONAL SCHOOL, GANAUR, SONEPAT

DEALT BY :-

CHECKED & SIGNED BY :-

AR. SUMIT VERMA

E-2038, ANSAL SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com

NOTE; WATER HARVESTING Water Harvesting shall be provided at site as per prevailing norms Govt. PROPOSED BUILDING MECHANICALLY VENTILATED WITH 100% POWER BACK UP. TOILETS PARTITION WALLS ARE 2.10M HEIGHT SYSTEM SHALL NORMS OF GOVT. SOLAR WATER HEATING SYSTEM water heating system Govt. STRUCTURE STABILITY CERTIFICATE Certified that the structure and calculations considered safe EARTHQUAKE SAFETY CERTIFICATE Certificate this the entire accordance the latest addition NATIONAL CODE stability and to withstand the earthquake structure drawing has been designed by MR. ASEEM JAIN Structure Engineer, have been submitted separately.
:-
SUBJECT
ELEVATIONS
KEY PLAN :S.No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. HEIGHT OF BUILDING (in meters) 10 15 18 21 24 27 30 35 40 45 50 55 and Above SET BACK / OPEN SPACE TO BE LEFT AROUND BUILDINGS.(in meters) 3 5 6 7 8 9 10 11 12 13 14 16
DATE :- 21-08-20 SHIVAM GARG SCALE :- 1:150
:-
E-001

