Circle and Line
“She turns and looks a moment in the glass, Hardly aware of her departed lover; Her brain allows one half-formed thought to pass:
“Well now that’s done: and I’m glad it’s over.” When lovely woman stoops to folly and Paces about her room again, alone, She smoothes her hair with automatic hand, And puts a record on the gramophone.“
The Waste Land
BY T. S. ELIOT
The moment described in the poem manifests itself in continuous repetition, as a sad routine. Words like , “you look back”, “another time” describe this cyclical time, where eternity is not included. They are moments that happen and return.
In ruins, on the contrary, time is eternity. Eternity is manifested in the moment of the apparition. The most authentic apparition, in my opinion, happens walking through the most precious places on the planet.
Still the sky in the photograph represents cyclic time (day and night), but at the same time the clouds are always different, they run through a continuous line.
They are two distinct tenses, two different geometric shapes: the circle and the line.
Both also show fragility: they are vulnerable and show the wounds of time.
Circle and line
Silvia Barberis
Silvia Barberis
30/08/1993
Lehensteig 21, 8037 Zürich, Switzerland
+41 762066024
barberis.sil@gmail.com
www.linkedin.com/in/silvia-barberis-b9a5ba104/
I am determined, creative and naturally curious. Interiors has always been my “idée fxe”. I really like to keep up with interior trends and their evolutions and my strong interest into various foreign cultures, in all their colours, shapes and faceted meanings always push me deep into the research for the different, into new codes and new stories. I’m available and always ready to listen, eager to learn, pretty fast in the process. When I work I devote all of myself to what I do. I’ve been taught, both in my family and at school, that targets are there to be reached, which helped me a lot in discovering I possessed strengths I wasn’t even aware of. My latest work experiences taught me really hard to develop a practical organization sense, in respecting deadlines and, most importantly, in working in a team.
Experience
MillerKnoll
Design Consultant - Milan
December 2021 - on going
Extravega Milano SB
Communication designer - Milan
January 2021 - December 2021
Angelo Pozzoli Architetto
Junior Architect - Como
January 2020 - November 2020
Aspesi
Freelance project manager/set designer - Milan
December 2019 - Fabruary 2020
Luxury Living Engineering
Jr architect - Milan
September 2018 December 2019
Education Skills
Accademia Adrianea
Master: Architecture and Museum Design for Archeology
September 2017 - March 2018
Roma Tre University, IT
Master Degree in Architectural Conservation - 110/110
October 2015 - March 2018
Pontifcia Universidad Católica de Chile, CL
International Mobility
2017
IUAV of Venice University, IT
Bachelor Degree in Architecture
2012 2015
Liceo Classico Cesare Balbo, Casale Monf, IT
High School Diploma
2007 2012
Vernonia High School, Oregon, USA Collaboratorio
Intern architect - Helsinki
April - August 2018
Biennale of Architecture
Intern executive curatorial assistant - Venice
August - Novermber 2014
High School Diploma - exchange year
August 2010 July 2011
Publication
Figura 15 disegno di precisione
“Rappresentare l’architettura. Note sulle categorie e le classi del disegno”di Daniele Giovanni Papi
Editore: tab edizioni
Data di Pubblicazione: luglio 2020
Italian
German
Spanish
Microsoft offce
AutoCAD 2D/3D
Adobe Photoshop
Adobe InDesign
Adobe Illustrator
Vectorworks
Archicad
Pcon planner
Rhinoceros
Vray
Ms project
English Teamwork
Award
Asuntoreformi, (National House Reform), 1st Prize
Interests
Photography, Fashion, Furniture, Modern Antiques, Wine, Reading, Museums, Travel, Horse Riding.
