PORTFOLIO
2014-2017
TOHOKU UNIVERSITY Department of Architecture and Building Science Osanai Shota
CV
CONTENTS Shota OSANAI April 29th, 1993 #601, ARTIS Sendai Kakyoin, 2-1-6, Kakyoin, Aoba-ku, Sendai-city, Miyagi, 980-0013, Japan E-mail : ossa.bsk@gmail.com
EDUCATION 2017
Graduate School of Engineering, Tohoku University | Sendai, Miyagi Urban Design Lab, Toshikazu Ishida, Department of Architecture and Building Science
2013
Tohoku University | Sendai, Miyagi Architecture Major : Toshikazu Ishida Lab Thesis : 1. STUDY ON BERNARD BIJVOET’S WORKS -Morphological Analysis of Architecture with Glass Blocks including “Villa Looyen”2. RECONSIDERATION OF UNUSED FLOOR -Consideration architecture from an unused road-
2009
Yamate Gakuin High School | Yokohama, Kanagawa
HOUSE ALLEY HOUSE
SCHOOL PEELED GROUND
COLLECTIVE HOUSE SEPARATED APARTMENT
EXPERIENCE 2016-2017 2017.7 2017.3-6 2016.7-2017.7 2015-2017
Ishida Lab | Sendai, Miyagi Group leader of Yawatahama City-Children's hall Competition project Group leader of Yawatahama City-Oshima Competition project Renovation of a Vacant House in Kesennuma Mitsubishi Jisyo Sekkei INC, Architects | Sendai, Miyagi Part time : Basic design(Vectorworks, modeling)
2015
SEKI KUKAN SEKKEI, Architects | Sendai, Miyagi Part time : Basic design(modeling)
2015
B1D Architects | Sakuragaoka, Tokyo Internship : Basic design(AutoCad, modeling)
2013-2016 2014-2015
Tohoku architecture student oganization Director of Tohoku architecture student organization
2013-2014
Volunteer group of the Great East Japan Earthquake
RECOGNITION 2016.9 2015.9 2015.9 2015.6 2014.12
The Jury Prize | ISAIA international competition First Prize | Tonchiku Furniture competition Winner | Architectural freshmen championship Award of Excellence | 2015s’ the latter term Architectural Design program Award of Excellence | 2014s’ the latter term Architectural Design program
EXPERTISE Digital Modelings Digital Graphics Hands-On
Rhinoceros, Grasshopper, SketchUp, Laser Cutting Adobe Illustrator, Photoshop, InDesign, VectorWorks, AutoCad Drawing, Modeling
LANDSCAPE BLEESING LINE
URBAN RECONSIDERATION OF UNUSED FLOOR
OTHER WORKS
HOUSE ALLEY HOUSE
One of the features of the modern world is the development of online communication. However, on the other hand, there are public communities such as schools and affiliated organizations in Japan, but declining communities at the local level is a problem. Therefore, in this project, I proposed a house where city, people and nature intersect with each other by using alleys in the "intermediate area" which was loved by Japanese residences before the Second World War which local communities were strong. This is the project made on 2014s’ the latter term Architectural Design program at Tohoku University. And this work won the first prize at the program.
concept drawing
site
To be on a narrow road means that people are close to each other.
The site is Tsukishima of Tokyo which is a landfill site facing Tokyo Bay. But there is a traditional downtown scenery here in Japan. New buildings and narrow houses are making contrast in the city. The boundary of the neighboring house and the house is separated by alleys. Residents' lives protrude behind narrow alleys, and alleys are communication spaces between neighbors.
diagram
elevation
west side (1:50) General house foam
Alley goes through
section 7850
Attic 5800
Child Room
WIC Bedroom
3700
In a conventional house, facades facing the road clarify the boundary between the city and the house.
3200
As the alley passes through the house, it shows various aspects to the city.Therefore alley house is opened to the city.
