Simran Kaur Kapoor | Architecture Portfolio 2021

Page 1

SIMRAN KAUR KAPOOR Architecture Portfolio Selected works 2018-2021

1


Simran Kaur Kapoor

I am a fourth year architecture student who believes in bringing a higher level of consciousness to the story a space narrates and the effect architecture has on humans.

Email | simrankapoor.arch@gmail.com Phone | +91-9971641979 Address | Delhi, In

2


Education

Work Experience

Bachelor of Architecture School of Planning and Architecture, New Delhi 2018 to present

Architectural Intern | SpaceMatters June 2021 -August 2021

Grade XII -Scored 94.5% in board examination Amity International School, Pushp Vihar 2018 Grade X - Scored 10 CGPA in board examination Amity International School, Pushp Vihar 2016

Software Skills Drafting: AutoCAD Modelling and Analysis: Revit, Trimble SketchUp, Rhinoceros 3D, Grasshopper, Ladybug, Honeybee, DesignBuilder 3D Visualization: Lumion, V-Ray

Achievements Top 10 in a batch of 120 students School of Planning and Architecture, New Delhi 2018-21 Semi Finalist | Solar Decathlon India Net-zero energy School Design 2020-21 Top 24 out of 800+ entries Annual NASA Design Competition (ANDC) 2020 People’s Choice Award | Reclaiming Modernity UNI Architecture Competition 2020

Presentation: Adobe Suite (Photoshop, InDesign, Premiere Pro), Microsoft Office Suite

Gold Medal | Inter-SPA Sports & Cultural Meet Basketball, Football and 400 m Relay 2020

Research & Documentation

Second Runner up | Fashion Trophy Annual NASA Convention, Bangalore 2019

Measured Drawing Dakshina Chitra Museum, Tamil Nadu 2018

Participated | Design your Dream Archasm Architecture Competition 2019

Settlement Study Maheshwar, Madhya Pradesh 2018

Vice-House Captain | Student Council Amity International School, Pushp Vihar 2017-18

Languages

Hobbies & Interests

English, Hindi, Punjabi

Photography, Sports, Travelling, Art and Craft, Fashion, Music, Reading

3


4


Academic/ Competitions

01

Turn35

02

ORD International

03

Stur Minus

04

Braid

05

Casa28

Core and shell office Page 6-17 Net-zero energy school Page 18-27 Bus Terminus Page 28-37 Culture and learning center Page 38-47 Group housing Page 48-57

Experience & Documentation

06 07

School Infrastructure Development

Internship | SpaceMatters Page 58-67

Sathanur Village House Measured Drawings Page 68-71

5


6


Turn35 Academic Work | Individual Project Core and shell Office Sketchup, Revit, Lumion, Photoshop The Turn is a core and shell office building located in Noida, Uttar Pradesh. With the total site area of 7917.5 Sq-M, the objective was to design office spaces with maximized floor plates and a food and beverage space. This office building aims to provide an environment which is flexible for the users and ensures collaborative work.

7


8

Block Block within the allowable area extruded to responding to the site.

Turn Building turned to reduce the radiation falling and add a play of volume.

Chamfer Acute edges chamfered to eliminate the inefficient spaces.

Atrium The atrium allows for natural light and facilitates stack ventilation.


9


Stack Diagram

10

Vertical Circulation


Site Plan

Roof Plan

11


12


1 2 3 4 5

6 3 4 5

Facade 6 3 4

1

The facade consists of a screen and louver system which protects the curtain glazing from radiations while creating interesting light and shadow inside. Furthermore, planters are placed along the recessed floor plates that help accentuate the overall volume. 1 230 thick brick wall, 2 350 thick good earth, 3 RCC beam as per design, 4 6x13x6 DGU curtain glazing, 5 22 thick timber louver, 6 PCC cill as per design

2 3 4 5

6 3 4 5

13


14


Working Drawings (Ongoing)

2

1

8500

3

8500

4

8500

6

5

8500

8500

7

8500

8

8500

9

8500

10

8500

11

8500

8500

12

13

8500

8500

14

15

8500

16

8500

13440

9770

26650

4830

3410

ELECTRICAL ROOM

17300

-3600 MM

LIFT

LIFT

6M ROAD LVL -3600

LIFT LOBBY

8M ROAD

8420

UP DN

5060

SKYLIGHT

3.2M ROAD

TOWARDS LOWER BASEMENT

PUMP ROOM

5000

B

LVL -3600

-3600 MM

FHC

8.4M ROAD

LVL -3600

TREAD: 300 RISER: 150 WIDTH: 2000

-1800 MM

29720

12000

LVL -3600

FIRE STAIRCASE

8695

6M ROAD

FROM GROUND FLOOR LEVEL

8730

6455

FROM LOWER BASEMENT

DG ROOM

6000

LIFT

37835

TREAD: 300 RISER: 150 WIDTH: 2000

-1800 MM

6M ROAD

C

4460

7700

FHC

8295

3200

ELECTRICAL ROOM

11370

9685

12000

-1800 MM

DN

5900

-3600 MM

TREAD: 300 RISER: 150 WIDTH: 2000

8730

UP

25100

DN

8730

FIRE STAIRCASE

17025

UP

230

FIRE STAIRCASE

17695

D

6455

LIFT LOBBY

230

20

18

16

14

03

05

07

09

11

12

21300

UP

4460

8295

8730

14

16

18

20

22

24

11

09

07

05

03

01

TREAD: 300 RISER: 150 WIDTH: 2000

-1800 MM 13

-3600 MM

25075

8730

33595

17300

9770

13140

13360

22

-1800 MM 01

4830

3410

A

24

DN

DN -3600 MM

TREAD: 300 RISER: 150 WIDTH: 2000

ELECTRICAL ROOM

TPWARDS GROUND FLOOR LEVEL

UP

9910

HVAC ROOM

6M ROAD FHC

5900

LIFT

FIRE STAIRCASE

LIFT

11370

LIFT

FIRE STAIRCASE

12000

LVL -3600

6000

LVL -3600

6M ROAD

N

26650

UPPER BASEMENT PLAN

Upper Basement Plan N

1

2 8500

3

8500

4

8500

6

5

8500

8500

7

8500

8

8500

9

8500

10

8500

11

8500

8500

12

13

8500

8500

14

15

8500

120840

8500

16

28460

10000

BASEMENT PARKING ENTRY

DROP OFF LVL +150

LVL +1650

4030

5300

4000

RETAIL SPACE

230

8270

8730

RETAIL SPACE 5060

3990

7225

LVL +300

SURFACE PARKING

2000

AIR HANDLING UNIT (AHU)

WOMEN'S WASHROOM

4000

LIFT

4890

LIFT

4890

16505

1820

C

RETAIL SPACE

4000

LVL +80

1820 770

UP

UNIVERSALLY ACCESSIBLE

LIFT

1120

+1650 MM

FHC

UP

2945

ELECTRICAL ROOM

MEN'S WASHROOM

TREAD: 300 RISER: 150 WIDTH: 2000

+3450 MM

12990

4460

3000

2315

DN

FIRE STAIRCASE

DN

+3450 MM

14710

13520

12000

4000

5670

+1650 MM

TREAD: 300 RISER: 150 WIDTH: 2000

LVL +150

2950

7640

UP

GAURD ROOM

5575

5060

8730

FIRE STAIRCASE

8710

2780

4095

LIFT

WOMEN'S WASHROOM

AIR HANDLING UNIT (AHU)

LIFT

12990

4460

2315

6210

8500

2950

4000

5670

DN

5575

SKYLIGHT FOR BASEMENT

FHC

31790

4705

SURFACE PARKING

SURFACE PARKING

LVL +300

+1650 MM

8730

2770 8795

3990

LVL +150

DROP OFF

LVL +150

TREAD: 300 RISER: 150 WIDTH: 2000

+3450 MM

UP

5060

+3450 MM

UP

ELECTRICAL ROOM

TREAD: 300 RISER: 150 WIDTH: 2000

7640

DN

2975

RETAIL SPACE

FHC

MEN'S WASHROOM

3000 1100

2700

7220

LVL +1650

LIFT

UNIVERSALLY ACCESSIBLE

4000 2585

GAURD ROOM

1965

LVL +1650

12405

4030

4890

4890

13520

4000 2000

12000

RETAIL SPACE

+1650 MM

A

5300

17450 23025

4000

230

2315

1820

8270

RETAIL SPACE

LVL +80

FIRE STAIRCASE

B

2800

12815

ATRIUM

5965

3990

2315

3435

5980

2800

17450

16505

23025

LVL +1650

FIRE STAIRCASE

1995

3435

2700

3435

LVL +150

PEDESTRIAN ENTRY

12815

12000

DN

5900

LVL +150

D

12405

ENTRY

LVL +150

EXIT BASEMENT PARKING EXIT 116610

28460

10000

Ground Floor Plan PLINTH LEVEL PLAN N

15


4.

5750 4320

230

230

2240

750

750

SHAFT

510

50

900

D06

565

D06

D05

700

02 SEC.

3245 450

1080

230

2905

01

115

C2

900

450

230

450

450

450

220

760

D06

230

BOYS TOILET 3125 X 5750

460 1530

450

450

450

90

450

450

D06

ISSUED TO: DATE S. NO D05

PURPOSE

ISSUED TO

N C

450

D06

900

50

635

U.A. TOILET 2600 X 1700

900

2800 10 mm DROP

1505

1820

D04

2620 50

900

3825

3945

565 1000

450

4000

450

D05

230

10 mm DROP

10 mm DROP

D03

2620 GIRLS TOILET 3825 X 5750

115

C1

450

1080

VENTILATOR AS PER SELECTION2905

230

MIRROR AS PER SELECTION

D06

01

TOILET FLOOR LEVEL F.F.L.±00 MM

TYPICAL TOILET MALE & FEMALE LAYOUT PLAN

WASH BASIN & WASH BASIN TAP AS PER BOQ WESTERN W/C AS PER SELECTION FLOORING TILE 600 X 600 WITH 3 MM GROOVE

115

PROJECT NAME:

1430

CORE & SHELL OFFICE D

01

ARCHITE SIMRAN NEW DEL 99716419

CLIENT: ABC PVT. LTD NOIDA 99000222XX DRAWING TITLE:

Toilet Elevation SECTIONAL ELEVATION

D04

SEC.

2100

300X300 TILE AS PER SELECTION

700

780

750

230

START TILE

700

TILES FINISH LEVEL F.F.L.+2100 MM

750

FALSE CEILING TO CONCEAL EXPOSED PIPES

950

230

700

V01

945

1530

V01

MIRROR AS PER SELECTION

3850

1190

230

D06

450

300X300 TILE AS PER SELECTION

WASH BASIN & WASH BASIN TAP AS PER BOQ WESTERN W/C AS PER SELECTION FLOORING TILE 600 X 600 WITH 3 MM GROOVE

3100 230

50

D06

10

1405 VENTILATOR AS PER SELECTION

900

D06

D06

TOP OF SLAB LEVEL +3500 MM

V01

230

1430

9

FALSE CEILING TO CONCEAL EXPOSED PIPES

50

10 mm DROP

2845

Core Plan D

10 mm DROP

SHAFT

510

230

2045

10 mm DROP

750 2585

230

695

750

895

900

900

575

375

750

350

1180

1525

900

375

230

1180

D04

SEC.

900

375

760

2240

415

750

950

750

375

230

230

115

3125

700

825

2620

GIRLS TOILET 3825 X 5750

1700

10 mm DROP

1200

230

D

230

10 mm DROP

230 AHU 3850 X 4000

885

2800 10 mm DROP

D03

230 1005

900

4320

1620

50

10

REVISION DETAILS

5750

D04

230 2000

900

REF. NO

780

90 4055

50

500

230 U.A. TOILET 2600 X 1700

1200

450

D06

230

450

2620 900

1505

LIFT L3

450

D06

01 SEC.

8600

895

D03

LIFT L2

450

9

1000

450

D06

700 695

REVISION SCHEDULE:

230

450

350

460 2600

635

1820

885

1530

780

1000

3300

230

01

230

BOYS TOILET 3125 X 5750

1200

450

1230

450

ELECTRICAL ROOM 3100 X 4000

230

2000

450

870

7640

450

230

230

D06

450

1530

C1

220

D06

2845

1430

LIFT L1

565 1000

760

1000

450

230

01

450

24

230

950

D04

2350

115

2580

2905

3950

230

2810

1080

230

1190

1200

D06

115

945

700

1000

230 1005

230

895

900

D05

1430

50

02 SEC.

230 360

900

10 mm DROP

DN

SEC.

TOILET DETAILS

02

DRAWING NUMBER:

C2

C1

A-5.3

9

D SHEET NUMBER:

TOP OF SLAB LEVEL +3500 MM

21/20

TOP OF SLAB LEVEL

DRAWN

PLASTIC LAMINATED PARTITION WALL 50 THK

START TILE

PLASTIC LAMINATED PARTITION WALL 50 THK

2400

2100

START TILE

2400

TILES FINISH LEVEL F.F.L.+2100 MM

1405

1405

+3500 MM SCALE: 1:50 @ A1

D06

D06

TOILET FLOOR LEVEL F.F.L.±00 MM

FALSE CEILING TO CONCEAL EXPOSED PIPES V01

VENTILATOR AS PER SELECTION

SHEET SIZE: A1 TILES FINISH LEVEL F.F.L.+2100 MM

CHECKED START TILE

300X300 TILE AS PER SELECTION

2100

450

10 mm DROP

SHAFT

510

1000

22

50

750 2585

895

01

TREAD: 300 RISER: 150 WIDTH: 2000

750

500

20

10 mm DROP

900

575

230

1200

18

375

750

KEY PLAN:

4415

1000

16

14

03

2240

1000

D03

375

230

750

02 SEC.

375

760

895

750

375 1505

05

1530 700

230

1505

C2

12

1200

4460

230

230 500

07

230

09

2620

GIRLS TOILET 3825 X 5750

230

90

10 mm DROP

4320

230

230

10 mm DROP

895

2800 10 mm DROP

2350

D04 11

FIRE STAIRCASE

895

900

4600

50

4830

900

3300

UP

2620 50

900

230

1700

D06

U.A. TOILET 2600 X 1700

4345 2425

945

D06

450

635

1200

450

350

460

D06

450

1700

450

2600

1820

885

450

3240

450

8500 6210

8270

230

D

8500 8500

2845

230

10

01 SEC.

1620

D05

9

895

TOILET 8BOYS 3125 X 5750

230

450

3355

450

90

450

1200

450

D06

1230

450

02 SEC.

220

760

450

1000

450

D06

1620

D06

LEGEND / NOTES:

230

1190

230

D05

1525

900

10 mm DROP

415

50

10 mm DROP

1000

Working Drawings (Ongoing)

10 mm DROP

2585

895

900

575

375

750

2000

375

1000

375

760

230 1005

375

TOILET MALE & FEMALE LAN

ILE

1200

230

230

ALL DRAWINGS MUST BE READ IN CONSO SERVICE DRAWINGS/ STR. DRAWINGS/ LA DRAWINGS ETC. ANY DISPARITY FOUND M BROUGHT TO THE NOTICE OF THE ARCHITE NECESSARY ACTIONS, PRIOR TO EXECUTIO

MIRROR AS PER SELECTION WASH BASIN & WASH BASIN TAP AS PER BOQ WESTERN W/C AS PER SELECTION FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOILET FLOOR LEVEL F.F.L.±00 MM

Toilet Section

16 SECTIONAL ELEVATION

01

SECTIONAL ELEVATION


GENERAL NOTES:

6

07

20

09

18

09

16

11

14

RISER: 150 WIDTH: 2000

05

LVL +35700

LVL +33900

3600 2555

A'

6240

TREAD: 300 RISER: 150 WIDTH: 2000 LVL +32100

15

DN

11

14

2615

FIRE STAIRCASE

2615

09

16

11

14

12

+6900 MM

230 230

3600

3600

230

230

2355

2655

230 230

6240

2035 230

D06

D06

ISSUED TO

TREAD: 300 RISER: 150 WIDTH: 2000

3600

D06

D06

PURPOSE

TREAD: 300 RISER: 150 WIDTH: 2000 NO. OF COPIES

LVL +5100

TREAD: 300 RISER: 150 WIDTH: 2000

SHEET NUMBER:

A-5.5

18/20

SCALE: 1:50 @ A1

DRAWN BY: SIMRAN

LVL +3300

GROUND FLOOR LEVEL (F.F.L.+1500 MM) NGL LEVEL (+00 MM)

D06

D02

SHEET SIZE: A1

CHECKED BY:

LVL +1500

1500

2035

2655

STAIRCASE PLANS LVL +6900

230 16

11

14

TREAD: 300 RISER: 150 WIDTH: 2000

LVL -1350

D02

PROJECT NAME:

CORE & SHELL

UPPER BASEMENT LEVEL CLIENT: (F.F.L.-3600 ABC PVT. LTD MM) NOIDA OFFICE DESIGN 99000222XX

+6900 MM

STAIRCASE PLAN 230 TYPICAL PLAN

DRAWING TITLE:

DRAWING NUMBER:

ISSUED BY

01

ISSUED BY

ARCHITECT: SIMRAN KAPOOR NEW DELHI 9971641979

CLIENT: ABC PVT. LTD NOIDA LVL +10500 99000222XX

LVL -3150

09

4600 5060

CORE & SHELL OFFICE DESIGN

D02

LVL +8700

7200

STAIRCASE PLAN NO. OF TYPICAL PLAN COPIES

PURPOSE

D02

CORE & SHELL OFFICE DESIGN

230

01

DRAWING TITLE:

STAIRCASE SECTION

DRAWING NUMBER:

A-5.5 SCALE:

1:50 @ A1

18/20SHEET SIZE:

A1

TREAD: 300 RISER: 150 WIDTH: 2000 LVL -5400

D02

LVL -7200

A-5.5

SHEET STAIRCASE PLANS 18/2001 SCALENUMBER: 1:100

SHEET NUMBER:

ARCHITECT: SIMRAN KAPOOR NEW DELHI 9971641979

ARCHITECT: DRAWING TITLE: SIMRAN LOWERKAPOOR BASEMENT LEVEL STAIRCASE PLANS NEW(F.F.L.-7200 DELHI MM) 9971641979

CLIENT: ABC PVT. LTD NOIDA 99000222XX

DRAWING NUMBER:

Typical Staircase Plan

4600 5060

ISSUED TO

230

230

8270

18

FIRE STAIRCASE

FIRE STAIRCASE

7

07

12

230

TREAD: 300 RISER: 150 WIDTH: 2000

230

PROJECT NAME:

6240

18

20

2315

07

05

6240

20

22

2035

2655

05

2615

22

840

03

840

2315

03

7

230

8730 24

DN

24

230

2355 8270

8730

6240 2315

01

S. NO DATE

DN

01

230

230

+8700 MM

UP

+8700 MM

UP

TREAD: 300 RISER: 150 WIDTH: 2000

4600 5060

D02

LVL +15900

D06

TREAD: 300 RISER: 150 WIDTH: 2000

2355 5900

6

ISSUED TO:

A'

2035 840

230

2655

DN

ISSUED TO:

230

A'

230

230

6

A

+6900 MM

S. NO DATE

STAIRCASE PLAN 01 GROUND FLOOR MEZZANINE 5900

D06

(F.F.L.+8700 MM)

7

230

A

01

01

01

4600 5060

ISSUED BY

3600

230

230

NO. OF COPIES

LVL +14100 PROJECT NAME:

14

REV. 12DATE

REVISION DETAILS

PURPOSE

LVL +12300

FIRST FLOOR LEVEL FIRE STAIRCASE

Staircase Plan at LVL -1350 7

STAIRCASE PLAN PLAN AT -1350 LVL

11

ISSUED TO

D02

3600

2315

230

01

18

D06

REV. DATE

SECOND09 FLOOR16 LEVEL (F.F.L.+12300 MM)

REVISION SCHEDULE: REF. NO

12

+3300 MM

07

REVISION DETAILS

2615

230

STAIRCASE PLAN4600 230 8960 PLAN AT -1350 LVL

230

20

S. NO DATE

TREAD: 300 RISER: 150 WIDTH: 2000

6240

16

D06

3600

09

FIRE STAIRCASE

4600

8960

8270

230

8730

18

840

03 22 REVISION SCHEDULE:

05

ISSUED TO:

LVL +17700

01

REF. NO

D02

A'

(F.F.L.+15900 24MM)

230

07

+8700 MM

2215

20

FIRE STAIRCASE

D06

LVL +21300

UP THIRD FLOOR LEVEL DN

6240

05 15

-1350 MM

6240

22

840

D06

LVL +19500

TREAD: 300 RISER: 150 WIDTH: 2000

2215

03 13

3900

UP

A'

ANINE

UP 24

-1350 MM

3900

230

ASE

01 11

KEY PLAN:

15

DN

DN

09

2555 8730 230 8270

2555

DN

6240

7

01

ASE

+5100 MM

230

7

2655

07

UP

230

13

D02

LVL +24900

(F.F.L.+195005900 MM)

2315

2355

230

TREAD: 300 RISER: 150 WIDTH: 2000

REV. DATE

REVISION DETAILS

TREAD: 300 RISER: 150 WIDTH: 2000

FOURTH FLOOR LEVEL KEY PLAN:

6

11

2035

840

230

2035 6240 840

03

05

230

2655 2315

ASE

5715230

6

09

D06

REF. NO

LVL +26700

D06

LEGEND / NOTES:

07

-3600 MM

D06

REVISION SCHEDULE:

LVL +28500

TREAD: 300 RISER: 150 WIDTH: 2000

A

5900 01

230

LVL +23100

3600

01

D02

LVL +30300

TREAD: 300 RISER: 150 WIDTH: 2000

2035 230

-3600 MM

230

2655

2255 05

D06

01

2315

-3150 MM

THIS DRAWING IS THE PROPERTY OF SIMRAN KAUR 3900 230 4600 KAPOOR AND SHALL NOT BE8960 USED OR REPRODUCED IN ANY MANNER WITH OUT THEIR PERMISSION 2. THIS DRAWING SHALL ONLY BE READ AND NOT MEASURED. 3. THESIXTH DRAWINGS ONLY INDICATIVE, AND WILL NOT FLOORARE LEVEL GENERAL NOTES: BE USED FOR CONSTRUCTION UNLESS UNTILL STAMPED (F.F.L.+26700 MM) 1. THIS DRAWING IS THE PROPERTY AS OF"GFC". SIMRAN KAUR 4.USED ALLOR DRAWINGS MUSTIN BE READ IN CONSONANCE WITH KAPOOR AND SHALL NOT BE REPRODUCED SERVICE DRAWINGS/ STR. DRAWINGS/ LANDSCAPE 230 ANY MANNER WITH OUT THEIR PERMISSION DRAWINGS ETC. ANY DISPARITY FOUND MUST BE 2. THIS DRAWING SHALL ONLY BE READ AND NOT BROUGHT TO THE NOTICE OF THE ARCHITECTS FOR MEASURED. NECESSARY ACTIONS, PRIOR TO EXECUTION AT SITE. 3. THE DRAWINGS ARE ONLY INDICATIVE, AND WILL NOT BE USED FOR CONSTRUCTION UNLESS UNTILL STAMPED FIFTH FLOOR LEVEL AS "GFC". 4. ALL DRAWINGS MUST BE READ IN CONSONANCE (F.F.L.+23100 MM) LEGEND / NOTES:WITH SERVICE DRAWINGS/ STR. DRAWINGS/ LANDSCAPE DRAWINGS ETC. ANY DISPARITY FOUND MUST BE BROUGHT TO THE NOTICE OF THE ARCHITECTS FOR 840 NECESSARY ACTIONS, PRIOR TO EXECUTION AT SITE.