oy
YEKATERINBURG RUSSIA
INTERIOR ARCHITECTURE
year 2020 - in collaboration with Angelo Pozzoli Architetto - job position architect
H 261 H 261 H 261 62 11 DETAIL 9 DETAIL 11 DETAIL TYPE 2 11 85 20 537,5 70 392 20 477 20 309,4 337,6 226,4 229 164,2 163,5 229,9 382 95 381,9 20,1 442,5 245,8 183,5 1 7 9 95 198,7 DETAIL 7 DETAIL 10 DETAIL 10 85 726,1 20 11,5 20 13 20 H 261 H 273 FALSE CEILING SCALE 1:50
DETAIL 9 SCALE 1:5
FALSE-CEILING WITH MARBLE COATING
FALSE-CEILING WITH WALL
DETAIL
FALSE-CEILING WITH TILES COATING DETAIL 9/1 SCALE 1:5
YES +2610 +2930 7,8 12,9 90 Panel Akustic one 35 mm Mood Door Rimadesio C Profile 50x27x0.6 mm Profil U 27X30x0.6 mm +2610 12.5 0,2 12.9 YES Gypsum Plaster 2 mm Mood Door Rimadesio Diamant GKFI 12.5 mm +2930 +2760 Edge covering 10 3,5 10 12,1 12.5 0,2 0,2 12.9 2,9 Vidiwall Standard gypsum fibre board Led Profile Knauf Self Tapping Screws 2,7 10,8 15 17 YES 90 Panel Akustic one 35 mm C Profile 50x27x0.6 mm Profil U 27X30x0.6 mm +2610 32 84,2 86,4 10 FLUSH WALL SIDE FIXED DISTANCE BETWEEN SUBFRAME AND SWITCHES SUBFRAME
DOOR
DETAIL 9/2 SCALE 1:5
MOON
DETAIL 8/1 SCALE 1:5
DOOR
Sail door 90 Panel Akustic one 35 mm Gypsum Plaster 2 mm Diamant GKFI 12.5 mm C Profile 50x27x0.6 mm 11,1 90 +2610 6,5 6,5 +2930 Sail/Velaria door Vidiwall Standard gypsum fibre board BUILT IN PROFILE DOUBLE RAIL Wall paper 90 Gypsum Plaster 2 mm Panel Akustic one 35 mm Mood Door Rimadesio Diamant GKFI 12.5 mm +2930 +2760 C Profile 50x27x0.6 mm Profil U 27X30x0.6 mm +2610 Edge covering 10 3,5 10 12,1 12.5 0,2 0,2 12.9 2,9 SPECIAL PROFILE BY RIMADESIO Vidiwall Standard gypsum fibre board Led Profile Knauf Self Tapping Screws 2,7 10,8 15 17 YES
DOOR DETAIL 7
1:5 MOON DETAIL SCALE MOON DETAIL SCALE MOON DOOR WITH WALL PAPER COATING
8/2
1:5 DETAIL 9 DETAIL MOON DOOR RIMADESIO DETAIL 7
PLAN MOOD
SCALE 1:5
SAIL
SCALE
DETAIL
SCALE
A-A A A A A A ZX ZX ZX L M-A M-A M-A O M-A M-A P N A A A-A R A-A A-A C-C H H H H H H W A-A A-A A-A H A-B z-z H 273 H 273 H 261 H 261 H 261 H 261 21 21 23 23 23 23 24 26 28 28 28 29 30 31 67 33 34 31 35 37 36 38 39 40 41 41 42 43 42 42 44 44 61 60 64 4 21 22 21 22 13 21 23 21 22 28 31 34 37 29 32 36 35 37 39 40 42 43 44 61 7 7 7 7 22 22 23 26 T 13 