Sigit prayogo architecture portfolio (internship)

Page 1


CV

PERSONAL DATA

Sigit Prayogo address. phone. e-mail.

EDUCATION

Rilfa Kinder Garten

jusin street no.36 ciracas, East Jakarta, ID 13750 +62 857 7948 5584 Prayogos74@gmail.com

place/date of birth. Jakarta/ June 03, 1995 gender. male status. single nationality. indonesian

@yogosigit https://issuu.com/sigit5/docs/1/1?e=23603724/30000297

02 Elementary School Kuntum Wijaya Kusuma Junior High School

51 Jakarta Senior High School Departement of Architectur, Atma Jaya Yogyakarta University (still student)


EXPERIENCE

SKILLS

Committee Experience :

Skills

1. Exhibition Team of HIMA TRICAKA (2015,2016,2017) a. Regular Exhibition for Student b. City Development Theory of history Exhibition c. Entrepreneur Exhibition d. Architecture Exhibition 2014, 2015, 2016 1. Archipelago 2. Eureka 3. Invantion or Invitation

Desing Computing : Autocad 2D SketchUp + Plugin Sketch + Vray Dialux Ecotech Adobe Photoshop Illustrator Rhino

Organitation

Manual rendering : Sketch with pencil, colour pencil, ink, watercolour.

1. Member of Hima tTicaka 2014-2016 (UAJY architecture Student Organization) 2. Coordinator Of Architectural Exhibition Affairs Committee 2016


COMPETITION

National Competition 2014 1. Visionary Bamboo Architecture (Petra University) 2. Share house ( Bina Nusantara University) 3. Wismaharman Expo (Gajah Mada University) 2015 1.Competition of mosque bekasi (Indonesian Institute of Architects) 2. Urban Futurist for our life (Arch Grand Festival) 3. Halte Trans Semarang(Diponegoro University) 4. Arch-Kids-Techture -Architecture festival 2015 ( Petra University ) 5. Indonesian Gallery (exporivm, Kristen Duta Wacana Univversity) 6. Eureka (Atma Jaya Yogyakarta University) 2106

1. Council on tall building and urban habitat 2016 (Hongkong) 2. Highrise Building 2016 ( Lustrum Uajy) 3. Asian Young Design Award 2016 (Nippon Paint) 4. Competition of IAI (Indonesian Institute of Architects) OďŹƒce D.I.Yogyakarta 5. Free Space of Architecture ( Atma Jaya Yogyakarta University )

6. Wismaharman Expo (Gajah Mada University)

Interational Competition International Competition

1. Council on tall building and urban habitat 2016 (Hongkong) 2. Asian Young Design Award 2016 (Nippon Paint) Real Project 1. The Quays, Apartment in Batam (Sketsa Integrah Company) 2. Ozon Hotel in Batam (Sketsa Integrah Company) AWARDS 1. 1ST WINNER of Lustrum UAJY VII Design Competition 2. 2ND WNNER of Ozon Hotel in Batam (Sketsa Integrah Company) 2. 3RD WINNER of Urban Futurist for our life (Arch Grand Festival) 3. FINALIST of Halte Trans Semarang (Diponegoro University) 5. BIG 10 of Arch-Kids-Techture -Architecture festival 2015 ( Petra University )


Project Content

01. Cahaya Amal National Competition for Students [page 05]

05. Anglur Selur National Competition for Students [page 05]

09. Teras Arsitek Istimewa National Competition [page 05]

02. Kampoong Pulo Vertical Settlement National Competition for Students [page 05]

06. Creative+Play School Community National Competition for Students [page 05]

10. Ozon Hotel National Competition [page 05]

03. Hotel National Competition for Students [page 05]

07. Jakarta Sub-Urban Vertical Dwellings International Competition for Students [page 05]

04. Bale Resik National Competition for Students [page 05]

08. The Quays National Competition for Students [page 05]


Timeline 02

04

03

06

07

2016

2015

01

2014

2013

Registered student in Atma Jaya University

05 09 10

Architecture Exhibition about “Archipelago”

Architecture Exhibition about “Eureka”

Architecture Exhibition about “Invantion or invitation”




AXIS & VIEW

3 9

K

10

8

axis orientation of the building in accordance with the direction. and has a view in all directions

