Client: Location: Completion Date: Sector:
John Sisk & Son Ltd 103 – 109 Wardour Street, London, W1F 0UQ January 2014 – August 2014 Structural Modifications
103 – 109 Wardour Street, London About the project:
Our services:
John Sisk & Sons Limited has awarded Deconstruct UK with further structural modifcations work at 103-109 Wardour Street, London. The project outline includes the removal of rear elevation curtain walling system, roof slab demolition including Mansard and structural modifications throughout the structure.
Deconstruction Services
3
Demolition Services
3
Scope of works includes:
Piling Services
• Rear Basement extension
Steelwork Installations
• Underpinning
Builders Works
• Temporary Propping
Emergency Dangerous Structures
• Basement Drainage & Reinstatement of Basement Slab
Temporary Works
3
Underpinning
3
• Construction of new vertical and horizontal RC Works
Reinforced Concrete Works
3
• Design & Installation of Temporary Propping. Project challenges: The project is being deployed in a live residential and commercial environment which means the Roof slab demolition must adhere to strict logistical constraints throughout the development of temporary works to suit reconstruction. The project is following a tight programme of works that Deconstruct is successfully delivering with minimum disruption to the building occupants.
Enabling Works Asbestos Removal Services Ground Works Services
3
3
Deconstruct (UK) Ltd have secured further structural modifications work with John Sisk & Son Ltd in the heart of SOHO.
For further information on our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com
Deconstruct (UK) Limited Silver House, 31-35 Beak Street, London W1F 9DP Tel: 020 7734 6655 Fax: 020 7734 6626 Email: ashley.griffiths@deconstructuk.com www.deconstructuk.com