Architecture Portofolio SINTA ISFANDIARY
Hi. I am Sinta, a Bachelor of Science in Architecture at Bandung Institute of Technology. I am interested in architecture and urban design. I am conscientious person who works hard and love to learn new things. I’m flexible, quick to adapt, quick to pick up new skills, and eager to learn from others. Best regards
SINTA ISFANDIARY Bandung, 13-01-1994 Gagak 84/150B, 40133 Bandung, Indonesia Contact: +6285624916477 s.isfandiary@gmail.com https://issuu.com/sintaisfandiary https://id.linkedin.com/in/sinta-isfandiary-3b26295b
RESUME EDUCATION 2005-2008 2008-2011
WORK EXPERIENCE 06.2015-08.2015 10.2015-01.2016 ORGANIZATION EXPERIENCE 2012-2014 2013 2013 2014 2014-2015
COMPETITION & AWARDS 2013 2015
1 Senior High School Bandung Science Program Bandung Institute of Technology Bachelor of Science in Architecture GPA 3.33/4 Airmas Asri, Jakarta Internship, Kreasi Division AECOM Jakarta Internship, Master Planning Division ITB Architecture Students Association (IMA-G) Staff of Internal Division Gaung Bandung: Kampung Kota Staff of Publication Division ITB Entrepreneurship Challenge, E-Camp Liason Officer Artepolis 5 International Conference Registration Desk ITB Architecture Students Association (IMA-G) Head of Internal Division
Playscape Competition Building Trust International Sinarmas Land Young Architect Competition 1st Winner of Commercial Category Sinarmas Land
SKILLS Language
Indonesia | English | Korean | Japanese
Hands-on
Sketch | Photography | Model-making
Software Modeling Drafting Visualization Parametric Word Processing
Sketchup | Rhino | Revit | 3ds Max AutoCAD Adobe Photoshop | Adobe Illustrator | Adobe Indesign | Lumion Grasshopper Ms Office Series
CONTENTS
ANTAPANI RESIDENCE
01
MERDEKA MIXED-USE
02
LOVINA’S
03
GARDEN OF CIAWITALI
04
THE AMBROSSIA
05
OTHER WORKS
06
AQUA-MARINE LIFE
01
ANTAPANI RESIDENCE 4rd Grade Studio Project
Year 2014 Professor Himasari Hanan, Ir., MAE., Dr., Ing. Location Antapani, Bandung
This project located in Bandung’s residential area, Antapani. Surounded by many different kind of residences from low to high class and dense area. This project is about creating another residence that can compete with residences around and can make good profit. Site divided by river into 2 area. And another river as site border. This residence had 2 different type of house, type 120 and 170. This residence also have public amenities such as sport center, elementary school, mosque, and shops.
SITE ANALYSIS
DESIGN STRUCTURE
Site located in dense residential area and lack of green space nor open space.
The strategies is to create good residence with green and open space as gathering facilities to all cluster but still can make good provit.
Blue and Green
Main road connecting the gate from other housing to primary road. Main road looping to all cluster.
Have 2 core as commercial and green open space that connected with green corridor.
The core located in the center of site with radius 400 m to all around site, so every houses can get easily reach the core.
Every cluster has community green and open space area in the center of cluster.
Road
Housing and Light Factory
Density
Type 170 located in the center of every cluster and near the river. River considered as good view with public facility. Location
Dense Housing
Community Green Space
Community Green Space
Community Green Space
Green Corridor
Commercial Area
Main Green Space Community Green Space
Public Amenities
Dense Housing
Light Industry
Community Green Space
6
7
6
4 3 5 2 1 2 3 4 5 6 7
: Utility Building : Commercial : Mosque : Elementary School : Sports Club : Jogging Track : Water Park
1
Type 120
Type 170
02
MERDEKA MIXED-USE
4rd Grade Studio Project
Year 2014 Professor Himasari Hanan, Ir., MAE., Dr., Ing. Location Merdeka, Bandung
This project is about making multi-function space located in the middle of Bandung City. Merdeka street is well-known as commercial area in Bandung. The challenge is to create a new commercial space that can attract more people to come and do many things of activity. Bandung is well-known as creative city, so this Merdeka Mixed Use not only accommodate people who want to shops, but also accommodate creative people to express their creativity in performances and arts. At the same time, this Mixed Use also can be a new gathering space for creative people.