10

4

CIRCULATION

7 5

11

U

2 6

K

male circulation female circulation General circulation

SITE PLAN

Skala 1 : 200

1 1 1

MASSING

information

1. Parking area 2. Male Toilet 3. Female toilet 4. Line male 5. Line female

6. Plaza 7. Multifunction room 8. Adm toilet 9. kitchen 10. adm room Main Building Toilet Supporting Building Minaret

RESPONSIVE DISASTER

Building Concept

3d massa

Mihrab Concept mihrab & Prayer room

massa concept

minaret

qibla axis

water & vegetation element

Masjid

toilet & dapur umum

Breathable wall

Rg serba guna

Air Circulation Prayer room porch

porch

river

morning

Daylight

Afternoon

Afternoon

night

The increase in the footprint of 1.5 m and a stage at the mosque andmultipurpose building in response to flooding

PROGRAM U

Lighting Concept in mimbar and Prayer room

plasa

K

Transparent, Wall mosque was left open but shading the porch as a form of harmonization with the environment and each other. Disclosure of the mosque is also a form of dialogue between God, man and nature. The whole porch using perforated boxes roster So with the spatial experience can eliminate the usual exclusive impression dibangunan mosques were impressed now closed and full of ornaments.

Seeing the mihrab form that develops in some mosque jami ', in fact the distance priest with sutrah exceed prescribed limits. This is a form of wastefulness. (Rahmawati, nur.2007). Then the mihrab design enabled only for prayer imam with mihrab broad enough no more, no ornaments, clocks, bookshelves etc. The physical form of the mihrab is designed as simple as possible with monolithic material so that it can become a media disclosure of the values of the surrounding community reflection.

sungai

Flexibility, with mass processing chamber inside-out like this then obtained a double extension on the building of the mosque to the plaza or multipurpose building to the plaza. The shape of the building is open and the stage is taken from the local architectural characteristics BEKASI, this design can be seen on the building of mosques and multipurpose room. This form is also a response to the catastrophic floods that often hit land this mosque. The mosque, multipurpose room and the plaza is accessible 24-hour.

Supporting the mosque as office space etc. placed above the multipurpose building. Multipurpose building shaped stage, to add functions written two business space with the system partition for the prosperity of the mosque in the multipurpose room.


WATER TREATMENT

Letak site tepat disebelah sungai, serta berada di kawasan rawan banjir sehingga kualitas air kurang baik. Penyaringan air menggunakan media pasir dan kerikil merupakan metode sederhana untuk mendapatkan kualitas air yang baik sehingga aman untuk dugunakan wudhu, MCK, dll.

Water Tank Pipa distribusi ke bangunan pendukung Pompa 1 Pipa distribusi ke bangunan Pendukung Akar Wangi Bronjong

Bak Penyaring 2 Bak Penyaring 1

Sungai

Tepi Sungai

Jalan 4m

Pompa 2 Wudhu Pria

Masjid GSB

Wudhu Wanita & Dapur Umum

Jalur Sirkulasi

R. Wudhu Wanita

Perspektif ruang Sholat

Perspektif bangunan ruang seba guna



K MPUNG PULO VERTIC L SETTLEMENT

A

Massing Concepts

First step is to relocate a number of people living in KampungPulo who get the harming impact caused by flood the most, and who get low quality of life because the inability to gain clean water and increasing density in that area.

Public facilities like kindergarten, commercial area for street vendors, and Puskesmas (health center) placed on ground floor's mezzanine with 1m height from ground surface to prevent flood's overflow. To make it hospitable for the disabled, ramp will be placed as circulation track.

Residential units are on 1st floor until 6th floor. There are 65 residential units in total. Each unit's size is 4x8 m with steel frame covered by precast concrete as the material.

Ramps are used as vertical circulation, but lift will be used as main vertical transportation. With the existence of ramps, people may feel spatial experience and interesting vista beside its hospitality for the disabled.

In general, the remaining land are used as open space and as rainfall drainage. Residential units use roof garden as cover to hamper direct sun radiation and to reduce Urban Heat Island.

Open spaces are treated in specific way to make it appropriate to be lived. Landscape treatment will be done by creating amphitheater, sport field and urban furniture so that can trigger high level of people's happiness index in that area.


Kampung (Village) Essence There are lots of solutions offered by government which prioritize physical aspects without paying specific attention toward social and cultural aspects as a part of society in specific area. For instance, a house is not merely a place to sleep for local villagers, but also as a place where social interaction happens and a place to start small independent shop. Ramp as a circulation connector for each floor can distinguish hierarchy in term of social gap.

wind turbin

Perspective Section infiltration wells

Residential units which placed side to side with open corridor, beside maximize natural lighting but also makes the space has that 'melting' characteristic between indoor and outdoor space. Building's orientation and communal space (plaza) which face the river as view are intentional, so that local villagers can respect their environment as they take care of their home.

ampitheater

kindergarten

aksonometri folding bunk bed

4.00

1.84

8.00

3.00

2.50

1.20

Residential unit's plan 1:100 Each units' size is 32m². The rooms inside are compactly designed to fulfill the needs of each occupants.

