Shunyi Olympic Rowing-Canoeing Park WORK IN PROGRESS 2008-04-01
1. starting point TOPICS 1.the presence of three trasversal axis corresponding to three existing streets, each one caracterized by a different function,connected by the existing longitudial axis 2. manteining the competition course according with the presence of water 3. covering the warming-up course creating tanks in order to collect the rain water for a near residential area 4. join the river bank with the course park making visual connections 5. make a “time line� showing how the venue could be transformed in the time
2. way of working •
DIVISION OF THE WORK
The chinese group and the italian one focused the attention on different aspects: CHINA
- masterplan - landscape design - water filtering
ITALY
- tanks’ structure - architectural design - different suggests to reuse the venue
•
WAY OF COMUNICATION
E-MAIL, SKYPE, MSN
to discuss on the project in real time
BLOG
- to publish our decisions or doubts - to let other people see them - to make a sort ok book the work in progress
3. Project until now
1. Suggestions from Experts of Water Treatment TANK
WATER SOURCE
WETLAND WATER PURIFY
Evaporation is natural and important process of the water circulation system. It’ll be better to make the tank unsealed. Water source 3 ways: 1>River water from Chaobai River after South-to-North Water Diversion Project. 2>Underground water. 3>Grey water from the sewage plant in Liqiao, Shunyi. 4>Rainwater collected is wasted, huge construction and inefficient.
Wetland is recommended. And transpiration of the vegetations makes water evaporation less. Use existed water treatment system. Add disinfector like chlorine in swimming pool.
Breathing cover
3 options and 3 plans
Wetland and vegetation
Man-made at least
2. Southern part—Sports Park Plan
3. Western part—Warming Up Pool
4. Water Circulation Mode Transformation
5. Axis
6. Bridges
bridges’ scheme
central bridge
movable bridges
7. “Land art”
4. future work