Bathroom
WC
Living
600
A
GL
A
A-A’ west side (1:50)
plan N
Irohamomiji Ginkgo
Shimatoneriko Arakashi
Shimatoneriko
Shirakashi
Kaizukaibuki Yamabuki
Hydrangea 3640
Kitchin
Childroom
Dining Hobby room
Blackberry 0
Dirt floor
3640
Study
Kurumetsutsuji
UT
WIC Shimatoneriko
Ivy
Bedroom -500
WIC
2730
Bathroom
2730
Childroom
Living
WC
WC
1820
2730
5460
ヒメシャラ
1F (1:50) Road Width :5m
2F (1:50) N
Site
:2 6 2 .5㎡
Building area :1 2 7 .5㎡ Total floor
:155㎡
1F
: 8 1㎡
2F
: 74㎡
Model
The alley becomes a way direction connecting each room and makes inside and outside cross.The alley as a semi-outdoor space becomes a new intermediate area as a buffer zone of residents and the city. At the same time, the light, wind and sight pass through in the alley, the environment which was completed only in the house, giving breadth of life.
SCHOOL PEELED GROUND
In crowded areas like cities, things and people are physically close. However, buildings that gathered together to shrink the distance worsened the outlook of the city. Furthermore, when cities have buildings that combine various functions, people's activities have turned inward. As a result, it seems that cities pursuing convenience have rather separated people. In contemporary Japan, the integration and elimination of educational facilities has progressed due to the declining birthrate, the vigor of children and the involvement of residents and children are declining in various areas. This work is a proposal of an elementary school which becomes a square in a densely populated city where students and the local people can relate, reviewing the values that elementary schools are originally local bases. This is made on 2015s’ the former term Architectural Design program at Tohoku University. And this work won architectural freshmen championship in Japan.
site
concept diagram
The site is the Kimachi district in Aoba-ku, Sendai. The Kimachi Road that contacts the site is a main trafic road in the city of Sendai. In recent years, as a consequence of construction of condominiums, the number of children is increasing, contrary to the trend of modern declining birthrate. S Hospitals, middle schools, condominiums, shops, etc. are built around the planned site, and the population density during the day is high. There is a car street called “Ring No.4” on the north side and “Bansui Road” on the east side, however a pedestrian passage is secured.
S
SQUARE
SCHOOL
➡
Current school tipe : High-rise. ➡A part of square.
SCHOOL From High-rise to Lowrise.
➡
SQUARE
SCHOOL
Press one side. ➡ Further more square.
element
M Looking at the overhead, it is clear that Sendai Mediatheque, the center of Sendai culture, and Sendai Municipal Secondary Junior High School are connected by a single axis.
L Further overlooking, there is a Katahira elementary school at the end point of Bansui Road. Kindergartens are scattered along Dansu Avenue. For this reason, Bansui Road has the character of education, and the planning site has a strong element to express the character of the surrounding area.
M
L
:Kindergarten
Peel off the ground
Continuous space from the ground and a space covered by the roof.
Cross
Gate or an eaves to lead to the inside of the site.
Connect
Central space that becomes a gathering of students and local residents
site plan
The street of the pedestrian is maintained.
Ring No.4
Bansui Road
It is a one-way street and the pedestrian passage is not maintained.
One way street
Intersection of one way street. There are many people crossing.
Sendai Mediatheque S : 1/1000
plan
Because there are many passengers, set the building volume inside and extend the aisle. Parents who came to pick up children will talk in the expanded aisle.
UP
UP
UP
B
Main ground used in physical education. Three consecutive roofs create afferentness in the
UP
UP
B
B
The school's courtyard. During the break time, the children are out here and spend their time in their own favorite spaces.
UP
UP
A
UP
A
schoolyard and extend the schoolyard.
A
B
A
UP
UP
UP
UP
A park surrounded by trees and roofs. Parents and children will visit during the day, and students will come to play after school.
B1F , 1F (1/800)
2F (1/800)
1. Teaching materials storage room, printing room 2. Drawing room 3. WC 4. CR 5. Staff room 6. Meeting room 7. Principal office 8. Office 9. changing room 10. Parents room 11. Living room 12. cooking Room 13. Home Economy Room 14. Library 15. Computer Room 16. Audio-Visual Room 17. Pool 18. Change Room 19.WC 20.WC 21. Science Room 22. Music Room 23. Gymnasium 24. Nursery Room 25.WC 26. Broadcast room 27. Equipment warehouse 28. Warehouse
model
scene
Extend the schoolyard to the top of the roof. When there is a school event such as athletic meet, people watch the schoolyard from the top of the roof.