6MWIDEMOTORABLEFTP

SETBACK LINE MUMTY +29150 +21150 +21150 +21150 6MWIDEROAD 6.000 6.000 6.000 6.000 7.500 7.530 7.540 7.500 Lvl ±00 Lvl -1800 Lvl -1800 ENTRYTO BASEMENT BASEMENTEXITFROM Lvl -4650 Lvl ±00 60.350 28.850 42.540 58.820 18.0M WIDE SERVICE ROAD 12.0MWIDE SERVICEROAD OTHER'S LAND PLUMBING PLANT ROOM RAW WATER TANK 2 NOS- 30 KL DOM WATER TANK 2 NOS - 30 KL IN BASEMENT-01 DG @ BASEMENT-2 (DOUBLE HT) FIRE CONTROL ROOM AT LGF TYPICAL DETAIL OF RAIN WATER HARVESTING PIT ROAD-IN-SLOPE SLOPE 1:10, WIDTH= 6M, SLOPEROAD-IN-SLOPE 1:10,WIDTH=6M, 6M WIDE MOTORABLE FTP 6M SETBACK LINE BASEMENT LINE PROPERTY LINE SETBACK LINE BASEMENT LINE PROPERTY LINE BASEMENT LINE MH MH MH MH LEGEND:GH F E D C 6.000 SETBACK LINE MUMTY +29150 MUMTY +29150 MUMTY +29150 TERRACE +25650 LVL +21150 LVL +11700 +11700 +21150 +21150 +21150 RETAIL COMMERCIAL B2+B1+LG+G+FF+SF+THIRD+FOURTH 12.0M WIDE SERVICE ROAD 6MWIDEROAD 6.000 6.000 6.000 6.000 6.000 6.000 6.000 6.000 6.000 7.275 7.500 7.500 7.530 7.540 7.500 10.460 7.850 Lvl ±00 Lvl ±00 Lvl ±00 Lvl -1800 Lvl -1800 ENTRYTO BASEMENT BASEMENTEXITFROM Lvl -4650 Lvl -1800 Lvl ±00 Lvl -1800 Lvl ±00 FIRE PLANT ROOM FIRE TANK NOS 150 KL EACH @ BASEMENT-01 9.360 14.785 91.000 19.645 1.030 60.350 28.850 42.540 58.820 27.000 60.0M WIDE SERVICE ROAD 18.0M WIDE SERVICE ROAD 12.0MWIDE SERVICEROAD OTHER'S LAND S.T.P. STP 75KLD @ BASEMENT-2 PLUMBING PLANT ROOM RAW WATER TANK NOS- 30 KL DOM WATER TANK 2 NOS 30 KL IN BASEMENT-01 DG @ BASEMENT-2 (DOUBLE HT) FIRE CONTROL ROOM AT LGF TRANSFORMER & LT PANEL ROOM ROAD-IN-SLOPE SLOPE 1:10, WIDTH= 6M, SLOPEROAD-IN-SLOPE 1:10,WIDTH=6M, SLOPEROAD-IN-SLOPE 1:10,WIDTH=6M, 6M WIDE MOTORABLE FTP 6M WIDE MOTORABLE FTP
SETBACK LINE BASEMENT LINE PROPERTY LINE SETBACK LINE BASEMENT LINE PROPERTY LINE SETBACK LINE BASEMENT LINE PROPERTY LINE 6M WIDE MOTORABLE FTP PROPERTY LINE BASEMENT LINE MH MH MH MH MH MH MH MH LEGEND:J H G F E D C B A DRAWING TITLE DRAWING NO. OWNER/AUTH. SIGNATURE ARCHITECT'S SIGNATURE PROJECT:PRINCIPAL ARCHITECT: KEY PLAN SCALE 1:250 S1-02 ORIENTATION PROPOSED BUILDING PLANS OF COMMERCIAL SITE-1 ADMEASURING 1.462 ACRES FALLING IN THE RESIDENTIAL PLOTTED COLONY OF 107.919 ACRES (LICENCE NO 97 OF 2010 DATED 18.11.2010, LICENCE NO 41 OF 2011 DATED 03.05.2011) AT SECTOR-66 AT GURUGRAM BEING DEVELOPED BY ELAN CITY LLP NOAD SITE SERVICES PLAN R4500 6000 6000 TYPICAL FIRE TENDER PATH TURNING RADIUS RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ALL HANDICAP RAMPS WITH RAILING. SETBACK LINE MUMTY +29150 +21150 +21150 6MWIDEROAD 6.000 6.000 6.000 6.000 7.530 7.540 Lvl ±00 Lvl -1800 Lvl -1800 ENTRYTO BASEMENT BASEMENTEXITFROM Lvl -4650 Lvl ±00 28.850 42.540 58.820 18.0M WIDE SERVICE ROAD 12.0MWIDE SERVICEROAD OTHER'S LAND PLUMBING PLANT ROOM RAW WATER TANK 2 NOS- 30 KL DG @ BASEMENT-2 (DOUBLE HT) FIRE CONTROL ROOM AT LGF TYPICAL DETAIL OF RAIN WATER HARVESTING PIT ROAD-IN-SLOPE SLOPE 1:10, WIDTH= 6M, ROAD-IN-SLOPE 6M WIDE MOTORABLE FTP SETBACK LINE BASEMENT LINE PROPERTY LINE PROPERTY LINE BASEMENT LINE MH MH MH MH LEGEND:GH F E D C SETBACK LINE MUMTY +29150 +21150 +21150 6MWIDEROAD 6.000 6.000 6.000 6.000 7.530 7.540 Lvl ±00 Lvl -1800 Lvl -1800 ENTRYTO BASEMENT BASEMENTEXITFROM Lvl -4650 Lvl ±00 28.850 42.540 58.820 18.0M WIDE SERVICE ROAD 12.0MWIDE SERVICEROAD OTHER'S LAND PLUMBING PLANT ROOM RAW WATER TANK 2 NOS- 30 KL DOM WATER TANK 2 NOS - 30 KL DG @ BASEMENT-2 (DOUBLE HT) FIRE CONTROL ROOM AT LGF ROAD-IN-SLOPE SLOPE 1:10, WIDTH= 6M, SLOPEROAD-IN-SLOPE 6M WIDE MOTORABLE FTP SETBACK LINE BASEMENT LINE PROPERTY LINE PROPERTY LINE BASEMENT LINE MH MH MH MH LEGEND:GH F E D C

LOWER GROUND FLOOR PLAN (LVL -1800)

