Silvan Halm | Portfolio APPROACH & ATTITUDE IN PROGRESS
Work *
PSYCHIATRIC HOSPITAL BASELLAND LIESTAL TWO NEW BUILDINGS ON CAMPUS 2017
BIOGEN - SOLOTHURN NEXT GENERATION MANUFACTURING 2015-2018
UNIVERSITY *
MUNICH MAIN LIBRARY 2015 „UMSONST UND DRINNEN“ - PUBLIC SPACE AND INTERFACE opernhaus zürich 2014 access reloaded
Volkstheater Munich 2013 „Radikal, Jung“, schlachthof conversion“
Personal *
... HANDS ON - SOME MORE WORK FROM THE PAST YEARS
8m
334.2
üN
.00
N= 0
m
PSYCHIATRIC HOSPITAL BASELLAND LIESTAL TWO NEW BUILDINGS ON CAMPUS 2017 project-position: lead architect design
urbanistic concept
the psychiatrie baselland announced a competition for two new buildings two provide a better health care for short term crisis intervention and long term geriatric or dementia patients. a main goal was to create an environment, overcoming the cleanliness appearance of a hospital building, by designing a space of residential qualities for long and short term inhabitants.
the buildings proceed the orthogonal order on campus in a free flowing topography around. being aware of the topographic circumstances a careful embedment of the newly set volumes has been a major challenge. surrounded by green meadows and forrest the buildings and especially the facade want to define the interface between in- and exterior space in a filtering but never blocking way.
Facts: Total floor area phase 1: ~15000 m² Est. Completion Cost 55 Mio CHF Competition Result: 2nd Prize
1
P
B
B
2
Exponierte Lage des Campus im Tal
Topographie im Umgriff Entwicklung des Geländes an den Baufeldern
Wald & Hang als Rückgrat <> Weitblick über Liestal
3
-
P
Topographie & Typologie ZAP: Programm und Volumen kompensieren die Topografie ZKI: Der Annex - horizontale topografische Einbettung und untergeordneter Antagonist zu Haus B
Halböffentliches Zentrum intern
-
-
4
Attraktor & Zentrum Haus B im orthogonalen Kontext
5
7
6
Landschaft und Volumen Autarke Solitäre auf einem grünen Teppich
Schlussstein für Internes Zentrum auch mit einem eventuellen „Haus im Park“
Satellit(ZAP) & Annex(ZKI)
-
8
Autarke Bausteine ergeben ein loses Gefüge auf dem Campus geschickt verbunden unterhalb der Topografie (1,7) Orthogonalität dient als ordnendes Prinzip (4,5,6) Das Haus B bleibt Zentrum und Hochpunkt (3,7,8) Mit dem ZKI entsteht ein das Prinzip von Haus B aufnehmender Annex, der einerseits klare Geste und Gegenstück ist. Zum anderen aber von seiner Einbettung in der Topografie profitiert und so direkten Bezug und Zugang zum Terrain erhält (3,5,7) In Phase 2 wird in der räumlichen Fortsetzung von Haus A ein internes Zentrum gestärkt. Dies würde mit einem eventuellen Haus im Park weiter unterstrichen. (6,7,8) Das ZAP schiebt sich als kompakter Satellit mit dem Rücken zum Wald. Die Orthogonale Setzung schafft klare Bezüge und Orientierung auf dem Gelände.(5,7)
ZAP und ZKI - städtebauliches Konzept & Verbindungstunnel Untergeschoss
Grundriss Niveau Erdgeschoss mit Schnittstelle Haus B
Idee und Konzept Architektur
Aussenraumkonzept
Transitions (Übergänge): Der Titel des Projekts versteht sich als übergeordneter Begriff. Die Erweiterung eines bestehenden Ensembles erfordert auf städtebaulicher und architektonischer Ebene eine sensible Betrachtung der Schnittstellen. Das Thema ist auch prägendes Element in der Inszenierung des Verlaufs zwischen Innen und Aussen. Darüber hinaus verstehen wir es als Teil des Weges den die Patienten in den Häusern gehen. Eine Veränderung in ihrem Leben - Ein Übergang zu einer neuen Perspektive.
Die Psychiatrie Baselland Liestal liegt etwas ausserhalb des Ortkerns der Stadt Liestal auf einer Anhöhe. Durch die Weitläufigkeit, Ausrichtung und topographische Setzung der einzelnen Baukörper markiert das Gesamtareal bereits zum jetzigen Zeitpunkt eine starke Präsenz im vorherrschenden Orts- und Landschaftsbild. Der zu bearbeitende Perimeter liegt zwischen angrenzendem Waldrand und bestehendem Campus inmitten schönster Natur. Aussenraum Die bestehende Landschaft mit Tierpark, Wald / Waldrand, Wiesenabschnitten, Obst- und Parkbäumen weist bereits zum jetzigen Zeitpunkt grosse Qualitäten aus. Ziel des vorliegenden Aussenraumkonzeptes ist es, bestehende und neue Aussenräume zu stärken, zu binden und in der Abfolge erlebbar zu machen. Eigentliches Herzstück und zusammenfassendes Gestaltungselement bildet eine Rundweg, welchem bestehende und neue Aussenräume angesiedelt werden. Ein Durchschreiten und Erleben verschiedenster Landschaftsräume wird dadurch ermöglicht und die Baufelder sowie das übergeordnete Areal gestärkt und zusammengehalten. Die Orientierung wird durch diesen „roten Faden“ in einheitlicher Materialisierung vereinfacht. Die einzelnen Spots werden inhaltlich mit verschiedenen Themen, vornehmlich im Bereich der Sinneswahrnehmung hinterlegt und generieren durch Ihre Ausgestaltung Identifikationspunkte sowie Orientierungshilfe innerhalb des Areals. Die sanfte Integration neuer Aussenbereiche mit vertrauten Inhalten soll beim Patienten Erinnerungen wecken und Ihn auch zu aktiver Mithilfe beispielsweise im Obstgarten animieren. Der Rundweg ist so in das Areal integriert, dass auch Besucher des Tierparkes in nutzen können und sollen. Durch geschickte Setzung und Ausgestaltung der Therapiegärten, werden Rückzugsorte gebildet, welche den Patienten vor Einblicken schützt und die notwendige Privatsphäre gewährleistet. Höfe Die Höfe werden analog den Aussenräumen in der Umgebung mit einem jeweiligen, indentifikationsstiftenden Gestaltungsthema versehen. Duft, Klang- und Farbwahrnehmungen spielen auch hier eine grosse Bedeutung und sollen auch Patienten mit (noch) eingeschränktem Aktivitätsradius adäquate Erlebnisse und Aussenraumemfindungen garantieren.
