1 minute read
Executive Summary
The Metro Tunnel project proposes an initiative to advance to complex urban sustainable development that develops a link between public and private actions and supports social, economic, and environmental aspects of sustainability. To implement the Metro Tunnel Project, the Victorian Government has partnered with the Cross Yarra Partnership (Project Co) under public private partnership (PPP). The Melbourne Central Business District (CBD) project co co is responsible for planning, developing, and managing the proposed Metro Tunnel Project. The project contains five subway stations, mechanical and electrical equipment. About State Library station, the Discrete Renewables Energy (RE) project is also being planned in partnership with RMIT University, Melbourne. This Renewal Energy project intends to provide an aspect of community education that provides renewable energy to 9 MWh annually. The customer requested the effective and stable operation of the so-called first renewable energy in Australia or the world. This further gives the opportunity to design (RE) that implements a unique model for RMIT students.
A proposed RE project site design is shown in the presented report. The approach includes a set of urban measurement methods and sustainable development techniques. The project is designed to achieve the sustainability objectives of the client and proposes more than required energy generation project. In addition, the design of the site revealed a highly efficient way to local traffic (pedestrians & cyclists).
Advertisement