E-2038, ANSAL +91-97287-00999, Arenainteriors2016@gmail.com

NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER SYSTEM WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) AS PER RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ALL HANDICAP RAMPS WITH RAILING. NOTES:  ALL LIFTS SHALL HAVE 100% POWER BACK-UP.  ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC.  FIRE-FIGHTING / SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. NOTES:  ALL LIFTS SHALL HAVE 100% POWER BACK-UP.  ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC.  FIRE-FIGHTING / SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY FHC
FIRE CONTROL ROOM UP TO GF LVL +2700 FROM GF LVL +2700 LG SHOP-01 2120 3200 3200 5155 4000 4000 4770 5515 2080 2800 5800 5800 5800 5800 4100 4100 4075 4000 4000 2800 5800 9215 4000 4000 4000 4000 8310 5900 5900 5900 4495 4000 4000 4000 4000 4075 4000 4000 4000 8450 5960 4000 4960 7100 2220 1795 6175 4000 4000 LG SHOP-02 LG SHOP-03 LG SHOP-04 LG SHOP-05 LG SHOP-06 LG SHOP-07 LG SHOP-08 SHOP-09 LG SHOP-10 SHOP-11 SHOP-12 LG SHOP-13 LG SHOP-14 SHOP-15 LG SHOP-16 SHOP-17 SHOP-19 SHOP-20 LG SHOP-21 LG SHOP-22 SHOP-23 SHOP-24 SHOP-25 LG SHOP-26 LG SHOP-27 SHOP-28 LG SHOP-29 LG SHOP-30 SHOP-31 LG SHOP-32 LG SHOP-33 LG SHOP-34 LG SHOP-35 LG SHOP-36 5800 SHOP-37 -1800 RAMP -1800 LVL -1800 LVL -1800 LVL -1800 LVL -1800 LVL ±00 LVL -4600 RAMP -4900 RAMP 4000 ±00 ROAD -1800 LVL -2700 LANDSCAPE FEATURE ±00 LEVEL ±00 LEVEL PROJ. ABOVE PROJ. ABOVE DN FROM ±00 LVL UP TO ±00 LVL UP FROM BASEMENT LEVEL UP UP UP FROM BASEMENT LEVEL PROPERTY LINE SETBACK LINE SETBACK LINE SETBACK LINE PROPERTY LINE RETAINING WALL UP TO ±00 LVL LG SHOP-18 MALE TOILET SLOPE 1:10 2300 HANDICAP TOILET UP FROM BASEMENT LEVEL 3060 6640 4630 4560 7880 3900 2550 4295 4565 C A B A B C 1 2 7300 FHC 2800 4900 7000 SERVICE LIFT-02 2500 2400 PAS. LIFT-01 2500 2400 PAS. LIFT-01 ST-03 T=300 ST-02 W=2000T=300R=150 W=2000ST-01R=150T=300 5505 6600 2170 2790 SERVICE LIFT-01 12MWIDE ROAD 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 RETAINING WALL SETBACK LINE BASEMENT-01 PLAN (LVL -6300) RAMP DN TO BASEMENT-01 LVL -4900 LVL -6300 90° 90° 90° 90° 90° 5000 4600 7500 5500 5500 1715 16615 5500 5500 5140 5500 5500 4530 13145 UGT STP RAMP UP TO GROUND RAMP DN TO BASEMENT-02 RAMPUPFROMBASEMENT-02 2915 4500 6015 6000 5500 WIDE DRIVEWAY 5140 WIDE DRIVEWAY 5500 WIDE DRIVEWAY 5500WIDEDRIVEWAY ENTRY EXIT 5500 4500 WIDE DRIVEWAY 5500WIDEDRIVEWAY DG ROOM DOUBLE HEIGHT LVL -6300 LVL -6300 SERVICES SERVICES SERVICES SERVICES SERVICES TRANSFORMER ROOM 01 08 09 SERVICES 14 15 26 27 36 37 53 54 55 59 60 68 69 77 78 80 BASEMENT -02 CARS PROVIDED NO. OF CARS (SURFACE + STACK)(8 + 144 = 152 SINGLE PARKING DOUBLE STACK PARKING DRAWING TITLE DRAWING NO. OWNER/AUTH. SIGNATURE ARCHITECT'S SIGNATURE PROJECT:PRINCIPAL ARCHITECT: KEY PLAN SCALE 1:200 ORIENTATION NROAD ROAD BASEMENT-01 PARKING PLAN NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER SYSTEM WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) AS PER RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ALL HANDICAP RAMPS WITH RAILING. PROPOSED BUILDING PLANS OF COMMERCIAL SITE-1 ADMEASURING 1.462 ACRES FALLING IN THE RESIDENTIAL PLOTTED COLONY OF 107.919 ACRES (LICENCE NO 97 OF 2010 DATED 18.11.2010, LICENCE NO 41 OF 2011 DATED 03.05.2011) AT SECTOR-66 AT GURUGRAM BEING DEVELOPED BY ELAN CITY LLP LOBBY ST-02 W=2000T=300R=150 6100 4900 2500 2400 2500 2400 PAS. LIFT-01 PAS. LIFT-01 6400 5500 3050 2050 W=2000ST-01R=150T=300 SERVICE LIFT-01 C A B A B C 1 2 ST-03 T=300 R=150 7300 4600 PROPERTY LINE A1-04

CORIDOORBELOW

2nd FLOOR PLAN (LVL +11700)

TERRACE PLAN (LVL +41700)

