disaster mitigation

Page 1

DISASTER MITIGATION IN INDIA -All these stages consider two major elements of action

Preparedness For Facing Disaster

PRE DISASTER -Planning intervention -Prepare for other stages

Non - Structural measure D2 STUDIO ARCHITECTS

© ‘Ar.A.Sivaraman'

1.ZONING Prepare plans in i. Regional level ii. City level 2.DEVELOPMENT CONTROL - Code & standards To Ensure safety measures like seismic, floods, environmental. 3.ENFORCING People need to follow

Structural measure

ACCEPT DISASTER & ADDRESS THE SAFETY

DURING ON

(disaster time operations) -Relief -Operation -Evacuation (Depend on situation)

POST DISASTER -Reconstruction affected building and infra structure like road etc -Retrofit -(strengthening measure of building ) -Rehabilitation


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.