SIRAMON SUVICHANVORASIN
Tel. : +1(917)573-1181 Email : ssuvicha@pratt.edu
SIRAMON SUVICAHNVORASIN
ARCHITECT I ssuvicha@pratt.edu I +1(917)573-1181 Creative and passionate architect with more than 3 years of International and New York City experience in the architectural design field with expertise in mid to high rise buildings, renovations, interior & detail design, with strong visualization, rendering and retouch skills. EDUCATION 2018-2019 MASTER OF SCIENCE in ARCHITECTURE, Pratt Institute School of Architecture, Brooklyn, NY 2010-2015 BACHELOR OF ARCHITECTURE, Chulalongkorn University, Bangkok, Thailand
SKILLS
PROFESSIONAL EXPERIENCE 2020-Present MESHBERG GROUP - Brooklyn, New York, USA •
Developed schematic design and made optional design.
•
Created presentation boards for projects.
•
Developed construction drawings.
2019-2020 TECNY GROUP INC. - New York, New York, USA •
Developed construction drawings for apartment and townhouse renovation projects.
•
Worked on a construction management field which associates with
DESIGN / DRAWING
manufacturers and workers; hardwares, lighting fixtures, plumbing fixtures and
•
appliances.
AutoCad / Revit / ArchiCad / Rhino / SketchUp
2017-2018
PRODUCTION
SILP ARCHITECTS - Bangkok, Thailand
•
•
•
Adobe Suits : Photoshop / Illustrator / Indesign / After Effects (Basic)
professionals and workers from areas such as branding, engineering,
Rendering : 3DsMax / KeyShot / Vray
manufacturers and construction workers.
FABRICATION •
Developed overall project understanding through working closely with
•
3D Printing / Multi-axis Robotic Milling (PowerMill) / CNC
Created construction drawings for renovation, interior and architectural design projects.
•
Developed detailed designs to enhance unique and memorability of projects.
LANGUAGE
•
Enhance an ability to work on small scale building and detail design.
•
English
2015-2017
•
Thai
TANDEM ARCHITECTS(2001) - Bangkok, Thailand
PARTICIPATION COMPETITION •
Nippon Paint Young Creative Design 2014 (3rd prize).
ORGANIZATION •
Rural Development volunteer camp, Faculty of Architecture, Chulalongkorn University.
•
Conduct detailed feasibility studies, design development, and team management for middle to high rise residential projects.
•
Played a key role in ensuring the client needs are met in a profitable manner and projects are executed within provided timeframes
•
Working on permitted and construction drawings for middle rise building.
•
Engaged in management and design of competition design.
CHEN ION 1
COLES ST.
MESHBERG GROUP Interior design project : Team Gross Area : Area of work : DD, CD Status : Underconstruction A 22-floor apartment building in Jersey City with a warm and welcome concept provides in luxury common areas. There is a main lounge and amenities almost half of the floor for residences including, courtyard, library, bar, play room and fitness center. Each of area give different mood but still controls unity by materials and colors palette which is in a warm tone.
Typical Unit VIEW 1
▼
2 47 WAT E R S T. 4 0 4 B R O O K LY N , N Y 1 1 2 0 1 O 7 18.222.1980 W meshberggroup.com
FLOORS LVT - WHITE WASHED OAK - 725-702-HY RIGID HYBRID FLOORFOLIO
4
LOBBY M AT E R I A L S 2 47 WAT E R S T. 4 0 4 B R O O K LY N , N Y 1 1 2 0 1 O 7 18.222.1980 W meshberggroup.com
P
7
HARDWARE BASE CABINET - EDGE PULL UPPER CABINET - GRIP HANDLE
BASE CABINETS PLASTIC LAMINATE - DOVE GREY TIGER
▼
P
OPTION 1
Lobby
UP WO AS TR
FLOOR PLAN
â–¼ 6TH FLOOR AMENITIES M AT E R I A L S 2 47 WAT E R S T. 4 0 4 B R O O K LY N , N Y 1 1 2 0 1 O 7 18.222.1980 W meshberggroup.com
P
1 2
Main Lounge
53E67
TECNY GROUP INC. Townhouse renovation project : Team Gross Area : 15,000 sq.ft. Area of work : CD, CA Status : Underconstruction A renovation town house project in upper east side that try to utilize spaces by providing backyard at the cellar level. The sunlight can shade inside more and makes the area lively. Moreover, there is an additional bulkhead for a special unit which is high enough to give a privacy for people up here to enjoy the terrace on the 5th floor. Front Yard
NEW ROOFTOP ADDITION 26'
44'-5"
30'
ECNY
NEW BULKHEAD
-78'-11"
ELEV. MECH. RM.