Plaza

Each units apply prefabrication system where units are made outside the site, then gathered with the main structure. This system makes units addition according to the demand possible as long as the main structure still can support its load.

Plaza can be a flexsible space. it also can be multifunction and be a space for traditional rituals, not only as a place for children’s playground. During holiday - weekend for instance - this place can transform into mini night market, therefor plaza is also functioned for livelihood source.



PUSH PUSH

KDB 50% Pohon

KDB 70%

PUSH PUSH

fact

Direct Sun

Hotel is Residential Vertical While interest and become human needs. Visual impression of monotony, and wasteful of energy becomes a major problem the majority of the hotel, so it takes a comfortable hotel livable, sustainable and environmentally friendly.

KDH 30% KDH 50%

U

Area bebas bangunan : 1. Taman Pasif 2. Area Parkir 3. Jalur Sirkulasi 4. Are Resapan

U

SETBACKS

MAXIMIMIZE BUILDING AREA Maximizing Buildable area with a maximum height 14meter and 3 floors. while providing green space cukupdengan use the basic building coefficientPUSH is only 50% from 70%.

Tangent building buildable area are taken into account so as to produce rectangular

Direct Sun

U THE COLOUR OF NATURE Selection of gray on a building in accordance with the natural color of natural stone, combined with vegetation that provides spatial feeling fresh Urban Void

Main Facade

Sli ce

int

Po

int Po

Vi

ew

PUSH

an

Vie

Ke

a nd

w

ra

Opening

si

UP POINT VIEW With the configuration of two masses in press down on the north and south, the view to the volcano to the north and also view to the cityscape will be seen with the maximum unobstructed.

u irk

U

S

U

Opening

la

Parking Area

URBAN FLEXIBILTY Building mass split into two paths out door mass produce dynamic and can be utilized to meet the needs of pedestrian and vehicle drop off.

U URBAN VOID Filling the gap / void between the buildings with maximizing green space on the site. so that the beautiful atmosphere can be awakened..

Convention and Meeting Room which has always been a mass in the hotel to make visitors uncomfortable or even uncomfortable with the activities of the hotel. And also to make visitors spend time in looking for convention and meeting room that became one mass with the hotel itself.


TAMPAK BARAT

TAMPAK SELATAN

SKALA 1:200

SKALA 1:200




Kids Experience Strategy

LIFE LESSONS

Structuring mindset children early about the importance of maintaining ecosystem environment by presenting can be a positive step. children have awareness of living space in the playing environment.

ATTRACTIVE CIRCULATION

COMPACT SPACE

PERMEABLE SURFACE

Vertical circulation as access to children who are not only so that children can independently to pass by, but also attractive to the deployment of ramp and slider as vertical circulation. make children become trained to be active and brave.

Various kinds of activities that can support develop ment of the child in the neighborhood Bantar Gebangpresented in the form of a compact space that can stimulate mental growth of children as well spaces ďŹ lled with interactions.

Field wall and roof coverings are permeable to allow air owing freely, and to provide the intensity illumination in daylight enough for kids can work but still be able to protect from the hot sun exposure.


Breathing Wall

Stunt Area

Air Pollution

Utilization of used wood waste to the The joy of a child when able to get environment abundant in Bantar Gebang as through the challenges that exist in constituent elements of sound wall the agile arena to bring the experience of childhood unforgettable.

Detail Arsitektural

Learning Meaning of Life Permeable Roof

Utilization of plants on NASA entity that can reduce pollution and odor impacts the existing environment of Bantar Gebang carry on playing a more pleasant situation.

Presenting nature in a child's play Enables the maximization of air and environment will have a positive n a t u r a l l i g h t i n t o t h e b u i l d i n g impact not only fresher air but helped sustainability. teach what the meaning of life.

Dinding Permeable

Material Beton

Genting Tanah Liat

O2 O2 co

O

2

O2

O2 O

2

O

Kayu

2

O2

Kawat Strimin

2

O2

O2 O2 O

Palet Bekas

O2

co

2

2

O

2

Papan Kayu

co

2

1

Papan Kayu

Beton

Baja Ringan

Beton Plesteran Papan Kayu

3D Section



ANGLUR SELUR Hilir mudik tiada henti.