SUSHANT CITY, PANIPAT +91-97287-00999, +91-80535-11999 Arenainteriors2016@gmail.com DRAWING TITLE DRAWING NO. OWNER/AUTH. SIGNATURE ARCHITECT'S SIGNATURE PROJECT:PRINCIPAL ARCHITECT: KEY PLAN ORIENTATION N NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER SYSTEM WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) AS PER RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. ALL HIGH RISE BUILDING ARE INTERCONNECTED THROUGH CORRIDOR BRIDGES. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ONE EXTERNAL WALL TOWARDS BALCONY SIDE IN ANY ONE OF THE ROOMS IN RESIDENTIAL APARTMENT SHOULD BE IN HR. FIRE RATED WITH PROVISION OF SPRINKLER ON INTERNAL SIDE OF THE SAME WALL. ALL HANDICAP RAMPS WITH RAILING.ROAD ROAD PROPOSED BUILDING PLANS OF COMMERCIAL COLONY MEASURING 1.462 ACRES IN RESIDENTIAL PLOTTED COLONY ADMEASURING 107.919 ACRES (LICENCE NO. 97 OF 2010 DATED 18.11.2010 LICENCE NO. 41 OF 2011 DATED 03.05.2011) IN SECTOR 66 & 65, VILLAGE MAIDAWAS, GURUGRAM MANESAR URBAN COMPLEX BEING DEVELOPED BY M/S ELAN CITY LLP. SCALE 1:200 LOWER GROUND FLOOR PLAN A1-06 W=2000ST-01R=150T=300 ST-03 W=2000 T=300 R=150 7300 4600 2800 2050 SERVICE LIFT-02 ST-02 W=2000T=300R=150
FLOOR PLAN (LVL +26100) OWNER/AUTH. SIGNATURE ARCHITECT'S PROJECT:PRINCIPAL ARCHITECT: KEY PLAN NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. ALL HIGH RISE BUILDING ARE INTERCONNECTED THROUGH CORRIDOR BRIDGES. SOLAR PANELS OF REQUIRED CAPACITY PROVIDED ON ROOF TOP AS PER HAREDA /ZONING ONE EXTERNAL WALL TOWARDS BALCONY ONE OF THE ROOMS IN RESIDENTIAL APARTMENT IN 1 HR. FIRE RATED WITH PROVISION OF SPRINKLER INTERNAL SIDE OF THE SAME WALL. ALL HANDICAP RAMPS WITH RAILING.WIDE OAD PROPOSED BUILDING PLANS OF COMMERCIAL COLONY MEASURING 1.462 ACRES RESIDENTIAL PLOTTED COLONY ADMEASURING 107.919 ACRES (LICENCE NO. 97 OF 18.11.2010 & LICENCE NO. 41 OF 2011 03.05.2011) IN SECTOR 66 & 65, VILLAGE MAIDAWAS, GURUGRAM MANESAR COMPLEX BEING DEVELOPED BY M/S LLP. OFFICE AREA OFFICE AREA OFFICE CORIDOOR DN UP DN UP DN 2500 2400 PAS. LIFT-01 2500 2400 PAS. LIFT-01 5505 6600 2055 2790 SERVICE LIFT-01 4900 7000 4020 4255 4705 3830 OFFICE AREA TERRACE AREA +26100 OFFICE AREA FHC FHC 33405 37795 21005 18080 11720 5670 9930 7460 4390 2550 CORIDOOR BELOW
FIFTH
CORIDOOR BELOW W=2000ST-01R=150T=300 ST-03 7300 4600 2800 SERVICE LIFT-02 ST-02 W=2000T=300R=150 2695 4000 4000 4000 4000 4075 4000 4000 8125 5900 5900 5900 5900 5100 5100 5100 5100 5100 4000 4000 3200 4000 1725 2120 3200 3200 5155 4000 4000 4765 4305 4600 4600 4600 4600 4100 4100 4075 4000 4000 4600 4600 4600 4000 4000 4000 4000 4600 4600 2080 4600 4000 4000 3105 7200 3300 4100 4000 7215 6215 6215 4000 4695 4700 5900 5900 4000 1760 2550 2560 4800 5265 3020 2490 2740 5905 5320 3625 5715 5715 2855 2830 7200 5810 2695 5810 3100 3100 2495 SF SHOP-01 SF SHOP-02 SF SHOP-03 SF SHOP-04 SF SHOP-05 SF SHOP-06 SF SHOP-07 SF SHOP-08 SHOP-09 SF SHOP-20 SF SHOP-19 SF SHOP-18 SF SHOP-17 SF SHOP-14 SF SHOP-13 SF SHOP-12 SF SHOP-11 SHOP-10 SF SHOP-21 SF SHOP-22 SF SHOP-15 SF SHOP-16 2685 2660 2845 2855 5850 4390 35005120
SF SHOP-23 SF SHOP-24 SF SHOP-25 SF SHOP-26 SF SHOP-27 SF SHOP-28 SF SHOP-29 SF SHOP-30 SF SHOP-31 SF SHOP-32 SHOP-33 SF SHOP-35 SF SHOP-36 SF SHOP-43 SF SHOP-44 SF SHOP-45 SF SHOP-46 SF SHOP-37 SF SHOP-39 SF SHOP-40 SF SHOP-41 SF SHOP-42 SF SHOP-47 SF SHOP-48 SHOP-49 SF SHOP-50 SF SHOP-51 SHOP-52 SF SHOP-53 SF SHOP-54 SF SHOP-55 SF SHOP-56 SF SHOP-57 SF SHOP-58 SF SHOP-59 SF SHOP-60 SF SHOP-61 SF SHOP-62 SF SHOP-63 SF SHOP-64 SF SHOP-65 SF SHOP-66 SF SHOP-67 SF SHOP-68 SF SHOP-69 UP DN FHC FHC UP DN UP DN C A B A B C 1 2 SF SHOP-34 SF SHOP-38 2500 2400 PAS. LIFT-01 2500 2400 PAS. LIFT-01 5505 6600 2055 2790 SERVICE LIFT-01 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MMWIDECORIDOOR DN TO GROUND FLOOR UP FROM FIRST FLOOR PROJ. ABOVE 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR 1800MM WIDE CORIDOOR UP TO THIRD FLOOR UP TO THIRD FLOOR DN FROM THIRD FLOOR 4900 7000 PROJ. ABOVE A1-09 SCALE 1:200 DRAWING TITLE DRAWING NO. OWNER/AUTH. SIGNATURE ARCHITECT'S SIGNATURE PROJECT:PRINCIPAL ARCHITECT: KEY PLAN ORIENTATION N NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER SYSTEM WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) AS PER RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. ALL HIGH RISE BUILDING ARE INTERCONNECTED THROUGH CORRIDOR BRIDGES. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ONE EXTERNAL WALL TOWARDS BALCONY SIDE IN ANY ONE OF THE ROOMS IN RESIDENTIAL APARTMENT SHOULD BE IN HR. FIRE RATED WITH PROVISION OF SPRINKLER ON INTERNAL SIDE OF THE SAME WALL. ALL HANDICAP RAMPS WITH RAILING.WIDEROAD PROPOSED BUILDING PLANS OF COMMERCIAL COLONY MEASURING 1.462 ACRES IN RESIDENTIAL PLOTTED COLONY ADMEASURING 107.919 ACRES (LICENCE NO. 97 OF 2010 DATED 18.11.2010 & LICENCE NO. 41 OF 2011 DATED 03.05.2011) IN SECTOR 66 & 65, VILLAGE MAIDAWAS, GURUGRAM MANESAR URBAN COMPLEX BEING DEVELOPED BY M/S ELAN CITY LLP. 2nd FLOOR PLAN MALE TOILET FEMALE TOILET HANDICAP TOILET
MUMTY +44200 TERRACE +41700 TERRACE BELOW +30000 MUMTY +44200