FRONT PROPERTY LINE NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT 37
NEW PRECAST CONCRETE COPING AND RAILING
D5
EXISTING CHIMNEY FLUES TO BE REPAIRED
New York, N
Tel: 212-697
-70'-6"
+66'-11" PROP. 5TH FLOOR ROOF
ELEV. DOOR
MASTER BEDROOM
11'
ELEV. DOOR
51 east 67th street building envelope
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
503
+58'-3" EXISTING CORNICE +55'-11" PROP. 5TH FLOOR LEVEL EX. FRONT ROOF
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
BEDROOM #3
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
HALLWAY
401
404
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
BEDROOM #4 408
NEW EXTERIOR BRICK WALL TO MATCH EXTSTING
+43'-11" EX 4TH FLOOR
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING HALLWAY
301
ELEV. DOOR
304
BEDROOM #2
10'
BEDROOM #1
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
308
+32'-11" EX 3RD FLOOR
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
REPAIR AND REPAINT ALL EXISTING BRACKED STONE LINTEL AND FULL WINDOW ENFRAMEMENT THROUGHOUT
LIVING/MUSIC ROOM
ELEV. DOOR
201
10'-11"
51 E 67TH ST REPAIR AND REPAINT EXISTING FACADE THROUGHOUT
LIBRARY 204
53 E. 67TH ST
505
10'
1'
HALLWAY
9"
2'-4" 3'-8"
11' 8'-3" 7'-6"
1'-4"
NEW LIGHT WEIGHT PAVERS THROUGHOUT EXISTING CORNICE TO BE REPAIR AND REPAINT
FRONT PROPERTY LINE
11'
NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT
www.tecny.c
PARAPET WALL
3'-4" 2'-9"
3' 3'-7"
ELEV. DOOR
115 West 29
NEW PRECAST CONCRETE COPING AND RAILING
1'-8"
NEW PELLA ARCHITECT SERIES FREND DOOR
D5
ELEV. MECH. ROOM BULKHEAD
NEW EMERGENCY BACK-UP GENERATOR W/ WEATHER PROOF HOUSING
NEW CONDENSING UNITS TO INSTALL ON NEW STEEL DUNNAGE HIDDEN FROM VIEW ON PUBLIC THOROUGHFARE
38
12'
NEW LIGHT WEIGHT PAVERS THROUGHOUT
ex. building envelope
# DATE
51 E 67TH ST
+21'-0"" EX 2ND FLOOR
NEW IRON STOOP RAILINGS
GALLERY
NEW STOOP TO SIDEWALK
103
ELEV. DOOR
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
12'-4"
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION 51 E 67TH ST RETAINING WALL
DINING ROOM 106
NEW RETAINING WALL
INSTALL EXISTING LIGHTING POLE
-7'-8"
INSTALL EXISTING WINDOW GUARD NEW STEEL IRON OPEN GATE TO CELLER NEW AREAWAY FENCE/DOOR
OPEN TERRACE LEVEL
6'
GALLERY
G02
ELEV. DOOR
G03
KITCHEN G07
+0'-0" EX SIDEWALK LEVEL
NEW RAILING
ex. ground floor level +2'-4"
21'
D2
NEW PELLA ARCHITECT SERIES FRENCH DOOR IN NEW OPENING
10'-5"
DEN
4
NEW PELLA ARCHITECT SERIES FRENCH DOOR IN NEW OPENING
10'-1"
NEW PELLA ARCHITECT SERIES AWNING WINDOW
HALLWAY
ELEV. DOOR
005
010
3'
ex. cellar level -12'-4"
-13'-5"
EX. REAR YARD LEVEL +2'-4"
-3'-5" TERRACE LEVEL
NEW CONPROCO STUCCO COLOR: MIRAGE S-4
1'-6"
001
(NO SLEEPING ACCOMMODATION IN CELLAR) RECREATION ROOM
10'-7"
MECHANICAL RM
NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT
-14'-0"
CELLAR LEVEL
6'-6 1/2" 1 A303
NEW BUILDING SECTION 3/16"=1'0"
63'-10 1/2" 71'-10 1/2"
8' 100'-5"
NEW BUILD THROUGH
REAR YARD LEVEL
22'
New Building Section
A 30
ECNY GROUP INC.
ECNY GROUP INC.
660 PARK AVENUE 660 PARK AVENUE
New York, NY 10001 Tel: 212-697-4040
FRONT PROPERTY LINE
FRONT PROPERTY LINE
Tel: 212-697-4040
FRONT PROPERTY LINE
7"
1'-9" 3' 4'-9"
6'-7" 3'-7" 3'
www.tecny.com
FDNY ACCESS LADDER NEW PELLA ARCHITECT SERIES FREND DOOR +66'-11"
PROP. 5TH FLOOR ROOF NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT
1'-4"
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
BEDROOM #3
HALLWAY
401
+44'-5" EX 4TH FLOOR
308
RECESSED DOWNLIGHT
NEW IRON STOOP RAILINGS
NEW STEEL IRON OPEN GATE TO GROUND FLOOR ENTRANCE
10'-0"
NEW PELLA ARCHITECT SERIES FRENCH DOOR IN NEW OPENING
KITCHEN G07
3'
4 D2
(NO SLEEPING ACCOMMODATION IN CELLAR) RECREATION ROOM
COPYRIGHT C 2020 BY TECNY GROUP INC.