Design Concept

Massing

Mass composition is defined as the space / shade of meaning shelter itself with the roof as the main element. Space Java architecture adopted and defined as longkang (stream) with a set of pillars that support the roof. Adoption and transformation performed Javanese architecture with geometric approach.

LONGKANG FIELD WALL PERMEABLE LONGKANG

SELF ENERGY

Field stop permeable wall in the form of synthetic wood Sunshade The stop has an independent energy sources such as still allow air to flow freely, but still protect the user from exposure to photovoltaic panels and interactive electric pedal. electrical the sun thanks to Sunshade and tritisan wide roof. energy is used here to meet the electricity needs such as lighting stop stop and digital advertising media at the bus stop.

MINIMIZATION VANDALISM

IDENTITY OF THE CITY

Design minimizes halt vandalism by reducing the area of the Identity of the city in stop-defined adaptation of the motif on wall, and defines shelter as the roof of the main field. It is also the floor cease and desist column is described as a pillar in a associated with public facilities that are often uncomfortable in traditional Javanese house. the rain, and respond to tritisan wide.

INTERACTIVE In addition to the electric pedal interactive, advertising media and media containing information on the route stops, schedules and bus fares are also made in the form of interactive digital media that are visually appealing. It can be proposed also that the media is integrated with a smartphone or android.


Ecotect Building Perform T est Daylight Factor 6500

8000

6500

The quality of light in the room effectively stops getting interesting lighting, it is not only seen from the quality of illuminance but fell a dynamic light pattern thanks to the existing Sunshade.

2100

A’

A

Predicted Mean Vote PMV index shows that the space effectively stops can walk comfortably, seating area and wait BRT can be classified able to accommodate users on solid hour.

PLAN

0

1

3

6

Aplication Dekson Product Special Purpose Hinge ES OL 102x71x2,5mm 2BB

Dekkson products applied in the hinge on which the seat is able to be folded, so that it can provide a space for people with disabilities. Seats in normal circumstances, be Armrest can recline into a chair when used as an armrest the number of passengers a lot.

Seats can be folded to make room for passengers with disabilities. TAMPAK DEPAN 0

1

3

TAMPAK KIRI

6

0

AKSONOMETRI

ROOF ALUMUNIUM COMPOSIT

WALL HOLLOW 40X60 SYNTHETIC WOOD SUNSHADE

FURNITURE HOLLOW SYNTHETIC WOOD DECK

PLATFORM

1

3

6



Based on survey by Brooking Institute, in 2011 economic growth in Jakarta ranked 17th among the worlds 200 largest cities, a jump from its 2007 ranking of 171. Jakarta has grown more rapidly than Kuala Lumpur, Beijing, and Bangkok.

land area water area population density

: 256,37 sq mi : 269,40 sq mi : 10,075,310 people : 38,000 people /sq mi

Jakarta, Indonesia.

Issues

Increasing economic growth in jakarta becomes a powerful magnet to attract urbanization in Indonesia, but ineffective land use is the main problem. jakarta suppose to be able to be more compact due ro thr high rise of population. because if we keep the same pattenrn of sattlement the lan will be spent for settlement only and there will be no remaining space for public space and green area

Unskilled Urbanization

small income

squatters settlement million people

Jakarta Sub-Urban Vertical Dwellings

9,61

10,08

8,35 6,48 2,91

1960

1980

2000

2010

2014

How dense is jakarta ? How big would jakarta be if it would have to density of :

Jakarta

Is the best solution ?

Barcelona

Reclamation policy carried out without the participation and consultation with the community, as well as the absence of attention to the ďŹ sherman and environment. more ever, excessive develptment only exacerbates ecological disasters, such as tidal ooding along the jakarta bay. Third, the existing enviromental damage in the Gulf region of Jakarta. Fourth, the need for much sea sand for reclamation damage the marine ecosystem itself. Fifth, the reclamation project can destroy Jakarta as the capital of a country that became a national strategic area. Sixth, the reclamation engineering environment that damage the environtment and natural ecosystems in the Bay of Jakarta

Our Design Strategy Manhattan, New york

Shanghai

Reclamation idea was based on the view of some people who thought that Jakarta had no space to live. while the fact is Jakarta still a vast if development is directed to vertical and more compacted. many horizontal settlement is the reason why space that can function became much less.

Shelter

Healthy

Education

Jobs

believe that key to reducing proverty is to increase productivity in the poorest community, increase productivity will lead to increased income, increase income will lead to a better educational and healt status, in short, increasaed productivity will get people out of proverty.