Funktion der Gebäude und Wohlbefinden der Benutzer sind die zwei wesentlichen Definitionskriterien für die Architektur der Neubauten „Haus im Wald“ und „Haus am Hügel“. Das Prinzip „form follows function“ erlangt durch organistorische und programmatische Zusammenhänge grosse Gewichtung. Effizienz, Klarheit, Zonierung, Flexibilität und Wirtschaftlichkeit prägen somit die Grundrisse der Stationen. Auch wenn sich die Abläufe stark am Betrieb eines Spitals orientieren, wird auf die Atmosphäre der Innen- und Aussenräume grossen Wert gelegt. Das Leben und Arbeiten im ZAP und ZKI darf Emotionen wie z.B. Bewunderung, Vertrauen, Freude und Gelassenheit wecken. Natürliches Licht, warme Materialien und Bezüge zur Natur schaffen die Atmosphäre der Räume und die Gestaltung der Fassaden. Wir verstehen die Architektur als eine Variable zur Unterstützung des physischen und psychischen Wohlbefindens von Personal, Patienten und Angehörigen. In der Regel wirkt sich bei Patienten ein konstanter Sichtbezug ins Grüne positiv auf das Krankheitsbild aus. Eine Folge kann eine kürzere Behandlungsdauer sein Konkret streben die Räumlichkeiten der Neubauten Verbesserungen in folgenden Bereichen an: Genesungsprozess von Patienten Arbeitskonditionen des Personals Unterstützung durch Angehörige Generell werden die Innenräume weitgehend natürlich belichtet, sämtliche Patientenzimmer und Therapieräume haben einen direkt inszenierten Bezug zur Natur. Auf die akkustische Umgebung sowie Qualität der Luft werden ebenfalls grossen Wert gelegt. Bei der Organisation der Stationen wird der Fokus auf eine klare Wegeführung und eine optimale Orientierung gesetzt. Insbesondere im ZAP ist dies erforderlich zur Umsetzung des Behandlungskonzepts. Der starke Einsatz von Tageslicht erfordert Nutzungsgemäss einen hohen Grad an Steuerung. Holzlamellenstoren sorgen als Filter für eine angenehme Atmosphäre im Innenraum. Die Revision und Reinigung der Fassade erfolgt über einen vorgehängten Wartungskorridor. Um die Natur im Sockel ohne weitere Untergrundaufbereitungen an das Gebäude zu bringen. Auch der Wald kann so näher an das ZAP heranwachsen
Therapiefortschritt
Um die Klarheit der Architektur zu unterstützen, werden die technischen Anlagen so konzipiert, dass diese so wenig wie möglich in Erscheinung treten. Wo möglich werden die Anlagen im direkten Zusammenhang mit der Architektur konzipiert. TRANSITIONS Das Dach des ZKI ist frei von jeglichen technischen Anlagen. Dies unterstreicht die Einbettung des Volumens in den Hügel und das Landschaftsbild. Das ZAP nutzt die Erfordernisse des Demenzgartens zur Gestaltung der Technischen Anlagen. Ein Teil der Technik wird konzentriert im Kern angeordnet. Die notwendigen Röhrenkollektoren und Photovoltaik-Module werden am Dachrand platziert um die maximale Wirkung zu erreichen und gleichzeitig wird ein physischer Abstand der Patienten zum Dachrand geschaffen.
TRANSITIONS Patientenzimmer mit Sichtbezug Umgebung
Evakuierung ZKI kann sowohl über Haus B also auch komplett über das offene Parkdeck erfolgen
Raum und Umgebung ZAP
38
47
plätz Stell
Innenhöfe mit/ohne Sichtbezug Umgebung
- Räumliches Erweitern des „Zimmers“ durch den geneigten Sonnenschutz und einen Wartungskorridor auf Höhe des Betts - Der Wald und die Natur sind auch bei geschlossenen Storen in Sichtbezug - Das Licht ist gut gedämpft ohne Irritationen zu verursachen - Die Korridore dienen lediglich der Wartung und sind nicht für Patienten zugänglich. Unterschiedliche Höhen sorgen für eine klare Zonierung
lle
e Belichtung und Dunkelzonen plätz Stell
Themen Gärten Umgebung/Innenhöfe - Anregen der Sinne - Erinnerungen wecken Diskretzugang ZAP via Auteinstellhalle - Aktive Mithilfe, Garten bewirtschaftung
Direkter Diskretzugang ZKI
Grundriss 2.& 3.Untergeschoss mit Schutzraum M 1:500
9.10 stellha Autoeinm² 2118
Bezug Aussenraum/Öffentlichkeit
Durchwegung
- Beide Teilstationen „schliessbar“ - Gemeinsam genutze Bereiche unabhängig
Therapiegärten in der Umgebung (begleitet) Rundweg/Spots Umgebung Belichtung und Dunkelzonen Durchwegung
Zonierung
- Dunkelzonen und Kerne Zentral - Personal mit „eigenem“ Korridor - Patientenzimmer orientiert zur Aussicht
- Zusammenbinden BaufelderStation mit Patio - Geschlossene - Durchschreiten / Erleben - direktes Rausgehen in Begleitung Landschaft
Infratsruktur/Personal Patientenräume
e
Raum und Umgebung ZKI
- Räumliches Erweitern des „Zimmers“ durch den geneigten Sonnenschutz und einen Wartungskorridor auf Höhe der Sitzbank - Pflanzen vor den Räumen reagieren auf die Aussichten und Ausrichtung des Gebäudes und unterstreichen die Geste des ZKI als Annex von Haus B - Der Bezug zur Natur ist immer gegeben
- Ergänzung neuer Aussenräume / Spots
Autoeinstellhalle
Zonierung
- Zimmer zur Aussicht - Gemeinsame Bereiche kontrolliert und geborgen
Zonierung Erweiterung Zentrum für Krisenintervention - Spiegeln des Grundrisses - Verbindungen ober- und unterirdisch möglich - Zonierungskonzept bleibt erhalten
Patientenräume
Freie Bewegung/aktive Nutzung Sport Umgebung immerhalb Areal
Gemeinsame Bereiche Erschliessung
Gemeinsame Bereiche Therapie
Therapie 9.10 stellha Autoein m² 2018
Ambulatorium
lle
Infratsruktur/Personal
Infratsruktur/Personal Empfang
Schwerpunkte im FunktionsablaufDU/WC der Station -Kurze Wege: .zentrale Infrastruktur und Kerne halt Aufent tze -Gute Orientierung: .Rundgang und Sichtbezüge erleichtern die Wegfindung ellplä 9.10 raum 38 St Lager Schutz m² .Keine tiefen Sackgassen 289 e .Viel Tageslicht in allen Aufenthaltsbereichen efläch Lieg -Funktionstrennung: .Personalräume/Büro in eigener Zone .Aufenthaltsbereiche nach Unterstation geteilt > unabhängige Funktionsweise der beiden Bereiche. tze ellplä 44 St .Beide Sationsbereiche können als offen oder geschlosse Station ausgebildet werden
Ambulatorium
Ergänzende Wegverbindung ZAP/ ZKI/Haus B
Atrium
Dunkelzonen
Schwerpunkte im Funktionsablauf der Station -Kurze Wege: .zentrale Infrastruktur und Kerne .Eigener Wegsystem Diskretzugang via offenem Parking Umgebung .Direkter- Anschluss an Haus B übergeordmeter Rundweg -Gute Orientierung: .Rundgang- und Sichtbezüge erleichtern die Wegfindung Anbindung Gebäude am .Viel Tageslicht RunDwegin allen Aufenthaltsbereichen -Funktionstrennung: in eigener Zone - 5Trampel und 0 1 10 Wiesenpfade Öffentlicher Raum .Personalräume/Büro
Velostellplätze Dunkelzonen
Patio
Grundriss Erdgeschoss 1:200 Stationsgrundriss ZKI & Demenzgarten ZAP Schnitt B Haus im Wald 1:200
Stationsgrundriss ZAP 1.-4. Obergeschoss & offenes Parking mit Verbindungsebene ZKI Grundriss 1.Untergeschoss 1:200 Schnitt A Haus im Wald & Haus am Hügel 1:200
Optionale Erweiterung „Haus am Hügel“
Tragwerk
Die Erweiterung des Zentrums für Krisenintervention sieht eine Spiegelung der ersten Phase vor. Die bisherigen Ansätze von interner Zonierung und Anbindung bleiben bei diesem Konzept bestehen. Die Patientenzimmer richten sich nach aussen. Ein neuer geschlossenerer Hof entsteht & die introvertierten Gemeinschaftsbereiche vermitteln weiter Geborgenheit und ermöglichen Kontrolle. Nach Aussen wird das innere Zentrum des Campus gestärkt und der Masterplan weiter interpretiert. Das ZKI bewegt sich in beiden Phasen stets in der Spannung einer Raumgreifenden Geste zum Tal und einer Integration in den Hügel. Trotz der Verdoppelung des Bauvolumens steht das ZKI immer noch in einer angemessener Hierarchie zu den Bauten Haus B und Haus im Wald. Wie in der ersten Phase wird grosse Rücksicht auf die Topographie genommen. Da bereits alle Stellplätze zur Verfügung stehen,sind insbesondere in der zweiten Phase minimale Erdbewegungen notwendig. Die Erweiterung kann bei laufenden Betrieb stattfinden.