3/16" = 1'-0"
+0'-0" EX SIDEWALK LEVEL
EXISTING HALLWAY
010
MECHANICAL RM
005
LADDER
001
EX. CELLAR LEVEL -12'-4"
-13'-5" CELLAR LEVEL
63'-10 1/2" 71'-10 1/2"
8'
22'
100'-5"
New Building Section 6'-6 1/2"
NEW BUILDING SECTION
1 A305
3/16"=1'0"
EXISTING CHIMNEY FLUES TO BE EXTENDED
NEW BULKHEAD
-78'-11"
NEW BUILDING SECTION THROUGH ADDITION
+7'-8" EX 1ST FLOOR
-3'-5" GROUND FLOOR
3'
PROPERTY LINE
G01
G03
EX. GROUND FLOOR LEVEL +2'-4"
NEW CONPROCO STUCCO COLOR: MIRAGE S-4
-10'-2" EX CELLAR LEVEL
A 302
NEW HATCH
VESTIBULE
GALLERY
EX. REAR YARD LEVEL +2'-4"
NEW ELEV. MECH. ROOM
PROPERTY LINE
103
NEW STOOP TO SIDEWALK
3/16" = 1'-0"
DESCRIPTION
GALLERY
INSTALL EXISTING LIGHTING POLE
NEW PELLA ARCHITECT SERIES FRENCH DOOR IN NEW RAILING NEW OPENING OPEN STAIR
NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT
Existing Building Section
3/16"=1'0"
106
7'-10"
EXCAVATE EXISTING CONCRETE SLAB/GRAVEL/UNDISTURBED SOIL TO THE1'-1" BELOW THE GROUND LEVEL
EXISTING SECTION
DINING ROOM
NEW RETAINING WALL
+0'-0" EX SIDEWALK LEVEL -2'-4" EX GROUND FLOOR
REMOVE EXISTING HATCH
EXCAVATE EXISTING CONCRETE SLAB/GRAVEL/UNDISTURBED SOIL TO THE1'-1" BELOW THE CELLAR LEVEL
101
660 PARK AVENUE RETAINING WALL
EXISTING SECTION
# DATE
+21'-0"" EX 2ND FLOOR NEW STEEL IRON & GLASS ENTRY DOOR IN EXPANDED OPENING
VESTIBULE
+7'-8" EX 1ST FLOOR
REMOVE EXISTING LAMP BASE
EXCAVATE EXISTING BRICK PAVED/CONCRETE SLAB /GRAVEL/UNDISTURBED SOIL TO THE11'-8" BELOW THE GROUND LEVEL
201
660 PARK AVENUE COURTYARD
13'-8" EXISTING LIGHTING POLE TO BE REMOVED, RESTORE AND REINSTALL
REMOVE EXISTING STAIRS
LIVING/MUSIC ROOM
EX. BUILDING ENVELOPE
REMOVE ALL EXISTING ENTRY DOOR
REMOVE EXISTING FENCE
301
+32'-11" EX 3RD FLOOR
LIBRARY 204
DESCRIPTION
REMOVE ALL EXISTING WINDOWS
660 PARK AVENUE RETAINING WALL
304
+43'-11" EX 4TH FLOOR
REPAIR AND REPAINT EXISTING FACADE THROUGHOUT
BEDROOM #1
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
660 PARK AVENUE
# DATE
HALLWAY
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
+21'-3" EX 2ND FLOOR REMOVE ALL EXISTING WINDOWS
10'
BEDROOM #2
12'-4"
REMOVE ALL EXISTING WINDOWS 660 PARK AVENUE COURTYARD
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
10'-11"
REPAIR AND REPAINT EXISTING FACADE THROUGHOUT
EXISTING RAILING TO BE REMOVED
12'-1"
+33'-4" EX 3RD FLOOR
REMOVE ALL EXISTING WINDOWS
408
EX. BUILDING ENVELOPE
10'-1"
EXISTING RAILING TO BE REMOVED
EXISTING REAR MASONRY/BRICK WALL TO BE REMOVED
53 EAST 67TH ST NY, NY 10065
11'-1"
REPAIR AND REPAINT ALL EXISTING BRACKED STONE LINTEL AND FULL WINDOW ENFRAMEMENT THROUGHOUT
53 E. 67TH ST TOWNHOUSE
REMOVE ALL EXISTING WINDOWS
EXISTING REAR MASONRY/BRICK WALL TO BE REMOVED
REPAIR AND REPAINT ALL EXISTING BRACKED STONE LINTEL AND FULL WINDOW ENFRAMEMENT THROUGHOUT
BEDROOM #4
404
NEW EXTERIOR BRICK WALL TO MATCH EXTSTING NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
+58'-3" EXISTING CORNICE +55'-11" PROP. 5TH FLOOR LEVEL EX. FRONT ROOF
53 EAST 67TH ST NY, NY 10065
502
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING LOCATION
660 PARK AVENUE
660 PARK AVENUE COURTYARD REMOVE ALL EXISTING WINDOWS
NEW LIGHT WEIGHT PAVERS THROUGHOUT EXISTING CORNICE TO BE REPAIR AND REPAINT
MASTER BATHROOM
3'-8" 2'-4"
501
53 E. 67TH ST TOWNHOUSE
12'-3"
REMOVE ALL EXISTING WINDOWS
EXISTING REAR MASONRY/BRICK WALL TO BE REMOVED
W.I.C.
503
NEW ELEV.
NE
NEW PRECAST CONCRETE COPING AND RAILING
SKY LIGHT
A 305
COPYRIGHT C 2020 BY TECNY GROUP INC.