To reducethe building cost, inhabitants encouraged to finish their home by themselves. Facade frames developedby governement. Inhabitants could finishthe facade panelsfrom collected waste or another recycle materials.Soit would be reflect different characteris in eachhousingunitswith

water catcher water reservoir

Residen

praying room

plan farming floor

Residen

each r use D.I.Y facade that made from recycle materials

plan farming floor

Residen

primary school

pekarangan or public courtyard on each floosr

Plan 1. 2. 3. 4. 5. 6. 7.

wet market dry market residen public courtyard mushola/ praying room puskesmas / public health sveirce primary school

plan farming floor

Residen Mezzanine Floor

dry market

wet market

0

Ground Floor 0

2

4

8

0

2

4

8

0

2

4

8

0

2

4

8

2

4

8



CREATIVE + PLAY SCHOOL COMMUNITY OF BANTAR GEBANG Not only to learn and play, creative play school + community of Bantar Gebang also seeks to improve the quality of life ranging from human resources, especially children and the common people around TPST bnatar gebang.

INTERVETION STRATEGY

DESIGN CONCEPT

1. EXISTING

FUTURE NEEDS

OUR IDEAS

Informal Education

Alternative learning

2. ZONING

2. PATTERN IN SITE

GOAL’S

Sociable Space

lingkungan tidak ramah anak S

0

Waste management Education

S

New Income

2

O pencemaran pencemaran Tanah air

Sustainable Design

Green Space

Breathable Building

Water Smart System

EDUC

Play Wall

Permaculture Farming

2

polusi udara

Painting Wall

Connecting Roof Garden

New Work Space ENVIRONMENT

Play Library

RESPONSIVE ENVIRONMENT

education culture & social economy PEOPLE’s LIFESTYLE

ATION

WORK SPACE

PRESENT ISSUES

G&

MIN FAR

+/- 13.121 M2 4. SPORT HALL & PERMACULTURE FARMING

5. LIBRARY

RT

SPO

2. WORK SPACE


Span of Age

The building is not as a city landmark but a place to meet and share the love listening to every individual to individual. hey dad !

?

?

+/- 1.75 men

1

1

1

hey dad !

hey kids !

? ? ?

2

2

2

+/- 1.62 woman +/-1.35 kids +/-0.50

Space 1 & 2 Separated

Massing

+/-0.00

space 1 & 2 connect

Massing

Massing

Scale & Habitude of kids Large building mass is avoided that makes an impression of the Massa made smaller buildings and inclusive for children. taking into building be exclusive to children. account the scale of human vision, especially children. cut a few sides to keep dearjat broader vision for children

Natural lighting

View & Circulation VIEW VIEW

VIEW VIEW

Tropical climate and rich sunshine, so it is very unfortunate if it is not Optimization look into a glass of direction means that the community and fully utilized. Application of openings located on each side of the the children realize that they are less habitable environment, so that they building to free incoming light from any angle and at any time, so it realize the importance of protecting the environment well. needs the light in the room used as a reading room are met.

Connect space to nature & Breathing Wall

Openings on each side of the building to allow air to enter freely and without hindrance, and the addition of one tree for each building unit is intended that the air entering the building can be ďŹ ltered before entering resurrection, so building users feel the fresh air.

Playing wall

The walls are made hollow with basic shapes such as triangles, squares, and circles functioned as sleek as well as children's playground. There is also space contained Sharing between two buildings where children can learn under a tree with a cool atmosphere.

sit


8

A’ 9

10

Keterangan :

3

1. Enterance 2. Sport Hall 3. Permaculture Farming 4. Water tank area 5. Library 6. Street 7. Enterance 8. Public bath 9. Workshop (waste management) area 10. Slider park 11. Landfill

7 5 2 6

4

A

11 1

Site plan Permaculture Farming

Water Smart system

Alternatif Learning

0

5

15

30

FRUIT & VEGETABLE POTENTIAL SUMMER

papaya, banana, jack fruit, nanas

formal Education

Rain Water as Main Water rambutan, manggosteen

12

Mango

9

s

3 6

Time

Ground Water Recharging

Jambuu

Bark

Strees

Economy

Multi Water Tanks

Soursop

Good People

Informal Education

DAY 1 spinach, kale

sawi, long beans

eggplant, kapri

Fresh Imagination

+

Artificial recharge of ground water

30 90

tomato, asparagus, carrot, selada

radish, broccoli, beans

Alternative learning

100

40 60 70-85

Bath Public

Water Consumption

Permaculture farming

Play Library

Painting Wall

Play Wall

Happy & No Strees



THE QUAYS

CREATING A NEW LIVEABLE PLACE EXPERIENCE FOR COMMUNITY

SITE Site is located at the existing collection of the shop. apartment development is done in the collection of the shop

OPEN SPACE Open space and supporting facilities placed every 7 floors. besides functional, open space at the center of mass also contributes to creating a friendly city skyline

MAXIMIZING SITE Utilization maximally broad footprint and mass of the building area grouping verticallya EN

PUB

LIK

M RTE APA R I K PAR

DISTINGUISHING 2 FACADES The facade of the building as a whole was also instrumental differentiate function. Massa more bulk defines the park, while the mass of apartments slimmer.