13 13 13 13 23 24 25 29 25 25 32 22 66 66 67 OUTDOOR LIGHTS 13 59 74 74 J H 273 H 261 48,4 10 14 57,5 31,5 226 14 98 92 27 26 14 75 11,5 62,5 142 142 82,5 M-A M-A M-A 28 28 28 142 142 221,4 451,7 328,3 49 140,5 14 83 14 14 147,5 22,5 171,1 144,5 18,5 14 49,5 425 122 60 95,5 60 149 18,5 19,5 85,8 23,5 48,4 116 53 66 53 T T T 7 14 14 21 41,4 14 41,4 10 18,1 371,6 84,5 53 31 37,2 20 44,6 10 156 142,5 221,4 284,4 20 302,6 95,5 87 217 45 51 45 PIPE G 35,5 26 42,5 PIPE 1 G 84,1 13 A B C D A B C D A B C D A B C A B C D A B C 1 41 40 41 02 38 38 28 28 66 31 34 1 42 13 59 60 74 75 61 62 24 TOTAL SWITCH OFF FOR MALE BEDROOM AND BATHROOM 5 6 3 WI-FI ROUTER INT INT TV UNIT ONE CONNECT IP TELEVISION APPLE TV WITH COVER TOTAL SWITCH OFF LIVING ROOM AND WI-FI ROUTER TV UNIT ONE CONNECT IP TELEVISION APPLE TV WI-FI ROUTER D T T T T T T T T T 10 A B 30 A C A B TOTAL SWITCH OFF FOR MALE BEDROOM AND BATHROOM LIGHTING LAYOUT SCALE 1:50
A A A A A-A A-A A A A A A-A A-A A-A K S S S Z V M-B M-B M-B M-B C-C U H H ZX H A A A-A H Y JX A-B 75 H H 273 H 261 H 261 42 42 42 44 45 45 46 47 49 48 50 51 51 51 51 51 52 53 54 54 54 54 55 56 57 59 60 60 62 62 62 60 63 47 45 59 47 46 68 53 56 49 50 48 52 51 68 48 57 63 62 64 65 65 OUTDOOR LIGHTS 45 58 58 57 53 56 58 58 54 52 OUTDOOR LIGHTS 74 14 77 52,5 83 83 128 14 27,5 133,5 213 14 58,5 58,5 92 72 69 35,5 50 25,5 145 197 145 32,7 113,5 267,5 60 98 14 18,5 26 30 14 33 24 98 14 99,5 A 105 14 14 18,5 24 14 25 25 28,5 125,6 44,5 40,5 86 96 52 52 76 20 20 324 111,4 53 58,5 20 266 196,5 11,5 11,5 183 185 E 87 80 45 11,3 44 45 51 45 PIPE 2 G PIPE 1 G 45 A B C D A B C A B C D E 4 03 51 52 04 68 57 54 55 76 TOTAL SWITCH OFF FOR BEDROOM AND BATHROOM LIGHT SENSOR TOTAL SWITCH OFF FOR GR 60,61,75 59 43 74 42 53 42 SWITCH OFF FOR GR 54,55,68,76 D 3 4 6 SWITCH OFF FOR GR 54,55,68,76 FOR AND KITCHEN WI-FI ROUTER INT T T T T T T
HER MASTER BATHROOM 55 73 103 103 180 MIXER CENTER 172 170,3 183,3 SPOUT CENTER DRAIN CENTER 1 2 60 33,5 52 5 90 281,1 45 168 50 PIPE G 13 35 14,5 DRAIN HEIGHT 80 12 20 12 32 120 70,5 124 88,2 33,5 32 ELECTRIC POWER SUPPLY CONNECTED TO THE CHRONOTHERMOSTAT 255 20 119,5 53 103 26,5 7 49 50 51 48 52 20 47 BOX 503 FOR CHRONOTHERMOSTAT 150 140 9 1 