Portfolio_2021

Page 1

Portfolio Selected Works 2016 - 2021

Silvia Missaglia


Details Silvia Missaglia Italian Como, Italy | 07.12.1996 silvia.missaglia@usi.ch


Education High school degree in Economics and Law, Como, Italy 2010 - 2015 First Bachelor in “Conservation of Cultural Heritage and Performing Arts Management” at Ca’ Foscari University of Venice 2015 - 2016 Bachelor Accademia Architettura Mendrisio, Switzerland 2016 - 2020 Bac_1 Mario Botta : Atelier for an Artisan Bac_1 Mario Botta : Guest House Bac_II Martino Pedrozzi : House in the Marshes Bac_II Martino Pedrozzi : Housing in Lugano Bac_III Giacomo Guidotti : Housing in Athens Bac_III Ruggero Tropeano : Wobatelier Haus in Basel Master Accademia Architettura Mendrisio, Switzerland 2020 - 2022 Mas_1 Michele Arnaboldi : Porto Marghera Mas_1 Kersten Geers : Housing in Milan Mas_II Aires Mateus : Open Architecture in Genoa

Working Experience Internship - Henning Stummel Architects London 07.2018 - 12.2018 Internship KHBT Architects London 01.2019 - 07.2019 Festival Construction team at Pitch the Noise Festival Como 2018 Festival Construction team at Horst art and music Brussels 2021

Languages Italian, English, Spanish, French


Content

Guest House in Torre 6 - 11 House in the Marshes 12 - 17 Housing in Milan 18 - 31 Internship 32 - 35 Other Works 36 - 44


Village of the Arts Ticino, Switzerland, 2017

Atelier Mario Botta Professor: Paolo Canevascini Assistant : Andrea Scheuber Bac_I Accademia di Architettura di Mendrisio

Piano 1:500

Irene G


A Guest House and a Rehearsal Space

In the first Bachelor we were asked to work in Torre, a small village in

and framing the valley’s panorama from many different perspectives.

Valle di Blenio, Switzerland, a reality characterized by the the spaces of

Their position allowed us to highlight the path that descends to the valley and in realtion to the other pre-existing buildings, a sort of

the former chocolate fatory Cima Norma.

square is formed, where a tower hosts the guesthouse.

During the second semester we focused on building a village of the

In the tower, through a system of stagered floor, it’s possible to access

arts, which core consists of existing buildings, while the valley and

the rooms from different loggias open on the landscape and on the

upstream areas will act as a scenario for completion.

sqaure, which represent common and transit areas.

The two buildings dialogue with each other creating differents views

Model 1 : 500 8

9


Plans Original Scale 1 : 200

Sketches

10

11


House in the Marshes Al Chibayish, Iraq, 2017

Atelier Martino Pedrozzi Professor: Martino Pedrozzi Assistants : Valentina Merz Bac_II


Building with Precast Concrete Rythm and Modularity

The challenge of the project was to design a precast concrete struc-

near city of Al Chibayish and to reach the observatory the visitor

ture set in an extreme climate environment condition.

must cross the suggestive environment of the Marshes.

The Marshes are characterised by a wet land and very warm seasons.

This strategy creates a connection between the small town and the

I choose to project an observatory tower, that can also host people,

swamp, offering to the visitors an evocative place to stay over for the

as researchers and students, for the night.

night and a possibility to observe the local nature and the landscape

The Building is located at the end of a long path that begins in the

from a different point of view.

14

15


A

A

A

A A

Pianta piano terra

A

Pianta primo piano

Pianta piano terra

A

Pianta primo piano Pianta piano terra

A

Pianta secondo piano

Pianta terzo piano

Pianta secondo piano

Pianta terzo piano Pianta secondo piano Pianta primo piano

Pianta piano terra

AA enoizeS Pianta terrazza

Pianta terrazza

Pianta secondo piano

Pianta terzo piano

Plan and Section Original Scale 1 : 200

Plans Original Scale 1 : 200

16

17

Pianta terrazza


Housing in Milan Via Washington, Milan, 2021

Atelier Kersten Geers Professor: Kersten Geers Assistants : Guido Tesio & Jelena Pancevic Msc I


nalP larutcurtS

A Tall House The project aims to create a reality of ambiguity through the com-

for electricity and the plumbing system and the biggest ones are

plexity of the building. Is the building just one? Or is it many?

carrying the elevators.

What we would like to think is of a many within one building.

The position of the four towers generates a constant visual connec-

Another ambiguity which comes up looking at the project is the

tion, giving to the person who lives in one of the apartments the

form of the building itself; it is a tower? And if so, which one is the

feeling of being part of a bigger community.

main tower?

The presence of many different terraces makes the project more

The structure is divided into a hierarchy of pillars: the first one has

dynamic and gives the opportunity to host many different activities

only a structural purpose, others are hosting the technical rooms

beside the housing program of the project.

20

Structural Plan

21


22

23


Groundfloor Groundfloor Plan Original Scale 1 : 200 24

25


Typological Tower Plan Typical Floor Plan_1 Original Scale 1 : 200 26

27


Typological Tower Plan Typical Floor Plan_2 Original Scale 1 : 200 28

29


Unit’s Axonometry Axonometry of an apartment

30

31


Professional work


Aufbruch - Area BEE 51

Unveiled

London, UK 2019 KHBT

Liverpool, UK 2019 KHBT

During this period i have been assigned for the developement of a parking lot located in a former American Military Barrack, converted into a multi-functional Public Space. The space is dominated by one mateial, the asphalt. The idea is to cut out the existing surface by framing the existing graphic elements as indipendent icons. The cut outs are used to and re-arrange the space and make room for other features, enhancing the contrast between the sealed and unsealed parts.

To mark the launch of RIBA North, Un-veiled visually and spatially interpreted the aims and purpose of the new architectural centre. The resulting pavillon in the Winter Gardens used curtains of mesh fabric, used on a building site scaffolding, to create sections through some of the most iconic architectural structures across the Northern Powerhouse.

Internship

Internship

34

35


Model Making

During each semester, redrawings of relevant project, as been a way to understand better the qualities of each project. I also developed an interest in shaping materials. Wood and concrete, are materials that i admire for their peculiarity and way you can transform them.

Atene

Atelier Guidotti | SA 2019 Silvia Missaglia

36

37


Recomposition of 6 Ruins Workshop

Mount Sceru, Malvaglia Valley, Ticino 2017 Martino Pedrozzi Mount Sceru is an abandoned settlement characterised by several ruins of typical houses. The workshop with an elementary gesture, returns the stones of the ruined farmhouses to within the perimeter of their remains.

38


Photos I Took



Thanks for your attention


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.