Approach
section 10800 5500 3300 2500
GL -1000
A
A
A-A (1/400)
A square surrounded by trees. Families take children before enrollment, live here during the day and gradually have familiarity with the atmosphere of elementary school.
Countryyard
model B-B (1/400)
COLLECTIVE HOUSE SEPARATED APARTMENT
In this proposal, I propose a high-rise architecture that does not separate the relationship between human beings and nature that existed there. The three-dimensionally Void is a hope for the site Arai district, which became the location of a disaster, to relate positively with the building of the high-rise. This is the project made on 2015s’ the latter term Architectural Design program at Tohoku University. And this work won the first prize at the program.
site
The planned site Iwanuma City Arai district is located on the Pacific coast and is a region damaged by the Great East Japan Earthquake. At present, the disaster recon-
ďźšsite
struction has progressed, and the people's lodging is gradually rebuilt. However, as the residential area has decreased, a huge breakwater was built on the land that was reset, and the high-rise building was dominated by the residential area.
site(1ďźš2000)
Arai Station
Park&Ride
scale : 1/4000
diagram
Component Surface
0.
1.
2.
Structure
3.
Furniture store Floor
House Floor
Elevator
Overall 1. Make a void in the volume of 30 Ă— 70 Ă— 35 m from the conditions of light, wind, and sequence.
2. Divide the volume further to create the scale of a house.
3. Extend the void space by removing volumes that do not become space.
House Unit Example1
Example2
EV
From north side
Example3
Sectional gap that can be made by overlapping multiple houses units in each volume becomes an external way direction connected to the dwelling unit. Example 1: Maisonette type as a result of overlapping houses in a volume. Example 2, 3: A house with rooms in multiple volumes.
70000
70000 16550
plan
17750
2160
10040
1040
15660
20210
16300
10040
curtain/carpet
market hall
table
outdoor space EV
26200 7310
EV
26300
cushion/blanket
13960
2670
entrance
5940
cahier
EV
13960
2260
livingroom
30000
20210
community space EV
3100
outdoor space
EV
EV
outdoor space
17700
12670
7610
10450
EV
39450
2000
16840
38340
2000
level 1
level 2
70000 20210
70000
15090
16260
10040
20210
5940
6040
wardrobe
14600
14900
10040
restaurant bathroom
rug/curtain EV
13380
13959
outdoor space
EV
EV
26110
30000
30000
26110
7110
outdoor space
7310
kidsroom
EV
outdoor space
EV
11430
7390
12666
7410
EV
EV outdoor space
16860
11020
showroom
25080
2000
15730
EV
36850
2000
level 3
level 4
70000 20210
13940
13970
10040
13401
kitchen EV bedroom
The volume divided by Void contains a furniture store besides the house.
dining EV 25803
By aligning furniture shops and dwellings to the same level, people could feel
11670
tense like staying in the city while staying in the house.
scale : 1/500
EV
14870
37630
2000
level 5
scene
Furniture store model room. By placing a space in addition to the dwelling units, the house and the furniture shop are treated in parallel.
A corridor of the dwelling appears in the void space.
The space created by the obliquely cut volume is taken as the exhibition hall of the furniture store.
Inside a dwelling, over furnishings furniture shops can be seen.
section Void space is the conductor of the furniture store and at the same time it
2630 2500
2810
2500
3750
460 0
3500
3500
377 0
329 0
2500
2840
4580
3420
becomes the garden of the residents.
36000
241 0
2130
2230
south
4650
4600
2500
4650
2570
2540
2910
2990
west scale : 1/500
LANDSCAPE BLEESING LINE
Inherit the memory of the tsunami On March 11th in 2011, we found that the coast of space becomes a sometimes frightening place. For a tsunami that we do not know when it will come , can architecture just wait to be destroyed? Every time the earthquake comes, can the cityscape of the sea be reset? This architecture is a retaining wall to protect the residents from the tsunami, a place for a life of local residents and bathers, one of the few wedding hall of the sea in the Northeast, and remains to convey the threat of tsunami. To the site of the negative image, we propose the architecture to create a positive space. This is the project made on 2016s’ the former term Architectural Design program at Tohoku University. And this work won the Jury Prize at ISAIA international competition.