REMOVE ALL EXISTING WINDOWS
MASTER BEDROOM
NEW PELLA SERIES DOUBLE HUNG WINDOWS IN NEW OPENING
2'-4"
+59'-0" EXISTING CORNICE +56'-8" FRONT ROOF
11'
EXISTING CORNICE TO BE REPAIR AND REPAINT
EXISTING PARAPET
10'
11'
REMOVE EXISTING SKY LIGHT
REMOVE EXISTING A/C UNIT AND STEEL DUNNAGE
115 West 29th St Suite 1103 New York, NY 10001
NEW RAILING
EXISTING LEADER AND GUTTER TO BE REMOVED
1 A302
660 PARK AVENUE
NEW LIGHT WEIGHT PAVERS THROUGHOUT
www.tecny.com
REMOVE ALL EXISTING EXHAUST FANS
ADJACENT BUILDING WINDOW DO NOT DISTURB
NEW WALL MOUNTED LIGHTING TYP. THROUGHOUT
NEW PRECAST CONCRETE COPING AND RAILING
EXTEND AND RELOCATED EXISTING VENT
EXISTING CHIMNEY FLUES TO BE EXTENDED
NEW PRECAST CONCRETE COPING AND RAILING
EXISTING CHIMNEYS FLUES TO BE EXTENDED
115 West 29th St Suite 1103
3'-7" 3'
ADJACENT BUILDING WINDOW DO NOT DISTURB
-78'-11"
ELEV. MECH. ROOM BULKHEAD
ELEV. MEC BULKHEAD
PROPERTY LINE
PR
NEW PRECAST CONCRETE COPING AND RAILING
NEW PRECAS COPING
NEW PRECAST LINTEL
NEW PRE
BRICK WALL
W
WALL SCONCE
REPLACE EXISTING A/C UNIT AND STEEL DUMMAGE
+66'-11" PROP. 5TH FLOOR ROOF
EXISTING CHIMNEY FLUES TO BE EXTENDED
EXISTING CHIMNEY FLUES TO BE EXTENDED EXISTING PARAPET WALL
PROPERTY LINE
NEW PELLA ARCHITECT SERIES FRENCH DOOR IN NEW OPENING
REMOVE EXISTING EXHAUST FANS
660 PARK AVENUE
EXISTING CORNICE TO BE REPAIR AND REPAINT
FDNY ACCESS LADDER 660 PARK AVENUE
EXISTING CHIMNEYS FLUES TO BE REPAIRED
NEW RAILING
D3
EXISTING CORNICE TO BE REPAIR AND REPAINT
D3
+58'-3" EXISTING CORNICE +55'-11" PROP. 5TH FLOOR LEVEL EX. FRONT ROOF
+58'-3" EXISTING CORNICE +55'-11" EX. FRONT ROOF
REPAIR AND REPAINT ALL EXISTING BRACKED STONE LINTEL AND FULL WINDOW ENFRAMEMENT THROUGHOUT
6'-6"
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING OPENINGS
+43'-11" EX. 4TH FLOOR
16
17
W1
W1
ADJACE 660 P
FRONT PR 7'-9"
REPAIR AND REPAINT ALL EXISTING BRACKED STONE LINTEL AND FULL WINDOW ENFRAMEMENT THROUGHOUT
REMOVE ALL EXISTING WINDOWS
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING OPENINGS
+32'-11" EX. 3RD FLOOR
13
14
W1
ADJACENT BUILD DO
15
W1
NEW WALL MOUNT TYP. T
W1
NEW LIGHT WE T
+32'-11" EX 3RD FLOOR REPAIR AND REPAINT EXISTING FACADE THROUGHOUT 7'-9"
REMOVE ALL EXISTING WINDOWS NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING OPENINGS
+55'-11" PROP. 5TH EX. FRONT
12
W1
W1
EXISTING WINDOW GUARD TO BE REMOVED, RESTORE AND REINSTALL
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS
EXISTING LIGHTING POLE TO BE REMOVED, RESTORE AND REINSTALL
INSTALL EXISTING WINDOW GUARD NEW IRON STOOP RAILINGS
REMOVE EXISTING AREAWAY FENCE
7
9'
NEW STEEL IRON & GLASS ENTRY DOOR IN ENLARGED OPENING
INSTALL EXISTING LIGHTING POLE
REMOVE EXISTING LAMPS
NEW STOOP TO SIDEWALK
REMOVE EXISTING LAMP BASE 53
W1
5
6
CURB
REMOVE EXISTING CURB
3' 3'-6" 5'-10"
REMOVE EXISTING STAIRS
W1 D1
+7'-8" EX 1ST FLOOR
NEW AREAWAY FENCE & DOOR CAST-CONCRETE STOOP TO MATCH FACADE FINISH NEW STAIRCASE TO GROUND LEVEL
REMOVE EXISTING DOOR
9
7'-8"
+7'-8" EX. 1ST FLOOR
8
11'-4"
REMOVE ALL EXISTING WINDOWS
9'
EXISTING WINDOW OPENING TO BE ENLARGED FOR NEW ENTRY DOOR
6" 2'-4" 3'-5"
1
NEW BLUESTONE FLOOR
-13'-5" CELLAR LEVEL
9' EXISTING
EX. VAULT
Existing Building Facade 1 A200
EXISTING FRONT FACADE 3/16" = 1-'0"
W1
W3
2
PROPERTY LINE
EXCAVATE EXISTING CONCRETE SLAB/GRAVEL/UNDISTURBED SOIL TO THE1'-1" BELOW THE CELLAR LEVEL
4
NEW HATCH AND LADDER NEW STEEL IRON OPEN GATE TO GROUND FLOOR ENTRANCE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
-3'-5" GROUND FLOOR
D2
13'-5"
+0'-0" EX SIDEWALK LEVEL
7 5/8"
INSTALL EXISTING WINDOW GUARD
+0'-0" EX. SIDEWALK LEVEL -2'-4" EX. GROUND FLOOR
-12'-4" EX. CELLAR FLOOR
11
W1
RECESSED DOWNLIGHT
REMOVE EXISTING HATCH AND LADDER EXCAVATE EXISTING CONCRETE SLAB/GRAVEL/UNDISTURBED SOIL TO THE1'-1" BELOW THE GROUND LEVEL
10
+21'-0"" EX 2ND FLOOR
+21'-0"" EX. 2ND FLOOR
EXISTIN FLUES TO
NEW LIGHT WE T
18
W1
+43'-11" EX 4TH FLOOR
REPAIR AND REPAINT EXISTING FACADE THROUGHOUT