AXIS To establish friendly city skyline and the mass of apartments that do not bulk, designed two apartment towers side by side. gap of which still allows sunlight coming.

DISTINGUISH CIRCULATION Defining the circulation of vehicles and people. Human circulation defined by the intimate scale in the form of walking plaza. while the circulation of vehicles with a mass worse.

LINKAGE-INTIMATE HUMAN SCALE

MAKING LIVABLE PLACE

THIN BUILDING AS PASSIVE DESIGN STRATEGY

Placemaking designs created with emphasis on users, ie pedestrians and the handicapped. The ground floor is processed into a walking plaza with a shelter that allows users to walk and interact. Expected to be a generator for the urban surroundings.

The apartments do not just rely on-sky terrace and other facili es as a support area, they are also designed to have open space on each floor for occupants gather and interact.

Massa apartment buildings designed thin a passive design strategies, so that the use of air condi oning and ligh ng can be reduced in public areas.

DISTINGUISHING DIFFERENT FACADE CHARACTER AS A LANDMARK There are two different mass character, ie the mass of apartments and parking. Massa apartments are all modern and minimal with a ver cal emphasis contras ng with parking bulky mass and without corner the icon for the surroundings.


2 1

1

2

6 4 10

9

7 6

6 8 1

11

5 2

2

6

1 3

LEGENDA

1

AKSES MASUK KENDARAAN

2

AKSES KELUAR KENDARAAN

3 4

AKSES MASUK AREA PARKIR APARTEMEN AKSES KELUAR AREA PARKIR APARTEMEN

5 6

AKSES PEJALAN KAKI MENUJU APARTEMEN TENANT (GYM, RESTAURANT, CAFE)

