SIMRAN RATNANI: ARCHITECTURE TRAINING PORTFOLIO

Page 1

PRACTICAL TRAINING PORTFOLIO JULY-NOV,2019 9TH SEM,B.ARCH DESIGN ICON ARCHITECTS,GURUGRAM.

SIMRAN RATNANI B.ARCH (2015-2020) LOVELY PROFESSIONAL UNIVERSITY


PROJECT-1



EXISTING LAYOUT AND IMAGES


CONCEPT SHEET


PROPOSED SHEET



PHASE DEVELOPMENT


DEMOLITION PLAN



RCP AND LIGHTING AHEET



POWER LAYOUT


ELEVATION


ELEVATION


ELEVATION


ELEVATION


MEETING ROOM SHEET



MATERIAL SHEET


CAMERA ANGLES LAYOUT AND VIEWS



GRAPHICS SHEETS


PROJECT DETAILS: Site Execution • DATE OF START – 23RD SEPTEMBER 2019 DAY 01 – 23rd SEPTEMBER 2019 Removal of old workstation, cabinets, storages and carpet

BEFORE

AFTER

DAY 03 – 25th -26th SEPTEMBER 2019 Removal of existing partitions

BEFORE AFTER DAY 08 –30th SEPTEMBER 2019 Placement of new partitions according to Proposed Floor Layout

NEW PARTITION FOR MD’S CABIN

NEW PARTITION FOR MEETING ROOMS

.SCHEDULED DATE OF HANDOVER –9TH NOVEMBER 2019. DAY 02 – 24th SEPTEMBER 2019 Removal of existing ceiling

BEFORE

AFTER

DAY 05 –27th SEPTEMBER 2019 Placement of new partitions according to Proposed Floor Layout

NEW PARTITION FOR PHONE BOOTH NEW PARTITION FOR CONFERENCE ROOM DAY 09 – 1st OCTOBER 2019 study of old HVAC on site, removal of glass & ceiling

DEMOLITION OF COMPLETE CEILING DEMOLITION OF COLUMN CLADDING


DAY 11 – 3rd OCTOBER 2019 Removal of existing Cladding from ledge walls

AFTER DEMOLITION OF EXISTING CLADDING FROM LEDGE WALLS ON SITE

DAY 13 –5th OCTOBER 2019 new partitions placement as per layout, ceiling conduit work

GYPSUM BOARD WORK & CEILING CONDUIT WORK

DAY 12 –4th OCTOBER 2019 new partitions placement as per layout, drilling the floor for raceway

NEW PARTITION FOR CONFERENCE ROOM DAY 14 –6th OCTOBER 2019 RACEWAY & CONDUIT WORK

FLOOR RACEWAY WORK DAY 18 – 9th OCTOBER 2019 furniture marking (workstations)

DAY 15 –7th OCTOBER 2019 gypsum board & wood work

GYPSUM PACKING FOR CEILING ACCORDING TO LAYOUT

CEILING CONDUIT WORK

DAY 19 –10th OCTOBER 2019 ceiling gypsum packing and raceway work

GYPSUM PACKING OF COLLAB -1 & MEETING ROOMS GYPSUM BOARD WORK

WOOD WORK

MARKING FOR WORKSTATIONS

RACEWAY (WORKSTATION AREA))


DAY 20 11th OCTOBER 2019 fixing of rock wool and raceway work

ROCKWOOL WORK FLOOR RACEWAY WORK DAY 21 –12th OCTOBER 2019 new partitions placement as per layout, ceiling work

new partitions placement as per layout, ceiling work

PHONEBOOTH PARTITION CEILING OF MEETING ROOM DAY 21 –12th OCTOBER 2019 DAY 22 –13th OCTOBER 2019 new partitions placement as per layout, gypsum board & wood work (partition) ceiling work

FRAME WORK FOR MD’S CABIN PARTITION GYPSUM CEILING DAY 23 –14TH OCTOBER 2019 raceway work, wood work & new sprinklers installation MD’S CABIN PARTITION

RACE WAY WORK

WOOD WORK & SPRINKLERS INSTALLATION

FRAME WORK FOR GYPSUM CEILING

GYPSUM BOARD WORK

WOOD WORK


PROJECT -2 TECH RETAIL 7th FLOOR, MAGNUM TOWER,GURUGRAM PROJECT TYPE: COMMERCIAL INTERIORS





















PROJECT -3 JAQUAR, JAMSHEDPUR













3D VIEWS


PROJECT -4 LANDMARK, CYBERPARK,4TH Floor GURUGRAM PROJECT TYPE: COMMERCIAL INTERIORS








RECEPTION LOBBY

COLLABORATIVE ZONE


PROJECT -5

11th November,2019

11TH November,2019





THANK YOU FOR YOUR TIME


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.