Wedding ceremony: Not only participants but also people who happen to come to the place share happiness.
site
distribution of wedding halls
10km
Miyagi
Kanagawa
Shobuta district in shichigahama town where tsunami destroyed the city scape on March 11th in 2011
Wedding by the sea Shichigahama town is a summer resort, as well as a place where sea bathers and foreigners gather, it is also called "Northeast Shonan". Comparing the Kanagawa Prefecture and Tohoku areas where the actual seaside space is crowded, there are many wedding ceremonies in Tohoku, centering on Sendai, whereas in Kanagawa there are many wedding ceremonies along the shore of Shonan . By establishing a new wedding hall next to the coast of Tohoku, it will attract many site : Shobuta
people from inside and outside the shichigahama town. Also, it is a new industry for enjoying happiness for tourists and local residents who are familiar with Shobuta such as sea bathers and surfers.
Tsunami simulation of Shichigahama town : Even now with a tide breakwater, there are risks of tsunami in Shobuta district.
program
Program Diagram
sea bathing Differentiation from Shiogama and Tagajo As Sendai City's bed town, the neighboring cities Shiogama and Tagajo are similar in resident type.Shichigahama is inferior to Tagajo and Shiogama in terms of convenience of transportation. Three cities are thriving industrial products and fisheries, respectively.
Food
Wedding
Sea house
In the future Shichigamahama, a service industry using tourism resources such as beach baths is effective for differentiation from neighboring cities. Combining wedding ceremonies and local shops
Daily necessities
As a program, combine the wedding hall and shopping, the ocean house. On this site, a casual wedding hall is prepared which is spacious in nature as opposed to cities like Sendai. Since the wedding industry systematically has a large number of visitors, it can be
Program placement
sasayama
expected that the operation will stabilize by cooperating with restaurants and restaurants that are usually operated.And dealing with locally produced ingredients and creating jobs will lead to
rice ďŹ eld
promotion of regional economy.Also, when a sea bathing guest, a general guest visits, it is impressed as a place where you can meet a happy scene from time to time, and Shichigahama will be a land with a positive image.
siomidai
masterplan
structure
Architecture as a retaining wall
This building plays a role of temporarily stopping the flow of the tsunami. For that purpose, the wall parallel to the coastline is a reinforced concrete with a thickness of 600 mm. This can withstand the tsunami of assumed
escape line 1.The yellowish green area is the site. Existing road of Shiomidai and Sasayama will extend to the site.This road is the evacuation road.
gard 2.For when tsunami comes in the future, create a retaining wall to defend the road.
height 5 m. In addition, filling is applied on the foundation, and it resists buoyancy when the tsunami comes. To achieve a depth sufficient for the growth of overhead plants and shrubs, fill up to 1 m in height. While fusing concrete and planting, a new Shobuta area will be passed down.
extend 3. The building develops like a belt.
tunami 4. As a result, it catches the tsunami in this site. And sink it to the center.
hotel
market shopping
restrant wedding restrant
big space 5. Furthermore, the wall makes a large open space.
6. Folding the wall, it makes a small space. Here is a restaurant and a bar and shops, etc.
site plan
escape to sasahara
Linen rooms and warehouses are placed, and in the event of a disaster, they are used as stockpiling warehouses.
warehouse
escape to siomidai
linen room hotel
The evacuation route which extended the road rising to shiomidai on a straight line is also the main access of the wedding guest.