+17.64 m
+15.30 m +14.04 m
+11.70 m +10.44 m
+8.10 m +6.84 m
2 +3.24 m
+3.24 m
Brandschutzkonzept
-0.72 m
-4.50 m
-7.56 m
-10.44 m
1
Zentrum für Alterpsychiatrie Der oberirdische Bau des ZAP ist ein rechteckiger Baukörper, welcher aus vier Obergeschossen und einem Erdgeschoss besteht. Die Hauptbetriebsräume der Klinik sind hier untergebracht. Zwei Untergeschosse folgen dieser Form, sind aber nach Osten um etwa 35% Zusatzfläche erweitert. Die Unterkellerung enthält eine Ein-stellhalle sowie die erforderlichen Nebenräume. Analog dem ZKI handelt es sich um einen Skelettbau, bei welchem Flachdecken von regelmässig angeordneten Stützen getragen und durch im Sockelbereich eingespannte Kerne stabilisiert werden. Die Fundation erfolgt über die Lastabtragung der Stützen auf die Bodenplatte des zweiten Untergeschosses und weiter via Pressung auf den darunter liegenden Schotterboden. Zentrum für Krisenintervention Das ZKI ist ein pilzartiger Flachbau mit quadratischem Grundriss und einem grosszügigen Innenhof zur Tageslichteinbringung. Das erdebene Geschoss ist der zurückgesetzte Stamm, welcher aus Stützen und Kernen besteht und hauptsächlich der Erschliessung und Fahrzeugabstellung dient. Darüber befinden sich die zwei ausladenden Klinikgeschosse. Die Geschossplatten sind Flachdecken, welche von Stützen mit regelmässiger Rasteranordnung getragen wer-den. Im ersten Obergeschoss wird jede zweite Patientenzimmertrennwand als einseitig gelagerte Scheibe akti-viert zur Ermöglichung der Deckenauskragung nach -6.12 m Norden und Osten. Mit diesem Konzept wird der gesuchte Effekt mit minimalem Aufwand erreicht. Das Gebäude ist nur für Erschliessungszwecke mit -9.00 m Verbindungsgängen zu den Nachbarbauten unterkellert. Mit dieser Bodeneinbindung werden die Kerne gehalten, so dass +11.88 m sie Erdbebenkräfte abtragen können. Das Gros der Fundation erfolgt unmittelbar am Fuss des Gebäudestamms. Die Stützen werden dort auf eine Bodenplatte abgestellt, welche die Pressungen verteilt und so auf den gutartigen Baugrund abgibt. Materialisierung Rohbau und Tragwerk werden grundsätzlich in Stahlbetonbauweise erstellt. Damit werden auf sehr zweckmässi-ge Weise die Anforderungen von Architektur, Statik, Brandschutz, Gebäudetechnik, Bauphysik und Wirtschaft-lichkeit erfüllt. Flexibilität Die konsequent umgesetzte Skelettbauweise bietet eine grosse Flexibilität für späteren Umnutzungsbedarf. Trennwände erfüllen keine statischen Anforderungen und können daher ohne Massnahmen jederzeit versetzt oder entfernt werden zur Schaffung anderer Raumanordnungen. Die Gebäudetechnik profitiert von unterzugslosen Flachdecken, welche sehr installations- bzw. nachinstallationsfreundlich sind.
Grundriss 2. Obergeschoss 1:200 Station - Zentrum für0 Krisenintervention 1 5 10
Feuerwehrzufahrten: Für beide Neubauten ZAP und ZKI sind die Bewegungsflächen für ein Löschfahrzeug und Stellfläche entlang einer Fassade zum Anleitern mit einem Hubrettungsfahrzeug gegeben. Die Flächen und Abstände entsprechen der Richtlinie für Gebäude mittlerer Höhe bis 30 m Gesamthöhe. Die Feuerwehrzufahrt erfolgt über die Bienentalstrasse. Bei dem ZAP erfolgt den Feuerwehrzugang über die S-O Fassade (Höhe 19.50 Meter) und bei dem ZKI über die N-W Fassade (Höhe 15.30 Meter). Für die Neubauten ZAP und ZKI werden die Brandschutzrichtlinien der Bauten mit einer Nutzung von Beherbergungsbetriebe wo Personen aufgenommen werden, die
+17.64 m
+14.04 m
+10.44 m
+6.84 m
+3.24 m
-0.72 m
-4.50 m
-7.56 m
-10.44 m
auf fremde Hilfe angewiesen sind, zu Grunde gelegt.
Technikaufbauten Dach ZAP 2 1
7 3 4
6
5
Tragwerksschema ZKI
1 2 3 4 5 6 7
-
Überströmgitter für Aussenluftansaugung der Kältemaschine Rückkühler Elektroschränke für Unterverteilung MSR-Schrank Abluftmonobloc mit KVS-Wärmerückgewinnung Abluftkanal Fortluftkanal
8
3
9
Legende Lastpfad äussere Einwirkungen auf Kragscheibe innere Zugkräfte innere Drukkräfte äussere Reaktionen
8 - Abluftkanal der Nasszellen, welcher in Abluftringleitung mündet 9 - Abluftkanal der Abluftringleitung, welcher mit dem Abluftmonobloc verbunden ist
10
11 0 1 5 10 10 - PV-Module für Erzeugung von Strom 11 - Röhrenkollektoren für Erzeugung von Wärme
Grundriss Station 1.-4. OG ZAP & offenes Parking ZKI 1:200 Ansicht Nord Haus im Wald 1:200
0 1
5
10
Grundriss Regelgeschoss ZAP & Station Ebene 2 ZKI - 3. Obergeschoss 1:200 Ansicht Süd Haus am Hügel 1:200
Patientenzimmer ZKI
u zu erstellenden Gebäude ZAP und ZKI ist für Erdwärme-, sowie Grundwassernutzung. Das deswegen einen Anschluss an das Fernwärmenetz von in den Gebäuden entstehenden Wärmelasten werden hine abgeführt, die auf dem Dach des ZAP platziert um einen Kaltwassersatz mit Rückkühlern, der mit Freikühlung, also ohne Kompressionskälte, n. notwendigen Kälteerzeugung werden ebenfalls auf ssflächig solare Röhrenkollektoren vorgesehen, ärmung im Tagesverlauf unter-stützt sollen. eraturheiz- und Hochtemperaturkühlsysteme Speichersystemen kombiniert werden um auftretende kungen abzufedern. e städtische Wasserver- und -entsorgung, werden Gebäuden realisiert. Die Energieverteilung erfolgt zentralen Steigschacht erfolgt in Niederspannung ab dem ternehmen der Stadt. Schnittstelle ist die verteilung, wo auch die Messeinrichtungen für die latziert werden. werden grossflächig Photovoltaik-Module im Stromversorgung im Tagesverlauf unterstützen. ie ht erfolgt in Niederspannung ab dem ternehmen der Stadt. Schnittstelle ist die verteilung, wo auch die Messeinrichtungen für die latziert werden. d Sicherheitsanlagen werden im UG im VStziert. Wahlweise werden die KVSElektroräume WC RG WRG zung bestückt (Starkstrom, Kommunikation,
Wandaufbau: - Innenputz auf Putzträgerplatte - Installationsebene - Holzrahmenfertigelement Ständerschicht KVH 6/24 - Helle Fassadenbahn - Grundlattung 3x5 cm Hintergrundfarbe gestrichen - Lattung Lärche horizontal nicht deckend weiss lasiert 3x5 cm stehend montiert - Storen Lärchenholzlamelle vorvergraut Wartungskorridor: - Betonfertigrahmen B=180 cm thermisch getrennt verankert an partieller Aufkantung Stahlbeton - Pflanztröge mit wartungsarmen Gräsern
Patientenzimmer des ZAP und ZKI werden Fassadenlüftungsgeräte, mit integrierter be- und entlüftet. chkeiten werden mittels zentraler Lüftungsanlagen, kzentralen Kaltwasser stationiert sind; be- und rmwasser Heizung ungsanlagen + sind gemäss Stand der Technik mit chwärmung Verteiler usgestattet. n bedarfsabhängig über Dach entlüftet. Diese chliessung Arealerschliessung schalter mit eingebautem Nachlaufrelais gesteuert, er Kaltwasser und bedarfsgerechten Betrieb zu ge-währleisten. Abluft der Nasszellen wird mittels KVSKVSWRG KVSur Vorwärmung des Brauchwarmwassers genutzt.
