ONEISTOXCapstoneProject
TheprojectisaHigh-rise,Mixed-usebuilding,locatedinthe CentralDistrictofHongKongIsland.
LOCATION:
IntersectionofWellingtonSt.andQueen'sRoadCentral, CentralDistrict,SheungWan,HongKong (N22°17'5.40''E114°9'12.12''Elevation:±00.00MM)
DETAILSOFTHEPROJECT:
TYPOLOGY:High-rise,Mixed-use,Office&ServiceApartments
SITEAREA:203.7m²
MAXIMUMSITEOCCUPATION:162.7m²
HEIGHTREQUIREMENT:21Storeys
FAR:13.797
TEAMWORKEDWITH:
3Individuals/TwoArchitects&1Engineer
MYROLE: Architect-1forZone–1(Basementtolevel6)
TOOLSUSEDFORTHEPROJECT:
-ForModelling-Revit
-ForClashTest-Navisworks&BIMTrack
-ForRenders&Presentation-Revit&Twinmotion
LEVELOFDETAIL:LOD350
SitePlan/1:100
Objective
Theexistingbuilding,builtinthe70's,doesn'tmaximize currentallowedGFAfortheplot.Giventheprime location,andunder-utilizedGFA(currentutilizedGFA: 1430.7m²),theobjectivewastocreateanotherbuilding volumethatcangiveabetterReturnofInvestment, whilemakingitalandmarkinacriticalurbanpoint.
-BIM–IndustryWorkflowsandStandards.
-TheRIBAWorkflow,
-Documentation&Presentation
-CoordinationandCollaborationbetweendifferentteams.
-Visualization&clashdetection.
-UnderstandingtheBIMusesfortheproject.
SiteView&Context
21storeyhighbuilding.
Zone–3 (Levels:14-21)
Thecompletebuildingis dividedinto3Zones: Zone–1(Basement-6), Zone–2(L:7-14), Zone–3(L:14-21).
ForeachZone: Setofteamsof3
Zone–2 (Levels:7-14)
individualswas appointed,consistingof: -2Architects,& -1engineer.
Zone–1 (Levels:Basement-6)
ZONE-1
Myrolewastoworkon
ZONE-1asArchitect1.
Levels:Basement–level 6.
MassingOptionPlansshowing floorplates&Levels
Level2/1:100
GeneralArrangementAtypicalFloorPlan
Level6/1:100
AtypicalFloorPlanRoom Schedule
RoomPlanTypicalFloor(L-2)
RoomPlanAtypicalFloor(L-6)
TypicalFloorFramingPlan
Level2/1:100
Column,Beam&Structural SlabScheduleofTypical FloorPlan
Sellable&Non-sellableAreaPlans
Sellable&Non-sellableAreaTypicalFloorPlan(L-2)
Sellable&Non-sellableAreaAtypicalFloorPlan(L-6)
Sellable&Non-sellableArea
SECTION:Zone1/1:100-Horizontal(Levels:Basement–6)
ELEVATIONZone1(Levels:Basement–6)
ModelElevation
Detail-2Zone1(L-6)Detail-3Zone1(L-2)
CoordinationModelZone1(Levels:Basement-6)
CoordinationPlanTypicalFloor-Zone1(Level6)
ModelshowingWorksets
Zone1(Levels:Basement-6)
PlanView
SectionView
Postsconstrains
Railsconstrains
StructuralandArchitectural FinishingAssemblyofStaircase
GroundFloor
ArchitecturalFinishing
ModelofStaircase
GroundFloor
RCPAtypicalFloor:Level6
LightingFixtures:
CeilingLight-Flat
Round:100W-120V
LightingFixtures:
PendantLight-Disk: 100W-120V
DetailSection:
CeilingLight-FlatRound
DetailSection:
PendantLight-Disk
ReinforcementPlanAtypicalFloorReinforcementPlan(L-6)/
EdgeoftheSlabPlanAtypicalFloorEdgeoftheSlabPlan(L-6)
4DSimulation(Navisworks)
WorkflowSchedule-Zone1for4DSimulation(Navisworks)
4DSimulations-Zone1(Navisworks)