7 8

APARTEMEN PARKING AREA THE BRIDGE

9 10

LOBBY TERRACE OFFICE

11

SITEPLAN

LOBBY LOUNGE 0

10 5

20 15

30 25


9

8

2

2

1

1

2

2

8

6

7

PLAN PARKING AREA LV. 1 0

SOUTHWEST ELEVATION 0

4

8

SOUTHEAST ELEVATION

16

0

6

6 4

5

2

1

8

16

5

1

2

2

5

4

1

3

5

5

5

4

6

1

1 2

3

2

2

2 PLAN FLOOR 1

PLAN FLOOR 1

PLAN FLOOR 1

PLAN SKY TERRACE A 0

2

4

6

6

6

1 4 2

1

3

4

4

1

4

2 4 5

5

5

5

4

PENTHOUSE TIPE A 2

4

5

PLAN FLOOR 2

PLAN FLOOR 2

0

4

5

PLAN FLOOR 2

PENTHOUSE TIPE B 0

8

2

4

4

PENTHOUSE TIPE C 0

8

2

2

2

4

LEGENDA LEGENDA

PLAN SKY TERRACE B 0

1 ELEVATOR

2

4

1 LIVING SPACE

3

DINING SPACE

5

BATHROOM

2 KITCHEN

4

BEDROOM

6

BALCONY

8

3

2 TANGGA DARURAT 3 RUANG BILAS 4 DRY AREA / DECK 5 WET AREA

PLAN PARKING AREA LV. 2 0

2

4

8

4

8


2 1

2 1

1

1

+97.0

2

2

6 4 10

6

9

4

7 6

6

10

9

8

7 1

6

11

5

6 8 1

5 2

6

2

+91.5

11

2

6

2 1

3

1 3

+97.0

KEYPLAN

7

7

+91.5

+85.0 +85.0

LEGENDA 1 GROUND TERRACE

LEGENDA

2 PARKING AREA

1 GROUND TERRACE

+57.0

3 TRANSITION LEVEL

2 PARKING AREA

4 LOBBY TERRACE

3 TRANSITION LEVEL

6

6

+57.0

+50.5

5 UNIT APARTEMEN

4 LOBBY TERRACE

6 ELEVATOR

5 UNIT APARTEMEN

7 PENTHOUSE

6 ELEVATOR

+50.5

7 PENTHOUSE

5

5 +26.0 +26.0

3

4

4

3

+20.0 +20.0

+15.5

2

2

+15.5

+12.0

+12.0

+8.0 +8.0

1

+0.0 +0.0

SECTION A-A’ 0

4

8

16

PARKING AREA PERMEABLE FACADE

6 5

5

4 4

1

4 4

3 2

4

3

3

1

3

2

3

5

4

3

2

2

5

PLAN TOWER A 0

2

4

TIPE 1 BEDROOM

8

0

2

3

3

4

1

3

3

2

2

4

TIPE 2 BEDROOM 8

0

2

4

6

4 LEGENDA 1 LIVING SPACE

4

4

4

3

2 KITCHEN 4

5

3

4

5

PLAN TOWER B

LEGENDA 0

1 ELEVATOR

3 1BR

2 TANGGA DARURAT

4 2BR

2

DINING SPACE

4

BEDROOM

5

BATHROOM

6

BALCONY

5

2

5

4

5 3BR

TIPE 3 BEDROOM 8

0

2

4

4

8

16

wall use that are permeable allowing the formation of a semi-open space of water, which means it can allow air to flow freely. air exchange between exterior and interior space in the parking area can maxmimal.wall use not only this is also a form of response of the climate in Indonesia. with characters humid tropical climate like Indonesia, the movement of the wind in the building is important to note. then, if viewed in terms of energy savings, the use of this pelingkup will affect the reduction of energy use of the building for the parking area no longer need water conditioner or a forced air flow for aeration in this area.

6 4

SECTION B-B’ 0

8

1





L plan

T plan

U plan

I plan

DESIGN STRATEGY

DESIGN VISION

ISSUES

CRITERIA

limited budget

fast easy adaptable assembling maintenance plan

The existence of an association of architecture in society still seem opaque. the introduction of the importance of the role of architects in each building design process into a specific vision in spite of the internal vision in the form of designing this portable office. location will fill the space - public space will open up the opportunity to give a positive paradigm for society. this can be done by giving space to the public in the form of public library and exhibition space architecture. the society is expected to be more sensitive and responsive to the importance of the role of the architect in any building design.

DESIGN STRATEGY

knockdown modular system plan & facade

PHASE 1 : RECOGNIZE urban heat island

culture crisis & public area

energy efficiency

cultural identity

light structure

public education

heat energy utilization

natural permeable vent & lighting facade

batik facade

library for everyone

truss system

architecture go public

PHASE 2 : REALIZE

VISIBILITY CONCEPT Patterns facade becomes a major element to be processed in order to attract attention, the public in general will be interested in the languages familiar form but applied in a different way, and the use of attractive colors are strong views. PATTERN use batik kawung and red on the application of vertical circulation becomes a strategy to attract attention can be public space.

MODULAR BENEFIT The most basic things with the use of a modular system is Palan of banguna can be adapted to various shapes and possibilities can provide convenience when positioned at various conditions of public space, while requiring a larger space can be made possible with expandable Mosul additional can form a larger space. other thanease of organizing mass form, with a module that is part of the offsite building construction can reduce the environmental impact compared to conventional construction process, by this time displacement will not leave traces or used, which means the public space.



roof with layering BIPV layer, thermal insulation, glubam and white paint is used as a roof coating to provide resistance of buildings at various locations will be selected

ASSEMBLY SCHEME ASSEMBLY PHASE 1 : MAIN STRUCTURE 1: PRECAST SLAB

red iconic skin Red is the color of the base of the IAI logo used until now will give accent to catch the eye of the public sphere as well become a counterweight to the mass of the building is dominated by neutral colors

permeable surface The use of aluminum 1.8cm, the outermost layer of the mass of the building is a solution to keep the thermal space inside while still allowing air can flow into the building. besides, the pattern of shadows on the room becomes more dramatic and dynamic form chambers.

2: GROUND FRAME

3: ALL FRAME

star ng with the prepara on of precast slab which serves as the successor to the mass load of the building to the ground.

Ringlock prepara on scaffolding and connected with precast slab as a channel load ground floor.