2 ELECTRICAL SYSTEM LEGEND N 2 SHUKO N 2 ITALIAN SOCKET ELECTRICAL CORRUGATED FOR MIRROR 4 METEO HEAD SHOWER - POWER 12V WITH SHEATHED CABLES FROM TRANSFORMER IP30- TO INSERT IN JUNCTION BOX 1P55 6 AIR EXAUSTER TO BE DEFINE 5 ELECTRICAL CORRUGATED LED LIGHT UNDER THE CABINET 7 N 6 SWITCHES 8 N 2 SCHUKO 9 THERMOSTAT FOR FLOOR HEATING A A A K S S S A A JX H H 261 49 48 50 51 51 51 51 51 52 49 50 48 52 51 68 48 57 54 52 74 14 77 52,5 83 83 128 14 27,5 92 24 14 25 25 28,5 125,6 44,5 40,5 52 52 20 20 196,5 13 185 87 45 11,3 51 45 PIPE G A B C E 4 51 52 D 6 WI-FI ROUTER INT T T T DIM 15x15 83 52,8 83 44,5 281,1 FLOOR SAVING FLOOR SAVING 40,5 79 15x15 81,5 187 MIRROR 3 CM WOOD PARQUET 3 CM COATING MATERIAL MARBLE 3 CM FEMALE BATHROOM BRAND ITEM a.lupi a.lupi COVER a.lupi BIDET a.lupi SHOWER a.lupi a.lupi a.lupi 8,6 1 1,7 1 1 survey INSIDE SHOWER SIDE VIEW A VIEW B MEP PLAN FLOOR SAVING PLAN MODULOR SYSTEM BY RIMADESIO FLOOR SAVING FOR BATHTUBE DRAIN CONNECTION 60X25XH12 CM FLOOR SAVING FOR BATHTUBE TAP NOSTROMO 15X152 CM POWER SUPPLY FOR LED CONTROLLER IP55 (LOOK AT TECHNICAL SHEET) WITH BIPOLAR SWITCH IN THE ELECTRICAL PANEL LED CONTROLLER IP55 SHOWER HEAD MOD METEO 2C JUNCTION BOX DETAIL SHOWER BOX RAIL DETAIL SHOWER BOX RAIL 45 PIPE 1 2 G 13 35 14,5 20 6 45 METEO 2C: ENCASED WATERFALL SHOWERHEAD WITH RGB LED LIGHTING WARNING: SHOWER GLASS - FLOOR TO CEILING 11,5 16 35 20 A JX H 51 24 14 20 13 87 45 51 45 PIPE 1 2 G 4 D WI-FI ROUTER INT DIM 15x15 44 45 83 52,8 83 125,5 44,5 238,1 312,5 281,1 130 12,7 FLOOR SAVING FLOOR SAVING FLOOR SAVING 40,5 79 43,8 61 42 15x15 15x15 81,5 187 92 10 A B E D C 261 130,8 2 25 PIPE 1 2 G 52 VIEW B VIEW C FLOOR SAVING PLAN VIEW D FLOOR SAVING FOR SHOWER DRAIN CONNECTION 30X30 CM MODULOR SYSTEM BY RIMADESIO FLOOR SAVING FOR BATHTUBE DRAIN CONNECTION 60X25XH12 CM FLOOR SAVING FOR BATHTUBE TAP NOSTROMO 15X152 CM SHOWER TRAY "SUMISURA" CM 90X130.8 POWER SUPPLY FOR LED CONTROLLER IP55 (LOOK AT TECHNICAL SHEET) WITH BIPOLAR SWITCH IN THE ELECTRICAL PANEL LED CONTROLLER IP55 SHOWER HEAD MOD METEO 2C JUNCTION BOX DETAIL SHOWER BOX RAIL PLANS - FEMALE BATHROOM SCALE 1:50