NEW PELLA ARCH FRENCH DOOR IN N
+58'-3" EXISTING C +55'-11" PROP. 5TH EX. FRONT
NEW PELLA ARCHITECT SERIES DOUBLE HUNG WINDOWS IN EXISTING OPENINGS
REMOVE ALL EXISTING WINDOWS
+66'-11" PROP. 5TH
New Building Facade 2 A200
NEW FRONT FACADE 3/16" = 1-'0"
SK64 OFFICE SILP ARCHITECTS
Renovation project : Team Gross Area : 10,000 sq.ft. Area of work : Detail Design, Detail Drawing, CD, CA Status : Completed 2018 Published : Archdaily The old building was a 2-storey commercial building and suurounded by small factories. The facade is inspired by metals and factory’s elements from the context. Moreover, to make the most efficient saleable area, one-flight staircase compacts a verticle circulation and provides more office spaces. Concept is to make the office floors float by using solid and void materials. The 1st and mazzanine floor are void, while 2nd and 3rd floors are solid. Likewise, there is blury facade on the office floors to provide green area for relaxing, and allow sunlight to this area while the facade help screening eyesight from outside.
Image from Archdaily : Front Entrance
Concept Diagram
Image from Archdaily : 3rd Floor
Section
Notes: 1. Measurements are based on metric system. 2. All levels are in metres to Principle Datum (mPD) unless noted otherwise. 3. Do not scale drawing. 4. Figure dimensions are to be followed. 5. Do not use for construction unless expressly permitted. 6. The Contractor shall verify all conditions on the Site & notify the Project Manager of any Variations from dimentions.
Notes: 1. Measureme 2. All levels ar 3. Do not scale 4. Figure dime 5. Do not use 6. The Contrac Variations from
- All designs and specifications are properties of Silp Architects co.,ltd They are not allowed to be used without prior written permission. - All prints and specifications shall be returned at the completion of work. - Do not scale drawings. - Contractor shall verify all dimensions and conditions in the field and report all discrepancies to the designers prior to commencement of work.
- All designs a They are not a - All prints and - Do not scale - Contractor sh the designers
REMARKS
Image from Archdaily : Entrance 1
2
3
4
5
REMARKS
Image from Archdaily : Office space
6
7
8
9
9
JOB NO.
Image from Archdaily : Staircase
8
7
6
5
4
3
2
1
201702
JOB NO.
PROJECT NAME
ROOF +12.80 W5
W3
Roof Beam level +11.30
W5
OWNER
W3
W5
Roof Beam level +11.30
ARCHITECTS
W3
2nd Floor +5.00
W1
Ground Floor +0.00
SANITARY EN
TITLE
TITLE
A2021
-
AREA CODE
2nd Floor +5.00
A1
DRAWING NO.
REV.
DATE
W1
BY
W1
REV. REMARK
Ground Floor +0.00
CHECK BY : XXXXXXX
SCALE :
8
1
7
6 A2021
ELEVATION 1 SCALE: 1:125
5
-
AREA CODE
Mezzanine Floor +2.50
W3
CHECK BY : SASI
DRAW BY : SRM
9
REMAR MECHANICAL
SANITARY ENGINEERS
REV. REMARK
W3
OWNER
ELECTRICAL
3rd Floor +8.00
MECHANICAL ENGINEERS
Mezzanine Floor +2.50
W1
LOCATION
STRUCTURAL
W3
ELECTRICAL ENGINEERS
3rd Floor +8.00
Notes:
ARCHITECTS
STRUCTURAL ENGINEER :
W5
201
PROJECT NAM
ROOF +12.80
LOCATION
1/125 (A3)
14-JUL-17 30-JUN-17
DATE :
ST CON
CHECK BY :
SCALE :
N
TIO
RUC
FOR
CHECK BY :
DRAW BY :
4
3
2
1 A2022
1
ELEVATION 2 SCALE: 1:125
FO
JOB
PRO
ROOF +12.80
W7 W5
W5
W3
Roof Beam level +11.30 W4
W4
LOC
OWN
ARC
W1
STR
W3
ELE
Office area +8.00
Balcony +7.90
W WC. +8.00
M WC. +8.00
Balcony +7.90
3rd Floor +8.00
MEC
SAN
W4
W5
Courtyard +5.00
W1
W1
W1
Office area +5.00
W7
W1
W WC. +5.00
W4
M WC. +5.00
W1
Balcony +4.90
TITL
2nd Floor +5.00
AREA
W7
Mezzanine Floor +2.50
Mezzanine +2.50 W3
W1
+0.25
Reception +0.10
W2
W2
WC. +0.10
WC. +0.10
Parking +0.00
W1
W2
REV
W1
Ground Floor +0.00
CHE
CHE
DRA
SCA
Notes: 1. Measurements are based on metric system. 2. All levels are in metres to Principle Datum (mPD) unless noted otherwise. 3. Do not scale drawing. 4. Figure dimensions are to be followed. 5. Do not use for construction unless expressly permitted. 6. The Contractor shall verify all conditions on the Site & notify the Project Manager of any Variations from dimentions.