SECTION AA

PART SECTION XX

SECTION BB

FOURTH FLOOR PLAN

FOURTH FLOOR PLAN

SECTION CC

PART SECTION XX

                                                D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 V1 V2 W1 W1 W1 W2 W2 W1 W2 W2 W2 W2 W2 W2 W2 W2 W3 W3 W3 W1 W3 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
                                             D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 V2 W1 W1 W1 W1 W2 W2 W1 W2 W2 W2 W2 W2 W2 W2 W3 W3 W3 W1 W3 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
LVL -1800 LVL +2800 GROUND FLOOR LVL +7300 FIRST FLOOR LVL +11800 SECOND FLOOR LVL +16300 THIRD FLOOR LVL +21250 FOURTH FLOOR LVL -6600 UPPER BASEMENT LVL -11400 LOWER BASEMENT 4800 4800 4500 4500 4500 4500 4950 LVL ±00 41700 4950 LVL +44300 MUMTY TOP 2500 3900 3900 3900 3900 LVL +26200 FIFTH FLOOR LVL +30100 SIXTH FLOOR LVL +34000 SEVENTH FLOOR LVL +37900 EIGHTH FLOOR LVL +41800 TERRACE FLOOR LOWER GROUND FLOOR EXTERNAL ROAD LVL LVL -750 LVL +100 INNER ROAD SCO FFL LVL ±00 INTERNAL ROAD LEVEL SITE BOUNDARY 6000 SECTION AA 8270 7500 TOILET LVL -2700 MEZZANINE LG SHOP-17 GF SHOP-17 SHOP SCO-26 LG SHOP-26 GF SHOP-24 FF SHOP-40 FF SHOP-45 FF SHOP-55 SF SHOP-40 SF SHOP-45 SF SHOP-55 KS 62 KS 56 KS KS 450MM RAISED 1050 MM HIGH RAILING SERVICE CORRIDOR 450MM RAISED SERVICE CORRIDOR 1050 MM HIGH RAILING FOOD COURT SEATING FOOD COURT SEATING 1050 MM HIGH RAILING IN ELEVATION 8270 SERVICE CORRIDOR SERVICE CORRIDOR 450MM RAISED 450MM RAISED 9300 OFFICES OFFICES OFFICES OFFICES ROAD IN SLOP VARIES LVL -4300 (FOOTPATH) 1500 3000 (INNER ROAD) (GREEN BELT) LVL -750 EXTERNAL ROAD LEVEL OTHER PROPERTY TRANSFORMER ROOM TOILET LVL -2700 LVL -11400 LVL -6600 LVL -8000 UPPER BASEMENT LOWER BASEMENT LIFT LIFT LVL -1800
4500 LVL +100 SCO FFL PROJECT:PRINCIPAL ARCHITECT: KEY PLAN NOTES: ALL LIFTS SHALL HAVE 100% ALL ELECTRICAL INSTALLATIONS PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED BUILDING CODE 2017. BUILDING HAS AUTOMATIC WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED RELEVANT I.S. CODES FOR EARTHQUAKE ALL HIGH RISE BUILDING ARE THROUGH CORRIDOR / BRIDGES. SOLAR PANELS OF REQUIRED PROVIDED ON ROOF TOP AS PER ONE EXTERNAL WALL TOWARDS ONE OF THE ROOMS IN RESIDENTIAL IN HR. FIRE RATED WITH PROVISION INTERNAL SIDE OF THE SAME WALL. ALL HANDICAP RAMPS WITHWIDE SERVICE WIDE LVL -1800 LVL +2800 GROUND FLOOR LVL +7300 FIRST FLOOR LVL +11800 SECOND FLOOR LVL +16300 THIRD FLOOR LVL +21250 FOURTH FLOOR LVL -6600 UPPER BASEMENT LVL -11400 LOWER BASEMENT 4800 4800 4500 4500 4500 4500 4950 LVL ±00 41700 4950 LVL +44300 MUMTY TOP 2500 3900 3900 3900 3900 LVL +26200 FIFTH FLOOR LVL +30100 SIXTH FLOOR LVL +34000 SEVENTH FLOOR LVL +37900 