2035

03

2255

TREAD: 300 RISER: 150 WIDTH: 2000

230

A'

5715

A

2655

230

840

6

-3150 MM

FIRE STAIRCASE

GENERAL NOTES: 1.

D06

3600

A'

5440

SEVENTH FLOOR LEVEL (F.F.L.+30300 MM)

STAIRCASE PLAN PLAN AT -1350 LVL

5440

TREAD: 300 RISER: 150 WIDTH: 2000

230

-1350 MM

UP

230

A

2035

230

6

01

230

D02

13

230

230

STAIRCASE PLAN UPPER BASEMENT

DN

A'

7

230

Upper Basement Staircase Plan

2655

-3600 MM

4600 5060

A

01

P

2315

2615

A'

230

D06

11

230

6240

8270

2315

7

KEY PLAN:

07

09

12

230

2035

TREAD: 300 840

EIGHTH FLOOR LEVEL (F.F.L.+33900 MM)

FIRE STAIRCASE

LEGEND / NOTES:

230

01

03

-5400 MM

ASE

D02

LVL +37500

3600

22

THIS DRAWING IS THE PROPERTY OF SIMRAN KAUR KAPOOR AND SHALL NOT BE USED OR REPRODUCED IN ANY MANNER WITH OUT THEIR PERMISSION 2. THIS DRAWING SHALL ONLY BE READ AND NOT MEASURED. 3. THE DRAWINGS ARE ONLY INDICATIVE, AND WILL NOT BE USED FOR CONSTRUCTION UNLESS UNTILL STAMPED AS "GFC". 4. ALL DRAWINGS MUST BE READ IN CONSONANCE WITH TERRACESERVICE DRAWINGS/ STR. DRAWINGS/ LANDSCAPE DRAWINGS ETC. ANY DISPARITY FOUND MUST BE BROUGHT TO THE NOTICE OF THE ARCHITECTS FOR NECESSARY ACTIONS, PRIOR TO EXECUTION AT SITE.

-3600 MM

D06

6240

8730

05

-3150 MM

5715

840

24

TERRACE LEVEL (F.F.L.+37500 MM)

2255

2035

01

03

TREAD: 300 RISER: 150 WIDTH: 2000

230

DN

MUMTY

230 LVL +40200

230

230 -3600 MM

2655

2655

2035

UP

5440

MUMTY TERRACE LEVEL (T.O.S.+40200 MM)

6

TREAD: 300 RISER: 150 WIDTH: 2000

-3150 MM

A'

230

230

6

230

A

5900

230

2655

840

A'

2215

A

26552700

A'

7

1.

Staircase Section DRAWN BY: SIMRAN CHECKED BY:

17


18


ORD International Academic Work | Group of 2 Net-zero energy school Pre-Final | Solar Decathlon India 2020-21 Revit, Rhino, Lumion, Photoshop ORD International is a greenfield educational project in Sector 134, Noida. Presently, it is in the design stage, the school aims for ‘Holistic Education’ which implies the overall development of the child. With total site area of 15,265 Sq-M, this school is being designed for students from different social and economic backgrounds, with an IB Board Educational Model.

19


School as a community Activity & learning spaces are organised along the street/the central spine, that acts as primary gathering space.

Montessori approach Allows for children to work, develop and learn at their own individual pace in their specific learning environments.

20


Towards the central spine

21


22

Sunken spine Aligned to the optimum orientation, the central sunken axis is the main breakout space.

Activating the spine Placement of activity rooms, sports facilities and cafeteria along the spine.

Primary and middle year program Placed keeping in mind its need for a separate entrance for younger kids.

High school program A part of the MVP, this active yet crucial year is placed separate but close to the spine.

Diploma program The senior block is placed at the end of the spine.

Administration and auditorium Due to the proximity to the main entrance, these functions are positioned so .


ADMIN

PYP BLOCK

CAFETERIA SPORTS

DIPLOMA

PLAN AT LVL +1200

23


24

Central spine


The primary kids are placed near the site entry to provide easy access for them and their parents by the road. High school students have been provided with an open courtyard towards the spine to allow for ample light inside the classrooms The activity rooms and labs are occupied for the least amount of time and hence they have been placed over the high school classrooms. Seniors of diploma have classrooms and activity rooms placed at a distance to allow for least disturbance during their lectures as they require least usage of these rooms as compared to other students. All classrooms and activity rooms face north and south to provide glare free sunlight inside the class rooms.

25


Sectio

Sectio 26


on AA’

on BB’ 27


28


SturMinus Competition | Group of 4 Bus Terminus Top 24 (out of 800+ entries), ANDC 2020-21 Rhino, Lumion, Photoshop Public transport is considered as the backbone of a country. When a pandemic strikes, all this comes to a pause, and a fear is instilled in the hearts of the people - a fear of a safe commute. In India, buses at their present state create a huge negative impact on the people in the first experience itself. Through this design scheme, the ultimate goal is to provide a safe user experience and to enhance those intangibles right at the culmination of one’s journey. Thus encouraging users to trust the bus services and prove to be an invaluable contribution to the community.

29


Creating a division Site is divided by metro station to provide additional space for future expansion.

Zoning Diagram

30

Defining the axes Site is extruded upwards to get a massing volume to work on and the two main axes are identified.

Creating voids The concave voids serve as an invard entrance and help divide the circulation of people.

Circulation | Vehicular


Accommodating bays Curves are introduced to increase the length of the edge to accommodate the bus bays.

Plugging in Metro Metro is plugged into the terminus to provide pedestrian connectivity.

Placing roads Catwalk on the top of the built mass provides access of people directly from the metro station.

Circulation | Pedestrian

31


Fire Staircase & Lift lobby Fingers with sanitisation booths connect to metro

Departure bays Fire Staircase & Lift lobby

Vertical circulation along the atrium Pick-up/Drop-off

Departure bays Flared Columns Mezzanine Landing Fire Staircase & Lift lobby

Space for retail Arrival bus bays Fire Staircase & Lift lobby Way to basement DTC bus bays

32


DTC bus bays (local buses)

33


Technology & Innovation

Flared Column Sectional 3D

Laminated Glass (skylight)

Aluminium Channels

Curved outer walls to channelise rainwater

Incident Sunlight

Hot and contaminated air rising up and moving out Glass panes on opposite sides allow diffused sunlight to illuminate the interior spaces

34


Kinetic Facade Photocatalytic pre-cast concrete frame contains titanium-di-oxide which helps neutralise major components of smog along with other organic and inorganic compounds.

Ventilation (Open)

Visual Connection (Open/Closed)

Laminated Glass Panes (For UV protection and Sound Absorption)

Sound absorption & Keeps pathogen out (Closed)

Tensile Vertical Louver System

35


36


37


38


Braid Competition | Group of 4 Culture and Learning Center People’s Choice Award | UNI design Competition Rhino, Lumion, Photoshop Leaving an everlasting mark on Sri Lanka’s built landscape, Geoffrey Bawa’s designs inspired architects across the world. The design challenge was to explore how his principles and framework can be scaled to accommodate an institute of learning and design located in Rajagiriya, Sri Lanka with total site area of 5521 m-sq and occupancy of 250 students.

39


Connection The institution provides users a sense of welcome through it’s only terminating visual access to the road i.e the main entrance.

40

Materiality Local materials like wood, clay tiles, glass and steel are used for construction keeping in mind the sustainable aspect.

Privacy Because of residences all around, walls and roofs are heightened to enclose the institution from any disturbance, visual or noise.


Entrance

41


42


Skylight allows light to enter the dense part of roof forms. Fluid roof form breaks the monotonous pitched roof factor.

Timber ring beams and purlin-rafter arrangement allow for light and sustainable construction.

Curved external shell compliments the roof form and makes the interior spaces more interesting.

Glass box acts as a modern element, contrasting to the rest of the of the school, breaking the geometry.

Wooden ring beams and purlin-rafter arrangement allow for sustainable and light construction supports floor slabs.

Slanting wooden columns allow for such roof form and twist strengthens the grain structure of wood.

Open spaces i.e field and OAT provides a breakout space for the users.

43


44

Semi-open corridor


Basement Plan

Ground Floor Plan

Section through the courtyard 45


46

Central courtyard


47


48


Casa28 Academic Work | Individual Project Group Housing Revit, Lumion, Photoshop Casa28 is a group housing project designed for 28 dwelling units with the total site area of 1067 Sq-M. The objective was to provide maximized daylighting, ventilation and view for all habitable spaces and ensuring privacy between units. This housing aims to provide a better definition of the open spaces outside as well as inside the built mass.

49


50


51


Dividing the site into four units to provide equal light and ventilation in all.

Bedroom 1 12 sqm

Placing vertical circulation that further helps separates the units.

Toilet 3.5 sqm

Adding a play of volume to allow ample amount of daylight to enter.

Living Room 16 sqm

Kitchen 9 sqm

Dining Room 14 sqm

Bedroom 2 12 sqm Toilet 3.5 sqm

Zoning diagram for one unit 52

Study 7.5 sqm


3

2650

4

5

4300

2650

6

3850

7

5350

BEDROOM

BEDROOM

3450

TOILET LIVING ROOM

BALCONY

BALCONY

DINING ROOM

LIVING ROOM

STUDY

STUDY

3050

UP

F

TOILET

UP

2200

BALCONY

TOILET

BALCONY

BEDROOM

DINING ROOM

KITCHEN

KITCHEN

BEDROOM

BALCONY

H

8

BALCONY

TOILET

BALCONY

2500

BALCONY

E

DN

DN

LOBBY

LIFT

STUDY

LIFT

STUDY

BALCONY

G

3850

BALCONY

3450

J

2

5350

FHC

K

1500

1

3450

D TOILET BEDROOM

C

A

1500

B

KITCHEN

BALCONY

BEDROOM

3450

BALCONY

DINING ROOM

TOILET

KITCHEN

TOILET DINING ROOM

BEDROOM

BALCONY

LIVING ROOM

BEDROOM LIVING ROOM

BALCONY

BALCONY

TOILET

BALCONY

Typical Floor Plan

(Four DUs on each floor)

53


Layout of one unit (2 BHK)

54


55


56


57


58


Internship SpaceMatters June 2021 -August 2021 SpaceMatters is a multi-disciplinary studio in New Delhi, India. The studio’s practice combines built and ‘unbuilt’ work, moving away deliberately from patenting a style. And thus creating a space anew to affect change while analyzing change through a spatial lens.

59


Development of School Infrastructure Sundargarh, Odisha

Development of Education Infrastructure is an ongoing project that covers 93 schools located in Sundargarh district of Odisha. The project involves preparing comprehensive design and development plan for each school including survey and developing project plan, understanding the site conditions to prepare the specific architectural designs. Each school is designed with the objective of improving the quality of education and ensures minimum land disturbance and protects all existing vegetation to the fullest. During the internship at SpaceMatters, I worked on 4 schools of Sundargarh district and prepared design iterations, working drawings, detailed project report (DPR) and 3D models for the projects.

60


Gopana government high school | Odisha

A

B

C

D

S02 SEC

E

F

H

G

4115

4115

4115

4115

4115

W1

W1

W1

W1

W1

W1

4360

3675 2035

4115

J

6870

03

V1

DORMITORY

V1

W3

STAFF TOILET 3100X1585 SPORTS ROOM 2845X4955

D3

6145

CLASSROOM 8000 X 6O00

CLASSROOM 8000 X 6O00

710

D3 07

GIRLS TOILET 6000X3650

D1

03

M

D3

0

614

D3

01

UP W3

D1

02

D1

D1

D1

D1

D1

D1

WATER COOLER

D1

L

2500

1815

PRINCIPALS ROOM 2845X4955

CORRIDOR LEVEL +450 MM

D3

0

252

K

CORRIDOR LEVEL +450 MM

2500 WIDE PASSAGE

D3

D1 H.TOILET

01

02 01

02 01

02 01

V1

BOYS TOILET 6000X3650

2200X1700

W3

6810

5

498

5 266

CLASSROOM 8000 X 6O00

05

W3

S02C 5685 SE

D1

V1

RAMP DN

370

10

W1

D1

03 02 01

0

19320

D2

379

09 ROAD LEVEL +300 MM

W1

08 5

411

DINING HALL 12185X6000

W2

D3 V1

TOILET 1865X1695

W2

W2

W2

W2

W2

W2

W2

2500 WIDE PASSAGE

D1

07 CLASSROOM 8905X4930

CLASSROOM 8365X4930

W1

02

411

LIBRARY 5840X4930

01

5

D2

W2

W2 GIRLS COMMON ROOM 2995X5285 D1

D1

W2

D1

D1

W2

D1

W1

D1

CORRIDOR LEVEL +450 MM

D1

PASSAGE 2180 WIDE

411

W2

STORE 2000X3415

06

RAMP DN

5 01

RAMP DN

02

02

02

01

01

01

01

CORRIDOR LEVEL +450 MM

D1

CORRIDOR LEVEL +200 MM

6545 N

PD

RAM

5

MEDICAL/ STORE ROOM 2995X7445

D1

05 411

W2

02

D1

W2

0

189

KITCHEN 4385X6000

W1 02

W2

04 W2

D1 W2

D1

W2

D1

SCIENCE LAB 4560X5790

W2

PASSAGE 2235 WIDE

COMPUTER LAB W2 2995X7665

D1

D1

W2

D1

W2

SCIENCE LAB 4560X5790

SCHOOL PLAYGROUND

W2

W2

D1

PAVEMENT LEVEL +00 MM

GROUND LEVEL +00 MM W2

PASSAGE 1675 WIDE

D1

D1

W2

W2

COMPUTER LAB W2 2995X7665 SCIENCE LAB 4560X6040

D1

W2

D1

W2

D1

CORRIDOR LEVEL +200 MM

W2

W2

W2

RAMP DN

CORRIDOR LEVEL +200 MM

D1

TEACHERS ROOM 4560X6040

COMPUTER LAB W2 2995X7665 W2

D1

D1

D1

GIRLS TOILET 4560X2975 D3

D3

V1 D3

RAMP DN

RAMP DN

W2

PAVEMENT LEVEL +00 MM

PAVEMENT LEVEL +00 MM D1 01

01

02

02

CORRIDOR LEVEL +200 MM

D1

W2

D1

D1

ROOM-01 7190X2995

W2

W2

W2

D1

W2

W2

W2

D1

FOR FUTURE EXPANSION ROOM-03 7315X2995

ROOM-02 7315X2995

W2

D1

W2

W2

W2

W2

D1

D1

W2

W2

W2

V1

D1

WAY TO BOYS HOSTEL

ROOM-05 6045X2995

ROOM-04 7190X2995

W2

D3

RAMP DN

PASSAGE 1675 WIDE

D1

BOYS TOILET 4560X2950

W2

W2

W2

W2

Site Plan

61


TEACHERS ROOM 4560X6040

W2

D1

GIRLS TOILET 4560X2975 V1 115 760 275 760 275 760 415

1455

D1

D3

D3

ONLY IN

1650

D3

325

Gopana government high school | Odisha 19

EXISTING 115

35610 15

RAMP DN 3525

COMPLET

1650 D3

BOYS TOILET 4560X2950

135 V1

EXISTING WALL

D1

D1

W2

W2

D1

W2

W2

D1

W2

FOR FUTURE EXPANSION ROOM-03 7315X2995

ROOM-02 7315X2995

D1

W2

W2

W2

PATHWAY

D1

W2

ROOM-05 6045X2995

ROOM-04 7190X2995

W2

W2

W2

W2

TENDER

DEMOLISH PATHWAY

WAY TO BOYS HOSTEL

CONSTRU

DEMOLISH WALL

SCALE

EXISTING DOOR & WINDOW REPLACE WITH NEW DOOR & WINDOW

W2

DRAWN B

CHECKED A

B

C

D

S02 SEC

E

F

REV.NO.

