Client: John Sisk & Son Ltd Location: Quadrant 2 South – Air Street, London, W1B 5AD Completion Date: February 2014 – August 2014 Sector: Construction
Crown Estate, Quadrant 2 South, Air Street, London About the project:
Our services:
Deconstruct UK has been contracted by John Sisk & Son Limited to undertake the installation of temporary propping, underpinning and below ground drainage on the Crown Estate Quadrant South construction project in Air Street, London.
Deconstruction Services
Works include the excavation and construction of new triple lift pit base, reinstatement of the basement slab; the construction of triple lift shaft from basement to 7th Floor level and reinforcement and concrete composite floors.
Ground Works Services
Demolition Services Enabling Works Asbestos Removal Services 3
Piling Services Steelwork Installations
3
Builders Works
3
Emergency Dangerous Structures Project challenges: The site comprises of two Grade II listed office buildings within the Regent Street Conservation Area. This means adhering to strict logistical constraints and being sympathetic to the overall environment throughout the course of the construction phase. Working against a tight programme of work, in a compact city centre site, Deconstruct is successfully operating a ‘just in time’ delivery programme of material requirements.
Deconstruct (UK) Ltd is delighted to secure a further contract with John Sisk & Son Ltd for the Quadrant 2 South, Crown Estate.
Temporary Works
3
Underpinning
3
Reinforced Concrete Works
3
For further information on our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com
Deconstruct (UK) Limited Silver House, 31-35 Beak Street, London W1F 9DP Tel: 020 7734 6655 Fax: 020 7734 6626 Email: ashley.griffiths@deconstructuk.com www.deconstructuk.com