SITE ANALYSIS
Site located in the commercial area in the middle of Bandung City. Located between Merdeka Street and Diponegoro Street and between 2 big Mall in Bandung, Bandung Indah Plaza and Bandung Electronic Center, that’s provitable to make connection between the two. Merdeka Street have various activity from formal activity such as working in the weekday and informal activity such as street performance. These activity can be mixed up in one place.
Commercial
Cultural & Education
Green Open Space
Office
WEEK DAY
WEEK END
Merdeka Street is 1 of 7 traffic point in Bandung. Around the site mostly are commercial, also there’s elementary school and university. City Hall near the site is the place for work in the weekday.
Car Free Day run in the Merdeka Street on the weekend. The street that used to filled by car, changed as bycicle trails. City Hall run as green open space on the weekend.
TYPICAL OF MERDEKA COMMERCIAL AREA
Simple movement for user.
Setback area used as parking area.
WHAT ABOUT THIS?
Create up & down movement for user to create different kind of space experience.
Using setback as plaza.
MASSING DIAGRAM
Unique site shapes.
Considering same frontage with existing building around.
Create simple form based from site’s shapes.
Cut and add mass to create good open space and for service area.
Create terrace and connecting two mass with bridge for user’s movement.
Push mass in level 3 to create theatre’s hall and for gathering area.
Smooting the edges of building.
Put 2 tower for hotel and office, considering the distance of two tower.
IARY
ND : FA MA IS NA NTA SI NIM:
1051
1521
g
.In , Dr
RP
, MU
, Ir.
Y
BO g ER R: Dr.In TO O PO E, MA DINAIBOW Ir, OR W N, : KO RU NG NA HE IMBI RI HA MB SA PE MA HI
IA
R
N
D IO AR PE SIT RA EK NC TU AN R G
AN
O
PR
ARSIT
LAH
SEKO
R PE
EKTU
IO
KN
ST
IO
N
51 Y N SIN AM A TA : IS FA N
D
IA R
JA : S 2 ING GA ILD A TU E BU DEK US MER
1051
P, D
r.In
g
N
IM
:
1521
R
ITU
M
INST
N
LA
ED
MIX
SI
INST
ED
MIX
IO
Y R IA
JA : S 2 ING GA ILD A TU E BU DEK US MER
Y
ITU
INST
N
LA
ED
MIX
OLO
KN
T TE
IA R
SEKO
R
EKTU
SIT
AR LAH
51
SI
AR
G
UN
ND
BA GI
N SIN AM A TA : IS N FA IM N : D
PR
THEATRE
ST
RAM
OG
BANG
EM
NG
N PE
N DA
ANAA
NC PERE
KEBIJ
AN
UR
KT
SITE
I AR
10
21
JA : S 2 ING GA ILD A TU E BU DEK US MER
GAN 0 409 CANUR AR PERAN KT TE
UD
ST AKAN
UD
r.In
N
LA
BA
GI
KN
T TE
ITU
15
OLO
RENC
NG
U ND
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
SKY LOBBY
AN
R PE
EKTU
ARSIT
LAH
SEKO
I AR
UD
ST
RAM
OG
PR
AE ,D
AR
EM
NG
N PE
DA AAN
N SIN AM A TA : IS N FA IM N : D
UR
KT
SITE
, Ir ,M
P H EM IM A
IO
BIM SA B R ING IH : AN AN
GAN 0 409 CANUR AR PERAN KT TE
UD
ST AKAN
KEBIJ
AN
BANG
g
K H OO ER R U DIN W A IB TO O R W O : PO ER
BO
SEKO
OLO
KN
T TE
, Ir .,
PR
R
EKTU
SIT
AR LAH
N SIN AM A TA : IS FA
51 :
SI
AR
G
UN
ND
BA
GI
U
RAM
OG
BANG
EM
NG
N PE
N DA
ANAA
KEBIJ
AN
UR
KT
SITE
NC PERE
10
IM N
15
GAN 0 409 CANUR AR PERAN KT TE