J

H

G

DATE: -

18150

4115

4115

4360

3675

33045 1800

2315

1800

995

230

1085

1800

2315

1800

995

230

21335

1085

1800

2315

1800

230

4130

230

2755

2700

6695

6000

6145

1000

4130

420

600

seating

600

45

R4

R26

4810

0 R44

255

255

W2 W2

W2 W2

W2 W2

SPOUT PROJECTION ABOVE

W2 W2

4930

CLASSROOM 8905X4930

255

2600 150

2010 150

760

760

2700

255

40

255

760

2015 255

UP

3300

3250

2390

115 MM PROJECTION ABOVE

455

05

2600

D1 D1

0

250

5

0

255 255

4560

710

255

1980

W2 W2

D1 D1

5790

2585

SCIENCE SCIENCE LAB LAB 4560X5790 4560X5790

1200 1320 1200

1070

255

1070 3555 255

2170 1200

1070

W2 W2

D1 D1

5950

2430

SCIENCE SCIENCE LAB LAB 4560X5790 4560X5790

255

SCIENCE SCIENCE LAB LAB 4560X6040 4560X6040

1295

D1 D1

1200

D1 D1

W2 W2

255

PASSAGE 1675 1675 WIDE WIDE PASSAGE

1070

1465

D1 D1

1465

2665

1070

255

1165

2490

D1 D1

1070

255

900

D1 D1

1200

2975

980

255

1070

625

D1 D1

W2 W2

ROOM-05 ROOM-05 6045X2995 6045X2995

ROOM-04 ROOM-04 7190X2995 7190X2995

1200

1335

1200 7190

W2 W2

1335

1200

W2 W2

1230 255

1200

W2 W2

1335

1200 7315

W2 W2

1335

1200

W2 W2

1295 255

1200

W2 W2

1335

1200 7315

W2 W2

1335

1200

W2 W2

1230 255

1200

W2 W2

1335

1200

W2 W2

1335

1200

7190

Demolition Marking Plan

W2 W2

1165 255

1200

W2 W2

770

1200 6045

W2 W2

850

1200

150

WAY WAY TO TO BOYS BOYS HOSTEL HOSTEL 1250

1200

1400

255

350

710 255

W2 W2

625 255

1285

0

PATHWAY

2270 W2 W2

00

1545

345

10245

1200 255

1200 6040

2485 1200 1380

255

325

325 760

2975

115

2765

115

1325

1650 555

1200

R2 2010

255

415

2950

2010 255

RAMP RAMP DN DN

1200 W2 W2

FOR FUTURE FUTURE EXPANSION EXPANSION FOR ROOM-03 ROOM-03 7315X2995 7315X2995

ROOM-02 ROOM-02 7315X2995 7315X2995

2490

415

325

2490

1230

V1 V1

760 325

255

1070

D3 D3 115 760

135

425

2490

1465

BOYS BOYS TOILET TOILET 4560X2950 4560X2950

370 425

255 38250

D1 D1

255

2490

1465

40

255

1070

2235

31

2490

CORRIDOR LEVEL LEVEL CORRIDOR +200 MM MM +200

3525

NEW BRICK WALL EXISTING WALL

4560

DEMOLISH BUILDING 1630 4895

1070 D1 D1

W2 W2

ROOM-01 ROOM-01 7190X2995 7190X2995

255

2800

1465

7010

2490

1200

2800

D1 D1

255

3960

1465

255 610

2490

1070

255

255

1230

D1 D1

W2 W2

3155

2490

1070

2995

255

1465

15

D1 D1

2490

1200

1420

02

255

1465

D3 D3

3525

1070

3050

610

2010

RAMP RAMPDN DN

1140

4345 255

2490

1070

19

710

D3 D3

1650 1650

15

02

255

01

D3 D3

1300

19

01

RAMP RAMP DN DN

PAVEMENT LEVEL LEVEL PAVEMENT +00 MM MM +00

PATHWAY

2235

16501050

1070 740

1200

GIRLS GIRLS TOILET TOILET 4560X2975 4560X2975 V1 V1 415 115 760 760 275 275 760 760 275 275 760 760 415 115

2765

4130

1455 1455

255

29

05

16155

D1 D1

4210

1830

31 40

11280

1525

35610

1420

1410

1410 2745 1070 1395

3555 600

600

12190

62

1070

255 3555 255

600

7145

7545

0

255

5180

1070

3555 1370

RAMP RAMPDN DN

2010

8305

1200 85 85

3460 255

W2 W2

D1 D1

756

PAVEMENT LEVEL LEVEL PAVEMENT +00 MM MM +00

1070 710

255

1200 710 255

1675

TEACHERS TEACHERS ROOM ROOM 4560X6040 4560X6040

0

255

W2 W2

85

2995

D1 D1

R1

D1 D1

0

15

R5

7290

W2 W2

D1 D1

600

5

W2 W2

915

77

1535

915

255

1230

1540

1070 1620

255 7540

255

17

85

85

2995X7665 2995X7665

1405

1200

COMPUTER LAB LAB W2 W2 COMPUTER W2 W2

1420

CORRIDOR CORRIDORLEVEL LEVEL +200 +200MM MM 3790

D1 D1

W2 W2

1490

1200

1230

1000

CORRIDORLEVEL LEVEL CORRIDOR +200MM MM +200

D1 D1 1995

1070

W2 W2

255

1200

3865

1620

2585

255

1200

W2 W2

6040

D1 D1

2325

1070

3555 25420

600

1780

1780

150

26970 8535

85

6400

255

1200

7575

85

85

1405

1535

3510

1070

PASSAGE PASSAGE1675 1675WIDE WIDE

1295

LEVEL LEVEL

3420

1490

1200

2995X7665

W2 W2

0

COMPUTER LAB W2 COMPUTER LAB W2 W2 W2 2995X7665

D1 D1

3555

GROUND GROUND +00 MM MM +00

956

D1 D1

W2 W2

1320

8515 915

1000

255

3610 43360 255

SCHOOL PLAYGROUND

60 0

1070 1295

3265

915

1200 1535

1490 1200

PATHWAY

W2 W2

D1 D1

915

5

255

2350

0 18

D1 D1 1995

1200

R1

70 15

W2 W2

0

00

85 85

2995X7665 2995X7665

PASSAGE PASSAGE 2235 2235 WIDE WIDE

41810

1620

PAVEMENT LEVEL LEVEL PAVEMENT +00 MM MM +00

255

1490 7665

1200

COMPUTER LAB LAB W2 W2 COMPUTER W2 W2

6990

6990

1070

D1 D1

W2 W2

3765

1200

255

255

2900

2475

3555

1070

1200

1070

3460

15 70

04

0

1535

255

4175

865

2470

18 05

85 85

1710

438

1230

0

388

230

154

150

1165 1070

2660

2390

255

1620

UP

3300

0

200

322

CORRIDOR CORRIDORLEVEL LEVEL +200 +200MM MM 3785

2880

230

D1 D1

115

CORRIDOR CORRIDOR LEVEL LEVEL +450 MM

560

1200

760

1370 1540

3530 1070

1930

1200

1200 5285

1490 1200

255

1080 1200

UP

2390

01

0

1490

UP 660

01

KITCHEN 4385X6000

W1 W1

107

7445

01

02

0

01

01

SPOUT PROJECTION ABOVE

250

1200

255 02

0

85

2795

0

85

255

02

201

1405

2795

NN PPDD RRAAMM

1200

255

0

255

2660

02

STORE 2000X3415

230

PASSAGE 2180 WIDE 2420

02

180

RAMP DN DN RAMP

W1

0

102

182

1230

06

5

2795

855

108

255

1070

0

255

490

D1 D1 2185

342

2795

1200

0

255

2045

180

2795

1070

107

255

1640

5 281

255

CORRIDOR LEVEL +450 MM 2795

W2 W2

D1 D1

1070

5 234

1910

5

1200

115

D1 D1

1910

585

1070

0 278

1295

250

D1 D1

W2 W2

D1 D1

1070

0 00 R1

W2 W2

2860

UP

W2 W2

D1 D1

1070

55 441111

MEDICAL/ MEDICAL/ STORE ROOM ROOM STORE 2995X7445 2995X7445

5

173

5

W2 W2

161

D1 D1 610

55 441111

D1 D1

0

115

0

1790

RAMP DN DN RAMP

250

W2 W2

0

200

D2 D2

120

255

0

1420

BLOCK - 5

930 308

D1 D1

seating 0

150

CLASSROOM 8365X4930

R440

5 231

LIBRARY 5840X4930

490 147

CYCLE STAND

R440

W1 W1

02

01

935

1560

2600

3955

3450

07

55 441111

W2 W2

2500 WIDE PASSAGE

115 MM PROJECTION ABOVE

0

150

W2 W2

W2 W2

1070

W2 W2

R4

625

200

W2 W2

180

1980760

855

0

115 905

1200

733

305

2055

5

1200

231

1915

0

1200

70

1640

180

1200

205

1780

5

GIRLS COMMON ROOM 2995X5285 2995X5285

5

1200

231

1780

2470

W1

DINING HALL 12185X6000

433

1710

R225

UP

1200

8905

0

0

W2 W2 W2 W2 GIRLS COMMON ROOM

120

141

1810

115

695

1695

1295

1200

255

R225

690

5 411

255

D1 D1

2600

8365

05

TOILET TOILET 1865X1695 1865X1695

1200

255

18

1185

5185

715

08 255

70

115

D3 D3 V1 V1

610

15

1695

D2

915

2900

5840

W1

D1

735

5

seating

SLOPE UP

3505 255

02

4360

00

1865

0

197

115 MM PROJECTION ABOVE

03

264

01

09

3355

5640

3550

SPOUT PROJECTION ABOVE

7305

0

10

8325

SPOUT PROJECTION ABOVE

SPOUT PROJECTION ABOVE

107

3960

4005

40

40

3080

6000X3650

115 0

170

0

UP

R4

4270

255

2200X1700 V1

V1

5 195 BOYS TOILET

D1 H.TOILET

600

490

02 01

600

490

1550

420

810

305

810

180

930

600

690

seating

D3

115

0

1535

0 379

PATHWAY 1855

255

D3

0 252

100

UP

3960

25 ABOVE SPOUT PROJECTION

320

2275

3325

2585

1330

115 760

1820

855

K

seating 02 01

1410

80

1070

370

2010

255

230 550

1645

480

280

910

1070

CORRIDOR LEVEL +450 MM

230

450

5270

2500 WIDE PASSAGE

0

600

1070

40

255

820

2

L

107

UP

695

seating

seating

02 01

RAMP DN DN RAMP

1070

0 614

810

WATER COOLER

5

435 650

5270

D3

D1

D1

510

105

2500

1070

5 428

0

1010

01 1540

820

R225

1070

D1

D3

165

255

5270

CORRIDOR LEVEL CORRIDOR +450 MM +450

D1

M

115 MM PROJECTION ABOVE

5 231

2500

230 250 1070

D1 D1

S02C SE

D3

230

3830

D1

40

2320

230

02

D1 D1

D3

255

825 1070

2225

UP

255

5640

GIRLS TOILET 6000X3650

01

255

865

07

DORMITORY

760

1070

BLOCK - 2

R4

5180

CLASSROOM 8000 X 6O00

03

2355

155

865

760 155

1700

300

155 760

730

05

W3 W3

2845

320

5

155

2840

CLASSROOM 8000 X 6O00

0 R1

760 305 625

1330

153

D1 D1

CLASSROOM 8000 X 6O00

R4

155

255

522R

2515

1070

115 MM PROJECTION ABOVE

115

V1

230

W3 W3

PRINCIPALS ROOM ROOM PRINCIPALS 2845X4955 2845X4955

760 155

1700

3355

1565

760

0

D1 D1

560

1055

W1

340

W1

2355

W1

W1

305 990

W1

810 305 810 305 810 305 810

W1 W1

D1 D1

W3 W3

255

ROAD LEVEL LEVEL ROAD +300 MM MM +300

995

230

1085

197

255

230

3050

155

SPORTS ROOM ROOM SPORTS 2845X4955 2845X4955

2515

4955

STAFF TOILET TOILET STAFF 3100X1585 3100X1585

255

255

1515

1515

03

W3 W3

515

4955

465 255

1885

255 360 760

V1 V1

155 760

255

2845

560

255

185 115 1330

4575

4115

25865

4115

18545

4115

1880

4115

9525

W2

D1

W2

DEMOLISH BUILDING

7010

W2

RAMP DN

PASSAGE 1675 WIDE

3960

D1

15

CORRIDOR LEVEL +200 MM

D1

SUBMISS

19

38250

PROPOSA

415 425

D1

NEW BRICK WALL

325

PAVEMENT LEVEL +00 MM

PATHWAY

3630

DEMOLISH PATHWAY DEMOLISH WALL

COLUMN CENTER LINE PLAN EXISTING DOOR & WIND GROUND FLOOR LEVELREPLACE WITH NEW DO


DOOR /WINDOW SCHEDULE TOTAL WIDTH SILL LVL. HEIGHT LIN.LVL. QUAN. (MM) (MM) (MM) (MM) 02 1220 2134 2134 D01 2134 D02 2134 01 1200 2134 D03 13 1070 2134 2134 D04 01 1070 2134 2134 D05 09 760 2134 1925 D06 03 760 1925 2134 W01 15 1800 900 1234 2134 W02 02 1800 900 1234 2600 V01 05 760 1800 800 1925 V02 04 760 1500 420

LOCATION

S.No.

ELE. D

SEC S01

A

B 4115

C

D

4115

E

4115

F

5820

G

A

B

J

H

2820

2500

3320

C

DINING HALL HANDICAP TOILET CLASS ROOM EXISTING KITCHEN TOILET TOILET CLASS ROOM & DINING HALL EXISTING KITCHEN TOILET EXISTING TOILET

2550

D

S02 SEC

E

F

J

H

G

18150

R26

0 R44

4930

C ELE.

255

40 R4

2470

760

1465

1070

1295

255

2490

255

2490

255

2490

255

1465

D1

1200

1465

1070

1230

D1

W2

1070

1465

255

2665

255

2490

255

2975

255

D1

1465

1070

1165

D1

W2

FOR FUTURE EXPANSION ROOM-03 7315X2995

ROOM-02 7315X2995

1070

900

D1

1200

980

1070

625

D1

W2

W2

W2

W2

W2

W2

W2

1200

1335

255

1200 7190

1335

1200

1230 255

1200

1335

1200 7315

1335

1200

1295 255

1200

1335

1200 7315

ROOM-05 6045X2995

ROOM-04 7190X2995

W2

1335

1545

345

1200 2475

255 5790 255

1320 1200

5950

2170 1200 1200

1780

255 6040

2325 1200

255

1200

1410 255

6040

2485 1200

255

1380

BOYS TOILET 4560X2950

D3 115 760 1300

D1

V1

415

2975 115

325 760 760 325

1650

2765

D3

2950

1325 1050

1650

D3

555

1200

D3

3525

2235

1285

0

GIRLS TOILET 4560X2975 V1 115 760 275 760 275 760 415

4560

1630

W2

W2

W2

W2

W2

WAY TO BOYS HOSTEL 150

1250

1200

1400

W2 255

350

W2

00

2010

RAMP DN

1200

2270 W2

710

4210

2010 2490

PASSAGE 1675 WIDE

1070

1455

370 425

2490

CORRIDOR LEVEL +200 MM

D1

W2

ROOM-01 7190X2995

255

D1

255

2490

W2

D1

1395 1070

1200

TEACHERS ROOM 4560X6040

4895

D1

255

1200

1230 255

1200

1335

1200

1335

7190

1200

1165 255

1200

770

1200 6045

850

1200

625

10245

2800

1465

40

2490

1070

W2

31

255

1230

D1

W2

3155

2490

1070

2800

255

1465

255 610

2490

1200

255

255

R2

1420

02

1465

D1

2235

1070

3050

01

610

2490

1070

W2

D1

2765

31 40

740

1200

PAVEMENT LEVEL +00 MM

2995

710

SCIENCE LAB 4560X6040

255

05

16155

RAMP DN

RAMP DN

2010 1140

4345 255

255

1200

1070 2585 1320 1070 1070

600 1830

12190

02

W2

3555

J

4130

01

D1

2745

0

11280

1525

W2

255

756

1070

H

29

255

255

D1

2585 1070 1070

CORRIDOR LEVEL +200 MM

255

G1

600

1070 1675

1420

9525

G

PAVEMENT LEVEL +00 MM

D1

5180

1070

3555 25420

6140

3555

F1

2550

1410

600

7545

F

1165 230

1910

3555

3460

8305

E

1800

1705

B ELE.