EIGHTH FLOOR LVL +41800 TERRACE FLOOR LOWER GROUND FLOOR EXTERNAL ROAD LVL LVL -750 LVL +100 INNER ROAD SCO FFL LVL -1800 LVL +2800 GROUND FLOOR LVL +7300 FIRST FLOOR LVL +11800 SECOND FLOOR LVL +16300 THIRD FLOOR LVL +21250 FOURTH FLOOR LVL -6600 UPPER BASEMENT LVL -11400 LOWER BASEMENT 4800 4800 4500 4500 4500 4500 4950 LVL ±00 41700 4950 LVL +44300 MUMTY TOP 2500 3900 3900 3900 3900 LVL +26200 FIFTH FLOOR LVL +30100 SIXTH FLOOR LVL +34000 SEVENTH FLOOR LVL +37900 EIGHTH FLOOR LVL +41800 TERRACE FLOOR LOWER GROUND FLOOR EXTERNAL ROAD LVL LVL -750 LVL +100 INNER ROAD SCO FFL 6000 8370
PLOT LINE LVL ±00 LG SHOP-08 LG SHOP-33 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 450MM RAISED 450MM RAISED 450MM RAISED 450MM RAISED 1050 MM HIGH RAILING IN ELEVATION OPEN SEATING AREA SERVICE CORRIDOR SERVICE CORRIDOR OPEN SEATING AREA MEZZANINE SHOP SCO-12 GF SHOP-08 GF SHOP-31 FF SHOP-11 FF SHOP-08 FF SHOP-62 SF SHOP-11 SF SHOP-08 SF SHOP-63 KS 20 KS 39 R 09 4F SHOP-23 OFFICES OFFICES OFFICES OFFICES OFFICES IN ELEVATION ROAD IN SLOP VARIES LVL -4300 SITE BOUNDARY RETAINING WALL OTHER PROPERTY -750 ROAD LVL SLOPE 1500 3000 6000 (FOOTPATH) (GREEN BELT) INNER ROAD LEVEL (CARRIAGE WAY) SLOPE UP
6000 SITE BOUNDARY 11420 11420 13220 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING 1050 MM HIGH RAILING SERVICE CORRIDOR SERVICE CORRIDOR FOOD COURT SEATING FOOD COURT SEATING OFFICES OFFICES OFFICES OFFICES 450MM RAISED 450MM RAISED 450MM RAISED 450MM RAISED 5420 OTHER'S LAND 3000 LVL -750 EXTERNAL ROAD LEVEL (FOOTPATH) (INNER ROAD) (GREEN BELT) LVL ±00 INTERNAL ROAD LEVEL LVL +100 SCO FFL PLOT LINE DRAWING DRAWING OWNER/AUTH. PROJECT:PRINCIPAL KEY PLAN NOTES: ALL ALL PROVISION FIRE-FIGHTING RELEVANT BASEMENT VENTILATED ALL BUILDING BUILDING WHEREVER BUILDING RELEVANT ALL THROUGH SOLAR PROVIDED ONE ONE OF IN 1 HR. INTERNAL ALL PROPOSED COLONY RESIDENTIAL 107.919 18.11.2010 03.05.2011) MAIDAWAS, COMPLEX LLP. LVL -1800 LVL +2800 GROUND FLOOR LVL +7300 FIRST FLOOR LVL +11800 SECOND FLOOR LVL +16300 THIRD FLOOR LVL +21250 FOURTH FLOOR LVL -6600 UPPER BASEMENT LVL -11400 LOWER BASEMENT 4800 4800 4500 4500 4500 4500 4950 LVL ±00 41700 4950 LVL +44300 MUMTY TOP 2500 3900 3900 3900 3900 LVL +26200 FIFTH FLOOR LVL +30100 SIXTH FLOOR LVL +34000 SEVENTH FLOOR LVL +37900 EIGHTH FLOOR LVL +41800 TERRACE FLOOR LOWER GROUND FLOOR EXTERNAL ROAD LVL LVL -750 LVL +100 INNER ROAD SCO FFL LVL ±00 INTERNAL ROAD LEVEL SITE BOUNDARY 6000