UD
I AR
10
IM : N
R IA D N N SIN AM A TA : IS FA
JA : S 2 ING GA ILD A TU E BU DEK US MER
AKAN
UD
21 Y R
IA D N
51 :
Y
N
LA
ED
MIX
ST
10
IM N
SI
AR
G
UN
ND
BA
GI
OLO
T TE
ITU
INST
NG
N PE
N DA
ANAA
RENC
U
ST
AM GR
BANG
EM
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
KT
SITE
AR DI
15
GAN 0 409 CANUR AR PERAN KT TE
UD
ST AKAN
KEBIJ
AN
UR
21
OLO
KN
T TE
TITU
INS
JA : S 2 ING GA ILD A TU E BU DEK US MER
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
R
EKTU
ARSIT
MIX
N SIN AM A TA : IS FA
U ST
R TU EK SIT R IA D U ST AM R G PR
O
LAH
SEKO
15
N
LA
ED
G
UN
ND
BA
GI
BANG
EM
NG
N PE
N DA
ANAA
NC PERE
21
0
409
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
OFFICE & HOTEL
AR
AKAN
KEBIJ
AN
D
LA
JA : S 2 ING GA ILD A TU E BU DEK S ER DU M
E MIX
IO
1051
1521
GAN 0 409 CANUR AR PERAN KT TE SI
UD
P, D
r.In g
AR
, Ir
.,
M
U
R
ST
r.In g AE ,D ,M , Ir
K H OO ER R U DIN W A IB TO O R W O : PO ER
BIM SA B R ING IH : AN AN
P H EM IM A
KN
T TE
ITU
M
IX
ED
U TU SE G M B AS ER UIL 2 D D : EK IN A G
JA
LA
N
INST
G
UN
ND
BA
GI
KEBIJ
BANG
EM
NG
N PE
N DA
ANAA
OLO
BO
AKAN
SITE
RENC
R PE
EKTU
ARSIT
AN
UR
KT
LAH
SEKO
I AR
UD
ST
RAM
OG
PR
90
GAN CAN R RAN U PE TEKT SI AR
N SIN AM A TA : IS N FA IM N : D
IA
R
Y
40 AR
IO
UD
ST
R IA D U ST AM R G O PR
R
EKTU
ARSIT
LAH
SEKO
OLO
KN
T TE
ITU
INST
G
UN
ND
BA
GI
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
SIT
EK
TU
R
AN
BANG
EM
NG
N PE
N DA
ANAA
NC PERE
1051
1521
AKAN
KEBIJ
N
LA
ED
MIX
JA : S 2 ING GA ILD A TU E BU DEK US MER
N
0 NGA 409 NCA R AR PERA EKTU IT
R IA N SIN AM A TA : IS N FA IM N : D
RETAIL
Y
DIO ARS
STU AKAN
R IA D U ST AM R G O PR
LA
T TE
TITU
INS
M
IX
ED
U TU SE G M B AS ER UIL 2 D D : EK IN A G
JA
LA
N
SEKO
1051
1521
G
UN
K H OO ER R U DIN W A IB TO P O R H EM W IM B O : AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
SIT
EK
TU
R
AN
BANG
EM
ND
BA
GI
OLO
KN
NG
N PE
N DA
ANAA
RENC
R PE
EKTU
SIT H AR
KEBIJ
AR
40
90
N GA AN NC R RA TU PE ITEK DIO ARS
NG BA EM
NG
G
PE
N
N
U
DA
AN
D
N
AA
51
15
IN
21
10
AN
IB G
LO
PE
O
KTU
KN
TE
AR
RE
R
SI
TE
H
T
LA
U IT
KO
IARY
ND : FA MA IS NA NTA SI NIM:
ST
SE
R
TU
EK
SIT
AR
NC
DI
TU
MS
RA
OG
PR
AN
KE
BI
JA
KA
N
STU
.Ing
, Dr RP MU , Ir., BO g ER R: Dr.In TO O PO E, MA DINAIBOW Ir, OR W N, : KO RU NG NA HE IMBI RI HA MB SA PE MA HI
N
LA
ED
MIX
N
0
JA : S 2 ING GA ILD A TU E BU DEK R US ME
IO A PE R R S A IT N E C K A TU N R G A
409
S
TU
D
AR
AKAN
UR N
N DA
G
UN
ND
BA
R
GI
D
OLO
IA
ANAA
RENC
R PE
N
IM
:
51
N SIN AM A TA : IS FA
N
KN
T TE
10
EKTU
ITU
Y
SITE
I AR
UD
ST
ARSIT
D A IO R AR PE 4 0 SIT RA 9 0 EK NC TU AN R G AN
M
IX
ED
U TU SE G M B AS ER UIL 2 D D : EK IN A G
JA
LA
N
K H OO ER R U DIN W A IB TO P O R H EM W : IM B O AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
INST
21
LAH
SEKO
KEBIJ
15
BASEMENT PARKING
KT
RAM
OG
PR
AN
BANG
EM
PENG
IARY
ST U
ND : FA MA IS NA NTA SI NIM:
AKAN
AN
U
N
.Ing
G
IB
AN
D
, Dr
LO
O
RP
, MU
, Ir.