255

01

230

RAMP DN

85 1535

D1

710

255

255

1160

1115

7145

1800

2500

SCIENCE LAB 4560X5790

TANK

230

2010

2470

W2

0

710

D1

2995

R5

W01

D1

85

W2

0

15

7000

7290

ANGANWADI

1780

150

255

8535 915

1370

230

D1

R1

1200

915

5

C1

W2

SCIENCE LAB 4560X5790

1410

D03

26970

02

600

3615

W2

255

550 230

1070

W01 600

1800

D1

2430

GROUND LEVEL +00 MM

6000

3865 255

CORRIDOR LEVEL +200 MM 3790

1160

255

3615

710

255

1070

2500

60 0

915

GROUND LEVEL -1000 MM

SCHOOL PLAYGROUND

4310

W01

1800

COMPUTER LAB W2 2995X7665

255

3555

230

PASSAGE 2235 WIDE

255

03

3510 255

1200 1620 1070 1230

1540

4560

255

6000

77

1405

255

255

3555

230

GROUND LEVEL -1500 MM

3555

3615

1800 1395

2000 WIDE PATHWAY TO ANGANWADI 230

550 2500

17

B1

1980

04

7000

1160

1070

D03

CLASS ROOM 7000 X 6000

7000

1200

255

1070

2470 W2

1420

25865

4005

255

1875 3615

1800 1160

3615

04

865

1070 4310

CORRIDOR LEVEL 8515 -550 MM

2000

W01

CLASS ROOM 7000 X 6000

W01

1620

W2

85

7540

3615

D1

1230 1200 1490

1800

4575

2355

600

45

1855

1880 340

600

2640

305 990 810 305 810 305 810 305 810

1885 1645

230 550

840

230 1610

760

115 1535

645

115

3895

1535 115

760

1845 230

1075

2700

4200

2410 1665 255 490

600

930

600

760 495

1830 330 760

490

40

780

230

WP-03

3615

seating 440 R44 0

1280

6990

6990

3610 255

PASSAGE 1675 WIDE

0

1000

230

1200

1160

D1

0

388

230

250

1535 85

1405 85 1490 1200

4200

W2

3385 W01

D1

GROUND LEVEL -1400 MM

0

1800

18

15 3960 70

3460 255 3765

2000

255

1535 1070 1295 1070

05

05

05

150

760

760

760

255 2010 1070

150 2600

440

7000

1930

150 2700

3270

1800

4310

CORRIDOR 2500 WIDE

2600

1370 2015

R4

JANITOR

150

1655

255 3530 255

CORRIDOR LEVEL +200 MM 3785 255

85 1535 1070 1230 1070 1620 1200 85

490

1075

3495 550 1070

150 2600

3450 1560 1200 1540 1070 1165 1070 1620 1200

CUT OUT

450 1330 320 90 1070 205 760 170 1200

4810

255

2645

625 1070

760 200 115 905

255

255 1625

230

435 1070

R225

3260 600

910

690

115

255 5640

600 1200

255

1220

450 1540

600

255 2355 255 2320

3830

1065

2755

6000

2225

825 1070

230 685

865 1070

865 155 760 2515 760 155 560

255

690 255

760 305 625

1865 115

1565 1200

5285

1490 1200

255

1080 1200 1490

7445

1200 85 1405 1200

255

1230 1200 1490

7665

1200 1490 1200

255

115 MM PROJECTION ABOVE

455

0

200

5

1295

2390

230

D1

322

1200

3250

KITCHEN 4385X6000

W1

115

CORRIDOR LEVEL +450 MM

UP

3300

230

01

02

154

D03

6400

5

2660

01

SPOUT PROJECTION ABOVE

0

COMPUTER LAB W2 2995X7665

108

01

UP

3300

255 02

438

W2

0

UP 2880

2795

0

01

255

02

255

1070

D03

342

2795

D03

915

780

0

255

560

1070

180

2660

02

0

7575

5 231

2795

0

3265

STORE 2000X3415

107

W01

A-035

915

W1

0

102

107

1200

0

06

250

490

180

2795

855

5 281

255

1070

5 234

255

UP 2390

5

173

490

D1 2185

PASSAGE 2180 WIDE 2420

CLASS ROOM 02 6000 X 7000 01

660

D03

1200

0

RAMP DN

255

W2 2045

115

2795

1070

585

255

1640

180

600

5

231

CORRIDOR LEVEL +450 MM 2795

06

D1

1070

0

2500

0

255

D1

1910

70

180

1200

205

1910

0 278

1070

201

230

5

231 0

115

N

1685

0 0

200

D2

930

PD

115

180

W1

R440

seating

5

230

0

230

100

2500

230

930

5

105

490

RAM

ELE. A

760

R440

02

411

D03

300

1295

W01

2350

4310

CLASSROOM 8905X4930

01

0

D1

2500 WIDE PASSAGE

07

182

1070 W2

SPOUT PROJECTION ABOVE

W2

0

W2

D1

1070

1000

2545

W2

5

CORRIDOR LEVEL -550 MM D1

855

120

2860

00

R1

1200

115 MM PROJECTION ABOVE

4175

PAVEMENT LEVEL +00 MM

RAMP UP

2055

250

3600

1200

W1

DINING HALL 12185X6000

UP

2900

255

5

2470

1915

07

R225

690

161

440 1710

1200

R225

935

D1

1070

2390

WP-02 A-035

D2

915

0

0

seating

08

8905

W1

D1

733

D1

610

250

930

R44

0

230

3615

A1

03

UP

165

01

WP-01 A-035

02

5

3475

1800

600

0

4360

W2

CLASSROOM 8365X4930

W01

09

03

264

01

09

6000X3650

115 0

170

3420

W01

1395

GROUND LEVEL -1200 MM

W2

440

0

R44

COMPUTER LAB W2 2995X7665

1995

230

W2

0

PRINCIPAL ROOM 3475 X 4200

W2

956

CYCLE STAND

W2

D03

3550

SPOUT PROJECTION ABOVE

08 1640

2200X1700 V1

V1

5 195 BOYS TOILET

D1 H.TOILET

411

W2

TEACHERS ROOM 6000 X 3290

115

1200

05

1765

1780

10

8325

115 MM PROJECTION ABOVE

255

5 231

1200

18

D03

1200

seating

0

RAMP DN

0

D03

TOILET 1765 X 1685

1780

2275

420

810

305

810

308

1790

7 15

V01

1200

02 01

D3

115

0

115 PROJECTION AT BEAM BOTTOM LEVEL 440

1070

1295

V01

D3

0

252

147

D1

W2

1995

800

D03

115 1000 115 1000

BOYS TOILET 3915 X 8365 3495

115

10

UP

L

320

0

D1

CORRIDOR 2500 WIDE W2 320 600 325 750 300 1070

1685

1700 255

1330

120

W2

440

seating

V01

230

D05

0

0

UP

D05

00 R1

R44

D02

855

5 411

W2

SPOUT PROJECTION ABOVE

LIBRARY 5840X4930

2645 255

3960

HP.TOILET 2220 X 1700

1200

W2

CYCLE STAND

1420

4270

1070

0

251

735

R

40

614

810

WATER COOLER

K

SEC S02

0

4

D3

D1

0

55

2470

JUNGLE GYM MEDICAL/ STORE ROOM 2995X7445

2600

R4

3080

420

285

5

D1

1200

1550

D05

4130

D3

107

610

5 1710

1535

D05 seating D05

480

M

115 MM PROJECTION ABOVE

433

D1

W2

UP

seating

1070

S02C SE

D3

UP

W2

5840

D05

02 01

11 CORRIDOR LEVEL +450 MM

D3

0

115

W2 GIRLS COMMON ROOM 2995X5285

W2

115 MM PROJECTION ABOVE

255

4 26

5270

2500 WIDE PASSAGE V01

UP

D1

DORMITORY

141

D1

41

1070

600115 785 115 1000 115 1000 115 1000 115 1000

SPOUT PROJECTION ABOVE

2900

2090

01

230

820

GIRLS TOILET 6000X3650

03

320

695

SWINGS

3960

0

R150

0 R1

255

W2

PLAYGROUND LEVEL -1000 MM

2585

1070

1700

07

255

GIRLS TOILET 4345 X 1000 3260

D03

1330

715

TOILET 1865X1695

1410

3325

SLOPE UP

01 1185

5270

695

00

115

1695

1820

05

MERRY GO ROUND

03

3505

D3 V1

435 650

UP

RAMP DN

18

115 PROJECTION AT BEAM BOTTOM LEVEL

1010

seating seating COOLER WATER

02 01

SPOUT PROJECTION ABOVE

1855

2400 1695

1070

70

255

820

730

05

D1

V1

5

UP

1070

1700

5730 D1

185 115 1330

197

40

860

3960

01

D1

760

5 411

R4

5270

CORRIDOR LEVEL CORRIDOR LEVEL -550MMMM +450

15

3890

230 250 1070

2010

1475

230 D1

1055

12

W1

CLASSROOM 8000 X 6O00

230

115 760

03 01

255

2890 D1

255

D06

4130

280

UP 1980

255

2400

seating

01

02

V02

TOILET 1475 x 2410

CLASSROOM 8000 X 6O00

230

3355

03

1440

D06

50

3355

seating

TOILET 1765 x 1625

D06

V02

995

0 379

2520

550

2845

CORRIDOR 2500 WIDE ROAD LEVEL +300 MM

1070

W1

1800

0

1220

255

TOILET 1765 x 1625

2315

107

3660

610

W02

1800

W1

V02

CLASSROOM 8000 X 6O00

610

1085

230

1800

V02

230 610995 760

1800

370

3665

W1

40

1220

D01

W3

W1

3675

33045 2315

40

PRINCIPALS ROOM 2845X4955

755

R4

550

W01

KITCHEN 4065 x 2690

D04

1155

1800

4360

5

D1

760

1085

R4

D01

255

1235 230

4115

153

W3

995

522R

4955

D1

760

1800

4115

0

255

W3

755

2315

4115

255

230

760 155

115

W02

1070

865

1800

W1

D1

255

1085

4115 1765

915

SPORTS ROOM 2845X4955

3045 230

230

1765

197

6700

03

STAFF TOILET 3100X1585

1220

4955

DINING HALL 12205 X 6700

AYGROUND LEVEL 100 MM

1515

835

W3

515

600

465 255

255

560

255

DINING HALL LEVEL -550 MM

2520

W01

155 760

W01

50 305 1220

255 360 760

V1

2515

230

W01

2845

2690

2365

255

255 865 4115 255

255

1800

6145

2425

230

1800

2500

2425

40654115

255

2500

1800

1205

3955

1210

230

230

12205 230

230

3630

COLUMN CENTER LINE PLAN GROUND FLOOR LEVEL

255

6535

Brick Work Marking Plan 63


Tetengagila U.G.U.P School | Odisha

1075

2725

MUMTY TERRACE LEVEL (T.O.S.+9100 M)

TERRACE

1325 PASSAGE

CLASS ROOM

D2

D2

EW2

EW2

EW2

300

DINING HALL

EW2

PASSAGE

150 300

GROUND FLOOR LEVEL (F.F.L.+150 MM)

2315

75 (FLOOR MARGIN)

3150

325

510

FIRST FLOOR LEVEL (F.F.L.+3300 M)

1000

3075

75 (FLOOR MARGIN)

750

TERRACE LEVEL (T.O.S.+6375 M)

PAVING LEVEL (F.F.L.-150 MM) PLAYGROUND LEVEL (F.F.L.-300 MM)

1

3

2

SECTION_A

4

Section A

01

2725

MUMTY TERRACE LEVEL (T.O.S.+9100 M)

CLASS ROOM

75 (FLOOR MARGIN)

CLASS ROOM

75 (FLOOR MARGIN)

TERRACE

TERRACE LEVEL (T.O.S.+6375 M)

FIRST FLOOR LEVEL (F.F.L.+3300 M)

1000

3075

JALI AS PER DETAILS

W1

D2

PASSAGE

CUT OUT D2

PASSAGE

375

DINING HALL

1200

2315

D2

300

300

75 (FLOOR MARGIN)

GROUND FLOOR LEVEL (F.F.L.+150 MM) PAVING LEVEL (F.F.L.-150 MM)

150

3150

325

510

TERRACE

PASSAGE

W1

PLAYGROUND LEVEL (F.F.L.-300 MM)

A

B

SECTION_B

5

C

4

3

1

2

Section B

01

GENERAL NOTES A-035 WP-01

A-035 WP-02

A-035 WP-01

A-035 WP-02

MUMTY TERRACETERRACE LEVEL LEVEL (T.O.S.+9100 M) M) (T.O.S.+6375

LINTEL LEVEL (F.F.L.+2100 MM)

150 1050 150

LEVEL±00

ROOF LEVEL (T.O.S.+3450 MM)

LEVEL±00

LINTEL LEVEL (F.F.L.+2100 MM)

43 41

LEVEL±00

39

2100

27

37 35

ELEVATION-A BLOCK-2

D2

03

ELEVATION-B BLOCK-5

EW2

SPOUT AS PER DETAILS

D2

D2

D2

SPOUT AS PER DETAILS

02

SPOUT AS PER DETAILS D2

D2

D2

D2

D2

D2

D2

D2

D2

LEVEL±00 01

LEVEL+15

13 11

LEVEL-2500

09 07

D2

D2

05

LINTEL LEVEL B (F.F.L.+2100 MM)

C

D

ELEVATION-A 110 Ø RAIN WATER PIPES 02 BLOCK-03 & 04

150

ELEVATION-A BLOCK-03 & 04

H

K

Elevation A

L

M

L

M

LINTEL LEVELN (F.F.L.+2100 MM)

Q

P

LEVEL±00

R

EV1

EW2

150

C

D

E

EW2

F

G

H

K

PAVING LEVEL (F.F.L.-150 MM)

02

ELEVATION-B BLOCK-2

LEVEL-2700MM

CORRIDOR LEVEL N (F.F.L.+150 MM) PLAYGROUND LEVEL (F.F.L.-300 MM)

ELEVATION-A BLOCK-5

02

Q

P

R

02

2725

02

G

450

EW2

B CORRIDOR LEVEL (F.F.L.±0.00 MM)

F

EW2

110 Ø RAIN WATER PIPES

2100

2100

LEVEL±00

E

2100

A

ROOF LEVEL (T.O.S.+3450 MM)

01

150 1050 150

A

PLAYGROUND LEVEL (F.F.L.-300 MM)

03

150 1050 150

ROOF LEVEL (T.O.S.+3450 MM)

150

150 1050 150

110 Ø RAIN WATER PIPES EW2

SPOUT AS PER DETAILS

D2

21

17

MUMTY TERRACE LEVEL (T.O.S.+9100 M)

ELEVATION-B BLOCK-1

D2

23

05

EW2

PAVING LEVEL (F.F.L.-150 MM)

D2

LEVEL-2500

D2

25

07

15

300

LEVEL-5900MM

MUMTY TERRACETERRACE LEVEL LEVEL (T.O.S.+9100 M) (T.O.S.+6375 M)

LEVEL±00

LEVEL±00 2725 3075

V01 W1

W1

W1

V01

W1

LEVEL-5900MM

TERRACE LEVEL (T.O.S.+6375 M) FIRST FLOOR LEVEL (F.F.L.+3300 M)

W1

30753150

W1

W1

W1

W1

W1

W1

W1

V01

V01

V01

V01

W1

W1

W1

W1

LEVEL±00

D2

3150 150

V01 W1

W1

OMBADC13 Location Govt. Tetengagila UP

LEVEL±00

W1

V01

W1 D2

W1

W1

OMBADC

W1

300

GROUND FLOOR LEVEL (F.F.L.+150 MM) 150

Q

L

K

H

G

F

E

D

C

B

A

P

N

M

L

K

H

G

F

E

D

C

B

A

W1

W1

W1

W1

FIRST FLOOR LEVEL (F.F.L.+3300 M)

890 135

1025

FIRST FLOOR LEVEL (F.F.L.+3300 M)

110 Ø RAIN WATER PIPES

W1

C9, 981

ENGINEERING CONSULTANCY SE 527, Pock PH:- B-1/117 011-2

Elevation B

02

LEVEL±00

W1

C9, 981

B-1/117

1025

ELEVATION-B BLOCK-03 & 04

64

M

02 Q

R

N

LEVEL±00

325 510

ELEVATION-B BLOCK-03 & 04

P

890 2315135

R

1025 3600

PLAYGROUND LEVEL (F.F.L.-300 MM)

10

PAVING LEVEL (F.F.L.-150 MM)

FIRST FLOOR LEVEL (F.F.L.+3300 M)

W1

W1

LEVEL-5900MM

PLAYGROUND LEVEL (F.F.L.-300 MM)

110 Ø RAIN WATER PIPES

Location 13 Govt. Tetengagila UP

LEVEL±00

W1

300

PAVING LEVEL (F.F.L.-150 MM)

W1

LEVEL±00

LEVEL±00

FIRST FLOOR LEVEL (F.F.L.+3300 M) GROUND FLOOR LEVEL (F.F.L.+150 MM)

FIRST FLOOR LEVEL (F.F.L.+3300 M)

W1

LEVEL-5900MM

LEVEL±00

1025 3150

CORRIDOR LEVEL (F.F.L.±0.00 MM)

27

09

D2

110 Ø RAIN WATER PIPES EW2

LEVEL+15 LEVEL-2500

SPOUT AS PER DETAILS

29

11

02

3150

150

LINTEL LEVEL (F.F.L.+2100 MM)

PAVING LEVEL (F.F.L.-150 MM)

19 17

15 31 13

PLAYGROUND LEVEL (F.F.L.-300 MM)

LEVEL±00 LEVEL±00

21

19

GROUND FLOOR LEVEL (F.F.L.+150 MM)

LEVEL±00

33

SPOUT AS PER DETAILS

CORRIDOR LEVEL (F.F.L.+150 MM)

D2

41 23

PLAYGROUND LEVEL (F.F.L.-300 MM)

ROOF LEVEL (T.O.S.+3450 MM)

LEVEL-2500

43

39

300

PAVING LEVEL (F.F.L.-150 MM)

SPOUT AS PER DETAILS D2

25

150

2100 150

FIRST FLOOR LEVEL (F.F.L.+3300 M) GROUND FLOOR LEVEL (F.F.L.+150 MM)

ED2

LEVEL-2700MM

450

02

33 31

PAVING LEVEL (F.F.L.-150 MM) 3075 3150

ELEVATION-A BLOCK-1

ED2

29

CORRIDOR LEVEL (F.F.L.±0.00 MM)

TERRACE LEVEL (T.O.S.+6375 M) FIRST FLOOR LEVEL (F.F.L.+3300 M)

PAVING LEVEL (F.F.L.-150 MM)

ED2

SPOUT AS PER DETAILS

EW2

2100

2725 3075

LEVEL-2700MM CORRIDOR LEVEL (F.F.L.±0.00 MM)

35 ED2

LEVEL±00

110 Ø RAIN WATER PIPES

37 EV1

ED2

150 1050 150

ROOF LEVEL (T.O.S.+3450 MM)

2725

LINTEL LEVEL (F.F.L.+2100 MM)

150 1050 150

MUMTY TERRACE LEVEL (T.O.S.+9100 M)

ROOF LEVEL (T.O.S.+3450 MM)

THIS DRAWING IS THE OF M/s SPACE MATTERS NOT BE USED OR REPR GENERAL ANY MANNERNOTES WITH OUT PERMISSION THIS DRAWING IS THE THIS DRAWING SHALL O OF M/s SPACE MATTERS NOT MEASURED. NOT BE USED OR REPR THE DRAWINGS ARE ON ANY MANNER WITH OUT WILL NOT BE USED FOR PERMISSION UNLESS UNTILL STAMPED THIS DRAWING SHALL O ALL DRAWINGS MUS NOT MEASURED. CONSONANCE WITH S THE DRAWINGS ARE ON STR. DRAWINGS/ LAN WILL NOT BE USED FOR ETC. ANY DISPARITY UNLESS UNTILL STAMPED BROUGHT TO THE ALL DRAWINGS MUS ARCHITECTS FOR NE CONSONANCE WITH S PRIOR TO EXECUTION AT STR. DRAWINGS/ LAN ETC. ANY DISPARITY BROUGHT TO THE ARCHITECTS FOR NE PRIOR TO EXECUTION AT

28-D Pocket-6 M.I.G FlatsSE ENGINEERING CONSULTANCY 527, Pock PH:011-2

LEVEL-2500MM LEVEL±00

28-D Pocket-6 M.I.G Flats


3

2725 TERRACE

TERRACE LEVEL (T.O.S.+6225 MM)

WITH PAINT FINISH

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

325

MUMTY

525

3075

75 (FLOOR MARGIN)

2725 1100

1015

1000

1075 940

2725

2725

2135

1075

3075

1075

940

940

450

3075

900 1015

900

1015

1015

3150

1235 2135

1235

3150

RCC SLAB BOTTOM FINISH PAINT OVER 6 MM PLASTE

115X 150 RCC PROJECTION 115X 150 RCC PROJECTION AT BEAM BOTTOM AT BEAM BOTTOM W02

115X 150 RCC PROJECTIO AT BEAM BOTTOM

DETAIL-04

900

900

450

450

450

450

1235 900 450

1235

1235

3075

3075

1235 900 1015

(FLOOR MARGIN) 3150 45075

PLAYGROUND LEVEL (F.F.L.-450 MM)

450

2725

1075 940

435 75 (FLOOR MARGIN)

75 (FLOOR MARGIN)

DETAIL-04

DETAIL-04

CLASS ROOM

GROUND FLOOR LEVEL (F.F.L.±0.00 MM) PLAYGROUND LEVEL (F.F.L.-450 MM)

15

01

Wall Section 3

165 115

01

125 25

3075

1235 900 1015

1000 3150

1235 900

450

435

D04 CLASS ROOM

GROUND FLOOR LEVEL (F.F.L.±0.00 MM)

330 X 100 RCC COPING

230

450

50

230 MM BRICK WORK 15 MM PLASTER (1:4)

230

160 120

40

50

160

280 X 150 MM RCC WINDOW SILL

230

15 MM SLOPE IN PLASTER INSIDE

50

6

DRIP MOLDING IN 15 MM P

WINDOW TOP AS PER DETAILS WINDOW TOP AS PER DETAILS

WINDOW TOP AS PER DETA

DETAIL-05

DRIP MOLDING IN 15 MM PLASTER 75 MM THK RCC COPING 75 MM THK RCC COPING

115

435

15 100

DRIP MOLDING IN 15 MM DRIP PLASTER MOLDING IN 15 25 MM PLASTER 25

RCC WINDOW LINTEL WITH 450 MM PROJECTION

25

330

EXPOSE BRICK FACE WITH OUT PLASTER FINISH WITH PAINT

6

DETAIL-05

75

50

75 1400

DETAIL-05

DETAIL-04

330 X 100 RCC COPING 10 MM DRIP IN 15 MM PLASTER

DETAIL-05 Detail 03

230 MM BRICK WORK

DETAIL-06

15 MM PLASTER (1:4)

WINDOW TOP AS165 PER DETAILS

EXPOSE BRICK WORK FINISH EXPOSE BRICK WORK FINISH WITH PAINT WITH PAINT

WINDOW BOT EXPOSE BRICK WORK FINISH WITH PAINT 280 X

325

115 X 150 RCC PROJECTION MM SLOPE IN PLASTER AT OUTSIDE BEAM BOTTOM LEVEL

230

15 MM PLAST

50

DETAIL-04

EXPOSE BRICK WORK FINISH WITH PAINT

DETAIL-06

Detail 02

Detail 04

1400

DETAIL-X

75

SLOPE

115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL

6 25

65

325

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

600

DRIP MOLDING IN 15 MM PLASTER EXPOSED BRICK WORK WITH PAINT FINISH 230 X 750 RCC BEAM

150

275

FLOOR FINISH LEVEL

150 MM

230 MM BRIC

DETAIL-06

75

DETAIL-03

75 MM THK RCC COPING

10 MM DRIP I DETAIL-06

75 MM THK RCC COPING

25

40 MM SLOPE IN RCC SLAB

RCC WINDOW LINTEL WITH 450 MM PROJECTION

40 MM SLOPE IN RCC SLAB

6

DETAIL-04

230 MM BRICK WORK 15 MM PLASTER (1:4)

40 MM SLOPE IN RCC SLAB 40 MM SLOPE IN RCC SLAB

15 MM PLASTER (1:4)

40

50

25

120

230

10 MM DRIP IN 15 MM PLASTER

230 MM BRICK WORK 230 MM BRICK WORK 15 MM PLASTER (1:4) 15 MM PLASTER (1:4)

230 MM BRICK WORK 230 MM BRICK WORK 15 MM PLASTER (1:4) 15 MM PLASTER (1:4)

RCC WINDOW LINTEL WITH RCC WINDOW LINTEL WITH MM PROJECTION 450 MM PROJECTION 230450MM BRICK WORK

6

280 X 150 MM RCC WINDOW SILL

450 160

230

450 DETAIL-04

230

WINDOW BOTTOM AS PER DETAILS 160

125 25

125 25

125 25 50

SLOPE

75

450

435

EXPOSE BRICK FACE WITH OUT PLASTER FINISH WITH PAINT

100

125 25

RCC WITH SLAB BOTTOM FINISH WITH RCC SLAB BOTTOM FINISH PAINT OVER 6 MM PLASTER PAINT OVER 6 MM PLASTER

230 MM BRICK WORK

280 X 150 MM RCC WINDOW 280 X 150 SILLMM RCC WINDOW SILL

DETAIL-X

600

DETAIL-05

150

15 115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL

W02

230 X 450 RCC BEAM AS P STRUCTURE DRAWING

DETAIL-05

15 MM PLASTER (1:4)

10 MM DRIP IN 15 MM10 PLASTER MM DRIP IN 15 MM PLASTER

DETAIL-X

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

DOOR LINTEL LEVEL 230PER X 450 RCC BEAM AS PER 230 X 450 RCC BEAM AS STRUCTURE DRAWING STRUCTURE DRAWING F.F.L.+2135MM

DETAIL-05

WINDOW SILL LEVEL F.F.L.+900MM

435

6 600

6

600 150

325

600

25

DETAIL-04

DETAIL-04CLASS ROOM

165 115

230 MM BRICK WORK

50

DRIP MOLDING IN 15 MM PLASTER WORK SLOPEEXPOSED BRICK DETAIL-02 WITH PAINT FINISH 230 X 750 RCC BEAM

W02 FIRST FLOORDETAIL-04 LEVEL (F.F.L.+3150 MM)

115X 150 RCC PROJECTION AT BEAM BOTTOM

150

1400

FLOOR FINISH LEVEL SLOPE

75

1400

AS PER STRUCTURE DEATILS DETAIL-X

75

75

6

DETAIL-X

330 X 100 RCC COPING

DETAIL-04

DETAIL-04 FLOOR FINISH LEVEL

100

450

Front Elevation

Side elevation

DETAIL-03

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER INSIDE

100

15

100

100

75 MM CC GOLA

75

275 325 150

450

Side elevation

15

15

EXPOSE BRICK FACE WITH OUT PLASTER FINISH WITH PAINT

EXPOSE BRICK FACE WITH OUT PLASTER FINISH WITH PAINT

100

100

75

75

75

275

1400

250

165 115

10 MM DRIP IN 15 MM PLASTER

230

10 MM DRIP IN 15 MM PLASTER

175

75

100

100

75 175

1400

230

330 X 100 RCC COPING

6

100

10 MM DRIP IN 15 MM PLASTER

165230115 MM BRICK WORK 230 MM BRICK WORK

10 MM DRIP IN 15 MM PLASTER DETAIL-03 DETAIL-03

PAINT OVER 6 MM PLASTER DETAIL-04

15 MM SLOPESECTION-WP-03 IN WALL SECTION-WP-03 WALL WALL SECTION-WP-03 01 01 PLASTER INSIDE

WINDOW BOTTOM AS PER WINDOW DETAILS BOTTOM AS PER DETAILS

15 MM PLASTER (1:4) BRICK WORK FINISH WITH PAINT 75 AS PER BOQ OVER 15 MM PLASTER INSIDE

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

115 X 150 RCC PROJECTION 115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL AT BEAM BOTTOM LEVEL

456.21

165 115

330

10 MM DRIP IN 15 MM PLASTER

W02

W02

CLASS ROOM

10 MM DRIP IN 15 MM PLASTER

RCC SLAB BOTTOM FINISH PAINT OVER 6 MM PLASTE

PLAYGROUND LEVEL RCC SLAB BOTTOM(F.F.L.-450 FINISH WITHMM)

