Content 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. ProjectBrief ConceptDevelopment&Massing
Section&Elevations
FloorPlans AreaScheme
SheetDocumentation&BrowserOrganization Co-ordination&Worksets
Families RCP&StructuralPlans
EnergyModels
ClashDetection&4DSimulation(Navisworks) BuildingPerformanceAnalysis,Sustainabilitytools(Clima,GBS&INSIGHT)

ENZYMETOWER,HONGKONG

ONEISTOXCapstoneProject

TheprojectisaHigh-rise,Mixed-usebuilding,locatedinthe CentralDistrictofHongKongIsland.

LOCATION:

IntersectionofWellingtonSt.andQueen'sRoadCentral, CentralDistrict,SheungWan,HongKong (N22°17'5.40''E114°9'12.12''Elevation:±00.00MM)

DETAILSOFTHEPROJECT:

TYPOLOGY:High-rise,Mixed-use,Office&ServiceApartments

SITEAREA:203.7m²

MAXIMUMSITEOCCUPATION:162.7m²

HEIGHTREQUIREMENT:21Storeys

FAR:13.797

TEAMWORKEDWITH:

3Individuals/TwoArchitects&1Engineer

MYROLE: Architect-1forZone–1(Basementtolevel6)

TOOLSUSEDFORTHEPROJECT:

-ForModelling-Revit

-ForClashTest-Navisworks&BIMTrack

-ForRenders&Presentation-Revit&Twinmotion

LEVELOFDETAIL:LOD350

DesignBrief

SitePlan/1:100

Objective

Theexistingbuilding,builtinthe70's,doesn'tmaximize currentallowedGFAfortheplot.Giventheprime location,andunder-utilizedGFA(currentutilizedGFA: 1430.7m²),theobjectivewastocreateanotherbuilding volumethatcangiveabetterReturnofInvestment, whilemakingitalandmarkinacriticalurbanpoint.

Learnings

-BIM–IndustryWorkflowsandStandards.

-TheRIBAWorkflow,

-Documentation&Presentation

-CoordinationandCollaborationbetweendifferentteams.

-Visualization&clashdetection.

-UnderstandingtheBIMusesfortheproject.

SiteRender

SiteView&Context

21storeyhighbuilding.

Zone–3 (Levels:14-21)

Thecompletebuildingis dividedinto3Zones: Zone–1(Basement-6), Zone–2(L:7-14), Zone–3(L:14-21).

ForeachZone: Setofteamsof3

Zone–2 (Levels:7-14)

individualswas appointed,consistingof: -2Architects,& -1engineer.

Zone–1 (Levels:Basement-6)

ZONE-1

Myrolewastoworkon

ZONE-1asArchitect1.

Levels:Basement–level 6.

Massing

MassingOptionPlansshowing floorplates&Levels

MassingOptionViews

Zone–1 (Basement-6)

TypicalFloorPlan

Level2/1:100

GeneralArrangementTypicalFloorPlan TypicalFloorPlanRoom Schedule

AtypicalFloorPlan

GeneralArrangementAtypicalFloorPlan

Level6/1:100

AtypicalFloorPlanRoom Schedule

AreaPlan

RoomPlanTypicalFloor(L-2)

RoomPlanAtypicalFloor(L-6)

RoomLegend

FramingPlan

TypicalFloorFramingPlan

Level2/1:100

Column,Beam&Structural SlabScheduleofTypical FloorPlan

Sellable&Non-sellableAreaPlans

Sellable&Non-sellableAreaTypicalFloorPlan(L-2)

Sellable&Non-sellableAreaAtypicalFloorPlan(L-6)

Sellable&Non-sellableArea

Schedule

SECTION:Zone1/1:100-Horizontal(Levels:Basement–6)

Details

Section KeyPlan
Detail-2Zone1(L-6)Detail-3Zone1(L-2) Detail-4Zone1(L-2)

Elevation

ELEVATIONZone1(Levels:Basement–6)

Details

ModelElevation

Detail-2Zone1(L-6)Detail-3Zone1(L-2)

TitleBlock

ProjectBrowser

FamiliesBrowser

SheetDocumentation
BrowserOrganisation
SheetsBrowser Organisation

Co-ordination

CoordinationModelZone1(Levels:Basement-6)

Worksets

CoordinationPlanTypicalFloor-Zone1(Level6)

ModelshowingWorksets

Zone1(Levels:Basement-6)

DoorFamily(LOD350) DoorSchedule
GlassDoorFamily FireDoorPlans FireDoorFrontView FireDoorSectionFireDoorFamilyParameters
Family–FireDoor

Family–Railing

PlanView

SectionView

Postsconstrains

Railsconstrains

FrontView

StaircaseDetail

StructuralandArchitectural FinishingAssemblyofStaircase

GroundFloor

ArchitecturalFinishing

ModelofStaircase

GroundFloor

StaircasePlanview GroundFloor

ReflectedCeilingPlans

RCPAtypicalFloor:Level6

RCPLegend

LightingFixtures:

CeilingLight-Flat

Round:100W-120V

LightingFixtures:

PendantLight-Disk: 100W-120V

DetailSection:

CeilingLight-FlatRound

DetailSection:

PendantLight-Disk

ReinforcementPlanAtypicalFloorReinforcementPlan(L-6)/

EdgeoftheSlabPlanAtypicalFloorEdgeoftheSlabPlan(L-6)

ClashDetection(Navisworks)ArcvsStructure

ClashDetection(Navisworks)MEPvsArc

ClashResolutionReport(Navisworks)MEPvsArc

ClashDetectionMatrix(Navisworks)

4DSimulation(Navisworks)

WorkflowSchedule-Zone1for4DSimulation(Navisworks)

4DSimulations-Zone1(Navisworks)

4DSimulations-Zone1(Navisworks)

4DSimulations-Zone1(Navisworks)

BuildingPerformanceAnalysis–(Clima)ClimateGraphs

BuildingPerformanceAnalysis–(Clima) DryBulbTemperatureClimateGraphs

BuildingPerformanceAnalysis–(Clima)

ClimateGraphs

RelativeHumidity

SunPathChartAnnualWindRoseChart
BuildingPerformanceAnalysis–(Clima)ClimateGraphs

BuildingPerformanceAnalysis–(Clima)ClimateGraphs

SeasonalWindRose

BuildingPerformanceAnalysis–(Clima)ClimateGraphs

PsychometricChartofsite

BuildingPerformanceAnalysis–(GBS&Insight)

EnergyModels

AnalyticalSpaces

SystemZoneModel

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.