BO
.Ing
KN
ER R: Dr TO O PO E, MA DINAIBOW Ir, OR W N, : KO RU NG NA HE IMBI RI HA MB SA PE MA HI
TE
ARSIT
1051
1521
KEBIJ
T
LAH
: IM N
G N
N
U IN W A IB TO P O R H EM W : IM B O AS IM PO AR BIN ER I H G: BO AN , Ir AN ., M , Ir U ,M R P, AE D ,D r.In r.In g g
U D
G
LO
K H OO ER R D
0
IO AR PE SIT RA EK NC TU AN R G
409
AN
MIX
ST
U
D
AR
AKAN
LAH
SEKO
SITE
ANAA
R PE
OLO
EKTU
RENC
KN
T TE
ITU
VERTICAL CIRCULATION
GI
BANG
EM
NG
N PE
N DA
I AR
UD
ST
ARSIT
INST
AN
UR
KT
RAM
OG
PR
21
15
N GA BA N
R
EM
PE
NG
TU EK
DA AN
NA
IB AN
SIT R IA
CA
EN
IT
U
T
TE KN
O
PE R
D U ST
UR TE KT
SI
AM G R O
AR
H
PR
SE KO LA
IN ST
N
LA
ED
Tower Circulation Commercial Circulation Theatre Circulation
10
KE BI JA
51
KA N
N SIN AM A TA : IS FA
N
D
IA
ST U
R
Y
D A IO R AR PE 4 0 SIT RA 9 0 EK NC TU AN R G
AN
M
IX
ED
U TU SE G M B AS ER UIL 2 D D : EK IN A G
JA
LA N
IN
ST
IT
SEKO
RENC
R PE
EKTU
ANAA
U
O
PR
TU
MS
A GR
N DA
G
R EMBANG KTU N PENG
ITE
RS
A DI
G
UN
ND
BA
KEBIJ
JA : S 2 ING GA ILD A TU E BU DEK US MER
Use vertical circulation, escalator, to create solid-transparant dynamic facade.
TERRACE CONCEPT
Terrace as Circulation
PROGRAM STUDI ARSITEKTUR SEKOLAH ARSITEKTUR PERENCANAAN DAN PENGEMBANGAN KEBIJAKAN
INSTITUT TEKNOLOGI BANDUNG
AR 4090
STUDIO PERANCANGAN ARSITEKTUR
TUGAS 2 : MIXED USE BUILDING JALAN MERDEKA
KOORDINATOR : HERU WIBOWO POERBO, Ir., MURP, Dr.Ing
NAMA : SINTA ISFANDIARY
PEMBIMBING: HIMASARI HANAN, Ir, MAE, Dr.Ing
15211051
NIM:
Terrace as Green Open Space
Terrace as Extended Shops
03
LOVINA’S AQUA-MARINE LIFE Undergraduate Final Studio Project
Year 2015 Professor Dr. Firmansyah, S.T., M.T. Location Lovina, Bali
Indonesia is the biggest archipelago country and house of many kind of fishes, corals, and seaweeds species. To showing off this beauty and diversity of Indonesia’s aquatic life, Indonesia needs aquarium. Lovina’s Aqua-Marine Life is a museum, aquarium, and oceanarium that showing off Indonesia’s aquatic life. Located in Lovina, North Bali, which is a tourism area that known for dolphin sight-seeing in Bali Sea. Lovina chosen because it’s existence in Bali dan draw international tourists and can promote to more people about Indonesia’s aquatic life.
8500 SPECIES
18 SPECIES
555 SPECIES
950 SPECIES
Many kind and diversity aquatic species lived in 5.8 milion km2 water that covered Indonesia. About 70% of them lived in the east of Indonesia include Bali.