15 MM SLOPE IN PLASTER INSIDE

50

230 MM BRICK WORK

BRICK WORK FINISH WITH BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

Detail 01

25

230

330 X 100 RCC COPING AS PER 15 MM PLASTER (1:4) 15 MM PLASTER (1:4) WINDOW BOTTOM 15 MM PLASTER (1:4) DETAILS

330WATER X 100 RCCPROOFING COPING

SLOPE

Front Elevation

DETAIL-01

50

15 MM PLASTER (1:4)

DRIP MOLDING IN 15 MM PLASTER 25EXPOSED BRICK WORK WITH PAINT FINISH 230 X 750 RCC BEAM

DETAIL-X

15 MM SLOPE IN PLASTER INSIDE

330

BRICK WORK FINISHRCC WITH PAINT SLAB & BEAM OVER 15 MM PLASTER INSIDE DETAIL-X

100

275

75 175

600 275

325

DETAIL-X

50

230 MM BRICK WORK

450 DRIP MOLDING IN 15 MM DRIP PLASTER MOLDING IN 15 MM PLASTER EXPOSED BRICK WORKEXPOSED BRICK WORK 25 Front Elevation WITH PAINT FINISH WITH PAINT FINISH 230 X 750 RCC BEAM 230 X 750 RCC BEAM

DETAIL-X

Side elevation

15 MM SLOPE IN PLASTER INSIDE

(F.F.L.±0.00 MM)

RCC WITH SLAB BOTTOM FINISH WITH RCC SLAB BOTTOM FINISH PAINT OVER 6 MM PLASTER PAINT OVER 6 MM PLASTER DETAIL-05

WINDOW LINTEL LEVEL F.F.L.+2135MM

325

15

600

75

75 75 100

elevation Front Side Elevation

230

330 X 100 RCC COPING330 X 100 RCC COPING 15 MM SLOPE IN PLASTER OUTSIDE

TERRACE FINISHING

450

Side elevation

330

DETAIL-02

75 X 10 MM DRIP IN 15 MM PLASTER

10 MM DRIP IN 15 MM10 PLASTER MM DRIP IN 15 MM PLASTER

FLOOR FINISH LEVEL FLOOR FINISH LEVEL

Side elevation

SLOPE

75 600

ER RK SH AM

100

BRICK WORK FINISH WITH BRICK PAINT WORK FINISH WITH PAINT

450 450

50

15 MM SLOPE IN PLASTER OUTSIDE

MM PLASTER OVER INSIDE15 MM PLASTER INSIDE 100 OVER 250 15100

450

DETAIL-X

EL

250

50

DETAIL-05

STRUCTURE DRAWING

DETAIL-03

100

NT DE

100

DETAIL-01

230

230 X 450 GROUND RCCDETAIL-05 BEAMFLOOR AS PERLEVEL DETAIL-05

01

330

10 MM DRIP IN 15 MM PLASTER

330 X 100 RCC COPING330 X 100 RCC COPING

150

DETAIL-X 115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL

330 X 100 RCC COPING

DETAIL-02

15 MM PLASTER (1:4)

250 456.21100

450

BRICK WORK FINISH WITH Side elevation Side elevation Front Elevation PAINT OVER 15 MM Side elevation SidePLASTER elevation

ER

DETAIL-02

325

450

RCC SLAB & BEAM AS PER STRUCTURE DEATILS

DETAIL-03

150

100

100

230 X 750 RCC BEAM 450

100 100

175

75 175

275

75

EXPOSED BRICK WORK WITH PAINT FINISH

RCC SLAB & BEAM AS RCC PER SLAB & BEAM AS PER STRUCTURE DEATILS STRUCTURE DEATILS

100

250

150

325

75 100

275

456.21

275

75

456.21

TERRACE FINISHING

DETAIL-01

75

75 X 75 MM CC GOLA

15 MM SLOPE IN PLASTER INSIDE

TERRACE FINISHING

50

50

WATER PROOFING AS PER BOQ

230 MMINBRICK 15 MM SLOPE IN PLASTER 15 MM OUTSIDE SLOPE PLASTERWORK OUTSIDE

456.21

275

FLOOR FINISH LEVEL

75

10 MM DRIP IN 15 MM PLASTER

EXPOSE BRICK FACE WITH OUT PLASTER

DETAIL-01

1401.32

DETAIL-01

EXPOSE BRICK FACE WITH OUT PLASTER

100 100 EXPOSE BRICK FACE 325 WITH OUT PLASTER FINISH WITH PAINT

325

150

150

115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER INSIDE

DETAIL-02

TERRACE FINISHING

330

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

325

BRICK WORK FINISH WITH BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

600

600

IN 15 MM PLASTER 230 X 750 RCC BEAM 10 230 MM X 750 DRIP RCC BEAM 230 X 750 RCC BEAM

230 MM BRICK WORK 15 MM75PLASTER (1:4)

150

75

EXPOSED BRICK WORK WITH PAINT FINISH

230 MM BRICK WORK 230 MM BRICK WORK 15 MM PLASTER (1:4) 15 MM PLASTER (1:4) 75 X 75 MM CC GOLA 75 X 75 MM CC GOLA

230

75

50

75

75

FLOOR FINISH LEVEL

330 X 100 RCC COPING

330

75 X 75 MM CC GOLA

230

DETAIL-02

50 WATER 230 PROOFING 50 AS PER WATER BOQPROOFING AS PER BOQ

1401.32

1401.32

EXPOSE BRICK FACE WITH OUT PLASTER

EXPOSE BRICK FACE WITH OUT PLASTER

BRICK WORK FINISH WITH PAINT MM PLASTER INSIDE 115 XOVER 15015RCC PROJECTION

FLOOR FINISH LEVEL FLOOR FINISH LEVEL

115 X 150 RCC PROJECTION 115 X 150 RCC PROJECTION AT BEAM BOTTOM LEVEL AT BEAM BOTTOM LEVEL

RCC SLAB & BEAM AS PER STRUCTURE DEATILS

BRICK WORK FINISH WITH PAINT OVER 15 MM PLAST

75 X 75 MM CC GOLA 75 X 75 MM CC GOLA

FIRST FLOOR LEVEL (F.F.L.+3150 MM)

230

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

EXPOSED BRICK WORKEXPOSED BRICK WORK WITH PAINT FINISH WITH PAINT FINISH

50

BRICK WORK FINISH WITH BRICK WORK FINISH WITH TERRACE PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

D04

435

100

100

230 X 750 RCC BEAM

2725

1325

WALL SECTION-WP-02

TERRACE FINISHING

50

230

DETAIL-03 330 X 100 RCC COPING

CLASS ROOM

01

WINDOW SILL LEVELWINDOW SILL LEVEL DETAIL-06 F.F.L.+900MM F.F.L.+900MM

100

75 X 75 MM CC GOLA

10 MM DRIP IN 15 MM PLASTER

15 MM SLOPE IN PLASTER AT OUTSIDE BEAM BOTTOM LEVEL 75

230

325

3075

325 1015

50

DETAIL-03

WATER PROOFING AS PER

120

50

CLASS ROOM

CLASS ROOM

2325 2135

2135

75 (FLOOR MARGIN)

450

01

MUMTY

WATER PROOFING AS PER WATER BOQPROOFING AS PER BOQ

75

50

TERRACE

W02

WINDOW LINTEL LEVEL WINDOW LINTEL LEVEL F.F.L.+2135MM F.F.L.+2135MM

PLAYGROUND LEVELPLAYGROUND LEVEL (F.F.L.-450 MM) (F.F.L.-450 MM)

MUMTY

DETAIL-03

WINDOW SILL LEVEL F.F.L.+900MM

GROUND FLOOR LEVEL GROUND FLOOR LEVEL (F.F.L.±0.00 MM) (F.F.L.±0.00 MM)

PLAYGROUND LEVEL (F.F.L.-450 MM)

Wall Section 2

WATER PROOFING AS PER BOQ

75

330

230

450

75 (FLOOR MARGIN)

1015

1015 2135

435

PLAYGROUND LEVELPLAYGROUND LEVEL (F.F.L.-450 MM) (F.F.L.-450 MM)

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER

TERRACEDOOR LEVEL LINTEL LEVEL (T.O.S.+6225 MM) F.F.L.+2135MM

WINDOW LINTEL LEVEL F.F.L.+2135MM

W02

PASSAGE

GROUND FLOOR LEVEL (F.F.L.±0.00 MM)

FIRST FLOOR LEVEL (F.F.L.+3150 MM)

DETAIL-05

330 X 100 RCC COPING330 X 100 RCC COPING

TERRACE LEVEL (T.O.S.+6225 M)

PASSAGE

FIRST FLOOR LEVEL FIRST FLOOR LEVEL (F.F.L.+3150 MM) (F.F.L.+3150 MM)

EXPOSE BRICK FACE WITH OUT PLASTER FINISH WITH PAINT

50

330 X 100 RCC COPING

100

330 X 100 RCC COPING330 X 100 RCC COPING

1401.32

330 50

EXPOSED BRICK WORK WITH PAINT FINISH

10 MM DRIP IN 15 MM10 PLASTER MM DRIP IN 15 MM PLASTER

BRICK WORK FINISH WITH BRICK PAINT WORK FINISH WITH PAINT OVER 15 MM PLASTER OVER INSIDE15 MM PLASTER INSIDE

230

15 MM SLOPE IN PLASTER OUTSIDE

2325

1325

1100

100 1400

3075

3075 1000

325 2325

75 (FLOOR MARGIN)

435

450

(F.F.L.±0.00 MM) (F.F.L.±0.00 MM)

TERRACE

WINDOW LINTEL LEVEL WINDOW LINTEL LEVEL F.F.L.+2135MM F.F.L.+2135MM

D04

EXPOSED BRICK WORK WITH PAINTFLOOR FINISH GROUND FLOOR LEVEL GROUND LEVEL

75

600

330 50

15 MM SLOPE IN PLASTER 15 MM OUTSIDE SLOPE IN PLASTER OUTSIDE

1400

100 1400

325

2725

2725 1100

1100 1400 325 1325 100 1400

75 (FLOOR MARGIN)

1000 MARGIN) 75 (FLOOR

2325

75 (FLOOR MARGIN)

D04

TERRACE LEVEL (T.O.S.+6225 M)

WALL SECTION-WP-03

15 MM PLASTER (1:4)

EXPOSE BRICK FACE WITH OUT PLASTER

1401.32

01

525

525

525 2725 100

100 1400 325 1325 100

1400 1000

1400

325

75 (FLOOR MARGIN)

325 2325

435

DETAIL-06 D04

FLOOR FINISH LEVEL

DE

ON EL

DETAIL-06

PLAYGROUND LEVEL (F.F.L.-450 MM)

01

Wall Section 1

DOOR LINTEL LEVEL F.F.L.+2135MM

CIRCULAR COLUMN FINISH WITH PASSAGE PAINT OVER 15 MM PLASTER

PASSAGE

WALL SECTION-WP-02 WALL SECTION-WP-02 WALL SECTION-WP-02 01 01 230 MM BRICK WORK

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER INSIDE

DETAIL-06

1

DETAIL-04

WINDOW SILL LEVELWINDOW SILL LEVEL F.F.L.+900MM F.F.L.+900MM

FIRST FLOOR LEVEL (F.F.L.+3150 MM)

GROUND FLOOR LEVEL (F.F.L.±0.00 MM)

PLAYGROUND LEVEL (F.F.L.-450 MM)

01

WALL SECTION-WP-01

TH ER

100 1325 100

WALL SECTION-WP-02

SECTION-WP-01 WALL SECTION-WP-01 WALL SECTION-WP-01 01 01

PASSAGE

CIRCULAR COLUMN FINISH WITH PLAYGROUND LEVEL PAINT OVER 15 MM PLASTER DETAIL-06 (F.F.L.-450 MM)

1

75 X 75 MM CC GOLA

MUMTY TERRACE LEVEL (T.O.S.+8950 M)

PASSAGE

CLASS ROOM

WINDOW SILL LEVEL F.F.L.+900MM

115X 150 RCC PROJECTION

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

MUMTY

TERRACE LEVEL (T.O.S.+6225 M)

WALL SECTION-WP-02

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER

115X 150 RCC PROJECTION AT BEAM BOTTOM

FLOOR LEVEL (F.F.L.±0.00 MM)

PLAYGROUND LEVEL (F.F.L.-450 MM)

PASSAGE

BRICK WORK FINISH WITH PAINT OVER LEVEL 15 MM PLASTER FIRST FLOOR FIRST FLOOR LEVEL

BEAM DOOR LINTELAT LEVEL DOORBOTTOM LINTEL LEVEL F.F.L.+2135MM F.F.L.+2135MM

GROUND FLOOR LEVEL RCC SLAB BOTTOM FINISH WITH (F.F.L.±0.00PAINT MM) OVER 6 MM PLASTER

EXPOSED BRICK WORKEXPOSED WITH PAINT BRICK FINISH WORK WITH PAINT FINISHEXPOSED BRICK WORK WITH PAINT FINISH

GROUND FLOOR LEVEL (F.F.L.±0.00 MM) GROUND

10 MM DRIP IN 15 MM PLASTER

NG

1400

325

450

3075

435

3150

PLAYGROUND LEVELPLAYGROUND LEVEL (F.F.L.-450 MM) (F.F.L.-450 MM)

PASSAGE

1

W02

WINDOW LINTEL LEVEL F.F.L.+2135MM

(F.F.L.+3150 MM) (F.F.L.+3150 MM)

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

115X 150 RCC PROJECTION 115X 150 RCC PROJECTION AT BEAM BOTTOM AT BEAM BOTTOM

COLUMN FINISH WITH 115X 150CIRCULAR RCC PROJECTION 15 MM PLASTER ATPAINT BEAMOVER BOTTOM

RCC SLAB BOTTOM FINISH WITH TERRACE TERRACE TERRACE LEVEL TERRACE LEVEL PAINT OVERLEVEL 6 MM PLASTER FIRST FLOOR LEVEL (T.O.S.+6225 MM) (T.O.S.+6225 MM) (T.O.S.+6225 MM) DETAIL-01 EXPOSED BRICK WORK WITH PAINT FINISH (F.F.L.+3150 MM)

D04

50

GROUND FLOOR LEVEL GROUND FLOOR LEVEL (F.F.L.±0.00 MM) (F.F.L.±0.00 MM)

100

1100 3075

75 (FLOOR MARGIN)

2725

1000

1075

1400

230

PASSAGE

EXPOSED BRICK WORK WITH PAINT FINISH

PASSAGE

MUMTY TERRACE LEVEL MUMTY TERRACE LEVEL (T.O.S.+8950 M) (T.O.S.+8950 M)

PAINT OVER 15 MM PLASTER RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER WINDOW SILL LEVEL

EXPOSED BRICK WORK WITH PAINT FINISH

WATER PROOFING AS PER BOQ

TERRACE

(T.O.S.+8950 MM)

230 X 750 RCC BEAM AS PER STRUCTURE DRAWING

75

330 X 100 RCC COPING

01

BRICK WORK FINISH WITH BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

450

75 (FLOOR MARGIN)

01

50

TERRACE

230 X 750 RCC BEAM AS PER STRUCTURE DRAWING

RCC SLAB BOTTOM FINISH RCC WITH SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER PAINT OVER 6 MM PLASTER

450

03

230 X 750 RCC BEAM AS 230PER X 750 RCC BEAM AS PER STRUCTURE DRAWING STRUCTURE DRAWING

CIRCULAR COLUMN FINISH WITH COLUMN FINISH WITH CIRCULAR PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

100 450

01

03

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

EXPOSED BRICK WORKEXPOSED BRICK WORK WITH PAINT FINISH WITH PAINT FINISH

F.F.L.+2135MM

330

PASSAGE PASSAGE

450

450

03

3150

3150

75 (FLOOR MARGIN)

PASSAGE

15 MM SLOPE IN PLASTER OUTSIDE

450

01

450

450

03

PASSAGE

GROUND FLOOR LEVEL BRICK WORK FINISH WITH BRICK WORK FINISH WITH (F.F.L.±0.00 MM) PAINT OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

DOOR LINTEL LEVEL F.F.L.+2135MM

WORK WITH PAINT FINISH

2325

CIRCULAR COLUMN FINISH WITH

R COLUMN FINISH CIRCULAR WITH COLUMN FINISH WITH CIRCULAR COLUMN FINISH WITH PLASTER PAINT OVER 15 MM PLASTER OVER 15 MMPAINT PLASTER PAINTOVER OVER 1515 MMMM PLASTER

DETAIL-06 DOOR LINTEL LEVEL DOOR LINTEL LEVEL F.F.L.+2135MM F.F.L.+2135MM

115X 150 RCC PROJECTIONBRICK EXPOSED AT BEAM BOTTOM

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER

75 (FLOOR MARGIN)

2325

2325

B BOTTOM FINISH RCC WITH SLAB BOTTOM FINISH WITH T OVER 6 MM PLASTER PAINT OVER 6 MM PLASTER

TERRACE

75 X 75 MM CC GOLA

FIRST FLOOR LEVEL EXPOSED BRICK WORK (F.F.L.+3150 MM) WITH PAINT FINISH

PASSAGE LINTEL LEVEL

3150

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

RCC SLAB FINISH WITH X 150 RCC PROJECTION 115XBOTTOM 150 RCC PROJECTION AT BEAM PAINT BOTTOM OVER AT BEAM BOTTOM 6 MM PLASTER

01

BRICK WORK FINISHWINDOW WITH LINTEL LEVEL

PAINT OVER 15 MM PLASTER 75 X 75 MM CC GOLA F.F.L.+2135MM MUMTY TERRACE LEVEL MUMTY TERRACE LEVEL MUMTY TERRACE LEVEL

F.F.L.+900MM

EXPOSED BRICK WORKEXPOSED BRICK WORK WITH PAINT FINISH WITH PAINT FINISH

FIRST FLOOR LEVEL (F.F.L.+3150 MM)DOOR

325

325

325

115X 150 RCC PROJECTION ICK WORK FINISH WITH BRICK WORK FINISH WITH OVER 15 MM PLASTER PAINT OVERAT 15 MM PLASTER BEAM BOTTOM

DETAIL-03 330 X 100 RCC COPING

WATER PROOFING AS PER BOQ

75 X 75 MM CC GOLA 75 X 75 MM CC GOLA

PASSAGE

TERRACE LEVEL

EXPOSED BRICK WORK WITH115X PAINT150 FINISH RCC PROJECTION AT BEAM BOTTOM BRICK WORK FINISH WITH

PLAYGROUND LEVEL 115X 150 RCC PROJECTION 115X 150 RCC PROJECTION 115X 150 RCC PROJECTION (F.F.L.-450 MM) AT BEAM BOTTOM AT BEAM BOTTOM AT BEAM BOTTOM DOOR LINTEL LEVEL RCC SLAB BOTTOM FINISH RCC SLAB BOTTOM FINISH WITH RCC WITH SLAB BOTTOM FINISH WITH FIRST FLOOR LEVEL PAINT OVER 6 MM PLASTER F.F.L.+2135MM PAINT OVER 6 MM PLASTER PAINT OVER 6 MM PLASTER DETAIL-01 DETAIL-01 DETAIL-01 (F.F.L.+3150 MM)

FIRST FLOOR LEVEL FIRST FLOOR LEVEL (F.F.L.+3150 MM) (F.F.L.+3150 MM)

CIRCULAR COLUMN FINISH WITH PAINT OVER 15 MM PLASTER

230 X 750 RCC BEAM AS PER STRUCTURE DRAWING

75 (FLOOR MARGIN) 2325

750 RCC BEAM AS 230PER X 750 RCC BEAM AS PER STRUCTURE DRAWING STRUCTURE DRAWING

PASSAGE

325 3075

3075

PASSAGE

2325

325

1400

1400

PAINT OVER 15 MM PLASTER

1075

75 (FLOOR MARGIN)

1075

75 (FLOOR MARGIN)

PASSAGE

RCC SLAB BOTTOM FINISH WITH WALL SECTION-WP-01 WITH PAINT OVER 6 MM PLASTER EXPOSED BRICK WORK WITH PAINT FINISH

WATER PROOFING AS PER WATER BOQPROOFING AS PER BOQ

TERRACE LEVEL (T.O.S.+6225 MM)

450

230 X 750 RCC BEAM AS PER STRUCTURE DRAWING EXPOSED BRICK WORKEXPOSED BRICK WORK BRICK WITH WORK FINISH WITH PAINT FINISH PAINT FINISH

DETAIL-03

TERRACE

WITH PAINT FINISH 2500 (T.O.S.+6225 M) 330 X 100 RCC COPING

2500

MUMTY

MUMTY

DETAIL-03

115X 150 RCC PROJECTION AT BEAM BOTTOM

75 (FLOOR MARGIN)

330 X 100 RCC COPING

75 (FLOOR MARGIN) 1400 100

100

100

330 X 100 RCC COPING330 X 100 RCC COPING

DETAIL-07

75 (FLOOR MARGIN)

DETAIL-07

DETAIL-07

2725 100

2725

2325

100 1400 325

450

1400

1325

1325

B BOTTOM FINISH RCC WITH SLAB BOTTOM FINISH WITH RCC SLAB BOTTOM FINISH WITH WITH T OVER 6 MM PLASTER PAINT OVER 6 MMPAINT PLASTERFINISH PAINT OVER 6 MM PLASTER