M4
- All designs and specifications are properties of Silp Architects co.,ltd They are not allowed to be used without prior written permission. - All prints and specifications shall be returned at the completion of work. - Do not scale drawings. - Contractor shall verify all dimensions and conditions in the field and report all discrepancies to the designers prior to commencement of work.
REMARKS
4
A6023
W5
W5
W5
W5
8 1 A6021
2
PLAN
SCALE: 1:50
A6021
M2
JOB NO.
2
1
A7001
A7001
201702
PROJECT NAME
LOCATION
OWNER
INTERNAL LEVEL +0.00
EXTERNAL LEVEL -0.10
ARCHITECTS
EXTERNAL LEVEL -0.10
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEERS
MECHANICAL ENGINEERS
C 2 A6031
B
A
8
SECTION
3
SCALE: 1:50
A7001
3 A6021
SECTION SCALE: 1:50
SANITARY ENGINEERS
TITLE
A6021
-
AREA CODE
A1
DRAWING NO.
REV.
M4
REV. REMARK
DATE
BY
CHECK BY : SASI CHECK BY : XXXXXXX DRAW BY : SRM
EXTERNAL LEVEL -0.10
SCALE :
1/50 (A3)
FOR
A 4 A6031
B FRONT ELEVATION
3
DATE :
S
CON
14-JUL-17
ION
CT TRU
C
A6021
SCALE: 1:50
Facade Detail
Facade Detail
Image from Archdaily : Facade Material
THE BRIGHT SILP ARCHTECTS
Interior&Facade design project : Team Gross Area : - sq.m. Area of work : Facade Design, Detail Design, DD, CD, CA Status : Completed 2018 Published : Designboom
1 A211
1
A221
D04
The condominium is located near a campus, Kasetsart University so main target will be students. The budget is constrain so, all the materials are basic such as metal, laminated and painting. The facade design is inspired by glowing light from a cave. Making terraces from each unit bright by using light color and emphasizing them with dark color surrounded. Interior design is flexible. There are a few fix-furnitures which are bed, closet and, cabinet.
D06
1 A101
1ST FLOOR PLAN SCALE: 1:100
1st Floor
1
A231
D04
D05
D05
D05
D05
D05
D05
1 A102
Colors Scheme
TYPICAL FLOOR PLAN SCALE: 1:100
Typical Floor
Image from Designboom
DOOR ELEVATION (D6)
1 A611
SCALE: 1:10
2 A611
DOOR DETAIL (D6)
3 A611
DOOR DETAIL (D6)
4 A611
DOOR DETAIL (D6)
SCALE: 1:5
SCALE: 1:5
SCALE: 1:5
Lobby Door Detail
Notes: 1. Measurements are based on metric system. 2. All levels are in metres to Principle Datum (mPD) unless noted otherwise. 3. Do not scale drawing. 4. Figure dimensions are to be followed. 5. Do not use for construction unless expressly permitted. 6. The Contractor shall verify all conditions on the Site & notify the Project Manager of any Variations from dimentions.
Lift lobby
Corridor
- All designs and specifications are properties of Silp Architects co.,ltd They are not allowed to be used without prior written permission. - All prints and specifications shall be returned at the completion of work. - Do not scale drawings. - Contractor shall verify all dimensions and conditions in the field and report all discrepancies to the designers prior to commencement of work.
REMARKS
S.F.L. +2.80
201604
100
350
200 JOB NO.
PROJECT NAME
200
100 350
200
S.F.L. +2.80
LOCATION
OWNER
2800
ELECTRICAL ENGINEERS
3 MECHANICAL ENGINEERS
2550
2350
4
2000
4
2550
3
2100
4
2350
ARCHITECTS
STRUCTURAL ENGINEER :
SANITARY ENGINEERS
TITLE
03
A236
AREA CODE
A2
DRAWING NO.
REV.
S.F.L. +0.00
S.F.L. +0.00
REV. REMARK
DATE
BY
CHECK BY : SASI CHECK BY : XXXXXXX DRAW BY : SRM SCALE :
Lift Lobby Detail
DATE :
1/25 (A3)
FOR
S
CON
19-APR-17
ION
CT TRU
Lift Lobby Detail
1350
150 +0.10 F.F.L.
200
11
500
300
400
21
21
21
LF 07
21
21
100
500
EQ
+0.00 F.F.L.
21
EQ 825 21
11
4
5
A266
A266
11
F4
-0.10 F.F.L. 11
LF 05
21
D01
775
LF 01
EQ
200
1625
21
11
LF 04
EQ
22
21
CL
850
375 22
22
350
LF 06
21
400
150
375
300
375
22
-0.10 F.F.L.
EQ
EQ 1600
2000
2600
D02
LF 02
300
800
EQ
300
2000
D02
700
800
D03
800
+0.00 F.F.L.
200
375
3
1
F22
22
1800
1300
200
775
F23
-0.10 F.F.L.
A256
A256
250 A266
200
500
2800
2000 22
2
A266
F23
21
400
2
EQ
150
1800
22
1 A256
21
21
F22
A266
22
EQ
LF 05
4
EQ
400
A256
A256
100
21
11 5
700
EQ
11
150
22
200
LF 02
300 3
F4
-0.10 F.F.L.