The central square becomes a wedding hall. By depression in the center and rising in the front, the scenery on the far side is concealed, and a wide sky is produced.
hotel hotel
+1000
Depending on the shape of the folds, each room holds the garden. On the second floor there is a large terrace, and emergency evacuation is possible when the tsunami comes.
hotel
hotel
parking banquet hall
hotel
preparation room back yard hotel
hole
A restaurant that can be used at the wedding ceremony etc. is entered. It becomes an area where ordinary customers, local residents, wedding guests mix.
park and chapel −1000
snack shop
flower shop
book store
hotel
hotel
Filling and planting is done on the wall of RC, and it becomes a space like a semi courtyard with greens.
a
restrant
People who visit the park can meet happy scenes. restrant
restrant
restrant
rounge
restrant
Areas to be used by sea bath customers, general customers.
a BBQ corner
hotel parking
restrant
sea house
restrant
parking
scale :1/1000
shower room
parking
component escape road
PARK PARK
wedding SHOPPING RESTRANT
hotel PARK PARK
escape road
SHOPPING RESTRANT SEA HOUSE
L
M
S
The wall of RC deforms like folds, surrounds the rooms and traverses the site.
ParkďźšThe building is a remains of the Tsunami attack.
A single axis passes through and rooms are set up along it.
Courtyard: As time goes by, the planting of Shichigahama is familiar to the walls.
In contrast to a strong concrete framework, wood is used for the inner wall.Because the wood panel has variability, the shape of the room changes according to the program at that time. Furthermore, even after being damaged by the tsunami, it is expected to recover quickly.
Sea house: It will be a place for residents, sea bathers, surfers to relax.
Interior : The shared view direction is along one axis, and the activity of the other building is visualized.
Restaurant: Normally local people get together, sometimes it is used at the wedding ceremony.
URBAN
RECONSIDERATION OF UNUSED FLOOR -THINK ABOUT ARCHITECTURE FROM AN UNUSED ROADI considered the meaning that urban planned roads that exist nationwide, yet do not fulfill the transport function even if planned before half a century ago exist in cities and suburbs. When these roads perform the original transportation function in a few years, this is a project to update a half a century previously constructed suburb extracting the latent spatiality and monumentality there, and by inserting a new scale architecture. This is the project made on 2017s’ Graduation Architectural Design program at Tohoku University.
case study :Yokohama City Ring 3 Route Road / South Totsuka Area
site : South Totsuka area, Totsuka, Yokohama, Kanagawa As a case study, I picked up the Yokohama City's Ring 3 Route Road, where the undeveloped roads are the worst level among the
Gumisawa elementary school
urban areas in Japan. Among them, I observed the relationship between the bridges that do not fulfill the original transportation function and the surrounding areas, which exist in the South Totsuka area, which is a node with the national highway No. 1 with heavy traffic.
to Fujisawa
Ring 3 Route Extension Site Nishi yokohama international hospital
National Highway No. 1
①
Ring 3 Route Road ②
③ Minami totsuka high school
to Kawasaki
環状三号線橋梁(対象敷地) ④
Yokohama
Ring 3 Route Extension Site ⑤
Shimogo elementary school
Minami totsuka elementary school
⑥
⑦
⑧
Ring 3 Route Extension Site
the national highway No. 1
<Development process of South Totsuka district bridge>
URL http://www.city.yokohama.lg.jp/doro/kensetsu/kan3/
5
Upper ďŹ gure / quotation: From Yokohama-shi road station
The Ring Road No. 3 was decided on city planning in 1969, under the jurisdiction of the Yokohama City Road Bureau. Due to issues such as site acquisition, maintenance has been delayed considerably than planned, and there are still unused points still present.
As the South Totsuka area is a mortar-shaped site by the Kanto Plain, the Ring No. 3 line was also planned above the valley. Therefore, bridges covering valleys were urged by local residents to destroy the landscape of Yato and to deteriorate the living environment. Even now it is not used as a road, the bridge part which remains only form for more than 10 years has turned into an aversified monument.
〈Development process around the South Totsuka district bridge / From the Meiji era to today〉 Meiji era
1956
1977
1988
1997
2005
today
東海道
2015 年
1977 年
Located in the Kanto Plain, it
Development began along the
In 1969 the No. 3 line was
The housing complex was
forms a Yato terrain. In the
Tokaido after the war.
planned, and many of Yato were
developed with the urban
Meiji era it was a rural area
covered with houses in 20 years
planned road interposed.
where paddy fields spread.
from development.
1988 年
Development of the bridge section began.