MUMTY

330 X 100 RCC COPING330 X 100 RCC COPING

01 BRICK WORK FINISH WITH PASSAGE PAINT OVER 15 MM PLASTER

115X 150 RCC PROJECTION AT BEAM BOTTOM

EXPOSED BRICK WORK

TERRACE

PASSAGE

TERRACE LEVEL TERRACE LEVEL (T.O.S.+6225 MM) (T.O.S.+6225 MM)

230 X 750 RCC BEAM AS PER 03 STRUCTURE DRAWING

WITH PAINT FINISH

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

X 150 RCC PROJECTION 115X 150 RCC PROJECTION AT BEAM BOTTOM AT BEAM BOTTOM

EXPOSED BRICK WORK TERRACE WITH PAINT FINISH

TERRACE

1325

325

325

330 X 100 RCC COPING

ICK WORK FINISH WITH BRICK WORK FINISH WITH OVER 15 MM PLASTER PAINT OVER 15 MM PLASTER

DETAIL-02 GOLA

DETAIL-07 EXPOSED BRICK WORK

100

EXPOSED BRICK WORKEXPOSED BRICK WORK WITH PAINT FINISH WITH PAINT FINISH

1400

1400

RCC SLABDETAIL-02 BOTTOM FINISH WITH DETAIL-02 CIRCULAR COLUMN FINISH WITH PAINT OVER 6 MM PLASTER PAINT OVER 15 MM PLASTER 75 X 75 MM CC

75 X 75 MM CC GOLA 75 X 75 MM CC GOLA

3 EXPOSED BRICK WORK

(T.O.S.+8950 MM) (T.O.S.+8950 MM)

3150

325 1325

100

100

WATER PROOFING AS PER BOQ

2500

DETAIL-03

3

TERRACEDOOR LEVEL LINTEL LEVEL (T.O.S.+6225 MM) F.F.L.+2135MM

MUMTY TERRACE LEVEL (T.O.S.+8950 MM)

3075

525

MUMTY TERRACE LEVEL MUMTY TERRACE LEVEL (T.O.S.+8950 MM) (T.O.S.+8950 MM)

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER PAINT OVER 15 MM PLASTER RCC SLAB BOTTOM FINISH WITH DETAIL-01 DETAIL-03 DETAIL-03 DETAIL-03 PAINT OVER 6 MM PLASTER 115X 150 RCC PROJECTION 330 X 100 RCC COPING330 X 100 RCC COPING 330 X 100 RCC COPING AT BEAM BOTTOM

PROOFING AS PER WATER BOQPROOFING AS PER BOQ

2725

3075

2725

325 TERRACE

1015

MUMTY

3 4

MUMTY TERRACE LEVEL

DETAIL-03 (T.O.S.+8950 MM) 330 X 100 RCC COPING

230 X 750 RCC BEAM AS PER WATER PROOFING AS STRUCTURE PER BOQ DRAWING

2135

115X 150 RCC PROJECTION AT BEAM BOTTOM

4

TERRACE LEVEL (T.O.S.+6225 MM)

FIRST FLOOR LEVEL (F.F.L.+3150 MM)

1325

525

325

1400

EXPOSED BRICK WORK MUMTY MUMTY WITH115X PAINT150 FINISH RCC PROJECTION AT BEAM BOTTOM BRICK WORK FINISH WITH

4

TERRACE

2500

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

BRICK WORK FINISH WITH 75 X 75PAINT MM CC GOLA OVER 15 MM PLASTER

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER DETAIL-01 MUMTY

1075

WATER PROOFING AS PER BOQ 230 X 750 RCC BEAM AS PER DETAIL-02 STRUCTURE DRAWING

2500 EXPOSED BRICK WORK WITH PAINT FINISH

PASSAGE3

525

100

WITH PAINT FINISH 2500 330 X 100 RCC COPING

3 GOLA

1400

3 4 75 X 75 MM CC

1400

4 4 EXPOSED BRICK WORK

75 (FLOOR MARGIN)

WATER PROOFING AS PER BOQ

DETAIL-03

115X 150 RCC PROJECTION AT BEAM BOTTOM

100

1325

330 X 100 RCC COPING

100

330 X 100 RCC COPING

MUMTY TERRACE LEVEL (T.O.S.+8950 MM)

DETAIL-03

RCC SLAB BOTTOM FINISH WITH PAINT OVER 6 MM PLASTER MUMTY DETAIL-07

450

525

MUMTY 115X 150 RCC PROJECTION AT BEAM BOTTOM

40

BRICK WORK FINISH WITH PAINT OVER 15 MM PLASTER

2500

MUMTY TERRACE LEVEL EXPOSED BRICK WORK (T.O.S.+8950 M)

120

EXPOSED BRICK WORK WITH PAINT FINISH

75 X 75 MM CC GOLA

MUMTY TERRACE LEVEL (T.O.S.+8950 MM)

6

TERRACE LEVEL (T.O.S.+6225 MM)

75

TERRACE

40

2500

3

325

75 X 75 MM CC GOLA

4

WATER PROOFING AS PER BOQ

1400

3

1400

DETAIL-02

525

4

WATER PROOFING AS PER BOQ

1100

330 X 100 RCC COPING

1075

330 X 100 RCC COPING

100

100

2725

2500

1 DETAIL-03

125 25

4 DETAIL-03


Tetengagila U.G.U.P School | Odisha

K

150 150 150 150 150 150 150 150 150 150 150 150

320

320

320

4150

43

25

3150

600

CORRIDOR 450

CORRIDOR

02

5 32 0

50

230

230

E

E

E

32

32 17

29

27 39

27

27

39 25

25

41 43

41 43

H

H

1885

2185

H

25 43

Landing Level Landing Level Landing Level +6600 MM F.F.L. +6600 MM F.F.L. +6600 MM F.F.L. DN DN Landing Level Landing Level Landing Level +6300 MM F.F.L. +6300 +6300 MM F.F.L. DN 21 MM F.F.L.

19

DN

D04

D04

D04

UP

1715

23

H

29 37

2400

37

230

1715

25

41

31 6000

29

13

37

31 35

6000

2400

2700

3000 1045

1045

1045

UP

H

2185

1885

1885

2185 6000

6000

DN

H

230

E

Landing +6300

1045

420

3275

3275

3275

Ground Floor Level Ground Floor Level Ground Floor Level +150 MM(F.F.L.) +150 MM(F.F.L.) +150 MM(F.F.L.)

DN 21

230

2230

230

1200

Terrace Level Terrace Level Terrace Level +6375 MM(T.O.S.) +6375 MM(T.O.S.) +6375 MM(T.O.S.)

230

H

H

230

1580

21

230

33

35

39

1645

230 1580

UP

DN 23

09

27

230

2230 1580 230

01

UP

21

33

15

19

230

510

H

23

19

230

2230 230

17

230

1200 510

H

UP

1645

3000 1200 510 420

H

230

230

2230

25

1800

35

1045

230 1200 420

420

25 19

17

3000

6140

6140 6000

03

1645

UP

23

WATER COOLER

01

25

05

1645

03

WATER COOLER

3000 WATER COOLER

UP

27

07

1045

1045

1045

UP

01

3000 WATER COOLER

3000 01

15

3000

03

27 17

27

6140

03

15

33

31

11

09

6000

05

530

13

2700

05

2700

05

09 15

2700

07

6140 6000

6000

09

1800 13

230

Landing Level Landing Level Landing Level +4950 MM F.F.L. +4950 MM F.F.L. +4950 MM F.F.L.

Landing Level +1800 MM F.F.L.

1800

11 13

230

230

11

530 1800

230 4130

4130

2185

1800 530 1800

6000

1800 530 11

07

2185

2185

1885

1885

1885

1800

4130

E

Landing Level Landing Level Landing Level +1800 MM F.F.L. +1800 MM F.F.L. +1800 MM F.F.L.

07

32 32

E

230

5

230

E

E

4130 230

230

230

E

230

4

230

230

4

2185

230

4

6000

230

4

5

6000

4130

5

3000

4130

5

1885

230 230 4130

5

2400

230

4

1715

E

230

4

230

230

E

4130

4

1885

230

4

5

2400

230

5

1715

230

04

230

230

5

230

4

230

4130

4

04

04

Staircase Section

5

4

600

Part section Partofsection Railing Partofsection Railingof Railing 04 Typical Railing TypicalDetail Railing TypicalDetail Railing Detail

CORRIDOR

230

600 450

05

450 4130

4130

JALI AS PER DETAILS

JALI AS PER DETAILS

WATER COOLER 01

01 CORRIDOR

Part section of Railing Typical Railing Detail

03

02

230

230

05

05

450

1650

1650

1650 450

450

230

09

GROUND FLOOR LEVEL 07 07 LVL (+)150 MM(F.F.L.) 05

50

07

Section-S01 02

230

09

450

09

304 GRADE 304 GRADE 304 GRADE 32MM X 32MM X 32MM 2MM X 32MM X32MM 2MM X 32MM X 2MM BALUSTRADE BALUSTRADE BALUSTRADE

Part PlanPart of Step PlanPart of Step Plan of Step 03 Nosing Detail Nosing Detail Nosing Detail

1535

09

18

13

15

600

11

18

304 GRADE 304 GRADE 304 GRADE 20MM X 20MM X 20MM 2MM X 20MM X20MM 2MM X 20MM X 2MM SS PIPE SS PIPE SS PIPE

11

03 03 03 PLAYGROUND LEVEL 01 COOLERWATER 01 COOLER WATER MM(F.F.L.) COOLERWATER LVL -300

PLAYGROUND PLAYGROUND LEVEL PLAYGROUND LEVEL LEVEL LVL -300 MM(F.F.L.) LVL -300 MM(F.F.L.) LVL -300 MM(F.F.L.)

5

17

32 20 20 32 32 32 50 50

15

CORRIDOR

1650

11

GROUND FLOOR GROUND LEVEL FLOOR GROUND LEVEL FLOOR LEVEL LVL (+)150LVL MM(F.F.L.) (+)150LVL MM(F.F.L.) (+)150 MM(F.F.L.)

5

21

CORRIDOR

19

13

07

5

CORRIDOR

1535

3150

15

21

230

3150

3150

3150

3150

3150

11

17

13

23

21 19

304 GRADE 304 GRADE 304 GRADE 32MM DIA SS PIPE 32MM DIA SS PIPE 32MM DIA SS PIPE

32 20

17

23

21 19

CORRIDOR

304 GRADE 32MM X 32MM X 2MM SS PIPE

19

25

23

15

23

27

25

17

25

32

100 Ht Skirting With 100 Ht Skirting With 100 Ht Skirting 5 mm Groove 5 mm Groove 5 mm Groove

1535

27

32

304 GRADE 304 GRADE 304 GRADE 32MM X 32MM X 32MM 2MM X 32MM X32MM 2MM X 32MM X 2MM SS PIPE SS PIPE SS PIPE

230

27

3150

FIRST FLOOR LEVEL 29 29 LVL(+)3300 MM(F.F.L.)

29

13

JALI AS PER DETAILS

31

1535

3075

3075

31

400

35 33

400

31

27

37

35 33

29

39

37

35 33

39

304 GRADE 304 GRADE 304 GRADE 32MM X 32MM X 32MM 2MM X 32MM X32MM 2MM X 32MM X 2MM BALUSTRADE BALUSTRADE BALUSTRADE

31

400

39

JALI AS PER DETAILS

41

3075

43

41

304 GRADE 32MM X 32MM X 2MM BALUSTRADE

450

2725

4150

43

41

304 GRADE 304 GRADE 304 GRADE 20MM X 20MM X 20MM 2MM X 20MM X20MM 2MM X 20MM X 2MM SS PIPE SS PIPE SS PIPE

100

33 43

100

4150

2725

37

37

FIRST FLOOR FIRST LEVEL FLOOR FIRST LEVEL FLOOR LEVEL LVL(+)3300LVL(+)3300 MM(F.F.L.) LVL(+)3300 MM(F.F.L.)MM(F.F.L.)

304 GRADE 304 GRADE 304 GRADE 32MM DIA SS PIPE 32MM DIA SS PIPE 32MM DIA SS PIPE

39

MUMTY

35

TERRACE LEVEL TERRACE LEVEL TERRACE LEVEL LVL(+)6375LVL(+)6375 MM(T.O.S.) LVL(+)6375 MM(T.O.S.)MM(T.O.S.)

3075

MUMTY

304 GRADE IN HAND 304RAILLING GRADE IN HAND 304 RAILLING GRADE IN HAND RAILLING 50MM DIA SS PIPE 50MM DIA SS PIPE 50MM DIA SS PIPE

41

100

4150

2725

MUMTY

304 GRADE 20MM X 20MM X 2MM SS PIPE

400

TERRACE LEVEL LVL(+)6375 MM(T.O.S.)

Section-S01 Section-S01 Section-S01 02

150 150 150 150 150 150 150 150 150

32 50

525

525

525

MUMTY TERRACE MUMTY TERRACE MUMTY TERRACE

304 GRADE IN HAND 304RAILLING GRADE IN HAND 304 RAILLING GRADE IN HAND RAILLING 50MM DIA SS PIPE 50MM DIA SS PIPE 50MM DIA SS PIPE

100

MUMTY TERRACE MUMTY TERRACE MUMTY TERRACE LVL(+)9100LVL(+)9100 MM(T.0.S.) LVL(+)9100 MM(T.0.S.)MM(T.0.S.)

304 GRADE 32MM DIA SS PIPE

MUMTY

6

K

15

K

10

H

6

H

1

15

H

304 GRADE IN HAND RAILLING 50MM DIA SS PIPE

150 150 150 150

10

E

2725

E

K

MUMTY TERRACE

525

MUMTY TERRACE LVL(+)9100 MM(T.0.S.)

E

H

320

E

510

1580

K

K

K

Ground Floor Level +150 MM(F.F.L.)

3275

First Floor Level First Floor Level First Floor Level +3300 MM(F.F.L.) +3300 MM(F.F.L.) +3300 MM(F.F.L.)

K

K

K

K 4590

4590

K

K

4590

First Floor Level +3300 MM(F.F.L.) JALI AS PER DETAILS JALI AS PER DETAILS 1000 JALI AS MMPER HEIGHT DETAILS 1000 PARAPET MM HEIGHT WALL 1000 PARAPET MM HEIGHT WALL PARAPET WALL

Part PlanPart of Staircase PlanPart of Staircase Plan of Staircase 01 Ground Floor Ground Level Floor Ground Level Floor Level

66

01

Part PlanPart of Staircase PlanPart of Staircase Plan of Staircase 01 First FloorFirst Level Floor First Level Floor Level

01

Part Plan of Staircase Ground Floor Level

01

01

K

01

Part PlanPart of Staircase PlanPart of Staircase Plan of Staircase 01 Terrace Level Terrace Level Terrace Level

Part Plan of Staircase First Floor Level

01

01

01

K

Part Plan of Stairca Terrace Level


06

115

START START TILETILE START TILE

1145

1950

D06

1710

750

660 1925 1710

825

375

375

375

375

965

START START TILETILE START TILE

SHAFT

HH

MIRROR AS PER SELECTION AS PER SELECTION MIRROR AS MIRROR PER SELECTION

START START TILETILE START TILE

08

START START TILETILE START TILE

J

WASH BASIN & WASH BASIN TAP AS PER BOQ

FLOORING TILE 600 X 600

D05 WITH 3 MM GROOVE

D05

TOILET FLOOR LEVEL F.F.L.±00 MM

WASH BASIN & WASH BASIN TAP AS PER BOQ

750

SECTIONAL ELEVATION-04 START START TILETILE START TILE

TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH LEVEL F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM MM

SECTIONAL ELEVATION-01

04

SECTIONAL ELEVATION-01

TOILET FLOOR LEVEL F.F.L.±00 MM

TOPTOP OF OF SLBSLB TOP LEVEL LEVEL OF SLB LEVEL

INDIANA W/C & FLUSH TANK AS PERD06 SELECTION

SECTIONAL ELEVATION-05 LEVEL START START TILETILE START TILE

F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM 300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

SECTIONAL ELEVATION-01

04

2100

H

MM

375

04

START START TILETILE START TILE

START START TILETILE START TILE

375

D06

INDIANA W/C & FLUSH TANK AS PER SELECTION

D06

375 375 375 WALL WALL FINISH FINISH WITH WALL WITH PAINT FINISH PAINT WITH PAINT

375

375

375

375

375

115

375

SECTIONAL ELEVATION-02

375

04

SECTIONAL ELEVATION-02

04

SELECTION

375

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

115 500

START START TILETILE START TILE

375

500 115 500

965

2100

750

1145

EXISTING DRG.

MIRROR AS PER SELECTION

28-D28-D Pocket-6 Pocket-6 28-D M.I.GM.I.G Pocket-6 Flats, Fla

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TENDER DWG. START START TILETILE START TILE

SECTIONAL ELEVATION-03

04

04

SCALE ONLY ONLYINFORMATION INFORMATION ONLY INFORMATION ELECTRICAL CONSUL

09

08 08

09

TOP OF SLB LEVEL

0404

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK START TILE PLASTER 300X300 TILE AS PER SELECTION

TILES FINISH LEVELV01 START TILE F.F.L.+2100 MM

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK START TILE START TILE PLASTER 300X300 TILE AS PER SELECTION

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK LEVEL START TILE STARTTILES TILE FINISH START TILE START TILE PLASTER

TILES FINISH LEVEL START TILE F.F.L.+2100 MM

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK START TILE START TILE PLASTER

START TILE

F.F.L.+2100 MM

300X300 TILE AS PER SELECTION

OILET FLOOR LEVEL F.L.±00 MM

TOILET FLOOR LEVEL F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOP OF SLB LEVEL

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK START TILE PLASTER

TILES FINISH LEVEL START TILE F.F.L.+2100 MM

2100 2100

2100

10 510 750750

SECTIONAL SECTIONAL SECTIONAL ELEVATION-07 ELEVATION-07 ELEVATION-07

09 10

750750750

750750750

TILESSTART FINISH LEVEL START TILETILE F.F.L.+2100 MM

08

750750750

TOP OF SLB LEVEL

0404

START TILE V01

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTERSTART TILE

START TILE

300X300 TILE AS PER SELECTION

2100 INDIANA W/C & FLUSH TANK AS PER SELECTION

INDIANA W/C & FLUSH TANK AS PER SELECTION

D02 FLOORING TILE 600 X 600 WITH 3 MM GROOVE

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER START TILE

TILES FINISH LEVEL START STARTTILE TILE F.F.L.+2100 MM

1010

510510

TOP OF SLB LEVEL

300X300 TILE AS PER SELECTION

2100

2100 INDIANA W/C & FLUSH TANK AS PER SELECTION

WASH BASIN & WASH BASIN TAP AS PER BOQ

WASH BASIN & WASH BASIN TAP AS PER BOQ

TOILET FLOOR LEVEL F.F.L.±00 MM

09 500

TOP OF SLB LEVEL

04

300X300 TILE AS PER SELECTION

D06

TOILET FLOOR LEVEL F.F.L.±00 MM

08

10

TOILET FLOOR LEVEL F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

09

08

750

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK

TILESSTART FINISH TILE LEVEL F.F.L.+2100 MM

V01PLASTER

CONSTRUCTION CONSTRUCTION CONSTRUCTION DWG. DWG. DWG. SCALE SCALE SCALE

TOILET FLOOR LEVEL F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

URINAL AS PER SELECTION

D02 FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOILET FLOOR LEVEL F.F.L.±00 MM

TOILET FLOOR LEVEL F.F.L.±00 MM

URINAL AS PER SELECTION

D02

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOILET FLOOR LEVEL F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOILET FLOOR LEVEL F.F.L.±00 MM

OVER 12 DRAWN DRAWN DRAWN BY- - AMIT BYAMIT - KUMAR KUMAR AMIT K STARTBY TILE PLASTER

V01 PLASTER

300X300 TILE AS PER SELECTION

300X300 SELECTIO

CHECKED CHECKEDCHECKED BY-BY- MOULSHRI MOULSHRI BY- MOULSH JOSHI JOSH

ONLY INFORMATION

URINAL PARTITION AS PER SELECTION INDIANA W/C & FLUSH TANK AS PER SELECTION

MIRROR A REV.NO. REV.NO.REV.NO.0.00 0.00 0.00

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

EXISTING DRG. WASH BASIN & WASH BASIN TAP AS PER BOQ

URINAL AS PER SELECTION

TOILET FLOOR LEVEL F.F.L.±00 MM

1:50@A1 1:50@1

WALL FIN

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK

TILES FINISH START TILE LEVEL F.F.L.+2100 MM

300X300 TILE AS PER SELECTION

URINAL PARTITION AS PER SELECTION INDIANA W/C & FLUSH TANK AS PER SELECTION

09

TENDER TENDERDWG. TENDER DWG. DWG.