HER MASTER BATHROOM 55 73 103 103 180 MIXER CENTER 172 170,3 183,3 SPOUT CENTER DRAIN CENTER 1 2 60 33,5 52 5 90 281,1 45 168 50 PIPE 1 2 G 13 35 14,5 DRAIN HEIGHT 80 12 20 12 32 120 70,5 124 88,2 33,5 32 ELECTRIC POWER SUPPLY CONNECTED TO THE CHRONOTHERMOSTAT 255 20 119,5 53 103 26,5 7 49 50 51 48 52 20 30 47 129,8 8 BOX 503 FOR CHRONOTHERMOSTAT 150 140 9 90 100 45 METEO 2C: SHOWERHEAD WARNING: 11,5 16 35 20 20 MIXER CENTER 45 1 2 ELECTRICAL SYSTEM LEGEND N 2 SHUKO N 2 ITALIAN SOCKET ELECTRICAL CORRUGATED FOR MIRROR 4 METEO HEAD SHOWER - POWER 12V WITH SHEATHED CABLES FROM TRANSFORMER IP30- TO INSERT IN JUNCTION BOX 1P55 6 AIR EXAUSTER TO BE DEFINE 5 ELECTRICAL CORRUGATED LED LIGHT UNDER THE CABINET 7 N 6 SWITCHES 8 N 2 SCHUKO 9 THERMOSTAT FOR FLOOR HEATING S S S JX 51 52 52 51 68 48 57 54 52,5 83 83 14 125,6 44,5 40,5 52 52 E WI-FI ROUTER INT T T 15x15 83 52,8 83 125,5 44,5 130 12,7 FLOOR SAVING FLOOR SAVING FLOOR SAVING 79 15x15 15x15 MIRROR 3 CM WOOD PARQUET 3 CM COATING MATERIAL MARBLE 3 CM FEMALE BATHROOM LEGEND BRAND ITEM MODEL FINISHING a.lupi WC KOMODO SATIN CERAMIC a.lupi COVER KOMODO a.lupi BIDET KOMODO a.lupi SHOWER TRAY SUMISURA MOODLIGHT SHOWER BOX CUSTOM a.lupi SHOWER HEAD METEO 2C a.lupi SINK WALL MOUNT SINK MIXER HANDLE a.lupi BIDET TAP ENCASED PART SINGLE LEVER MIXER BIDET WC PLA06- FLUSH PLATE- JET TOILET CLEANER NICE SATIN CERAMIC SATIN CERAMIC GLASS CHROME STAINLESS STEEL HANDLE BUILT-IN THERMOSTATIC SHOWER MIXER - 3 WAYS ENCASED PART HANDLE SHOWER SET-WATER PLUG WITH SHOWER HOLDER NOSTROMO BATHTUBE SHOWER SET-WATER PLUG WITH SHOWER HOLDER ENCASED PART SHOWER RADIATOR TOWEL BAR Ridea TO DEFINE CHROME CHROME CHROME CHROME CHROME PMMA WHITE PMMA WHITE PMMA WHITE 8,6 1,7 1 1 survey INSIDE SHOWER SIDE VIEW A VIEW B VIEW C MODULOR SYSTEM BY RIMADESIO NOSTROMO 15X152 CM JUNCTION BOX DETAIL SHOWER BOX RAIL DETAIL SHOWER BOX RAIL 90 45 PIPE 1 2 G 13 35 14,5 20 119,5 53 103 26,5 7 49 50 51 48 52 20 30 47 129,8 8 BOX 503 FOR CHRONOTHERMOSTAT 150 140 9 43,8 61 90 146,8 BIDET CENTER 100 6 24 13,5 5 24 9,5 33,5 9 9 9 36 18 Ø 2,5 Ø 2,5 Ø 5,5 Ø 10,5 Ø 2,5 42,5 Ø 2,5 18 9 9 4 4 33,6 9 18 8 36 12 WC CENTER CEA PLATE WITH IDROSCOPINO (LOOK AT TECHNICAL SHEET) 42 45 METEO 2C: ENCASED WATERFALL SHOWERHEAD WITH RGB LED LIGHTING WARNING: SHOWER