8270 7500 TOILET LVL -2700 MEZZANINE LG SHOP-17 GF SHOP-17 SHOP SCO-26 LG SHOP-26 GF SHOP-24 FF SHOP-40 FF SHOP-45 FF SHOP-55 SF SHOP-40 SF SHOP-45 SF SHOP-55 KS 62 KS 56 KS KS 450MM RAISED 1050 MM HIGH RAILING SERVICE CORRIDOR 450MM RAISED SERVICE CORRIDOR 1050 MM HIGH RAILING FOOD COURT SEATING FOOD COURT SEATING 1050 MM HIGH RAILING IN ELEVATION 8270 SERVICE CORRIDOR SERVICE CORRIDOR 450MM RAISED 450MM RAISED 9300 OFFICES OFFICES OFFICES OFFICES ROAD IN SLOP VARIES LVL -4300 (FOOTPATH) 1500 3000 (INNER ROAD) (GREEN BELT) LVL -750 EXTERNAL ROAD LEVEL OTHER PROPERTY TRANSFORMER ROOM TOILET LVL -2700 LVL -11400 LVL -6600 LVL -8000 UPPER BASEMENT LOWER BASEMENT LIFT LIFT LVL -1800
LVL +100 SCO FFL SCALE :- 1:200 SECTIONS AA AND PART SECTION XX A1-21 DRAWING TITLE DRAWING NO. OWNER/AUTH. SIGNATURE ARCHITECT'S SIGNATURE PROJECT:PRINCIPAL ARCHITECT: KEY PLAN ORIENTATION N NOTES: ALL LIFTS SHALL HAVE 100% POWER BACK-UP. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PER PROVISION OF NBC. FIRE-FIGHTING SAFETY PROVISIONS WILL BE AS PER RELEVANT NBC PROVISIONS. BASEMENT AREA SHALL HAVE MECHANICALLY VENTILATED AS PER RELEVANT CODE. ALL TOILETS ARE VENTILATED AS PER HARYANA BUILDING CODE 2017. BUILDING HAS AUTOMATIC SPRINKLER SYSTEM WHEREVER REQUIRED BY NBC. BUILDING WILL BE DESIGNED (STRUCTURES) AS PER RELEVANT I.S. CODES FOR EARTHQUAKE RESISTANCE. ALL HIGH RISE BUILDING ARE INTERCONNECTED THROUGH CORRIDOR BRIDGES. SOLAR PANELS OF REQUIRED CAPACITY SHALL BE PROVIDED ON ROOF TOP AS PER HAREDA /ZONING NORMS. ONE EXTERNAL WALL TOWARDS BALCONY SIDE IN ANY ONE OF THE ROOMS IN RESIDENTIAL APARTMENT SHOULD BE IN HR. FIRE RATED WITH PROVISION OF SPRINKLER ON INTERNAL SIDE OF THE SAME WALL. ALL HANDICAP RAMPS WITH RAILING.-IN-SLOPE ROAD WIDE PROPOSED BUILDING PLANS OF COMMERCIAL COLONY MEASURING 1.462 ACRES IN RESIDENTIAL PLOTTED COLONY ADMEASURING 107.919 ACRES (LICENCE NO. 97 OF 2010 DATED 18.11.2010 & LICENCE NO. 41 OF 2011 DATED 03.05.2011) IN SECTOR 66 & 65, VILLAGE MAIDAWAS, GURUGRAM MANESAR URBAN COMPLEX BEING DEVELOPED BY M/S ELAN CITY LLP.
Comunity Gardens Comunity Lounge Spaces Comunity Recreation Spaces Management Office Bike Storage Communal Kitchen Commercial & Retail Public Green Spaces Public Restrooms Public Entry Points Co Working Spaces Restaurant Library Public Plaza Club House Covered Parking Comunity Restrooms Individual Green Space Apartments Shared Laundry Private Entry Points Individual Storage Space 1 2 3 4 5 N S E W E N W Comunity Lounge Spaces Community Gardens Individual Green Spaces Community Recreation Space Public Green Space Commercial And Retail Covered Parking Management Office Bike Storage Public Plaza Individual Storage Space Co-working Spaces Restaurant Library Public Entry Points Private Entry Points Public Restrooms Community Restrooms Communal Kitchen Club House Apartments Shared Laundry NECESSARY UNNECESSARY OPTIONAL
1 1 1 1 1 1 2 2 2 3 3 3 4 4 4 4 5 6 6 6 6 7 8 10 11 12 13 9