TOP OF SLB LEVEL

04

300X300 TILE AS PER SELECTION

URINAL PARTITION AS PER SELECTION INDIANA W/C & FLUSH TANK AS PER SELECTION

REV.NO. 0.00 PLUMBING CONSU

Engineering S PROPOSAL PROPOSAL PROPOSAL DWG. DWG. DSRDWG. 28-D Pocket-6 M.I.G Flats, Mayur Vihar Ph-3, New D DATE: - 17/06/2021 Mob:- 099103 SUBMISSION SUBMISSION SUBMISSION DRG. DRG. dsrengg50@gm DRG. email:-

MIRROR AS PER SELECTION

2100

2100

2100

2100

2100

D06

10 09

1685 115115500500115 500 500 500115115500 500500115 500 500 500

MIRROR AS PER SELECTION

MIRROR AS PER SELECTION

WASH BASIN & WASH BASIN TAP AS PER BOQ

08

115 1685 1685

2100

START TILE V01

0404

08 1500115115

2100

300X300 TILE AS PER SELECTION

TILES FINISH LEVEL F.F.L.+2100 MM

SECTIONAL SECTIONAL ELEVATION-06 ELEVATION-06 ELEVATION-06 TOP OF SLB LEVEL SECTIONAL

TOP OF SLB LEVEL

04

965 WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER START TILE

MIRROR AS PER SELECTION

D06

09

D06 FLOORING FLOORING TILETILE 600 FLOORING 600 X 600 X 600 TILE 600 X 600 WITHWITH 3 MM 3 MM GROOVE WITH GROOVE 3 MM GROOVE

965

10

011-27785471, Mob:9818 CHECKED BY- MOU email:ecs2000.india@gm

COMPLETION COMPLETION COMPLETION DWG. DWG. DWG.

D06D06

965

08

PH:-

F.F.L.±00 F.F.L.±00 MM F.F.L.±00 MM MM

965

SECTIONAL SECTIONAL SECTIONAL ELEVATION-05 ELEVATION-05 ELEVATION-05

TOP OF SLB LEVEL

TILES FINISH LEVEL V01 F.F.L.+2100 MM

09 10

DRAWN(Building BY Engineering - AMCo SERVICES

527, EXISTING Pocket A6 Narela, Delhi-1 EXISTING EXISTING DRG. DRG.7 SecDRG.

LEVEL

2100

START TILE

10

1500 1500

965

965 TILES FINISH LEVEL F.F.L.+2100 MM

START TILE

1010

F.F.L.±00 F.F.L.±00 MM F.F.L.±00 MM MM

2100

ILES FINISH LEVEL F.L.+2100 MM

09

ST.AR. CONSULTING ENGI CONSTRUCTION DW

B-1/1177A, VASANT KUNJ, NEW DELHI-1 TEL : 46 Email : saratgupta@ya

WASH WASH BASIN BASIN & WASH & WASH BASIN BASIN & WASH BASIN TAPTAP AS PER AS PER BOQTAP BOQAS PER BOQ

FLOORING FLOORING TILETILE 600 FLOORING 600 X 600 X 600 TILE 600 X 600 TOILET TOILET FLOOR FLOOR TOILET LEVEL LEVEL FLOOR WITHWITH 3 MM 3 MM GROOVE WITH GROOVE 3 MM GROOVE

510

TOP OF SLB LEVEL

04

965

0404

750 510510

WALL WALL FINISH FINISH WITH WALL WITH PAINT FINISH PAINT WITH PAINT OVER OVER 12 TO 1215 TOMM OVER 15 MM THICK 12THICK TO 15 MM THICK PLASTER PLASTER PLASTER 300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

URINAL URINAL AS PER AS PER URINAL SELECTION SELECTION AS PER SELECTION

D02

LEVEL

965

SECTIONAL SECTIONAL SECTIONAL ELEVATION-04 ELEVATION-04 ELEVATION-04TOP OF SLB LEVEL

08

750750750

PROPOSAL DWG. ARCH

STRUCTURAL CONSUL

SECTIONAL ELEVATION-03

URINAL URINAL PARTITION PARTITION URINAL AS PER AS PARTITION PER AS PER SELECTION SELECTION SELECTION INDIANA INDIANA W/CW/C & INDIANA FLUSH & FLUSH W/C & FLUSH TANK TANK AS PER AS PER SELECTION TANK SELECTION AS PER SELECTION

965

750750750

F.F.L.±00 F.F.L.±00 MM F.F.L.±00 MM MM

965

10 09

750750750

FLOORING FLOORING TILETILE 600 FLOORING 600 X 600 X 600 TILE 600 X 600 TOILET TOILET FLOOR FLOOR TOILET LEVEL LEVEL FLOOR WITHWITH 3 MM 3 MM GROOVE WITH GROOVE 3 MM GROOVE

LEVEL

965

08

WASH BASIN & WASH BASIN TAP AS PER BOQ

SPACE M FLOORING TILE 600 X 600 WITH 3 C9,MM9812,Vasant Kunj,New Delhi 1 GROOVE SUBMISSION DRG. Ph:011-460 email:mail@spacema

965

D02D02

750750

OP OF SLB LEVEL

2100

2100 2100

2100

2100 2100

2100 2100

2100

D06

09

COMPLETION DWG.

D06

300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

INDIANA INDIANA W/CW/C & INDIANA FLUSH & FLUSH W/C & FLUSH TANK TANK AS PER AS PER SELECTION TANK SELECTION AS PER SELECTION

FLOORING FLOORING TILETILE 600 FLOORING 600 X 600 X 600 TILE 600 X 600 TOILET TOILET FLOOR FLOOR TOILET LEVEL LEVEL FLOOR WITHWITH 3 MM 3 MM GROOVE WITH GROOVE 3 MM GROOVE

08

WASH BASIN & WASH BASIN TAP AS PER BOQ 1200 MM HT. LEDGE WALL

MIRROR MIRROR AS PER AS MIRROR PER SELECTION SELECTION AS PER SELECTION ENGINEERING CONSULTANCY

WASH WASH BASIN BASIN & WASH & WASH BASIN BASIN & WASH BASIN TAPTAP AS PER AS PER BOQTAP BOQAS PER BOQ

D06D06

ONLY INFORMATIO

750

04

F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM MM

04

WASH BA DATE: DATE:- 17/06/2021 -DATE: 17/06/2021 - 17/06/2021 TAP AS P

COMPLETION DWG.

D06

D06

TOILET FLOOR LEVEL F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

PROPOSAL DWG.

FLOORING WITH 3 M

SUBMISSION DRG. 750

SECTIONAL ELEVATION-04

04

750

750

750

SECTIONAL ELEVATION-04

510

750

750

SECTIONAL ELEVATION-04

04

750

750

750 510

750

SECTIONAL ELEVATION-05 04

Sectional Elevation 04

750

04

750

1500

510

SECTIONAL ELEVATION-05

SECTIONAL ELEVATION-05 SECTIONAL ELEVATION-06

04

04

04

115

1685

115 500

500 115 1500 500

SECTIONAL ELEVATION-06

Sectional Elevation 05

500

115

1685

SECTIONAL ELEVATION-06

04

1151500 500

500115115 500

1685 500

SECTIONAL ELEVATION-07

04

em

300X300 TILE AS PER SELECTION

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

750

B-1/1177A B-1/11 PR

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK ENGINEERING ENGINEERING ENGINEERING CONSULTANCY CONSULTANCY CONS SER PLASTER WALL FINISH WITH PAINT527,527, Pocket Poc 300X300 TILE AS PER OVER 12 TO 15 MM THICK PLASTER SELECTION PH:-PH:- 011-27 011 PH START

OMBADC

0808 08

1200 MM HT. LEDGE WALL

750

C9, C9, 9812 9

MIRROR AS PER SELECTION

0909 09

TOILET FLOOR LEVEL F.F.L.±00 MM

28-D Po

C

START STARTTILE TILE

V01 300X300 TILE AS PER SELECTION

WASH BASIN & WASH BASIN TAP AS PER BOQ

SECTIONAL ELEVATION-07 LEVEL V01V01 V01

300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

START TILE

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER START TILE

START TILE

WASH BASIN & WASH BASIN TAP AS PER BOQ

INDIANA W/C & FLUSH TOILET FLOOR LEVEL TANK AS PER SELECTION F.F.L.±00 MM FLOORING TILE 600 X 600 WITH 3 TOILET FLOOR LEVELMM GROOVE TOPTOP OF OF SLBSLB TOP LEVEL LEVEL OFMM SLB LEVEL F.F.L.±00

510

SECTIONAL ELEVATION-03

04

1010 10

115

J

MIRROR AS PER SELECTION

WALL WALL FINISH FINISH WITH WALL WITH PAINT FINISH PAINT WITH PAINT OVER OVER 12 TO 1215 TOMM OVER 15 MM THICK 12THICK TO 15 MM THICK TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH PLASTER PLASTER PLASTER

START START TILETILE START TILE

START TILE

MIRROR AS PER SELECTION

500

375

START START TILETILE START TILE

TILES FINISH LEVEL F.F.L.+2100 V01 MM

URINAL PARTITION AS PER SELECTION URINAL AS PER SELECTION

115

Location 017_Govt. Primary School, Dhamanadarah

MIRROR MIRROR AS PER AS MIRROR PER SELECTION SELECTION AS PER SELECTION

TOILET TOILET FLOOR FLOOR TOILET LEVEL LEVEL FLOOR LEVEL F.F.L.±00 F.F.L.±00 MM F.F.L.±00 MM MM

25

LEDGE WALL TILE/GRANITE FIXING DETAIL SCALE=1:10

H

SELECTION

1010 10

TOILET FLOOR LEVEL F.F.L.±00 MM

375

ENGINEERING

115

08

Sectional Elevation 03

INDIANA W/C & FLUSH URINAL PARTITION AS PER SELECTION TANK AS PER SELECTION URINAL AS PER SELECTION URINAL AS PER SELECTION WASH BASIN & WASH BASIN TAP AS PER BOQ FLOORING TILE 600 X 600 INDIANA W/C & FLUSH 3 MM GROOVE D05TANK AS PER SELECTION WITH D06

D06

1685

375

SECTIONAL ELEVATION-06 STARTSTART LEVEL TILETILE START TILE

F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM MM

04

D05

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

OVER OVER 12 TO 1215 TOMM OVER 15 MM THICK 12THICK TO 15 MM THICK TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH PLASTER PLASTER PLASTER

START START TILETILE START TILE

SECTIONAL ELEVATION-02

04

375

115

GJ H

TILES FINISH LEVEL V01 F.F.L.+2100WALL MMFINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER FINISH LEVEL START TILE START TILE F.F.L.+2100 MM 300X300 TILE AS PER V01 300X300 TILE AS PER

URINAL PARTITION AS PER MIRROR AS PER SELECTIONSELECTION

WASH BASIN & WASH BASIN TAP AS PER BOQ

D02

TOILET D05 FLOOR LEVEL F.F.L.±00 MM FLOORING TILE 600 X 600 WITH 3 TOILET FLOOR TOILET FLOOR LEVEL MMLEVEL GROOVE TOPTOP OF OF SLBSLB TOP LEVEL LEVEL OF SLB LEVEL MM F.F.L.±00 MM F.F.L.±00

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

300X300 TILE AS PER SELECTION

0909 09

OMBADC OMBADC OMBADC

TILE

LEDGE WALL TILE/GRANITE FIXING DETAIL FLOORING TILETILE 600 600 X 600 X 600 WITH 3 X3 600 WITH 3 FLOORING TILEWITH 600 SCALE=1:10 FLOORING MMMM GROOVE GROOVEMM GROOVE

TOP OF SLB LEVEL

04

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK START TILE PLASTER WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER TILES STARTSTART TILE TILE

START TILE

TILES FINISH LEVEL F.F.L.+2100 MM

URINAL PARTITION AS PER SELECTION URINAL AS PER SELECTION

0808 08

WASH BASIN & WASH BASIN TAP AS PER BOQ FLOORING TILE 600 X 600 INDIANA W/C & FLUSH WITH 3 MM GROOVE D06 TANK AS PER SELECTION

25

09

G

TOP OF SLB LEVEL

0404

MIRROR AS PER SELECTION

1500

WALL WALL FINISH FINISH WITH WALL WITH PAINT FINISH PAINT WITH PAINT OVER OVER 12 TO 1215 TOMM OVER 15 MM THICK 12THICK TO 15 MM THICK TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH V01PLASTER PLASTER PLASTER

G

965 INDIANA W/C & FLUSH TANK AS PER SELECTION

START TILE

300X300 TILE AS PER SELECTION

510

V01V01

04

D05

F.F.L.+2100 MM

SELECTION

965 965

750

965 965

750

965

750

0808 08

WASH BASIN & WASH BASIN TAP AS PER BOQ

INDIANALEVEL W/C & FLUSH TOILET FLOOR D05 D05 TANK AS PER SELECTION F.F.L.±00 MM

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TOILET FLOOR LEVEL F.F.L.±00 MM

0909 09

START TILE WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER START TILE START TILE

LEVEL STARTTILES TILE FINISH START TILE

MIRROR AS PER SELECTION

965

D05

MIRROR AS PER SELECTION

1010 10

D06

TOILET FLOOR LEVEL F.F.L.±00 MM TOILET FLOOR LEVEL TOPTOP OF OF SLBSLB TOP LEVEL LEVEL OF SLB LEVEL F.F.L.±00 MM

G

SECTIONAL SECTIONAL SECTIONAL ELEVATION-03 ELEVATION-03 ELEVATION-03

TOP OF SLB LEVEL

Sectional Elevation 02 SELECTION

115

TOP OF SLB LEVEL

TILES FINISH LEVEL F.F.L.+2100 MM

TILES FINISH LEVEL F.F.L.+2100300X300 MM TILE AS PER 300X300 TILE AS PER

300X300 TILE AS V01 PER SELECTION

2100

2100

2100

1010 10

G

115

10

2100

V01 300X300 TILE AS PER SELECTION

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER

START TILE START TILE WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER START STARTTILE TILE

2100

2100 2100

0909 09

LEVEL 10

965 965

START TILE

TILES FINISH LEVEL START START TILE TILE V01 F.F.L.+2100 MM

MIRROR AS PER SELECTION

0808 08

H

965

START TILE

OVER 12 TO 15 MM THICK PLASTER START TILE START TILE

MIRROR MIRROR AS PER AS MIRROR PER SELECTION SELECTION AS PER SELECTION

LEDGE WALL TILE/GRANITE FIXING DETAIL SCALE=1:10

F.F.L.±00 MM F.F.L.±00 F.F.L.±00 MM MM

H

2100

TILES FINISH LEVEL WALL MM FINISH WITH PAINT F.F.L.+2100

START TILE

JG

375

GRANITE

300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

WASH WASH BASIN BASIN & WASH & WASH BASIN BASIN & WASH BASIN TAPTAP AS PER AS PER BOQTAP BOQAS PER BOQ

FLOORING TILETILE 600 FLOORING X 600 WITH TILEWITH 600 3 X3 600 WITH 3 FLOORING 600 X 600 TOILET FLOOR LEVEL TOILET FLOOR TOILET LEVEL FLOOR MMMM GROOVE GROOVEMM GROOVE

09

2100

TILES FINISH LEVEL STARTSELECTION TILESTART TILE F.F.L.+2100 V01 MMV01

START TILE

KEY PL Location Location Location 017_Govt. 017_Gov 017 School, School,School, Dhamanadar Dhamanad Dham

12001200 MMMM HT. HT. LEDGE LEDGE WALL 1200 MMWALL HT. LEDGE WALL

25

INDIANA W/CW/C & INDIANA FLUSH W/C & FLUSH INDIANA & FLUSH TANK AS PER SELECTION TANK AS PER SELECTION TANK AS PER SELECTION

D06

TOP OF SLB LEVEL

04

965

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER

Sectional Elevation 01 START TILE

TOP OF SLB LEVEL

2100

V01

FINISH LEVEL F.F.L.+2100 MM

MIRROR AS PER SELECTION

965 965

H J

375375 375375 375375375 375375375 375375375 375375375 375

0404

965 V01

300X300 TILE AS PER

START TILES TILE

START TILE

03

WALL WALL FINISH FINISH WITH WITH PAINT PAINT WITH PAINT WALL FINISH OVER OVER 12 TO 1215 TOMM 15 MM THICK OVER 12THICK TOPLASTER 15PLASTER MM THICK PLASTER

START START TILETILE START TILE

965

J

SECTIONAL SECTIONAL SECTIONAL ELEVATION-02 ELEVATION-02 ELEVATION-02

TOP OF SLB LEVEL

965

START TILE

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

TILE

TOP OF SLB LEVEL

TOP OF SLB LEVEL

04

965

965 965

TILES FINISH LEVEL F.F.L.+2100 MM TILES FINISH LEVEL F.F.L.+2100 MM

TOP OF SLB LEVEL

0404

965

SECTIONAL SECTIONAL SECTIONAL ELEVATION-01 ELEVATION-01 ELEVATION-01

1710

WASH BASIN & WASH BASIN TAP AS PER BOQ

JJ

2100

J

D06D06

08

TOP OF SLB LEVEL

TOP OF SLB LEVEL

1200 MM HT. LEDGE WALL

965

J

H

500

JANITOR

965

GJ H

G

09

TOILET FLOOR LEVEL TOILET FLOOR TOILET LEVEL FLOOR LEVEL F.F.L.±00 MM F.F.L.±00 MM F.F.L.±00 MM

D05

2100

H

TOP OF SLB LEVEL

D05D05

965

G

10

D06

OMBADC

MIRROR AS PER SELECTION

WASH BASIN & WASH BASIN & WASH BASIN WASH BASIN & WASH BASIN TAPTAP AS PER BOQTAP AS PER BOQAS PER BOQ

D06D06

FLOORING FLOORING 600 X 600 TILEWITH 600 FLOORING TILETILE 600 X 600 WITH 3 X3 600 WITH 3 GROOVEMM GROOVE MMMM GROOVE

10

2100 2100

2100

URINAL PARTITION URINAL AS PER PARTITION SELECTION AS PER SELECTION URINAL PARTITION AS PER SELECTION URINAL AS PER URINAL SELECTION AS PER SELECTION URINAL AS PER SELECTION

965

09

TOILET FLOOR TOILET LEVEL FLOOR LEVEL TOILET FLOOR LEVEL F.F.L.±00 MM F.F.L.±00 F.F.L.±00 MM MM

500

115

TOILET FLOOR LEVEL F.F.L.±00 MM

WALL FINISH WITH WALL PAINT FINISH WALL FINISH WITH PAINT WITH PAINT OVER 12 TO OVER THICK 12THICK TOPLASTER 15PLASTER MM THICK PLASTER OVER 1215 TOMM 15 MM

MIRROR AS MIRROR PER SELECTION AS PER SELECTION MIRROR AS PER SELECTION

INDIANA & FLUSH W/C & FLUSH INDIANA W/CW/C & INDIANA FLUSH TANK AS PER TANK SELECTION AS PER SELECTION TANK AS PER SELECTION

D05

1150 300X300 TILE AS PER SELECTION

660

660

115 115115

JANITOR

08 H

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER

SHAFT

LEDGE LEDGE WALL WALL TILE/GRANITE LEDGE TILE/GRANITE WALL FIXING TILE/GRANITE FIXING DETAIL DETAIL FIXING DETAIL SCALE=1:10 SCALE=1:10 SCALE=1:10

08

TILE 1150 750

2000

750

2000

START TILE TILETILE

500

15 15 6 396 39 15 6 1710 39

500

START TILE

1150

Typical Toilet Male & Female Typical Toilet Male & FemaleTypical Toilet Male & Female 03 03 SECTIONAL ELEVATION-03 TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH LEVEL 04 Plan GRANITE Electrical Plan Electrical Electrical Plan F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM MM V01V01 V01

02

START START TILETILE START TILE

300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

2100 2100 D05D05

School, D

825

375

300X300 300X300 TILETILE AS300X300 PER AS PERTILE AS PER SELECTION SELECTION SELECTION

2100

2100 2100

08

D05

1925

500 825

TOPTOP OF OF SLBSLB LEVEL TOP LEVEL OF SLB LEVEL

WASH BASIN & WASH BASIN BASIN & WASH BASIN WASH BASIN & WASH AS PER BOQAS PER BOQ TAPTAP AS PER BOQTAP

D05D05

500

1725

825

09

G

500

660

500 500

850

1925

1925

920

1145

1925 1925 1710 1710

750

750 750 1925

J

500

500

115

GRANITE GRANITE GRANITE

965 2100

600

825

825 115

500

3670

500 3670 SLOPE SLOPE

1725

JANITOR

GG

825

TILE

LEDGE WALL TILE/GRANITE FIXING DETAIL SCALE=1:10

H

1925

SLOPE

1145 15 6 39 500

1950

80525

NOT BE USED OR REPRODUCED IN ANY MANNER WITH OUT THEIR PERMISSION THIS DRAWING SHALL ONLY BE READ A 825 925NOT MEASURED. 925 THE DRAWINGS ARE ONLY INDICATIVE, WILL NOT BE USED FOR CONSTRUCTION UNLESS UNTILL STAMPED AS "GFC". 825 ALL DRAWINGS MUST BE READ CONSONANCE WITH SERVICE DRAWIN STR. DRAWINGS/ LANDSCAPE DRAW ETC. ANY DISPARITY FOUND MUST BROUGHT TO THE NOTICE OF 920850 1725 NECESSARY 920ACTI ARCHITECTS FOR PRIOR TO EXECUTION AT SITE. Location