200
22
CL
375
21
EQ
+0.00 F.F.L.
375
EQ
22 22
1050
21
D01
400
11
1475
F21
1575
21
LF 03
11
550
400
21
1000
EQ
11
500
21
21
300 900
1050
1000
200 1 A251
STUDIO TYPE PLAN SCALE: 1:25
1 A261
1-BEDROOM TYPE PLAN
+0.10 F.F.L.
SCALE: 1:25
Studio Unit
One-Bedroom Unit
Studio Unit
Studio Unit
Studio Unit
4
200
1800
A511
200
550
1825
100
1 A513
2
2EQ=1825 500 65 35
200
100
1 A512
50
200
300
50
50 4EQ. =1800
50
SCALE: 1:25
3EQ=1825
2000 1 A511
FF01 PLAN
4 A511
SCALE: 1:25
FF01 DETAIL 1
5 A511
SCALE: 1:10
SCALE: 1:25
FF02 PLAN
200
50
FF03 PLAN 1
100
A511
375
100
4EQ=1800
2050
600
50
500
100
CL
2 A513
FF01 DETAIL 2 SCALE: 1:10
FF03 PLAN 2 SCALE: 1:25
4
3
A513
A512
3
FF01 SECTION 1 SCALE: 1:25
3 A511
FF01 SECTION 2
Bed Detail
One-Bedroom Unit
100
125
350
125
150 600
50 600
2550
2500 1750
2
1000
A513
50 2 A512
SCALE: 1:25
1 A513
625
350
250 100
450
65
250 100
A511
2 A511
1
A512
1000
1
1750
5 A511
350
2EQ=1200 1800
2550
4EQ=2000
2550
2550
50
0
50
23
2EQ=625
700
A511
FF02 ELEVATION SCALE: 1:25
3 A512
FF02 SECTION SCALE: 1:25
Closet Detail
3 A513
FF03 ELEVATION SCALE: 1:25
4 A513
FF03 SECTION SCALE: 1:25
Cubboard Detail
One-Bedroom Unit
One-Bedroom Unit
PRIVATE HOUSE SILP ARCHTECTS
Architectural design project : Team Gross Area : 5,000 sq.ft. Area of work : DD, CD, CA Status : Completed 2018 This minimal house design is owned by an old lady who loves to spend her time with fresh breeze from the garden outdoor. So in a living space, there is a huge opening with many windows connect to the pebble garden outside. The tall brick fence provides a privacy, so she can freely enjoy the breeze from both indoor and outdoor.
Brick Fence
Front Elevation
Notes:
1. Measurements are based on metric system 2. All levels are in metres to Principle Datum 3. Do not scale drawing. 4. Figure dimensions are to be followed. 5. Do not use for construction unless express 6. The Contractor shall verify all conditions on Variations from dimentions.
- All designs and specifications are properties They are not allowed to be used without prio - All prints and specifications shall be returne - Do not scale drawings. - Contractor shall verify all dimensions and co the designers prior to commencement of wor
REMARKS
JOB NO.
201704
PROJECT NAME
LOCATION
OWNER
ARCHITECTS
STRUCTURAL ENGINEER :
1 A4001
SCALE: 1:100
2 A4001
ELECTRICAL ENGINEERS
SCALE: 1:100
Sections
MECHANICAL ENGINEERS
SANITARY ENGINEERS
TITLE
-
A40
AREA CODE
DRAWI
REV. REMARK
CHECK BY : SASI CHECK BY : SASI
3 A4001
DRAW BY :
SRM
SCALE :
1/100 (A3)
ศิลป์ ส
157 Yaak 8, Ramkhamhaeng 24 Bangkapi, Bangk Tel. Whatsapp: +6686788 Email: silparch
SCALE: 1:100
Interior from living room
ROYAL GEM PATTAYA TANDEM ARCHITECTS(2001) Competition project : Team Gross Area : 15,000-35,000 sq.yard Area of work : Analysis, SD for building 1 and 4, Masterplan, Presentation, Coordination Mega project consisting of many attractive tourst spots ; shopping center, pedestrian retails, circus, zoo arena and hotels. A location of Royal Gems Hotel and Plaza is in Pattaya which is a famous city in Chonburi province, Thailand. There are walking streets, animal show&zoo, botanical garden and many famous beaches. So concept is to provied one-stop tourist spots that tourists can enjoy many activities at the place. A combination of various destinations in one place, the project aims to serve both tourists and local people nearby. It is consisted of commercial plaza, manetic show and entertainment including hotels and accomotations.
Site Analisis
Attraction & Shopping
Animal Show
Shopping Mall
Aqua Tube
Thai Traditional Display on Rooftop
Facade Design
Inspiring by Thai weaving and gem pattern, the concept is to bring out the identity of Thai detail and the luxurious modernity of gems which expresses the company character ; Royal Gem.
