Shunyi Olympic Rowing-Canoeing Park
DIANO Francesca, XIE Yingying, MANDRILE Manuele, GUO Yong ,2008.03.09
•
Plan conditions analysis – – – –
•
Post-Games objectives – – – –
•
Current situation Existing planning Olympic games summary Venue for international competition and professional training base Recreation center and aquatic sports center shift of the using mode of water resource Inducement of local tourism economy
Gaps – Problems of water – Problems of interaction – Problems of scale
•
Strategies – WATER: avoiding evaporation; water usage senariles; self-sustainability ; serving surrounding area – INTERACTION: spacial structure goes with the structure of the city – SCALE: zoning plan inside the site, different stages of construction
•
Subjects – – – –
MASTER PLAN TANK: structure, buildings, landscape, water treatment ROWING COURSE: bridges and dams, surfaces, landscape OTHER: land art, pipe, marks and etc.
CONDITIONS
Current situation
Existing planning
Olympic Games
SUMMARY
• • • • •
An opportunity for city development An heritage of the Olympics Keep the value of Olympic Develop the value of the city Make it part of the city and the highlight of Beijing
OBJECTIVES
• VENUE for international competition and professional training base • Recreation CENTER and aquatic sports center • INDUCEMENT of local tourism economy • Shift the using mode of water resource—a BASE
GAPS
Problems of Water, Interaction and Scale • Water Beijing City belongs to the II district of rainfall, but high evaporation and penetration makes it a city short of water.
• Interaction
• Scale
918M
2746M
STRATEGIES
• WATER: – avoiding evaporation; water usage scenarios; selfsustainability ; serving surrounding area
• INTERACTION: – spacial structure goes with the structure of the city – finally be one important spot of the city
• SCALE: – zoning plan inside the site(for seasons) – time stages of construction(timeline)
Water Strategies
Avoiding evaporation • Reduce the area of water surface • Water storage tank and landscape on it • Pipe system to supply water
Water usage scenarios
A
B
C&D
Serving the surrounding
Serving the surrounding
Interaction Strategies
Current situation
Scale Strategies
Zoning plan
Construction stages
Construction stages
Construction stages
Construction stages
Construction stages
SUBJECTS
Master Plan
Tank
Rowing Course
Industry and Activities
THE END Thank you☺☺☺☺