1997 年
2005 年
Over the course of about 10
It was completed in 2010, and
years, residential areas were
now it is waiting for completion
gradually covered with huge
of the extended road.
civil engineering structures.
〈The situation of the valley〉 Residential area
Completion of bridge (monument)
Development of bridge (monument)
Population increase in town
Residential area development period
Forest field
At the bridge section, there are currently signs of no trespassing by name alone. However, in fact, it is a walking road of local residents in the morning, a playground of children after school, a place where young people invade in the night and is not managed. The road planned in the daytime logic and made for the car functions as a floor where 24 hours of activities, people are active, which was not considered in conventional urban planning while the construction is stagnant .
〈Development process around the South Totsuka district bridge / From today〉
The bridge is an independent, disgusted foreign body that exists
The bridge becomes a part of the annular No. 3 railroad line, and it will
in a residential area.
become the original transportation function.There was no activity in the
But here the hidden activities of the city are hidden.
hidden city,The disgusted monument is updated to a simple pass.
〈The situation of the valley〉
Current : residential area
Future: A quiet residential area becomes a node of traffic.
<Proposal> Insert a new foreign object in the bridge part of the ring 3 railway line, which is a foreign matter that allowed residents' activities for 24 hours because it was left over 10 years. When changing from a quiet residential area to a traďŹ&#x192;c space with noise, it will be updated from a place of hobby preference of 24 hours to a place of performance of 24 hours.
Current (2017 year)
2023 year
<Extraction of Space> Extract the shape and scale of bridge made by civil engineering logic and apply it to building.
One lane width: 3.5m Rental apartment With the start of the tunnel construction, withdraw. (From the road station)
Widthďź&#x161;22m
Arch pier Height under elevated ďŹ&#x201A;oor: 12
15 m Design speed: 40 km / h.
Texture: Concrete with rough texture
From Article 15 of the Road Structure Order (Regarding Road Linear Form) Curve radius: 50 m
<Extraction of Activity> Extract what happened in the bridge section and incorporate it into the program.
Just right for children playing with balls : 22 m
Wall crawls when young people chat at night : Height 2 m
A distant view can be seen, a bridge ramp way A node treated as a music square
where painting has appeared
<update> Constructed in stages according to the road construction that will be carried out in the future. At the same time, the activity that was done at the upper part of the bridge moves to the space under the elevated which becomes void in step with the update.
Current
Rental apartment
2018 年
Tunnel construction
2020 年
2023 年
〈Architectural process〉
· Quiet residential area · Roads are not managed
· Withdrawing housing
· Construction ended
· Entire construction complete
· Road construction restart
· Extended road construction started
· Shared start
⇨ Add a new roof.
⇨ Connect the void space and the road
⇨ A function is given to a new slab, and it
with a slope. Embank the void with soil
is opened to the public in general.
generated by the tunnel construction.
〈Inheritance of road space〉
In the road space that is not
The activity moves to the void
Road space and voids are used
When the road is shared, the
currently used, various activities
surrounded by the road.
together.
activities are completely transferred
of local residents are being carried out.
under the elevation.
<Architectural form / composition>
· Existing road
Planned and decided in 1969, it is nearly completed in 2010 after extensive extension. It will be used as a shared road in 2023. ·roof
It extends from the bridge lamp in a semicircle shape with a radius of curvature of 50 to 60 m, enclosing the void space and making it central. ·wire
Hang a flow line slab connected to the road from the roof. Position the stagnant space in the flow line space. · Flow line slab (Orange)
External space connecting the road and void space. It becomes a new everyday flow line, and it turns into a place of performance occasionally. · Function Slab (light blue)
Slabs such as galleries, workshops and meeting places, which are inserted along the activity that had been taking place on this road, applied a circular grid of 3500 mm.A flow line slab and a double helical structure are formed, and actions and environments occurring in mutual space intersect. · Each room (red: studio, gallery / purple: studio, meeting place etc. / blue: cafe, library / yellow: projection room, cooking workshop etc.)
While using wall pillars as structural walls, they support the functional slab and become the core of the whole building. · Stairs
Directing round plazas as auditoriums, directing performance places as a stage. · Pier
The pier which had been isolated by fence and net so far functions as a wall segmenting the flow line space. ·mound
Use soil generated by tunnel construction. Make centrality and gently partition the external space adjacent to each function.