Elevation
Basement
Ground floor
2nd-3rd floor
Rooftop
Perspective - Entrance
Perspective - Overall project
URBAN GEODE PRATT GAUD
Academic project : Spring 2019 Professor : Ariane Lourie Harrison Co-teacher : Jeffrey Anderson Brian Ringley Partner : Anushree Patel The project is an urban geode: a vertical element that pulls the dark bedrock of Gotham up into the bright offices and pulls people down into one of the most communal urban networks which is the subway. The darkness is intentional into the idea that something as ancient as bedrock could link the contemporary office space to the urban community. The cast concrete outer shell retains the mood and darkness of these urban moments, and the geode brings the darkness into the space. The Geode inhabits the current spaces of the city with a performative skin that capacities as a responsive, unique interface. Rocky outer shell yet beautiful mineral inside give two qualities of materiality which are concrete as an artificial bedrock, and digital screen as a glowing mineral. The casted concrete shows interiority and concavity qualities. The concave gives darkness and mysterious feeling which represent by shadow that casts the spaces. Inside the rocky dark shell has digital screens in order to provide brightness. The screens does not only give the light but also an interactive digital technology to collect data of people’s movement then represents the movement as a delay of dot metrix datas and registers people’s bodies as point clouds. These two information that show on the screen provide a sense of community, the digital ghost community.
Layout Plan
Axon Section
Section
Detail Section
X-Box : Digital Ghost on screen
Physical Model : Subway
Physical Model : Office Space
Physical Model : Office space
Physical Model : Office space
EXQUISITE CORPSE PRATT GAUD
Academic project : Fall 2018 Professor : Jonas Coersmeier Co-teacher : Brian Ringley The studio takes a material approach to the post-digital project in current architectural discourse. It sacribes design intelligence to both, the (building) material itself and the universal (fabrication) machine that acts upon it - the robot. The studio encourage deep material explorations in search of organizational and aesthetic principles ; and it encourages the full participation of machine in the design process. Robots here are not reduced to only manufaturing laborers, but they, along with their evolving drivers and routines, are invited to enter into ‘creative’ dialogue with the human and material. The studio will allow for moments of poetic immersion into this relationship. Using digital documentary, for example, photogrammetry,and texture mapping to enhance the moment from fabication. The geometry and material affect show quality of cavity to expose relationship between exterior and interior, positive and negative. The cavity loose a boundary of what is inside and outsied and make them continuely connect an as architectural affect which could look through inside-out and outside-in. Apart from the relationship between geometry itself, a context is parasited by the object which embed through the inside, does not just stand on it. Composite Drawing
Photogrammetry
Collage image from Physical model section
Composite Drawing of Model section
Physical Model : Rough Robotic Toolpaths
Physical Model : Finished Robotic Toolpaths
Physical Model : All Robotic Toolpaths
Physical Model
Physical Model : Rough Robotic Toolpaths
Physical Model : All Robotic Toolpaths
Physical Model : All Robotic Toolpaths
Physical Model
CONTEXT-OBJECT PRATT GAUD
Academic project : Summer 2018 Professor : Jason Vigneri-Beane The world comprised of so many different things, creatures, environments, and societies. Recently, there is a new interest in describing how these objects co-exist and inflect each other : theories such as Graham Harman suggest they affect each other aesthetically They are all have their own identity and self-expression. Whatever happens in the same context, it creates a relationship between itself and context in clearly way or just hidden expression. It is inevitable that the relationship between them s an evolving dynamic. According to the importance of contexts, the idea of this project is to make a relationship between all elements which they are all different from each other by using some elements to tie them together. The project is to explore posibility of relationship between context and object(s) : forms, spaces, patterns, colors, resolutions, and footprints etc.
Related by Pattern(grid), Footprints, and Space
Related by Hidden Geometry
Related by Pattern(grid) and Footprints
Physical Model
Related by Diversity
KPK HOSPITAL UNDERGRAD
Academic project : Thesis Gross Area : 15,000 sq.yard Professor : Triwat Viriyasiri A hospital with calm and refresh atmosphrere at outskirt of Bangkok. The hospital is a general hospital and orthopedics center include, so apart from concerning about healthcare functions there is a safety concern for orthopedics patient who mostly cannot move properly. The concept design for this project is to make a hospital which can heal both physical and mind. For physical healing is to compact all the functions in order to support users ; doctors, nurses, staffs and patients. So the patients can have a treatment as soon as possible. Likewise, for mind healing is to provide a stressless atmosphere in the hospital by green space. There is a courtyard hall which can be seen from all the OPDs (Out Patient Unit) and also a garden for orthopedics patients in rehability department. In addition, there is also safety concern, the main floor is on the second floor in order to lower traffic on the first floor. Pedestrians can access to the hospital safely.
Section
Green Space
Vertical Circulation Diagram
Drop-off
Reception Hall
Green Court
BODHI MUSEUM UNDERGRAD
Academic project : Undergraduate Musuem Gross Area : 30,000 sq.ft. The Museum is a Thai museum loccated in Ayuttaya province, Thailand. The location is in Thai historical area in front of the riverside, the famous river named “Chaopraya” wihich is an important river in Thailand. “Bodhi” is a meaningful tree in Buddhism which is a national religion in Thailand. The meaning of the tree is “wisdom”. Bodhi museum contains all Thai wisdom and tradition from the past until now, so the design is represent Thai in a modern way while keep some of Thai unique element ; wooden terrace and facade patern.
River -Side Terrace
Section
BRIDGE MARKET UNDERGRAD
Competition project : 3rd Prize Urban Development Nippon Paint Young Creative Design SAPHANPUT MARKET is a famous pedestrian night market in Thailand but the areas invade pedestrian path. So, if there is a proper place for the market, it would be easier to organize the market and pedestrian area. The concept is to provide the areas for not only shopping but also resting which are organized by time. The bridge provides a space cycling, jogging and taking a chaopraya river scenerio. Concept is lantern stencil that glow in the dark.
Day Time
Night Time
Elevation