- Bodenbelag in Holzdielen Lärche Verglasung: - Holzrahmenfenster 3-Fach Isolierverglasung
4
- Lüftungsgerät integriert im Sturz
WRG
- Lüftungsflügel in Laibung
wird ringförmig die Absturzsicherung mit Legende Photovoltaikmodulen versehen, welche die Sanitär Sanitär merzeugung unterstützt. Heizungim/ Tagesverlauf Kälte Warmwasser denWarmwasser Nasszellen und WC-Anlagen wird im Heizung Kaltwasser lt. Kaltwasser Die Abluftkanäle verlaufen dabei nicht Kälte Apparate Apparate in der Absturzsicherung zusammen und anschliessend Fussbodenheizung / ntrale. Über eine Wärmerückgewinnung wird die Fussbodenkühlung wärmung des Warmwassers genutzt und anschliessend Apparate n geblasen
realerschliessung altwasser Arealerschliessung Kaltwasser
Lüftungsflügel in Laibung
Sanitär Sanitär Warmwasser Warmwasser Verteilung Kaltwasser hacht Kaltwasser Apparate Apparate WC-Abluft
e nlage mit Ansaugung Aussenluft ntrale Lüftung Fussbodenheizung / nenräume
vertikale Verteilung im zentrale vertikale Steigschacht Abluftanlage Verteilung im KVS-WRG Steigschacht
WC
usblass Fortluft ber Fassadenöffnung
M
WC
realerschliessung
Ansaugung Aussenluft
Ausblass Fortluft über Fassadenöffnung
Warmwasser Vorwärmung
uft luft zentrale Abluftanlage mit Ansaugung zentrale Aussenluft KVS-WRG Abluftanlage mit Ansaugung Aussenluft KVS-WRG
Warmwasser Nachwärmung
HeizungLegende / Kälte
Elektro Heizung Heizung / Kälte Kälte Niederspannung Heizung Fussbodenheizung Kälte Telefon, IT, / Fussbodenkühlung Fussbodenheizung / Kommunikation Apparate Fussbodenkühlung Apparate Photovoltaik Apparate
ptverteilung
ZUL/ABL über Deckenauslässe
Wohnen Fenster zur Natur
Kaltwasser + Heizung Verteiler Kaltwasser + Heizung Verteiler
Legende
Legende
ng
Holzrahmenelement vormontiert
Schlafen / Geborgenheit
Nasszellen/Garderobe(DZ)
Arealerschliessung Kaltwasser Arealerschliessung Kaltwasser
Ausblass Fortluft lektro Lüftung über Fassadenöffnung Ausblass Fortluft iederspannung Aussenluft über Fassadenöffnung Arealerschliessung elefon, IT,Fortluft Arealerschliessung ommunikation Zuluft hotovoltaikAbluft tro tverteilung pparate ktro Apparate
ng
KVSWRG KVSWRG
Arealerschliessung
Telefon, IT, Elektro rteilung Kommunikation lung Hauptverteilung Warmwasser Warmwasser & 2. OG Gebäudeanschluss Vorwärmung Nachwärmung
g
mit
Fussbodenkühlung Fussbodenheizung / Fussbodenkühlung
Sanitär Warmwasser Sanitär Kaltwasser Warmwasser Apparate Kaltwasser
dezentrale Lüftungsgeräte
Apparate
vertikale Verteilung im Steigschacht vertikale Verteilung im Steigschacht
ZUL/ABL über Elektro Deckenauslässe Elektro Niederspannung Niederspannung Telefon, IT, Telefon, IT, Kommunikation Kommunikation Photovoltaik Photovoltaik Apparate Apparate
WC-Abluft zentrale Lüftung Innenräume zentrale Lüftung Innenräume
WC-Abluft zentrale Abluftanlage mit Ansaugung Aussenluft KVS-WRG zentrale Abluftanlage mit Ansaugung Aussenluft KVS-WRG Ausblass Fortluft über Fassadenöffnung Ausblass Fortluft über Fassadenöffnung Arealerschliessung
M
M
Arealerschliessung
Telefon, IT, Elektro Telefon, IT, Elektro Kommunikation Unterverteilung Kommunikation Hauptverteilung für 1. & 2.OG 1. & 2. OG Gebäudeanschluss Telefon, IT, für Elektro Telefon, IT, Elektro Kommunikation Unterverteilung Kommunikation Hauptverteilung für 1. & 2.OG für 1. & 2. OG Gebäudeanschluss
Legende
Lüftung Legende Aussenluft Lüftung Fortluft Aussenluft Zuluft Fortluft Abluft Zuluft Apparate Abluft Apparate
Elektro Niederspannung Elektro Telefon, IT, Niederspannung Kommunikation Telefon, IT, Photovoltaik Kommunikation Apparate Photovoltaik Apparate
3-Tafel Projektion Patientenzimmer ZKI 1:20 Ansicht Ost Haus am Hügel 1:200
BIOGEN - SOLOTHURN NEXT GENERATION MANUFACTURING 2015-2018 project position: lead architect envelope package
BMC Bulk Manufacturing Cell 1-2 (3-7)
Admin Building phase 1&2
Admin Building Phase 1 & 2
LEVEL 0
LEVEL 1
burckhardt + partner ag was assigned as a regional partner for Jacobs engineering. the scope contained local support on permitting process and regulations, overall envelope design and the design of the future administration building on site. facade materialization was defined by the client due to a „ci-driven“ campus philosophy for european sites.
LEVEL 0,5
LEVEL 2
entering the project about four months after starting in august 2015 the full building permit documents were submitted in december 2015. i was assigned architectural lead on the design and development of the enevlope package, releasing tender documents in february 2016. due to the schedule, ongoing detail development together with the contractor stahlbau pichler for final construction was highly required and a main task of accompanying the construction progress in the past year.
ROOFTOP
Facts: Total facade Area Phase 1: ~22000 m² Overall cost envelope: 21 mio. CHF Est. building time: 06/2015 - 08/2017
1. BUILDING STRUCTURE 2. SUBSTRUCTURE 2. SANDWICH PANELS 3. GLAS PANELS 4. WINDOWS WITH PRINTED DOTS
STORYBOARD FACADE
DNA-MICROARRAY
SLIDE
DNA-MICROARRAY SIGNAL PATTERN
SIZE 1
Ø 16cm
SIZE 2
Ø 12cm
SIZE 3
Ø 8cm
SIZE 4
Ø 6cm
EMPTY COLOUR
GREYSCALE
LIGHT INTENSITY SCAN
ADAPTING TO FACADE
D2
D3
Section LSM Facade East
1 : 50 Konstruktion von innen dampfdicht inklusive deren Anschlüsse
D1 180 260.76
16.76
LSM_Level 2 LSM_Level 2
15.27 15.27
Elevation LSM East 1 - 50
1 : 50
PRESENTATION 28.10.2015 18:03:51
60 80.76
260.76 180 270
0.30
Details D1-D3 1 - 5
Innere Margarethenstr. 26, CH-4051 Basel Tel. 061/279 91 20, Fax 279 91 21 E-Mail: info@nm-ag.ch / Web: www.nm-ag.ch
FASSADENTECHNIK
Index
-
A3 Zeichng.-No.