GLASS FLOOR TO CEILING 11,5 16 35 FLOOR SAVING FLOOR SAVING 60,5 86 38,9 20 20 MIXER CENTER 45 1 2 ELECTRICAL SYSTEM LEGEND N 2 SHUKO N 2 ITALIAN SOCKET ELECTRICAL CORRUGATED FOR MIRROR 4 METEO HEAD SHOWER POWER 12V WITH SHEATHED CABLES FROM TRANSFORMER IP30- TO INSERT IN JUNCTION BOX 1P55 5 ELECTRICAL CORRUGATED LED LIGHT UNDER THE CABINET H 20 13 45 45 PIPE 2 G INT DIM 15x15 44 45 83 52,8 83 125,5 44,5 238,1 312,5 281,1 130 12,7 FLOOR SAVING FLOOR SAVING FLOOR SAVING 40,5 79 43,8 61 42 15x15 15x15 81,5 187 92 10 A B E D C PARQUET 3 CM MATERIAL FEMALE BATHROOM LEGEND BRAND ITEM MODEL FINISHING a.lupi WC KOMODO SATIN CERAMIC a.lupi COVER KOMODO a.lupi BIDET KOMODO a.lupi SHOWER TRAY SUMISURA MOODLIGHT SHOWER BOX CUSTOM a.lupi SHOWER HEAD METEO 2C a.lupi SINK WALL MOUNT SINK MIXER HANDLE a.lupi TAP ENCASED PART NICE CODE KOMODO3 KOMODO3 KOMODO4 SUMISURA 65 02 S011SB 65 F1 S 248 44 00 M011A SATIN CERAMIC SATIN CERAMIC GLASS STAINLESS STEEL METEO 2C BAL CHROME PMMA WHITE 261 130,8 2 25 PIPE 2 G 52 THE MEASURES WITH THE FRAME MUST BE CONSIDERED FIXED VIEW B VIEW C FLOOR SAVING PLAN VIEW D FLOOR SAVING FOR SHOWER DRAIN CONNECTION 30X30 CM MODULOR SYSTEM BY RIMADESIO FLOOR SAVING FOR BATHTUBE DRAIN CONNECTION 60X25XH12 CM FLOOR SAVING FOR BATHTUBE TAP NOSTROMO 15X152 CM SHOWER TRAY "SUMISURA" CM 90X130.8 POWER SUPPLY FOR LED CONTROLLER IP55 (LOOK AT TECHNICAL SHEET) WITH BIPOLAR SWITCH IN THE ELECTRICAL PANEL LED CONTROLLER IP55 SHOWER HEAD MOD METEO 2C JUNCTION BOX 90 45 PIPE 1 G 13 35 14,5 20 119,5 53 103 26,5 7 49 50 51 48 52 20 30 47 129,8 8 BOX 503 FOR CHRONOTHERMOSTAT 150 140 9 43,8 61 90 146,8 BIDET CENTER 100 6 24 13,5 5 24 9,5 33,5 9 9 9 36 18 Ø 2,5 Ø 2,5 Ø 5,5 Ø 10,5 Ø 2,5 42,5 Ø 2,5 18 9 9 4 4 33,6 9 18 8 36 12 WC CENTER CEA PLATE WITH IDROSCOPINO (LOOK AT TECHNICAL SHEET) 42 45 METEO 2C: ENCASED WATERFALL SHOWERHEAD WITH RGB LED LIGHTING WARNING: SHOWER GLASS FLOOR TO CEILING 11,5 16 35 FLOOR SAVING FLOOR SAVING 60,5 86 38,9 20 20 MIXER CENTER 45 1 2 ELECTRICAL SYSTEM LEGEND N 2 SHUKO N 2 ITALIAN SOCKET ELECTRICAL CORRUGATED FOR MIRROR 4 METEO HEAD SHOWER POWER 12V WITH SHEATHED CABLES FROM TRANSFORMER IP30- TO INSERT IN JUNCTION BOX 1P55 5 ELECTRICAL CORRUGATED