Ringlock connec on scaffolding will shape the field of modular space.

es mated me: 2 hours

es mated me: 1 hours

es mated me: 2 hours

ASSEMBLY PHASE 2 : FACADE FRAME 6: FACADE FRAME

4: STAIR FRAME

2.4x2.4 modules use on any part of the floor in each level of the floor provide material efficiency, and minimize material wastage.

stairs are separated by a mob has a separate structure in order to provide stability to the structure.

es mated me: 1.5 hours

es mated me: 2 hours

es mated me: 1 hours

secondary frame Hollow metal serves to maintain the stability of the secondary skin that envelops the building, but it also serves as a pathway for the removal of skin may have to increase visibility when needed

5: FLOORING

The next step is the assembly of the framework which will be the venue for facade

ASSEMBLY PHASE 3 : SURFACE & ROOFING thermal insulation transparent glass fiber used to maintain thermal comfort within the building, the goal that sun exposure can be detained and reduced in intensity when touching the inside of the building.

7: ROOFING

8: PARTITION

9: SURFACE

gable as an op on because mudahnnya on the applica on during installa on

installa on of par ons which will be useful as a barrier between the func on space

moun ng frame on a ladder frame skin and a ached with a connec on to the frames that have been connected.

es mated me: 1/2 hours

es mated me: 1 hours

es mated me: 2.5 hours

transparant surface Wiremesh used at the mini-library on the ground floor, to precisely maintain the visibility of space but still gives the impression of open public spaces

vertical access a separate staircase from the mass of the building will allow it to maintain a degree of privacy in the building, which is currently in place in any public space, vertical access can be controlled by the IAI

TOTAL ESTIMATED TIME: 13.5 HOURS WITH 3 TO 4 PEOPLE

multiplex partition partition as high as 2.5 is used to cover the prayer room and toilet area to preserve user privacy

multipleks + laminates module measuring 2.4x2.4 floor is a strategy for saving time and cutting costs in existing plant material added by using environmentally friendly flooring material, in addition to also guard against the shock effect of the displacement of outer space and in the public area

ringlock scaffolding Ringlock as the main structure which provides lightweight structural loads but still can load building mass with a stable load distribution

precast slab Slab measuring 60x60x20 serves to hold the mass of the building to remain stable. slab anchoring created to be flat in order to give the possibility to be stacked when the process of moving the building

COST ESTIMATION GROUND WORK Type of Work Sub Total

soil excavation footplate Rp. 12.240,00

FOUNDATION WORK & FRAMEWORK Type of Work Precast plate 60x60x20 Ringlock Scaffolding Frame hollow 4x4 Sub Total Rp. 18.344.800,00

WORK ALUMINUM, IRON, GLASS Type of Work Alumunium Frames Glass Wiremesh Door Turning Stair ACP Sub Total Rp. 131.306.400,00 FLOOR WORK Type of Work

Multipleks 18mm Laminates Rp. 58.788.000,00

ROOF WORK Type of Work Sub Total

Roof Work Rp. 22.550.000,00

Sub Total

OTHERS WORK Type of Work Sub Total

Interior Rp. 31.050.000,00

WORK OF SANITATION Type of Work Work of Sanitation Sub Total Rp. 14.812.000,00

ELECTRICAL INSTALLATION WORKS & AC Type of Work Instalation of the Lamp Instalation Outlet Instalation Outlet AC Lamp SL ex Philips 18watt Lamp TL LED Philips 18watt Double switch Biaya pemasangan (daya 3500 w) Sub Total Rp. 10.089.000,00 LOCK OUT WORK Type of Work Slot sliding door Hings door Handle door Latch Door Rp. 10.089.000,00 Sub Total

CAT WORK Type of Work Sub Total

TOTAL

Cat kayu Cat eksterior Rp. 10.089.000,00

Rp. 310.652.440,00

material selection considering the resistance of each element forming a mass that at the time of assembly can be done relatively quickly, as well as maintenance material that is easy to do. hence, the costs to be incurred when divided by the area of the building, into Rp. 1.500.000,00 per m2





SOUTH ELEVATION

NORTH ELEVATION

EAST ELEVATION

WEST ELEVATION



Other Works

wex UGM ESCAPE HOUSE 2016

wex UGM ESCAPE HOUSE 2016

Sepekan Arsitektur Anjungan Entikong 2016

Exprivm Galeri Nusantara 2016

Visionary Bamboo Architecture Omah Wayang 2015


Art Works Instalation

Exhibition of Architecture

location : Jogja Gallery years :2014 as : Committee

location : Jogja Gallery years :2015 as : Committee

location : Benteng Vredeburg yogyakarta years :2016 as : Coordinator

Models Works

Final ProjectStudio Senior Living azki muhammad

National Competition Kamppong pulo Vetical Settlement sigit, hasto, duta

National Competition Halte trans semarang sigit, hasto, duta


Thank you

Sigit Prayogo prayogos74@gmail.com +62 857 7948 5584


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.