ESSCA Project List

Page 1

EAST SILVER SPRING CITIZEN'S ASSOCIATION (ESSCA) Development in Fenton Village 18 September, 2012

PROJECTS EAST OF GEORGIA AVENUE A

Project & Location First Baptist Church Development East side of Fenton St., between Wayne & Bonifant

B

Senior Housing NW corner of Bonifant & Fenton Adjacent to new Library

C

Bonifant Plaza North side of Bonifant St., between Kafa Kafe & brick rowhouses w/Roger Miller Restaurant

D

The Adele SW corner of Thayer and Fenton (current site of vacant service station)

• • • •

Scope 6 stories 220 residential apartments 20,000sf street level retail Below grade structured parking

Status Site plan filed August 2012

• 8 stories • Approximately 110 residential apartments • Street level retail • 9 stories • 72 residential apartments • Gym on street level

• No approvals yet • Currently in early planning and programming phase

• • • •

• Project plan approved in December 2008 • Project on hold (property was put up for auction in early 2012 by developer and is currently held by bank)

8 stories 96 residential apartments 18,000sf street level retail 15,000sf office space

Page 1 of 5

Approved a couple of years ago

Notes/Comments • Existing church to be demolished • New sanctuary constructed further east on Wayne Affordable senior housing


PROJECTS EAST OF GEORGIA AVENUE, CONTINUED E

F

G

Project & Location Studio Plaza Parking Lot 3 (middle of block bounded by Thayer and Silver Spring Avenues, Fenton Street and Mayor's Alley behind Georgia Avenue

814 Thayer Ave. Mid-block, south side, 2 doors east from Weller's Cleaners Silver Spring Park SE corner of Silver Spring Ave. and Fenton

Scope Phase I: • 11 stories • 415 residential apartments • Street level retail on Thayer • Below grad structured parking for residents + 152 public spaces

Status Phase I: • Project Plan approved • Site Plan likely to be submitted Sept. 2012

Phase II: • TBD, likely 6 stories fronting Fenton • No decision on depth of 60’ on Fenton • The rest to be 110’and an additional 100+/- residential apartments • 5 stories • 52 residential apartments

Phase II: • Project Plan Approved • No deal yet with adjacent properties • Future phase

• • • •

• Project approved • Start date not yet determined

60’ tall 58 residential apartments 110 hotel rooms Some street level retail at corner of SS & Fenton and in existing office building

Page 2 of 5

Site plan approved May 2012

Notes/Comments Phase I: • 11 story building between Thayer and Fenton • Center plaza B • Below-grade parking accessible from SS Ave. No access from Fenton St. • Includes affordable* units Phase II: • To occupy balance of Parking Lot 3 • Narrow building fronting Fenton Includes affordable* units through HUD program • Project includes rehab. of existing adjacent 3 story office buildings fronting Fenton plus demolition of first two houses east and fronting on south side of Silver Spring Ave. • Significant public space delineating the commercial from the residential • Includes affordable* units


PROJECTS EAST OF GEORGIA AVENUE, CONTINUED H

Project & Location Eagle Bank Building SE corner of Sligo and Fenton

• • • •

Scope 8 stories (existing tower) 6 stories (adjacent new construction on parking lot) 90 residential apartments Approximately 4,000sf of street level retail and possible community space

Status • No approvals at this time • Still in early planning stages

• •

• I

Sligo Ave. Police Station NW corner of Sligo & Grove

None determined at this time

J

National Dry Cleaning Institute NE corner of Georgia and Burlington

• 10 stories • 210 residential apartments • 2 levels of underground parking

K

Safeway NW corner of Thayer and Fenton

We have not seen plans, but understand intent is for additional height and housing to be added

Page 3 of 5

Notes/Comments The existing tower will be converted to apartments New mid-rise construction, an entrance plaza and some surface parking will occupy the balance of the site Affordable* micro units Civics asking for art center and community gardens HUD pushing for affordable housing

• No community presentations or • approvals yet • Police Station to relocate to White Oak in approximately 2 • years • No plans at this time. building RFP to be issued late Fall Under construction • Adaptive reuse of existing building • Plus new construction high rise residential tower on the back/track side No community presentation or approvals yet


PROJECTS WEST OF GEORGIA AVENUE L

M

N

Project & Location The Soliare 1150 Ripley St., 700 South of Metro station 1155 & 1015 Ripley St.

Progress Place Current location, on Colonial Lane, between Silver Spring Ave. & Ripley St.

Scope 200' tall 295 residential apartments 9 live-work units 4 levels of underground parking 385 residential units total for both

Status Under construction

Notes/Comments

1155 Ripley: 200' tall

1155 Ripley: Under construction

1155 Ripley: Townhouses & flats wrapping a garage and a multi family tower above

1015 Ripley: • 80' tall • 5,500 sf street level retail None determined at this time

1015 Ripley: Under construction

1015 Ripley: Shorter building w/loft units Plan is for existing site to be redeveloped by private developer and for Progress Place to be relocated behind the new fire and police station

Project comprised of two buildings:

RFP already issued County reviewing proposals

* Note: The term "affordable " refers to projects/units for work force housing (for people earning approximately $40k - $60k annually).

Page 4 of 5


ADDITIONAL GENERAL COMMENTS ON DEVELOPMENT PROJECTS

1. Elza Hissel-McCoy – elza.Hisel-McCoy@mncppc-mc.org or 301 495-2115 Planning Staff assigned to review most projects in Fenton Village and send recommendations to the Planning Board. He can direct you to other staff who may be working on different aspects of a project. 2. Françoise Carrier, Chair, The Planning Board mcp-chairman@mncppc-mc.org 3. The staff recommends a position and the Board schedules hearings on Thursday. The public can attend and sign up to testify at a hearing and/or send in written comments. Written comments will be included in the record, if they are received 48 hours before the hearing. Heading of email should include hearing Item #. 4. The Board agenda for Thursday hearings and staff packets with recommendations for each project can be accessed at the Board website http://www.montgomeryplanningboard.org 5. The County Council votes on Master Plans and changes to zoning, but does not weigh in on individual projects, unless there is a request for a Zoning Text Ammendment (ZTA) or some other exemption which may or may not also involve the Hearing Examiner. 6. To Ensure comments go to all Councilmembers and are included in the record, comments should be sent to county.council@montgomerycountymd.gov

Page 5 of 5


E.

AY

NE

AV

A

W

B C

S NT

T.

IFA

N BO

K THAYER AVE.

F

M L

D

E N

SILVER SPRING AVE.

& X CS

SLIGO AVE.

KS

AC

TR

ESSCA 18 SEPTEMBER 2012 FENTON VILLAGE PROJECT INVENTORY AERIAL VIEW NOTE: LETTER DESIGNATIONS KEYED TO CORRESPONDING CHART

GIST AVE.

I

FENTON ST.

RO

ET

M

GEORGIA AVE.

G

H


M L

C

N

B E

D

A

K

F G

H

I

ESSCA 18 SEPTEMBER 2012 FENTON VILLAGE PROJECT INVENTORY MODEL VIEW #1 NOTE: LETTER DESIGNATIONS KEYED TO CORRESPONDING CHART


A B C K

D

F

M E

G I

L N H ESSCA 18 SEPTEMBER 2012 FENTON VILLAGE PROJECT INVENTORY MODEL VIEW #2 NOTE: LETTER DESIGNATIONS KEYED TO CORRESPONDING CHART