GRANITE

825

500

500

825 805

25 25 11511525

Start Tile

INDIANA W/C & FLUSH TANK AS PER SELECTION

825

825

0303 03

3725

1150

660 1950 660

500

500 500

500

500

SLOPE

1950

1150 1150

925

850

H

920

1710

500 500

03

V01

600

SLOPE

600

START TILE

SHAFT

08

FLOORING TILE 600 X 600 WITH 3 MM GROOVE

920920

3285

825

600

URINAL Start Tile PARTITION AS PER SELECTION StartURINAL Tile AS PER SELECTION

G

825

G 1725J H

1725 1725

3285

1925

1145

1145 1145

500

500 500

500 500

500 500

GG

D06

825825

850

3725

SLOPE

TILES FINISH LEVEL F.F.L.+2100 MM

300X300 TILE AS PER SELECTION

600

600

G

WASH BASIN & WASH BASIN TAP AS PER BOQ

D05

825

SLOPE

600 600SELECTION MIRROR AS PER 600

JANITOR

850850

825825

JANITOR JANITORJANITOR

3670 SLOPE

SLOPE

2000

SLOPE

600

SHAFT

600Start Tile600

H

825

SHAFT SHAFT SHAFT

Typical Typical Typical Toilet ToiletToilet Male Male&Male &Female Female & Female825 TOP OF SLB LEVEL Electrical Electrical Electrical Plan Plan Plan 825 09

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER SLOPE

600 600

Start Tile

825825

500

500 500

G

825

SLOPE

SLOPE SLOPE

SLOPE

SLOPE

SLOPE

09

600 Start Tile 600

JANITOR

08 HH

925

500

500 500 1925

1925 1925

2000

SLOPE

2000 2000

SLOPE SLOPE

600

H

825

10 mm DROP 0808 08

SLOPE

SLOPE

600 600

600 600

600

1925

500 1925 1950

1950 1950

3670

3670 3670

SLOPE SLOPE

600

SLOPE 600 600

SLOPE

600 600

SLOPE SLOPE

SLOPE

SLOPE

2000

SHAFT 600

925925 1150

10 Toilet Electrical Plan

SLOPE

SLOPE

SLOPE

START TILE

600 600

600

500

3670 2000

SLOPE

600 SLOPE SLOPE SLOPE

SLOPE SLOPE

600 600

SLOPE

G

SLOPE

SLOPE

Start Tile

825

660

500

500

SLOPE SLOPE SLOPE

SLOPE SLOPE

600

SLOPE

SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE

SLOPE

SLOPE SLOPE

SLOPE SLOPE

600 600

SLOPE

600

2000

SLOPE

10 mm DROP

09

600

600

2100

SLOPE

SLOPE

Start Tile

WALL FINISH WALL WITH FINISH PAINT WITH PAINT WALL FINISH WITH PAINT OVER 1215 TOMM OVER 15 MM 12THICK TOPLASTER 15PLASTER MM THICK PLASTER OVER 12 TO THICK

V01

3285

SLOPE

10 mm DROP

Typical Toilet Male & Female Typical Toilet Male & FemaleTypical Toilet Male & Female 02 02 SECTIONAL ELEVATION-02 TILES FINISH LEVEL TILES FINISH TILES LEVEL FINISH LEVEL 04 Flooring Plan F.F.L.+2100 Flooring Plan Flooring Plan F.F.L.+2100 F.F.L.+2100 MMMM MM

01

START START TILETILE START TILE

Tile

10 mm DROP

10 mm DROP SLOPE

920

15 6 39

START START TILETILE START TILE

Start Start TileTile Start SLOPE

SLOPE

115 1500

03 SEC. 600

J

1085 230 TOILET FLOOR LEVEL 1200 HT. LEDGE WALL F.F.L.±00 MM

600

07SLB LEVEL LEVEL TOPTOP OF OF SLBSLB TOP LEVEL OF

965 965

965

965 965

START START TILETILE START TILE

H

SLOPE

SLOPE

375

Typical Toilet Male & Female Typical Toilet Male & FemaleTypical Toilet Male & Female 01 01 SECTIONAL ELEVATION-01 TILES TILES FINISH FINISH TILES LEVEL LEVEL FINISH LEVEL 04 Layout Plan Layout Plan Layout Plan F.F.L.+2100 F.F.L.+2100 F.F.L.+2100 MMMM MM V01 V01V01 V01V01

600 600

SLOPE SLOPE

SLOPE

1725

15 6 39

FLOORING230 TILE 600 X 600 WITH 3 2300 MM GROOVE 1200 HT. LEDGE WALL

1085

07

10

600600

J

G

0202 02

SEC. 02

08

320

JANITOR

0909 09 Typical Toilet Male & Female Electrical Plan 10

3670

3915

3670

750 375 375

SLOPE

JANITOR

JJ

1000

SHAFT825 825825

08

3725

SLOPE

SLOPE

10 mm DROP 10 mm DROP

825 825825

825

805

805

J

965

365

600

Start Start TileTile Start Tile

START TILE

600 600

D06

600600

SLOPE SLOPE

600

375

JANITOR JANITORJANITOR

CL OF WB

230 600

SLOPE

SLOPE

SLOPE

600

600

230

600

510 600 600 375 600 600

600

Start Tile

600

J

H 3725

SLOPE

SLOPE SLOPE

600600

850 825

15 6 39

115

600600

SHAFT

230

INDIANA W/C & FLUSH 1200320 250 TANK AS PER SELECTION

320 1000

05

600

600

SLOPE SLOPE SLOPE

230

1000 2000 2000

SLOPE SLOPE

115

3915 1000 115

SLOPE SLOPE

1685

1500

2000

J

365

SHAFT SHAFT SHAFT

J

3725

965

600 1330

GJ H

SLOPE SLOPE SLOPE

JJ 3725 3725

SLOPE

3285

02

TILES FINISH LEVEL F.F.L.+2100 MM

V02

D02

08

SLOPE SLOPE

SLOPE

10 Toilet Flooring Plan

CL OF WB

03 SEC.

805805

600 Start Tile

3285

SLOPE SLOPE

825

H

SLOPE

SLOPE SLOPE SLOPE SLOPE

2000 3670

3670 3670

500

2300 X 1500

D06

SEC.

SEC.

SEC.

06

SLOPE

WASH BASIN & WASH BASIN TAP AS PER BOQ

JJ

2300

04

485

HP. AS TOILET MIRROR PER SELECTION

250

230

07 05

SEC.

04

SEC. SEC.

SEC.

SEC.

SEC.

06

360

600

SLOPE SLOPE SLOPE

925

3285

825825

965 965

1200635

480

V02

G

CL OF WB

GIRLS TOILET 3495 X 3915

WALL FINISH WITH PAINT OVER 12 TO 15 MM THICK PLASTER

JANITOR

SLOPE SLOPE

01

600600

3285 3285

SEC.

1085

320 1000 D05

CL OF WB

300X300 TILE AS PER SELECTION

600

D02

230 1000 1330 320 320

3670 500 500 500 750 375 375

09

485 SHAFT

03

230 370 115

D06

D05

SEC.

115

360

H

Typical Typical Typical Toilet Toilet Toilet Male Male&Male &Female Female & Female SEC. 750 750 02 TOP OF SLB LEVEL 375 Flooring 375 375Flooring 375 Flooring Plan Plan Plan 10 mm DROP 09

750 375 375

START TILE

480

585

1500

D05 V01

JANITOR

HH

SLOPE

Start Tile

SLOPE

CL OF WB Start Start TileTile Start Tile SEC.

SLOPE

375 375 C OF WB 750 L

750

500 1000

115

500 500

BOYS TOILET 3260 X 4345

375

01 SEC.

10 mm DROP 10 mm DROP 0808 08

CL OF WB

375

J

GIRLS TOILET 3495 X 3915 375

750 375 375

600

G

1010 1009

10 10 mmmm DROP DROP 10 mm DROP

600

3725

115

SEC. 750 375 02 375

SHAFT

3285

V01

CL OF WB

D05

375

115 500

D05

J

GG

SLOPE

SLOPE SLOPE

3495 230 0909 09 Typical Toilet Male & Female 115 1845 230 Flooring Plan 10

500 510

1500

1500 500 1500 1000 115

500 230

10 mm DROP

1685

375 375 750

115

03 SEC.

500

03 03 SEC. SEC.

07 SEC.

G

115

230 1535 230

V01

500

115

375

SLOPE

SLOPE

10 10 mmmm DROP DROP 10 mm DROP

825

SLOPE

SLOPE

115 3915

375 115 115

115

1200 HT. LEDGE WALL

05

08

J

3725

SLOPE

10 10 mmmm DROP DROP 10 mm DROP

500

D05 D05

SLOPE

600

3725

1000

230 230 500

1000

230

500

3915

375

1000

SEC.

375

07

750 375 10375 mm DROP

D06 JANITOR

600

1500

375 375

375 3915 750 3915 230

375 375 375 375

SEC.

1000 500

115

375 750 375

SEC. SEC.

375 375 500 SEC.

CL OF WB

CL OF WB 750

06 SEC.

1845 115

230 500

510 375

375 500 750 500 375 500

1085 230230

SHAFT

115

3670

3915

375 375

230

230 230 510

510 510 375 375 375 375 750 750

1000 115 1685

1685

SEC. 1685

510 500

2300

320

HP. TOILET SEC. 2300 X 1500

08 600 635365 HH H

1000 250 D05

D05

12001200 HT. HT. LEDGE LEDGE 1200 WALL WALL HT. LEDGE WALL

07 07

750500

115 1000

2000

115

1200 320

585

V02

115 1535

01 SEC.D05

1000 320320

1151085 1085

START TILE

03 SEC.

SLOPE

375 750

1000

115 1685

1000 115

115 115 1000 1000 115 115

320

115115

CL OF WB

D05

SLOPE

375

1000 115

500

500 1000 1000

500 500 500 500

500 500

500 500 1000 1000 115 115

1000 1000

3670

115 115

SEC. SEC.

1685 1000

SEC.

2000

485

D06

D02

H

D05

230 370 115

6002100

500

500 500

500 500 500 500

3670

750 375

SEC. SEC.

375 750

500

115

SEC.

360

HP. TOILET 2300 X 1500

JANITOR

06

SEC. 750 375 02375

BOYS TOILET START 3260 X TILE 4345

480

D05

365 1000 1000

CL OF WB

375 10 mm DROP

START TILE

2300

D06

10 mm DROP CL OF WB

CL OF WB

09

TOILET FLOOR LEVEL F.F.L.±00 MM 04 SLB LEVEL TOP LEVEL OF TOPTOP OF OF SLBSLB LEVEL

2300 2300

CL OF WB

D06D06

1200 250250 600600 250 365 600 365

J SEC. 02

10

V01

500

230 510

500 500

500 500 500 500 500

500 500

375 375 600

600 230 370 115 600

500

0101 750 01 375

V02

CL OF WB

GIRLS TOILET 3495 X 3915

375 375 750

750 375 375

08 GG 1330G

V02V02

D02

3201200 1200 D05

CL OF WB

03 SEC.

635

D02D02

06 06

375 375 750

SEC. SEC. 02 02

3495

1535 115

3725 3725

Start Tile

H

3725

3260

115 1610

485

01 HP.HP. TOILET TOILET HP. TOILET CL OF WB SEC. 2300 2300 X 1500 X 1500 2300 X D05 1500

D05

05

CL OF WB

SHAFT

230 370 115

1000

115

1535230 230

V01 480480 V01 360360 480 485485 360

V01

585

2000

D06

08

01

1330 320320

F.F.L.+2100 MM

03 SEC.

230 230

115 1845

03 SEC.

07 SEC.

C OF CL WB OFWALL WB CL OF WB 1200 HT. LLEDGE

3285

3285

SLOPE

SLOPE SLOPE

05230 SEC.

SEC.

3285 3285

1010 1009 01 SEC.

SLOPE SLOPE

07

825

JJ

H

10 mm DROP

320

108506

SEC.

10 mm DROP

HH

SEC. 02

CL OF CL WB OF WB CL OF WB

GJ H

10 mm DROP

SLOPE

230

1000

SLOPE

G

CL OF WB

D06

250GIRLS 600 GIRLS TOILET TOILET GIRLS365 TOILET 23003495 11504 3495 X 3915 X 3915 3495 X 3915 375

3260

825

805

GG

CL OF WB

CL OF CL WB OF WB CL OF WB

V02

115

510

585

115 115 585 585

500 500

230 370 115 230 370 115

500 500

G

500

965

1000

D05

BOYS TOILET 3260 XTILES 4345FINISH LEVEL

3495

10 mm DROP 10 mm DROP

1330 1330

115

750 CL OF WB

D05

1200

1610 115

JANITOR JANITORJANITOR

05 05

Typical Typical Typical Toilet ToiletToilet Male Male&Male &Female Female & Female SEC. TOP OF SLB LEVEL 02 Layout Layout Layout Plan Plan10Plan mm DROP 09

320

500 500

500 500

1000

1000 1000

500 500

230

SHAFT SHAFT SHAFT

635

SLOPE

01 01 CL OF CL WB OF WB CL OF WB SEC. SEC.

750750 750750750 750 3725 3285 750750 750750750 75006 750750 750 375375 375375 375375375 375375375 375375375 375375375 375 375

CL OF WB

04

D05 D05 D02

06 04 07 05 375375 375375 375375375 375375375 375 SEC. SEC. SEC. SEC. 05

D05 2301535

CL OF WB

1000

04 04

HP. TOILET 2300 X 1500

320

CL OF WB

1000 635635

500 SEC.

115

375 375

01 SEC.

SEC.

1000

320 1000 1000

D05

09

1330

V01

10 Toilet Layout Plan

SEC.

115

D06

D05

SEC. 02

D05

SEC.500

04

115 115

750 1000

375 375

3670

D06D06

320320

CL OF WB

230

230230

mm485 mm DROP DROP 10 mm DROP 36010 10

480

JANITOR

G

1000

1000 1000

H

D05D05

10 mm DROP

CL OF WB

J

GIRLS TOILET 3495 X 3915 230230

1845 1845 1845 750 375 375

D05

10

CL OF WB

JJ

07 SEC.

500 1000

635

3285

D05

0808 08

D05

500 500

1000

05 SEC.

375

115

D05D05

115 115

375

320

V01

03 SEC.

3725

V01V01

D05D05

SHAFT

230 500 370 115500585 500 500

1000 1000

750

D06

D05

500

1000

115 500 500

115

1000 1000 115 115

375 375

10 10 mmmm DROP DROP 10 mm DROP

D05

10 10 mmmm DROP DROP 10 mm DROP

750

CL OF WB

2000

2000 2000

510

03 03

D05

115 1535 1535 750 1535 115115 750 115 375 375 375 375

500

V01

BOYS TOILET 3260 X 4345D05D05

CL OF CL WB OF WB CL OF WB

CL OF WB SEC. SEC.

1535 115115

500

1000 500 500

V01V01

230 3260 115 0909 09 Typical Toilet 115 Male & 1535 Female 115 230 1610 BOYS BOYS TOILET TOILET BOYS TOILET D05D05 X 4345 3260 X 4345 Layout Plan 32603260X 4345 10

01 SEC.

10 mm DROP

07 07 SEC. SEC.

375 375 3495 375 3495 3753495 750 750

115

500

115 1535 1535

600 500

510

510 510 375 375

2000

375 375 750 3670 750

3670 3670

375 375 375 375

115115 D05

10 mm DROP

CL OF CL WB OF WB CL SEC. OF WB

750 750

3260

1610 115115

CL OF CL WB OF WB CL OF WB

10

H

06 SEC.

3725 3725

115

230 1610 1610

CL OF WB

04

06 06 SEC. SEC.

3285

3260 3260

SEC.

SEC. 02

HH

1000

230

CL OF CL03 WB OF WB CL OF WB

G

05 SEC. D05

115

3285 3285

01C OFC WB L L OF WB CL OF WB SEC.

08

05 05 SEC. SEC.

SEC. 115

1010 1009

750

230230

SEC. 02

1000

G

04 SEC.

375 375

CL OF WB

SEC. SEC. 02 02

10 01 SEC.

CL OF WB

500

10 mm DROP

04 04 SEC. SEC.

CL OF WB

230230

500

115

375 750

3670

GG

D05

THIS DRAWIN OF M/s SPACE NOT BE USED ANY MANNER PERMISSION THIS DRAWING NOT MEASURE THE DRAWING WILL NOT BE UNLESS UNTILL ALL DRAWIN GENERAL GENERAL GENERAL NOTES NOTESNOT CONSONANCE THIS THISDRAWING DRAWING THISSTR.DRAWING ISDRAWIN ISTHE THEPIS ETC. ANY MD OFOFM/sM/sOF SPACE SPACE M/s MATTERS SPACE MATTER BROUGHT TO NOT NOTBEBE NOT USED USED BEORUSED ORREPRO REPR OR ANY ANYMANNER MANNER ANYARCHITECTS MANNER WITH WITHOUT WI OU PRIOR TO EXE PERMISSION PERMISSION PERMISSION THIS THISDRAWING DRAWING THIS DRAWING SHALL SHALLON SHO NOT NOTMEASURED. MEASURED. NOT MEASURED. THE THEDRAWINGS DRAWINGS THE DRAWINGS ARE AREONL ON A WILL WILLNOT WILL NOTBEBE NOT USED USED BEFOR US FO UNLESS UNLESSUNLESS UNTILL UNTILLUNTILL STAMPED STAMPEST ALLALL DRAWINGS ALL DRAWINGS DRAWINGS MUST MU CONSONANCE CONSONANCE CONSONANCE WITH WITH SE W DWG NO. STR. STR. DRAWINGS/ STR. DRAWINGS/ DRAWINGS/ LAND LAN 0RS-L017-A-0 ETC. ETC. ANY ETC. ANY DISPARITY ANY DISPARITY DISP GENERAL NOTES BROUGHT BROUGHT BROUGHT TOTO THE THE TO J ARCHITECTS ARCHITECTS ARCHITECTS FOR FOR FON THIS DRAWING IS3725THE PROPERTY NEC PRIORTO PRIOR TOAND EXECUTION EXECUTION TO EXECUT ATA OF M/s SPACE PRIOR MATTERS SHALL

3725

230

V01

1000

375

D05

CL OF WB

01 01 SEC. SEC.

500

510

V01

CL OF WB

3285

500

1845

10 01 SEC.

3725

GENERAL N

J

H

230

115

SLOPE SLOPE

1535

G

510

115 750 500

04

500750115 500 750 500

750

SECTIONAL ELEVATION-07

510

750

750

750

SECTIONAL ELEVATION-07

04

Sectional Elevation 06

510 750

L-017 Govt. Primary School Dhamanadarah

3495

115

SLOPE SLOPE

1535

SLOPE SLOPE

115

115

3285

2000

1610

J

H

3725

3260

230

G

600

3285

230

J

07 SEC.

750

06 SEC.

H

SLOPE

05 SEC.

SLOPE

04 SEC.

G

750

750

750

TENDER DWG.

CONSTRUCTION DWG. 04 SCALE

1:50@A1

DRAWN BY -

AMIT KUMAR

CHECKED BY- MOULSHRI JOSHI REV.NO.

0.00

DATE: - 17/06/2021

67

750


68


Sathanur Village House Academic Work Measured Drawing The house was built in 1850 A.D. in Sattanur village by a Hindu Naidu family of agriculturalists. The house is a typical example of architecture found in Mayavaram and Tanjavur districts. The house has been relocated to Dakshina Chitra Museum and reconstructed like the original built form,.

69


PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Exploded isometric

SATHANUR HOUSE, TAMIL NADU DAKSHINACHITRA MUSEUM, TAMIL NADU

*NOT TO SCALE

PRODUCED BY AN AUTODESK STUDENT VERSION

70

EXPLODED ISOMETRIC

Chaitanya Simran Divyansh Aditi

Vithika Harshit Kamal Vansh

School of Planning and Architecture, New Delhi

07


PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

LEVEL +984

PRODUCED BY AN AUTODESK STUDENT VERSION

LEVEL +909

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

LEVEL +496

LEVEL +1003

LEVEL +629

PRODUCED BY AN AUTODESK STUDENT VERSION

GROUND LEVEL ±0.0

Ground floor plan GROUND FLOOR PLAN PRODUCED BY AN AUTODESK STUDENT VERSION

DAKSHINACHITRA MUSEUM, TAMIL NADU

0

500 250

2000 1000

Chaitanya Simran Divyansh Aditi

Vithika Harshit Kamal Vansh

School of Planning and Architecture, New Delhi

SATHANUR HOUSE, TAMIL NADU

02

DAKSHINACHITRA MUSEUM, TAMIL NADU

GROUND FLOOR REFLECTED CEILING PLAN

0

500 250

2000 1000

Chaitanya Simran Divyansh Aditi

Vithika Harshit Kamal Vansh

School of Planning and Architecture, New Delhi

03

PRODUCED BY AN AUTODESK STUDENT VERSION

SATHANUR HOUSE, TAMIL NADU

Reflected ceiling plan

PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

SECTION CC'

Section through the courtyard

C'

Front elevation

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

ELEVATION X

71


SIMRAN KAUR KAPOOR

Architecture Student simrankapoor.arch@gmail.com 72


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.