RETROFITTTING

CONNECTING

CULTURE

Inner Ring Road

Major Road

Arterial Road

Sub-Arterial Road

NODES

Bus Route

Violet Metro Line

Pink Metro Line

300M Walking Radius from Bus Stand

300M & 800M Walking Radius from Metro

Metro Station Bus Stand

Retail Corridor T.O.D Corridor
amp PICK UP AR D OP OFF PICK UP AR OP OFF
PEDESTRIAN CORRIDOR . CENTRAL MARKE T

Situated in Gurugram, the site is a large empty plot opposite to the RITES Ltd. and Hotel Westin and adjacent to this site is empty greens and the sub arterial road.It is located in a zone where mostly public buildings and hotels are present and a huge park. But what this site lacks is a public space for all of this visiting population in this area. Hence the proposal of a Mixed use building with the functions of an office, retail and a hotel on this site with a vision to create not only spaces for commercial activities but also interwoven along with it is the idea of public inclusive spaces.

Negligible Visual Interaction Of People With The Architecture And Built Vocabulary
Socio -
Augmented Polarity Between The Inside And The Outside.
HOTEL SPORTS COMPLEX SPORTS COMPLEX OFFICES RETAIL 1 2 3 4
Green Spaces are created on the Roof
Creating
Economic
Inclusive space by Staggering the Blocks
BUISNESS
1 ST FLOOR 4TH FLOOR 5TH FLOOR 7TH FLOOR 8TH FLOOR 9TH FLOOR 6TH FLOOR 2ND FLOOR 3RD FLOOR
CO-LIVING HUB INTEGRATING MIXED USE Lifestyle Density Urbanization Time Connections Combinations Economics Brand Creatives,Millennials Collaborators, Live+Work+Play Co-Living and Co-Working Convenience Community Collaboration

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.