D 作業室b
A staircase room Hot water supply room WC Warehouse Work room B
C
Work room A
Workshop
2,700 3,500
Equipment room
3,500
飲食店
WC
2,700
D Exhibition and Tasting Room
50,000
C
WC
warehouse
A A
Vegetable direct selling place
Projection roo m
EV
B
Warehouse
WC
Maintenance room Low pressure cabin room Switchboard
Changing room Heating room
Food storage
Air conditioning room
Kitchen
Restaurant
B N
plan GL+2200 1:500
A staircase room Showcase Showcase
Showcase
Showcase
Showcase
Cooking works hop
Lounge
Terrace
Office
EV
Staff Room WC
Library
N
plan GL+7500 1:500
A staircase room
Exhibition room A
Exhibition room C
Gallery Exhibition room B
Meeting place WC
Hot water supply room
Studio
N
plan GL+12,500 1:500
<Example of activity on a certain day>
Slope space in front of the gallery.
In front of the projection room.
In the daytime, the slope which was a flow line space changes to a place of
In the morning, the figure of the person who was active until midnight the previous day
The space surrounded by something beyond the human scale is the space that the local
is recalled.
people gather in the evening
Young people gathering at the end of work at night ⇨Dreaming of working as an artist in the future, immersed in hobby time.
0
street live at night.
A woman who comes to show songs on the street ⇨Sing till the morning, buy the vegetables at the direct sales place and return home.
A man walking early in the morning ⇨Invited by young singing voice. Parent and child returning from the night nurseries ⇨An important communication time that can only be taken at night
18
6 A salaried worker commuting in the morning ⇨Going to the company to look forward to the work of authors who worked last night, which is displayed in the gallery.
Elementary school student after school with parents returning late every night ⇨When playing in the plaza, artists coming from the evening will play.
An old woman going to the gallery ⇨Refering to the work that was made at midnight.
12
Housewives going to cooking classes ⇨Cook dishes that you made too much will be divided for those who work at night.
1,000
6,500
500
7,750 Projection room
A
200
GL
A
section A-A 1:200
Projection room / Place quietly in the residential area, a place for people's way back
Library
3,200
1,000
5,500 Restaurant
Kitchen
160
B
B
GL
section B-B 1:200
Cafe / pier will enter the room, civil engineering and architecture create space
3,800
Meeting room
1,000
5,000
500 2,100 GL
C
meeting place It is at the same height as the bridge, reminiscent of the road space that once existed
C
section C-C 1:200
1,000
5,200
Gallery
1,000
3,500
500
4,600
GL
Studio / bridge piers split the space and gently divide the room
Workshop
60
D
D
section D-D 1:200
2016 ĺš´
2025 ĺš´
People's activities that were taking place on uncared roads are taken over by the void space, and from this space the resident's personality appears in the residential area of the valley.
OTHER WORKS
Gallely
Furniture
Door
Resort
Roadside station
Bridge
LEANING BOX
MORI NO BYOBU
DOCODEMO DOOR
OKU NO YAKATA
HOUSE OF TOWER
RTERNING WATER
2014/10 - 2014/12
2015/8 - 2015/10 Competition
2015/10 - 2015/11
2015/10 - 2015/12
2015/12 - 2016/1
2016/4 - 2016/5
Architecutural Design Program
Architecutural Design Program
Architecutural Design Program
Architecutural Design Program
Competition
Studio excellent work
Studio excellent work
Competition
Architecutural Design Program Studio excellent work
First Prize | Tonchiku Furniture competition
Environmental House
Complex
HOUSE SURROUNDED BY ALLEY 2016/5 - 2016/7 Architecutural Design Program
IT IS A SUMO WORLD
Studio excellent work
2016/5 - 2016/7 Competition
Traditional Japanese thick earthen walled family storage buildings NIWAGURA 2017/4 - 2017/5 Competition
Regional exchange facility
Complex
OSHIMA ROOF
UNSUNG HEROES
2017/4 - 2017/6
2017/6 - 2017/7
Competition
Competition