LED LIGHT UNDER THE CABINET H 20 13 45 51 45 PIPE 1 G 4 D INT DIM 15x15 44 45 83 52,8 83 125,5 44,5 238,1 312,5 281,1 130 12,7 FLOOR SAVING FLOOR SAVING FLOOR SAVING 40,5 79 43,8 61 42 15x15 15x15 81,5 187 92 10 A B E D C MIRROR 3 CM WOOD PARQUET 3 CM COATING MATERIAL MARBLE 3 CM FEMALE BATHROOM LEGEND BRAND ITEM MODEL FINISHING a.lupi WC KOMODO SATIN CERAMIC a.lupi COVER KOMODO a.lupi BIDET KOMODO a.lupi SHOWER TRAY SUMISURA MOODLIGHT SHOWER BOX CUSTOM a.lupi SHOWER HEAD METEO 2C a.lupi SINK WALL MOUNT SINK MIXER HANDLE a.lupi TAP ENCASED PART NICE CODE KOMODO3 KOMODO3 KOMODO4 SUMISURA 65 02 S011SB 65 F1 S 248 44 00 M011A SATIN CERAMIC SATIN CERAMIC GLASS STAINLESS STEEL METEO 2C BAL CHROME CHROME PMMA WHITE 261 130,8 2 25 PIPE 1 2 G 52 THE MEASURES WITH THE FRAME MUST BE CONSIDERED FIXED VIEW B VIEW C FLOOR SAVING PLAN VIEW D FLOOR SAVING FOR SHOWER DRAIN CONNECTION 30X30 CM MODULOR SYSTEM BY RIMADESIO FLOOR SAVING FOR BATHTUBE DRAIN CONNECTION 60X25XH12 CM FLOOR SAVING FOR BATHTUBE TAP NOSTROMO 15X152 CM SHOWER TRAY "SUMISURA" CM 90X130.8 POWER SUPPLY FOR LED CONTROLLER IP55 (LOOK AT TECHNICAL SHEET) WITH BIPOLAR SWITCH IN THE ELECTRICAL PANEL LED CONTROLLER IP55 SHOWER HEAD MOD METEO 2C JUNCTION BOX RAIL 55 73 103 103 180 MIXER CENTER 172 170,3 183,3 SPOUT CENTER DRAIN CENTER 1 2 60 33,5 52 5 90 281,1 168 50 DRAIN HEIGHT 80 12 20 12 32 120 70,5 124 88,2 33,5 32 ELECTRIC POWER SUPPLY CONNECTED TO THE CHRONOTHERMOSTAT 255 MIRROR 3 CM WOOD PARQUET 3 CM COATING MATERIAL MARBLE 3 CM 8,6 1 1,7 1 3 survey INSIDE SHOWER SIDE DETAIL SHOWER BOX RAIL 55 73 103 103 172 DRAIN CENTER 60 52 5 90 281,1 DRAIN HEIGHT 80 32 120 70,5 124 88,2 119,5 53 103 140 1 2 ELECTRICAL SYSTEM LEGEND N 2 SHUKO N 2 ITALIAN SOCKET ELECTRICAL CORRUGATED FOR MIRROR 4 METEO HEAD SHOWER POWER 12V WITH SHEATHED CABLES FROM TRANSFORMER IP30- TO INSERT IN JUNCTION BOX 1P55 6 AIR EXAUSTER TO BE DEFINE 5 ELECTRICAL CORRUGATED LED LIGHT UNDER THE CABINET 7 N 6 SWITCHES 8 N 2 SCHUKO 9 THERMOSTAT FOR FLOOR HEATING MIRROR 3 CM WOOD PARQUET 3 CM COATING MATERIAL MARBLE 3 CM 8,6 1 1,7 1 survey INSIDE SHOWER SIDE DETAIL SHOWER BOX RAIL ELEVATIONS - FEMALE BATHROOM SCALE 1:50
A
B SHOWER BOX DETAIL
C
VIEW
VIEW
VIEW