101.1
1:3
NEUSCHWANDER + MORF AG
N M A G
Format
Massstab
23.33
29. Sept. 2015
LSM_Level 3
23.33
Auftrags-Nr.
LSM_Level 3
-
260.76
Datum:
180
Gezeichnet: R.Rieder
51
135
15
NEUSCHWANDER + MORF AG
N M A G
Innere Margarethenstr. 26, CH-4051 Basel Tel. 061/279 91 20, Fax 279 91 21 E-Mail: info@nm-ag.ch / Web: www.nm-ag.ch
FASSADENTECHNIK
Glas / Paneel Fassadenkonstruktion Regelfeld mit SSG-Verglasung Vertikalschnitt, Detail Sturz
Burckardt + Partner AG, Basel
Biogen, Luterbach
Zeichng.-No.
1:3
Massstab
101.2
-
Auftrags-Nr.
Datum:
A3 Index
-
Format
29. Sept. 2015
Gezeichnet: R.Rieder
Konstruktion von innen dampfdicht inklusive deren Anschlüsse
Inhalt:
Architekt:
Objekt:
205
32.58
180
Glas / Paneel Fassadenkonstruktion Regelfassade mit135 SSG-Verglasung Vertikalschnitt, Detail Brüstung
51
260.76
Burckardt + Partner AG, Basel
15
32.58
60
Biogen, Luterbach
51
16.76
Inhalt:
51
LSM_Penthouse
Architekt:
15
LSM_Penthouse
Objekt:
205
D-a
DETAIL DESIGN CONCEPT BMC
80.76 270
DETAIL DESIGN CONSTRUCTION BMC
DETAIL DESIGN CONCEPT DOUBLE SKIN FACADE
DETAIL DESIGN CONSTRUCTION ADMIN BUILDING FACADE 620
EL. +10.980
190
EL. +10.859
101
Stainless steel ø5.5x19 screw DIN7504 Wood blocking
Aluminium profile Oxidised E6C0
Galvanized sheet 20/10 25
211
134 103
ARCHITECTURALCAP LEVEL EL. +16.060
Hilti HUS-HR 6x45/15
170
80÷100
25
~410
20
80
SCH-Gasket
Steel transom sandblasting + primer + final coating on site (TBD)
80
138
-20
+20
200
Stainless steel M12x120 screw DIN 931 + steel M12 nut DIN 934
TBD
300
680
Anchor FISCHER FAZ II M16 - A4
10
2
200 ~470
Steel sheet th. 3mm Mineral wool insulation fusion point> 1000°C FSP-032
130
+ 20 / - 20
EL. +10.709
Stainless steel ø5.5x19 screw DIN7504N
TBD
300
Aluminium profile RAL9005
SLAB LEVEL EL. +15.960
Steel mullion sandblasting + primer + final coating on site (TBD)
160
Mineral wool Flumroc-Dammplatte DUO 48kg/mc thk. 90mm
376
640
+ 20 / - 20
- 20 / + 20
220
Stainless steel M16x140 screw DIN 931 + steel M16 nut DIN 934
5
5
EL. +10.570
200
SLAB FLOOR LEVEL EL. +15.660
2.5
6
~50
EL. +10.789 EL. +16.027
2
Galvanized sheet 30/10
~265
33
42
Alucobond cap painted silver
Continous waterproofing damp open black membrane sd>3m
102
EL. +16.130
Plastic shim (purenit)
Continous waterproofing damp open black membrane sd>3m
Alucobond cap painted silver Wood blocking
+20
Steel sheet th. 3mm Plastic shim (purenit)
-20
24
Stainless steel M4x12 screw DIN912 + M4 nut DIN934
5304
191
01 5312
Aluminium bent sheet 30/10 Oxidised E6C0
01
CAP LEVEL (NEW POSITION) EL. +16.210
25
Stainless steel ø5.5x19 screw DIN7504
450
Anchor FISCHER FAZ II M16 - A4 Steel bracket treatment rustproofing APPROVAL - APPROVAZIONE STATUS STATO
240
Alucobond painted silver
Alucobond painted silver
200
Cz
Cy
Cx
Cb
Cw
Cc
Cv
Cd'
Cd
C1
ADMIN
C2
Steel transom sandblasting + primer + final coating on site (TBD)
Stainless steel M10x35 screw DIN933
C3
C4
C5
Hh
Hg
Hf
He
Hd
Hc
Hb
C6
Ha
Dj
Dh
Dg
Df
De
Dd
Dc
Db
Da
C7 D1
D2
150
H1
D3
H2
Aluminium profile RAL9005
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C
KEY-PLAN - INQUADRAMENTO
Ca
Steel RAL9005
D4
H3
SCH-Gasket
D5
BMC
WH
H4
H5
D6
D7
H6
D8
H7
Stainless steel M8x30 screw DIN933
H8
Aluminium sheet RAL9005
D9
H9
D10
H10
H11
D11
Aluminium profile Oxidised E6C0
2 20
APPROVAL - APPROVAZIONE STATUS STATO
Ca
Cz
Cy
Cx
Cb
Cw
Cc
Cv
Cd'
EL. +10.300
Steel mullion sandblasting + primer + final coating on site (TBD)
Cd
C1
ADMIN
C2
150
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C
KEY-PLAN - INQUADRAMENTO
C3
C4
C5
Hh
Hg
Hf
He
Hd
Hc
Hb
Ha
C6
Dj
Dh
Dg
Df
De
Dd
Dc
Db
Insulated glass GL-34 ESG 8-16-6-20-55.2
Da
C7 D1
D2
EL. +15.345 RAFFSTORE LEVEL
D3
D4
H3
D5
80
16
BMC
WH
H4
Alucobond painted silver
330
H1
H2
H5
D6
D7
H6
112
D8
H7
H8
D9
H9
PROFILE LEVEL EL. +15.280
WAREMA T.B.D
D10
255
5 20 16 8 25
10
32
328 140
13
39
INDEX - INDICE
First Emission DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
01
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com
2316 SP/aa
CLIENT
INTERNE KONTROLLE CONTROLLO INTERNO
SITE
DEPARTMENT REPARTO
45
ST PL
132
CANTIERE
Biogen the envelope
UNTERSCHRIFT FIRMA
DESCRIPTION
EL. +5.565
61
19
160
Hilti HUS-HR 6x45/15
TRANSOM LEVEL EL. +10.955
Double skin facade @ +15.660m Cap Vertical detail DRAWING NUMER
NUMERO DISEGNO
2316 F
00
VIEW VISTA
JOB COMMESSA
DEPARTMENT SETTORE
LOT LOTTO
P 5312 00
TYPE TIPOLOGIA
NR° PROGRESSIVO
Black weather sealant
REVISION REVISIONE
SCH-Gasket
stainless steel M12x140 screw DIN933
stainless steel M12x140 screw DIN933
Aluminium L profile oxidised E6C0
Aluminium L profile oxidised E6C0
20
GL33 ESG 15+15.2
Aluminium profile oxidised E6C0
Aluminium profile oxidised E6C0 10 10
EL. +10.853
10
EL. +10.853
97
46
SCH-Gasket
60.8
Stainless steel screw
8 16 6
Plastic shim (purenit)
10
20 5
19
40
Steel transom sandblasting + primer + final coating on site (TBD)
280
Sika Seal in horizontal and vertical side
5
Stainless steel ø4.8x25 screw DIN7504-N
0.76
By Others
EL. -0.008
40
360
27
Stainless steel bent sheet 30/10
01
01
4316
4316
Stainless steel M12x120 screw DIN 931 + steel M12 nut DIN 934
28
Continous dampproof membrane sd>150m +20
12
Baker rod + sealant
31
EL. -0.150
-20
40
31
12
Nail Hilti X-DNI 27
80
PROFILE LEVEL EL. +10.710
8 10 17 10 17 10 8
PROFILE LEVEL EL. +10.710
80
PROFILE LEVEL EL. +10.790
8 10 17 10 17 10 8
60
PROFILE LEVEL EL. +10.790
Galvanized steel bent sheet 8/10
GL33 ESG 15+15.2
GL33 ESG 15+15.2
-20
-20
+20
KEY-PLAN - INQUADRAMENTO
Alucobond painted silver
Alucobond painted silver
Aluminium profile Oxidised E6C0
Aluminium profile Oxidised E6C0
Ca
Cz
STATUS STATO
KEY-PLAN - INQUADRAMENTO
Cy
Cx
Cb
Cw
Cc
Cv
Cd'
Cd
Ca
C1
ADMIN
C2
C3
Hh
Hg
Hf
He
Hd
Hc
Hb
C6
Cy
Cx
Cb
Cw
Cc
Cv
Cd'
Dh
Dg
Df
De
Dd
Dc
Db
ADMIN
C3
Da
Hh
Hg
Hf
He
Hd
Hc
Hb
C6
Ha
Dj
Dh
Dg
Df
De
Dd
Dc
Db
D1
H5
D2
H1
D4
125
BMC
WH
H5
H6
Aluminium oxidised E6C0
D8
WAREMA T.B.D
WAREMA02T.B.D13/12/2016 01 00
Plastic shim (purenit)
Aluminium profile Oxidised E6C0
ZEICHNER DISEGNATORE
Aluminium profile Oxidised E6C0
DEPARTMENT REPARTO
TB ST
BMC
WH
PL SCALE SCALA VIEW VISTA
Stainless steel M12x110 screw DIN 931 + steel M12 nut DIN 934 (Bolt for temporary regulation)
+20
H5
2316 SP/aa
CLIENT
INTERNE KONTROLLE CONTROLLO INTERNO
SITE
COMMITTENTE AUFTRAGSNR.