SITE ANALYSIS SINGARAJA DOWNTOWN
LOVINA BEACH Located between Singaraja Downtown and Lovina Beach that connected by primary road.
Located near 4-star resort and houses. The commercial area stand along the primary road.
Located near Bali Beach that known for dolphin sight-seeing for tourist.
Not far from Kubutambahan Airport. Also accessible from Ngurah Rai Airport and Gilimanuk Port.
DESIGN ISSUE
Attractive Building Located in new tourism area, building must have attractive shapes that can draw people to come.
Arouse Tourism Activity The new International Airport, Kubutambahan Airport built to increase the tourism in Lovina. To support this, Lovina needed new tourism activity that can draw more people to come.
Structure Safety Aquarium have very big dead-load, water. Also the life-load, animal and group visitor. So, aquarium needs good and strong structure.
Considering Children & Family Aquarium is a good place for family to travelling. Aquarium must to consider about children safety, also, children facility such as nursery room and making ramp for access.
DESIGN STRATEGY
ORIENTATION Orientation to the beach and make it as main area.
FORM Arch shapes from site form to create dynamic form and experience.
CIRCULATION Visitor from primary road. Services from secondary road.
Public Private
GREEN AND PLAZA Plaza needed as orientation and rest place for visitor
ZONING Private area is for visitor with ticket.
Drop-off Area : a Ticket box : b Library : c Souvenir Shop : d Commercial : e Cafe/restaurant : f Fresh Water Area : g Salt Water Area : h Seaside Plaza : i Dolphin Port : j Pray Room : k Service Area : l
j h l i
f l
f
l
k
g
f
b
l
c d
l
a
e
e
SEASIDE PLAZA
CAFE
SALT WATER AREA
FRESH WATER AREA
TICKET DROP-OFF BOX AREA
BIG CONCEPT : STORY-TELLING AQUARIUM The way of presenting the exhibition is using story line, expected to interest the visitor. Story line that used is prologue, conflict, climax, and conclusion. Prologue present by museum, conflict presented by small aquarium, climax by main aquarium, and conclusion by theater.
PROLOGUE
CONFLICT
CLIMAX
CONCLUSION
BORROWING LANDSCAPE
Design use site’s views and givens to create real animal’s habitat as way of presenting them to the visitor. Visitor can imagine how the animal lives in their real habitat.
ZONING & CIRCULATION Coral Reef Pool
Touch Pool Dolphin Pool
CONFLICT ATTRACTION
PROLOGUE
Museum
CONCLUSION
Theater
CLIMAX
Main Pool
Main pool tunnel Dolphin show in 2nd floor
FORM & FACADE CONCEPT : BALINESE Bali known for their traditional cultural. This traditional cultural also ruled by the government. To build a building in Bali, architects must follow the regulation and apply Balinese traditional building concept to their bilding as much as they can.
KUL-KUL
Kul-kul is the small temple to keep traditional musical instrument. Design of kul-kul applied in the entrance of Lovina’s Aqua-Marine Life’s entrance to create balinese feel and accent.
PROPORTION
Another balinese concept is the proportion of the building. Bali traditional house has head-bodyfoot propotion. Head and foot that solid, and void body. Head-foot proportion uses in this design. Also, material of traditional building applied in this design.
MATERIAL
LONG-SPAN STRUCTURE
To respond structure safety issue, this design use longspan structure. Also, this structure can optimalized visitor movement.
LANDSCRAPER
Use landscaper slope to smoothing the massive building with the surroundings.
SKY-LIGHT
To create natural lighting, sky-light use in the Exit Hall Area.
WIND CIRCULATION
The interlude between roof structure and building, can make wind come freely into the building to create natural cooling.
Aquarium exit door to main plaza Aquarium hall entrance
04
GARDEN OF CIAWITALI Real Proposal Project
Year 2014 Team Sinta Isfandiary, Daniel Caesar, Kevin Trikusumo, Sari Sartika Location Ciawitali, Cimahi, Bandung
Cimahi located in the intersection of West Java’s silk road. Baros toll gate and Husein Sastranegara Airport can be easily access from this city. Baros District is going to be the new CBD in CImahi and will be developed to realize Cimahi as Creative City. As a growing city, Cimahi became destination for the investor and entrepreneur, especially in industrial, commercial, and services area. The team proposed a design of lifestyle center with office, commercial, and public facilities function in one place. This place will fullfil the needs of recreation and work for Cimahi people.
