Measure Drawing - Basic

Page 1

MEASURED DRAWING

ARN-213: Measured Drawing Camp

For the measured drawing exercise, I have selected a community center in Faridabad , 5-minute walking distance from my home , Managed by residential welfare association of our sector. In the project I have provided the complete set of drawing made by me and the onsite research . I have referred to NBC 2016 & Haryana By Laws to check if the construction details are according To the codes and mentioned the defects which I have encountered with the structure.

WIND ROSE

Faridabad is 207m above sea level. Faridabad's climate is a warm climate. There is not much rainfall in Faridabad all year long. According to Köppen and Geiger, this climate is classified as Cwg. The temperature here averages 24.7 °C | 76.5 °F. The rainfall here is around 700 mm | 27.6 inch per year.

• CLIMATE & SITE ANALYSIS
SUN PATH
N
E Sector
Faridabad Haryana
India
LATITUDE : 28.4
LONGITUDE : 77.3
17 ,
,

PLOT AREA =1789 m2

BUILT UP AREA =380 m2

N • SITE
PHOTOGRAPHY
Residential area Residential area School Market Residential area S U R R O U N D I N G JIGSAW PUZZLE LIKE PLAN

APPROACH & TRAFFIC MOVEMENT

Respected approaches are highlighted on the map

For fire or any medical emergency

Peak Traffic Times

1. 6:30am – 8:00am

• People come to market for groceries , milk and daily items & morning walks

• Traffic of school vehicles & students.( shool starts)

2. 1:30pm – 3:00pm

• Traffic of school vehicles & students.( shool closes)

3. 5:00pm – 7:00pm

• People come to market for shopping & eating at food stalls and resturants

• Children ome to park

For Noise estimation & most appropriate time for mid break

According to th sun path diagram

appropriate shading is provided

TYPE – Eggcrate shading

• SUN
PATH & SHADING

PLOT AREA =1789 m2

BUILT UP AREA =380 m2

HEIGHT =6 m

WALL

THICKNESS = 0.3 m

Floor Plan In Cm
Location of columns Location of windows • ENTRY , EXIT & CIRCULATION Staircase • Column , Window , Gates & Staircase location • FRONT ELEVATION
HEIGHT = 6 m

PLOT AREA =1789 m2

BUILT UP AREA =380 m2

Ground coverage = 380 x 100 = 21% 1789

HEIGHT = 6 m

Total Floors = 1

Floor Area = 274 m2

MEANS OF ACCESS

Road Width = 10 m

Entrance gate width = 3.5 m

Main gate to building

distance = 14 m

• FAR &
COVERAGE

Front = 14m

Rear = 17 m

Side1 = 680m

Side2 = 485m

Open Spaces = 4

No proper ventilation in store room, and is also not connected with the main hall.

Set Back & Ventilation Front Rear

Exits

Total Exits = 4

Main exit Door width = 2m

Opens = both inside & outside

• Plinth

And therefore at times of heavy rainfall water enters the building as there is no proper drainage in roads

= 370 mm = 2 m

Not according to norms

• Passage width

• Off Street Parking = 4 ecs

Off-street parking users differ from short to long-term, i.e. monthly tenants and regular users. In many urban centers, some areas are exclusively allotted for parking which will be at some distance away from the mainstream of traffic. Such parking is referred to as offstreet parking. They may be operated by either public agencies or private firms.

1 2 3 4
= 1 ECS
OFF STREET PARKING

For 143 sqm , maximum capacity = 256 people

Or 200 people + performing area

Temporary enclosure

Door Width = 0.8 m

Door Height = 1.8 m

( Not according to minimum standards)

Area of Guest Room 1 not according to norms

Bathing Area not provided for guest rooms

DRAINAGE

Sq
OTHER SPACES Sq ft
ft
*Temporary sitting arrangement for functions

DOORS

Main front door Store room steel door Inside wooden door
DETAIL OF JOINERY FOR INSIDE WOODEN DOOR

STAIR

DETAILS OF STAIRCASE :

To reach the roof

TYPE STRAIGHT

RISER 17 cm

THREAD 22 cm

NUMBER 20

STAIR

MATERIAL STEEL

RAILING DOUBLE SIDED

RAILING BARS

MATERIAL

HAND

RAIL

MATERIAL

IRON PAINTED IN BLACK

IRON

WIDTH 55 cm

WINDOW
Iron grill frame & Glass Panel

CONSTRUCTION MATERIAL

Exterior walls = High density exposed concrete

Interior walls = Brick

Floor = Marble

Outer = Concrete blocks

Roof = Brick

• FUNTIONALITY – Socio - Culture

• Festival celebration

• Stalls

• Acupressure

• Blood & other camps

• Yoga & Taekwondo Training

• Sports & Games

❖ Table Tennis

❖ Billiards

• Higher compressive strength

• Greater Durability & strength

• Higher modulus of elasticity

• Fire Resistant

• High Thermal Insulation

INDOOR

❖ Chess

❖ Carrom

❖ Lawn Tennis

OUTDOOR

❖ Badminton

Marble Brick roof Concrete blocks

All the spaces are well arranged and organised in a jigsaw puzzle like plan and pattern.

Building is designed by in accordance to the byelaws and provisions made by the Haryana Urban Development Authority (HUDA).

Plot periphery is harmonised with the adjacent park using green cover.

An ample amount of open spaces and the allowance of ventilation and lighting.

OBSERVATIONS

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.