13/12/2016 26/09/2016 02/09/2016
INDEX - INDICE
AUFTRAGSNR. NR°COMMESSA
DEPARTMENT REPARTO
NR°COMMESSA
Biogen
ZEICHNER DISEGNATORE
CANTIERE
2316 SP/aa INTERNE KONTROLLE CONTROLLO INTERNO
SITE
Biogen the envelope DEPARTMENT REPARTO
DESCRIPTION
DESCRIZIONE
TB
ADMIN FACADE
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com CLIENT
Plastic shim (purenit)
ST
Hilti HUS-HR 6x45/15
SCALE SCALA
DRAWING NUMER
2316 F JOB COMMESSA
DEPARTMENT SETTORE
NUMEROSCALE DISEGNO SCALA
00 LOT LOTTO
1:1
P 5311 02
VIEW TYPE VISTA TIPOLOGIA
NR° PROGRESSIVO
PL VIEW VISTA
COMMITTENTE
Biogen
UNTERSCHRIFT FIRMA
M. Primisser
-----------Double skin facadeST @ +10.980m PL M Bellutti Vertical detail REVISION REVISIONE
DESCRIZIONE
ADMIN FACADE
Double skin facade @ +10.980m Vertical detail
DRAWING NUMER
NUMERO DISEGNO
2316 F
00
JOB COMMESSA
DEPARTMENT SETTORE
LOT LOTTO
P 5311 02
TYPE TIPOLOGIA
NR° PROGRESSIVO
REVISION REVISIONE
Module L. 2387
2213 2122
71.5
SGP 1.52 15 15
20 31.5 20
20
1.52
20
15 15
GL33 ESG 15+15.2 Aluminium profile oxidised E6C0
20
20
53
20
3 21
2
ule
68
21
L.
od
M 33
50 79
Module L. 2168
2367
112
33
GL33 ESG 15+15.2 Aluminium profile oxidised E6C0
-20
80
+20
Aluminium profile oxidised E6C0
20
Steel grid
17
Module L. 2387
80
128
393
2337
50
366
650
50
Aluminium bent sheet 20/10 Oxidised E6C0
Alucobond painted silver
10
55 50
Aluminium profile Oxidised E6C0
15
250
4
223
Aluminium profile oxidised E6C0
15
Aluminium profile RAL9005
22 15
Stainless steel M8x35 screw DIN933
59
121
+20
59
25
20 350
20
14
301
-20
6
36
Steel bracket treatment rustproofing 55
-20
470
Cx
Cb
Cw
Cc
Cv
Cd'
Hg
Hf
He
Hd
Hc
Hb
C6
Cb
Cw
Cc
Cv
Cd'
DATE DATA
Cd
ADMIN Ha
Dj
Dh
Dg
Df
De
Dd
Dc
Db
Da
C7 D1
D2
H1
1
Cy
Cd
D3
H2
25
ADMIN
C3
Cx
C4
C5
12
Cz
C2
Cy
C3
Hh
59
Ca
C1
50
D4
H3
H4
H5
C4
Insulated glass GL-32 ESG 8-16-4-20-55.2
Cz
C1
15
C
Alucobon painted silver
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C Ca
4
Slab flexion
STATUS STATO
KEY-PLAN - INQUADRAMENTO
22
Continous dampproof A membrane sd>150m B KEY-PLAN - INQUADRAMENTO
C2
APPROVAL - APPROVAZIONE
°
40.5 STATUS STATO
+0 -16
APPROVAL - APPROVAZIONE
0
40
50
F.F.L.