SITE LOCATION Cimahi still cannot provide public facilities needs for Cimahi people. There’s not much shopping center in Cimahi, so it’ll be profitable to create another shopping center. Taman Taman Raya Kartini Pemkot
Alun-Alun
PUBLIC SPACE Cimahi Mall Buana Dept. Store
Yogya Plaza
SITE
RESIDENTIAL
CIMAHI PARK
SHOPPING CENTER
SITE ANALYSIS River on the back side of the site.
Steep slopes
Next to the dense housing
Fertile soil
CIMAHI CITY HALL
CITY’S ISSUE
CITY COMPETITIVENESS
HAPPINESS INDEX
ENTREPENEURSHIP DEVELOPMENT
CITY BRANDING
SUSTAINABLE CITY
CIMAHI PEOPLE NEEDS????
+ WORK
EAT
+ =
+ SHOP
GATHER
LIVABLE AND PRODUCTIVE AREA
DESIGN STRATERGY
CONTEXTUAL Form followed site form. Form and material responsive to the context.
CONTINOUS CIRCULATION To create an easy way-finding space.
IMAGINARY SPACE Use site’s natural given to define space.
LANDSCAPE AS GUIDE Use pattern, color, and material to guide visitor’s movement & direction
SYMBIOTYC FUNCTION Integrate all function to create benefit from one with another.
Divided building complex into public-private zone. Area that closer to the river is more private and exclusive. Visitor will welcomed by welcoming plaza and information center building. Main plaza as buffer from public area to private area, surrounded by retail, cafe/ restaurants, and office. At the end of the site, there’re hall and amphitheater. Residential Green Area
AMPHITHEATRE
OFFICE
INFORMATION CENTRE
RETAIL
PEDESTRIAN ENTRANCE
PUBLIC
PRIVATE
MULTIFUNCTION HALL
CAFE/ RESTAURANT
VEHICLE ENTRANCE
MODERN
STEEL WINDOW
ICONIC
BAMBOO
HUMBLE BRICK
PATHWAY STONE
05
THE AMBROSSIA
Sinarmas Land Young Architect Competition 2015
Year 2015 Team Sinta Isfandiary, Dena Hilmi, Kevin Trikusumo,Sari Sartika Location Bumi Serpong Damai, Serpong, Tanggerang Status 1st Winner of Commercial Category
This Mixed-Use Development contains Trade Center and Apartment. Using comprehensive approach such as siteplan and landscape planning, and sustainable environment to create a better community for BSD intermode district. Strategically located next to Atmajaya University, province railway, and Serpong-Jakarta toll road (plan). This Mixed-Use will be developed as the forefront of Intermode Bussiness District that can interact in one dynamic commercial zone and can catalyze development of other commercial zone.
ISSUE STATEMENT
SITE ANALYSIS
‘ B U L K Y ’ I T C
2 1
To create a ‘new face’ for ITC, which not massive and has comfort human scale.
3
P E O P L E MOVEMENT To create path and nodes in one place that integrated with other function around.
4
CONSTRAINS 1 Good view that interfered by High Tension Electricity Tower 2 Potentially create traffic in west side that facing Modern Market 3 Interfered view by Apartment in south side 4 Noisy sound from railway in south side.
L I V A B L E C O M M U NITY
2
1 4
1
To create effective, eficient, and attractive space that active and can fulfill their needs.
3
5
SUSTAINABLE L I V I N G To create sustainable space and friendly environment design.
4
OPPORTUNITY 1 Several acces from primary road to site 2 Inviting site form towards primary road 3 Wide face to green space 4 Potentially synergize with Modern Market and Apartment 5 Potentially became transit center from Cisauk Train Station
DESIGN STRATEGY
Cisauk Train Station
3 1
2
4
Ojek & Taxi
3
1 Transit Plaza inviting people from Cisauk Station, and spreads to other plaza 2 Main Plaza as orientation center for people 3 Secondary Plaza inviting people from every corner of site and connected with each other 4 Continous Plaza delivers people to taxi and ojek queue area
2 1 3 1
2 2
1 Put Apartment facilities in green rooftop and Sky Lobby area 2 Green plaza inviting and welcoming people from every corner of site 3 Sheltered path in ‘Street Market’ area.