D5
BMC
WH
D6
D7
H6
D8
H7
C5
Hh
Hg
Hf
He
Hd
Hc
Hb
C6
Ha
Dj
Dh
Dg
Df
De
Dd
Dc
Db
Da
H8
D9
H9
C7
D1
D10
D2 H10
H11
D11
H12
H1
D3
H2
D4
H3
H4
H5
D5
BMC
WH
D6
00
H6
Anchor FISCHER FAZ II M16 - A4
D12
D7
D8
H8
13/12/2016
INDEX - INDICE
H7
First Emission
DATE - DATA
SP/aa DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
NAME - NOME
D9
H9
D10
H10
H11
D11
H12
D12
Hilti HUS-HR 6x45/15
8
3 86
Alucobond painted silver
00
13/12/2016
INDEX - INDICE
First Emission
NAME - NOME
ule
od
SP/aa DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
DATE - DATA
M
0 .9
L
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com AUFTRAGSNR. NR°COMMESSA ZEICHNER DISEGNATORE
DEPARTMENT REPARTO
TB ST PL
EL. +5.540
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com
893
12 950
D8
D9
D12
General Revision General Revision First Emission
DATE - DATA
SP/aa SP/aa SP/aa DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
NAME - NOME
2316 SP/aa
CLIENT
INTERNE KONTROLLE CONTROLLO INTERNO
SITE
COMMITTENTE
Biogen
UNTERSCHRIFT FIRMA
M. Primisser -----------M Bellutti 1:1
CANTIERE
Biogen the envelope DESCRIPTION
DESCRIZIONE
ADMIN FACADE
Double height steel facede Bottom vertical detail
DRAWING NUMER
NUMERO DISEGNO
2316 F
00
JOB COMMESSA
DEPARTMENT SETTORE
LOT LOTTO
P 5303 02
TYPE TIPOLOGIA
NR° PROGRESSIVO
REVISION REVISIONE
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
CANTIERE
Biogen the envelope DESCRIPTION
30.5
WAREMA T.B.D
151
D5
D6
D7
D10
ZEICHNER DISEGNATORE
SCH-Gasket
Steel grid
D3
D4
BMC
WH
D11
02 01 00
Stainless steel M20x80 screw DIN931 SLAB FLOOR LEVEL EL. +6.150
Da
H9
NAME - NOME
655
Aluminium L profile oxidised E6C0
Db
H6
SP/aa SP/aa SP/aa DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
623
Stainless steel M12x120 screw DIN933
Dc
H7
D10
NAME - NOME
Alucobond painted silver
Steel bent sheet 8/10 Hilti HUS-HR 6x45/15
Dd
H8
D12
SP/aa General Revision SP/aa General Revision SP/aa First Emission
DATE - DATA
655
4
De
H3
H4
D11
H12
13/12/2016 26/09/2016 23/09/2016
Glass H. 4543
Continous dampproof membrane sd>150m
5
Df
H1
H10
02 01 00
DENOMINAZIONE DESCRIPTION OF MODIFY - INDEX - INDICE MODIFICA
Module H. 4600
5
F.F.L. EL. +6.300
Module H. 4025
59
20 16 8
Cd
H10
H11
D11
D12
General Revision General Revision First Emission
01
0.76
Cd'
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com
4320
137
Cv
Dg
H12
5313
Aluminium profile Oxidised E6C0
Cc
H11
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT DERODER INHALT ANDIESER DRITTEZEICHNUNG PERSONEN IST WEITERGEGEBEN UNSER GEISTIGES WERDEN. EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI IL LEGGE. PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
Steel ø3.5x13 screw DIN7504-N
Dh
H2
Anchor FISCHER FAZ II M16 - A4
01
Insulated glass GL-32 ESG 8-16-4-20-55.2
Dj
D2
-20
D9
D10
H10
H12
1:1
Cw
ADMIN Ha
D8
H8
H11
UNTERSCHRIFT FIRMA
C6
D1
H9
DATE - DATA
M. Primisser -----------M Bellutti
Hb
EL. -0.400
D5
D6
H6
D9
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com AUFTRAGSNR. NR°COMMESSA
Module H. 4025
Hilti HUS-HR 6x45/15
Plastic shim (purenit)
Module H. 4025
Hilti HUS-HR 6x45/15
TRANSOM LEVEL EL. +10.300
Hc
D7
Anchor FISCHER FAZ II M16 - A4 TRANSOM LEVEL EL. +10.300
Hd
C7
TB
Anchor FISCHER FAZ II M16 - A4
He
H7
H8
H9
26/09/2016 23/09/2016
INDEX - INDICE
125
-20
Hf
D4
H3
H4
H7
Aluminium oxidised E6C0
+20
Hg
D3
H2
D5
D6
D7
Cb
C5
Mineral wool Flumroc-Dammplatte DUO 48kg/mc
Da
C7 D1
D2
D3
Cx
C4
Hh
Stainless steel M12 nut DIN934
C5
Dj
H2
H3
H4
Cy
C2
250
C4
Ha
C7
H1
Cz
C1
C3
Cd
C2
C5
Slab flexion
Cz
C1
Ca
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C
KEY-PLAN - INQUADRAMENTO
Weldings on site for mullion fixing
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C
APPROVAL - APPROVAZIONE STATUS STATO
Anchor FISCHER FAZ II M16 - A4
XPS By Others Steel bracket treatment rustproofing
APPROVAL - APPROVAZIONE
DATE DATA
APPROVED WITHOUT NOTES APPROVATO SENZA NOTE APPROVED WITH NOTES APPROVATO CON NOTE NOT APPROVED RIEMETTERE
A B C
C4
Slab flexion
+20
+20
STATUS STATO
+0 -16
Hilti HUS-HR 6x45/15
Stainless steel M12x100 screw DIN933 (removable temporary bolt for mullion regulation) APPROVAL - APPROVAZIONE
+0 -16
Continous waterproofing damp open black membrane sd>3m
10
516
516
150
Weld to fix regulation
Galvanized sheet 15/10
10
388
Aluminium profile 10oxidised E6C0 10
Glass H. 4547
Aluminium profile RAL9005
Aluminium profile oxidised E6C0
Module H. 4600
Aluminium profile RAL9005
RAFFSTORE LEVEL EL. +10.595
Glass H. 4547
RAFFSTORE LEVEL EL. +10.595
Module H. 4600
350
350
+20
300
150
F.F.L. EL. +0.000
10
10
28
-20 -20
NR° PROGRESSIVO
T.B.D.
17
Plastic shim (purenit) +20
P 5304 02
TYPE TIPOLOGIA
Steel transom sandblasting + primer + final coating on site (TBD)
80
40
-20
LOT LOTTO
80
+20
-20
80
+20
80
60
300
DEPARTMENT SETTORE
Steel mullion sandblasting + primer + final coating on site (TBD)
Black weather sealant
15 1.52
GL33 ESG 15+15.2
Steel grid
Sika Seal
00
JOB COMMESSA
EL. +5.530
stainless steel M20x80 screw DIN931stainless steel M20x80 screw DIN931
164
40
31.5 15
15 1.52
Alucobond painted silver
Sika Seal SLAB FLOOR LEVEL EL. +10.830
20
31.5 15
SCH-Gasket
Steel grid
SLAB FLOOR LEVEL EL. +10.830
623
Insulated glass GL-32 ESG 8-16-4-20-55.2
Alucobond painted silver
NUMERO DISEGNO
2316 F
35
SCH-Gasket
871
623
DRAWING NUMER
Stainless steel M10x25 screw DIN7991
3
TRANSOM LEVEL EL. +10.955
871
Insulated glass GL-32 ESG 8-16-4-20-55.2
Glass H. 4433
59 10.8 20 1 46 8
Double height steel facade vertical cap detail
1:1
Sika Seal
120
EL. +5.595
DESCRIZIONE
Module H. 4490
7
Glass H. 4433
Galvanized steel bent sheet 8/10
Hilti HUS-HR 6x45/15
59 130 10.8 20 1 46 8
DESCRIZIONE
ADMIN Facade
VIEW VISTA
ADMIN FACADE
1:1
SCALE SCALA
5303
COMMITTENTE
Biogen
M. Primisser -----------M Bellutti
TB
12
Module H. 4490
Galvanized steel bent sheet 8/10
01
7 F.F.L. EL. +10.980
CANTIERE
Biogen the envelope
GL33 ESG 15+15.2
ZEICHNER DISEGNATORE
185
164
steel ø3.5x13 screw DIN7504-N Continous dampproof membrane sd>150m
4316
130 F.F.L. EL. +10.980
Module H. 4175
Module H. 4175
steel ø3.5x13 screw DIN7504-N Continous dampproof membrane sd>150m 01
PL SCALE SCALA
120
4316
ST
COMMITTENTE
Biogen
DESCRIPTION
NAME - NOME
Insulated glass GL-34 ESG 8-16-6-20-55.2
Aluminium profile Oxidised E6C0
SITE
SP/aa
DATE - DATA
AUFTRAGSNR. NR°COMMESSA
583
655
13/12/2016
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
01
CLIENT
UNTERSCHRIFT FIRMA
M. Primisser -----------M Bellutti
TB
360
D12
2316 SP/aa INTERNE KONTROLLE CONTROLLO INTERNO
DEPARTMENT REPARTO
Sika Seal
Module H = 4735
15 15
Glass H. 4437
Module H. 4175
139
5311 Aluminium profile Oxidised E6C0
ZEICHNER DISEGNATORE
Continous dampproof membrane sd>150m
180 280
Module H = 5600
10
1.5 SGP
TRANSOM LEVEL EL. +15.130
4
00
Module H. 4490
Aluminium profile Oxidised E6C0
0.76 5
NAME - NOME
REVISION REVISIONE
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
Insulated glass GL-32 ESG 8-16-4-20-55.2
Aluminium profile Oxidised E6C0
SP/aa Sp/aa SP/aa DESCRIPTION OF MODIFY - DENOMINAZIONE MODIFICA
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com
100
5 19.4
D11
Aluminium profile Oxidised E6C0
Continous dampproof membrane sd>150m Aluminium bent sheet 20/10 Oxidised E6C0
General Revision General Revision First Emission
DATE - DATA
AUFTRAGSNR. NR°COMMESSA
0.76 8 16 6 20 5 60.8
H10
H12
13/12/2016 26/09/2016 02/09/2016
INDEX - INDICE
H11
SCH-Gasket
Galvanized sheet 20/10
01
+0 -16
Plastic shim (purenit)
Hilti HUS-HR 6x45/15
5311
02 01 00
D12
Slab flexion
24
Slab flexion
Module H = 4735
+0 -16
EL. +10.330
+20
+ 20 / - 20
Black weather sealant
-20
350
H12
45
AUFTRAGSNR. NR°COMMESSA ZEICHNER DISEGNATORE
DEPARTMENT REPARTO
TB ST PL SCALE SCALA VIEW VISTA
2316 SP/aa
CLIENT
INTERNE KONTROLLE CONTROLLO INTERNO
SITE
SCALE SCALA
COMMITTENTE
VIEW VISTA
Biogen
UNTERSCHRIFT FIRMA
M. Primisser -----------M Bellutti 1:1
CANTIERE
DESCRIZIONE
ADMIN FACADE
Double skin facade @+6.300 Bottom vertical detail
DRAWING NUMER
NUMERO DISEGNO
2316 F
00
JOB COMMESSA
DEPARTMENT SETTORE
CLIENT
SITE
COMMITTENTE
Biogen
UNTERSCHRIFT FIRMA
M. Primisser SP/aa M. Bellutti 1:1
CANTIERE
Biogen the envelope DESCRIPTION
DESCRIZIONE
ADMIN Facade
Horizontal Detail Double skin North-East corner DRAWING NUMER
NUMERO DISEGNO
2316 F
00
JOB COMMESSA
DEPARTMENT SETTORE
LOT LOTTO
P 4320 00
TYPE TIPOLOGIA
NR° PROGRESSIVO
REVISION REVISIONE
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
Biogen the envelope DESCRIPTION
2316 SP/aa INTERNE KONTROLLE CONTROLLO INTERNO
LOT LOTTO
P 5313 00
TYPE TIPOLOGIA
NR° PROGRESSIVO
REVISION REVISIONE
DER INHALT DIESER ZEICHNUNG IST UNSER GEISTIGES EIGENTUM UND DARF NICHT OHNE UNSERER GENEHMIGUNG VERVIELFÄLTIGT ODER AN DRITTE PERSONEN WEITERGEGEBEN WERDEN. IL PRESENTE DISEGNO E`DI PROPRIETA` DELLA NOSTRA DITTA CHE NE VIETA LA RIPRODUZIONE E CESSIONE A TERZI A TERMINI DI LEGGE.
MUNICH MAIN LIBRARY 2015 „UMSONST UND DRINNEN“ - PUBLIC SPACE AND INTERFACE
easy access programm research
The project was chosen out of the ongoing debate about the new concert hall in munich. in correlation with a necessary refurbishment of the old gasteig cultural center, the munich library was facing a temporary loss of their space. in collaboration with the „stadtbibliothek münchen“ the master thesis aims to create a project dealing with a cluster of cultural functions and a space, which is easy to access.in a city that is facing the needs of a polycentric approach on its basical functions.
site crossing infrastructure
A plot, about two kilometres west from the city center offered the chance to solve a problem in the development axis from central station to „münchenlaim“. the existing bridge is an intersecting flow barrier for unmotorized traffic in east-west direction. the new library creates a multilayer interface turning this crucial point into public space as a distributional hub between neighborhoods.
primary volume & access interface
Two primar geometric volumes, Socket and tower, contain the main functions of the building. allowing the socket to be multifunctional in its way of creating space and proportion could be seen as the main point on developing an open interface inbetween enclosed and open areas. integrating the building, as being a public space itself, into the existing urban flow and connections.
+0.00
+3.74
EMPFANG HAUPTEINGANG
AUFENTHALT & GARDEROBE
JUGENDBIBLIOTHEK
above: 2nd level (plaza) below: 1st level (educational)
VORLESUNG 1 & 2
INFO VHS
VHS UNTERRICHTSRÄUME / VERWALTUNG
AUTOMATISCHE SCHLIEßFACHANLAGE
EMPFANG / AUFENTHALT EG CAFÉ
VORTRAGSSAAL
+0.00
-2.00
OFFENE AUFENTHALTSZONEN
ELTERN KIND BIBLIOTHEK
FAHRRADSTELLPLÄTZE
FREIHAND / LESENISCHE
FREIHAND
example layouts: 3-Story-library-Module / intermediate administration floors
FREIHAND / LESENISCHE
VERWALTUNG
cross- and longitudinal sections
opernhaus zĂźrich 2014 access reloaded
CARVING THE SOCKET A PUBLIC BALCONY AT SECHSELÄUTENPLATZ
REMOVING THE „FAKE-PORTIKUS“
CLADDING THE „FLEISCHKÄSE“ A HOMOGENICAL COVER
ONE FOR TWO - A COMMON OPEN SPACE FOR THE OPERA HOUSE & THE BERNHARD THEATRE
A DETACHED GLASS CUBE BREAKING THE SYMMETRY OF THE NEW SOCKET REEMPHASIZING THE ORIGINAL STRUCTURE OF THE HISTORIC SUBSTANCE
OK +0,72
basement access parking garage
level 1 open lobby space
level 2 terrace and opera vestibule
DETAIL SECTIONS HORIZONTAL & VERTICAL 17 3 4 16
14
15
13 14
13 1 2
6
9 11
3 4
10
12
5
7
8
18
20
19
1
6
11
Volkstheater Munich 2013 „Radikal, Jung“, schlachthof conversion“
small hall
Large hall
demolish abandonned structure, redefining urban typologie & link the plot to the city
the project relocates one of munichâ&#x20AC;&#x2DC;s most successfull theatres to the former slaughterhouse area. a composition of three primary volumes is representing the basic program. a small and a large theatre are attached to a linking bar for lobby and circulation. a project to explore functional - and social relations in the very specific task of designing a theatre.
level 1 theatre plaza & lobby
level 2 restaurant & courtyard
level 3 small hall
... HANDS ON - SOME MORE WORK FROM THE PAST YEARS
2500
12
2104
650
3710
650
1910
250
350
650
300
650
Schreibtischplatte
1800
285
125
131
384
2110
300
390
4360
2500
1 St. 2500 x 650 mm MDF COLOR 16 mm Schwarz
Grundriss
1800 2450 1800
6
200
624
194
1400 12
200
1388
12
194
1400
1388
12
194
274
12
200
300
Ansicht
6
300
585
194
20
20
6
274
125
131
285
200
750
20
2800
650
Regalboden Ecke
900
650
2 St. 2450 x 585 mm mit Ausschnitt 1800 x 300 mm MDF COLOR 16 mm Schwarz Fräsnut BxT 6x3 mm Ober- und Unterseitig
6 St. 1800 x 300 mm MDF COLOR 16 mm Schwarz Fräsnut BxT 6x3 mm Ober- und Unterseitig
Gefräste Nut Ober- und Unterseitig B x T 16 x 2 mm
125
16
125
301 301 301 301 251 16 401
417
401
250
Bauteilübersicht
2800 x 250 mm MDF COLOR 16 mm Schwarz
5016
58
50
58
16
417
16
267
401
417
150
16 134 16
317
16
2800
317
16
301
16
317 317
301 301 301 16
317
16
317
2800
16
317
16
301
317
16
317
301
133
16
317
133
Regalständer
315
125
323
125
16
323
Gefräster Ausschnitt 16 mm
250 2800 x 250 mm MDF COLOR 16 mm Schwarz
3D - Explosionsgrafik
3D REGAL WHG HALM - 08-02-17