MASSING DIAGRAM
Massing Separation
Shaping the Edges
Welcoming Corner
Dynamic Edges
Adding Skybridge
Sky Lobby
Tower Placement
Triangle-shaped Site
To create inviting form in Transit Plaza
As Apartment Facilities Area
THERMAL ANALYSIS
Circulation seperate the mass
Soften edge to create dynamic shapes.
To welcoming people
Connecting 3 mass with skybridge
To maximize view from Apartment
LIGHTING ANALYSIS
INSOLATION ANALYSIS
Because of the distance of mass, Apartment tower mass has good Sun heat affected much more in the thermal comfort in the site looks shadow and light from morning to green rooftop. Meanwhile, ground good about 24o Celcius. noon. And ITC building got shad- plaza has shadow from building. ow in the noon from the Apartment tower.
POROUSITY PLACE “Providing continous movement for people and fulfilling everyone needs�
E C O N O M Y To catalyze economyc development in this Commercial Zone
ENVIRONMENT To create more green space as water infiltration area and thermal comfort zone.
A C T I V I T I E S To create space as place to fulfill people needs.
1 Drop-off Area
Retail
2 Connection Walk
Semi-rentable Space
3 Main Plaza
Supermarket
4 Drop-off Area
Departement Store
5 Taxi and Ojek Queue Area
Toilet
6 Loading Dock
Storage
5
1
2 4
3 2
2 6
1 5
SITE CONCEPT
GREEN BUFFER P O R O U S I T Y R E S P O N D F U N C T I O N TO EVERY DIRECTIONS C I R C U L A T I O N T O S U R R O U N D I N G S G R A D A T I O N
5th-19th floor
4th floor
3rd floor
2nd floor
1st floor
1st basement floor
Escalator Circulation Lift Circulation Parking Area Fashion Retail Area Supermarket Department Store Cafe/Restaurant Electronic Retail Area Green Roof Sky Lobby & Apartment Facility
2nd basement floor
Apartment Units
FACADE CONCEPT
ACRYLIC 2MM SECONDARY STEEL FRAME GLASS FACADE
SKIN CONCEPT Transparent facade concept applied to create new face of Trade Center. Using secondary skin from steel frame as heat reductor and air circulation to cooling down the building. Module and color stacks alternately vertical to create dynamic pattern.
COLOR CONCEPT Color scheme choosed from the color scheme that usually used in typical Trade Center. This intentionnaly done due to the old image of Trade Center that has embedded in people’s minds.
STACKING Studio 20 m2 1 Bedroom 24 m2 2 Bedroom 40 m2 Core
POROUSITY Modified the corridors for the units that placed backwards. The remaining space used as void that gives acces for air to flow. Also this void provides natural lighting to the corridor.
GREEN COMMUNAL SPACE Placing green space crossed horizontally to create cross-ventilation. This green space is used as communal place.
Apartment mass stacking design formed from 3 different module to create dynamic facade design. Back-forth mass form designed to create shadow for the units above. Mass placement arrange to not block view for each other. Green spaces placed in different level to maintain user’s privacy.
Transit Plaza
ITC Building 1
South Gate
ITC Building 1
ELEVATION A
ITC Building 2
Transit Plaza
ITC Building 1
ELEVATION B
ITC Building 1
ELEVATION C
Market Corridor
ITC Building 3 + Intermode Plaza
ITC Building 2
Placing small pool at some point in plaza to maintain humidity levels outside the building.
Green Rooftop as semi-public function such as gym, pray room, and open space as part of community development.
Uses low emission paint and coatings.
Placing solar panels in Apartment rooftop to fulfill electricity needs for Apartment’s resident.
Using low-e, low iron glass, that can reduce 62% heats but maintain 73% light.
Secondary skin as thermal barrier and air flow channel.
Placing atrium to allow light and reinforce natural air flow inside the building.
Plaza as public space and water retention area.
06
OTHER WORKS
INTERNSHIP - AIRMAS ASRI As architect assistant, to create scaleable drawing, model design, presentation making, and also gives design ideas.
PARASITIC ARCHITECTURE The project is about making architecture temporary element to awaken dead space. This element called “Banyu Biru”, because of the form that look like banyu or wave and using biru or blue material color. It’s a team work of 10 people
MODEL MAKING
PHOTOGRAPHY
Architecture Portofolio 2016 s.isfandiary@gmail.com