STADIUMS OF THE 21ST CENTURY
A SURVEY OF CONTEMPORARY SPORTS ARCHITECTURE PROJECTS 2006 - 2022
S. JONATHAN MYERS GEORGIA INSTITUTE OF TECHNOLOGY MASTER’S OF ARCHITECTURE 2014
TABLE OF CONTENTS SECTION 1 COMPLETED STADIUM PROJECTS
1
SECTION 2 IN-PROGRESS STADIUM PROJECTS
183
SECTION 3 UNBUILT STADIUM PROJECTS
377
SECTION 4 DIAGRAMS
397
SECTION 5 STATISTICS
409
SECTION 6 SUMMARY CHARTS
421
COMPLETED STADIUM PROJECTS
1 ALLIANZ RIVIERA NICE, FRANCE 2 ARENA CORINTHIANS SAO PAOLO, BRAZIL 3 ARENA DO GREMIO PORTO ALEGRE, BRAZIL 4 ARENA FONTE NOVA SALVADOR DA BAHIA, BRAZIL 5 ARENA KIELC KIELC, POLAND 6 ARENA LVIV LVIV, UKRAINE 7 ARENA PALESTRA ITALIA (ALLIANZ PARQUE) SAO PAULO, BRAZIL 8 ARENA PERNAMBUCO (ITAIPAVA ARENA) RECIFE, BRAZIL 9 AT&T STADIUM (COWBOYS STADIUM) DALLAS, TX 10 AVIVA STADIUM DUBLIN, IRELAND 11 BALIKPAPAN STADIUM BALIKPAPAN, INDONESIA 12 BAO’AN STADIUM SHENZEN, CHINA 13 BASRA SPORTS CITY BASRA, IRAQ 14 BAYARENA LEVERKUSEN, GERMANY 15 BBVA COMPASS STADIUM HOUSTON, TX 16 BC PLACE STADIUM VANCOUVER, CANADA 17 BEIJING NATIONAL STADIUM BEIJING, CHINA 18 CAPE TOWN STADIUM (GREEN POINT STADIUM) CAPE TOWN, SOUTH AFRICA 19 CITI FIELD QUEENS, NY 20 COFACE ARENA MOGUNCJA, GERMANY 21 DIALOG ARENA (STADION ZAGLEBIA LUBIN) LUBIN, POLAND 22 DUBAI SPORTS CITY MULTI-PURPOSE STADIUM DUBAI, UNITED ARAB EMIRATES 23 ESTADIO BEIRA-RIO PORTO ALEGRE, BRAZIL 24 ESTADIO INDEPENDENCIA BELO HORIZONTE, BRAZIL 25 ESTADIO MINEIRAO BELO HORIZONTE, BRAZIL 26 ESTADIO NACIONAL MANE GARRINCHA BRASILIA, BRAZIL 27 ETO PARK GYOR, HUNGARY 28 FISHT OLYMPIC STADIUM SOCHI, RUSSIA 29 FRIENDS ARENA STOCKHOLM, SWEDEN 30 GEDEBAGE STADIUM BANDUNG, INDONESIA 31 GHELAMCO ARENA (ARTEVELDESTADION) GHENT, BELGIUM 32 GLUCKSGAS STADIUM (RUDOLF-HARBIG STADIUM) DRESDEN, GERMANY 33 HANGZHOU SPORTS PARK HANGZHOU, CHINA 34 INVESTORS GROUP FIELD WINNIPEG, CANADA 35 JABER AL-AHMAD INTERNATIONAL STADIUM AL-ARDIYA, KUWAIT 36 JUVENTUS STADIUM TURIN, ITALY 37 KADIR HAS SEHIR STADYUMU KAYSERI, TURKEY 38 KAOHSIUNG NATIONAL ARENA KAOHSIUNG, TAIWAN 39 KAZAN ARENA KAZAN, RUSSIA 40 KING ABDULLAH SPORTS CITY JEDDAH, SAUDI ARABIA 41 LUCAS OIL STADIUM INDIANAPOLIS, INDIANA 42 MARACANA RIO DE JANEIRO, BRAZIL 43 MARLINS PARK MIAMI, FL 44 MBOMBELA STADIUM NELSPRUIT, SOUTH AFRICA 45 MERCEDES-BENZ ARENA STUTTGART, GERMANY 46 METLIFE STADIUM EAST RUTHERFORD, NJ 47 MINAA STADIUM BASRA, IRAQ 48 MOLINEUX STADIUM WOLVERHAMPTON, UNITED KINGDOM 49 MOSES MABHIDA STADIUM DURBAN, SOUTH AFRICA 50 MOTOARENA TORUN TORUN, POLAND 51 NATIONALS PARK WASHINGTON, DC 52 NELSON MANDELA BAY STADIUM PORT ELIZABETH, SOUTH AFRICA
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 100 102 104 106
53 NOU MESTALLA VALENCIA, SPAIN 54 NOVO ESTADIO PLACIDO CASTELAO FORTALEZO, BRAZIL 55 OLYMPIC STADIUM AT QUEEN ELIZABETH PARK LONDON, UNITED KINGDOM 56 PETER MOKABA STADIUM POLOKWANE, SOUTH AFRICA 57 PGE ARENA GDANSK GDANSK, POLAND 58 PPL PARK CHESTER, PA 59 RECTANGULAR ARENA MELBOURNE, AUSTRALIA 60 RED BULL ARENA HARRISON, NJ 61 RIO TINTO STADIUM SALT LAKE CITY, UT 62 SAMMY OFER STADIUM HAIFA, ISRAEL 63 SOCCER CITY JOHANNESBURG, SOUTH AFRICA 64 SPARDA-BANK-HESSEN STADION OFFENBACH AM MAIN, GERMANY 65 SPORTING PARK KANSAS CITY, MO 66 STADE OCEANE (GRAND STADE DE HAVRE) LE HAVRE, FRANCE 67 STADE PIERRE-MAUROY (GRAND STADE LILLE) LILLE, FRANCE 68 STADION BATE BORISOV BORISOV, BELARUS 69 STADION CHERNOMORETS ODESSA, UKRAINE 70 STADION CRACOVII (JOZEF PILSUDSKI STADIUM) KRAKOW, POLAND 71 STADION EDEN PRAGUE, CZECH REPUBLIC 72 STADION ESSEN ESSEN, GERMANY 73 STADION GOSIR W GDYNI GDYNIA, POLAND 74 STADION MIEJSKI IM HENRYKA REYMANA KRAKOW, POLAND 75 STADION MIEJSKI POZNAN (STADION LECHA) POZNAN, POLAND 76 STADION MIEJSKI WE WROCLAWIU WROCLAW, POLAND 77 STADION NARODOWY WARSAW, POLAND 78 STADION OLIMPIJSKI KIEV, UKRAINE 79 STADION PIAST GLIWICE, POLAND 80 STADION STALI RZESZOW RZESZOW, POLAND 81 STADION WOJSKA POLSKIEGO WARSAW, POLAND 82 STADION ZDZISLAWA KRZYSZKOWIAKA BYDGOSZCZ, POLAND 83 TARGET FIELD MINNEAPOLIS, MN 84 TELE2 ARENA STOCKHOLM, SWEDEN 85 TIMSAH ARENA BURSA, TURKEY 86 TIVOLI AACHEN, GERMANY 87 TURK TELEKOM ARENA ISTANBUL, TURKEY 88 YANKEE STADIUM SOUTH BRONX, NY 89 YONGIN SPORTS PARK YONGIN, SOUTH KOREA
108 110 112 114 116 118 120 122 124 126 128 130 132 134 136 138 140 142 144 146 148 150 152 154 156 158 160 162 164 166 168 170 172 174 176 178 180
XX COMPLETED NEW CONSTRUCTION PROJECT XX COMPLETED RENOVATION PROJECT
ALLIANZ RIVIERA NICE, FRANCE
1
ARCHITECT JEAN-MICHEL WILMOTTE TENANT/USAGE EURO2016 CONSTRUCTION COST $332 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
4
CAPACITY 35,624
ALLIANZ RIVIERA NICE, FRANCE
5
ARENA CORINTHIANS SAO PAULO, BRAZIL
2
ARCHITECT ANIBAL COUTINHO TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $460 MILLION COMPLETION DATE 2013 SETTING URBAN
6
CAPACITY 65,000
ARENA CORINTHIANS SAO PAULO, BRAZIL
7
ARENA DO GREMIO PORTO ALEGRE, BRAZIL
3
ARCHITECT PLARQ ARQUITECTURA TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $154 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
8
CAPACITY 60,540
ARENA DO GREMIO PORTO ALEGRE, BRAZIL
9
ARENA FONTE NOVA SALVADOR DA BAHIA, BRAZIL
4
ARCHITECT SCHULITZ & PARTNER ARCHITEKTEN TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $296 MILLION COMPLETION DATE 2013 SETTING URBAN
10
CAPACITY 55,000
ARENA FONTE NOVA SALVADOR DA BAHIA, BRAZIL
11
ARENA KIELC KIELC, POLAND
5
ARCHITECT ATJ ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $65 MILLION COMPLETION DATE 2006 SETTING URBAN
12
CAPACITY 15,500
ARENA KIELC KIELC, POLAND
13
ARENA LVIV LVIV, UKRAINE
6
ARCHITECT ATELIER ALBERT WIMMER / ARNILA TENANT/USAGE EURO2012 CONSTRUCTION COST $280 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
14
CAPACITY 34,915
ARENA LVIV LVIV, UKRAINE
15
ARENA PALESTRA ITALIA SAO PAULO, BRAZIL
7
ARCHITECT TOMAS TAVEIRA TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $250 MILLION COMPLETION DATE 2013 SETTING URBAN
16
CAPACITY 60,000
ARENA PALESTRA ITALIA SAO PAULO, BRAZIL
17
ARENA PERNAMBUCO RECIFE, BRAZIL
8
ARCHITECT FERNANDES ARQUITECTOS ASSOCIADOS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $265 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
18
CAPACITY 46,154
ARENA PERNAMBUCO RECIFE, BRAZIL
19
AT&T STADIUM DALLAS, TEXAS
9
ARCHITECT HKS, INC. TENANT/USAGE DALLAS COWBOYS (NFL) CONSTRUCTION COST $1 BILLION COMPLETION DATE 2009 SETTING SUB-URBAN
20
CAPACITY 80,000
AT&T STADIUM DALLAS, TEXAS
21
AVIVA STADIUM DUBLIN, IRELAND
10
ARCHITECT POPULOUS TENANT/USAGE IRISH NATIONAL STADIUM CONSTRUCTION COST $555 MILLION COMPLETION DATE 2009 SETTING URBAN
22
CAPACITY 51,700
AVIVA STADIUM DUBLIN, IRELAND
23
BALIKPAPAN STADIUM BALIKPAPAN, INDONESIA
11
ARCHITECT ARKITEK TEAM EMPAT TENANT/USAGE PERSIBA BALIKPAPAN (INDONESIAN SUPER LEAGUE) CONSTRUCTION COST N/A COMPLETION DATE 2013 SETTING SUB-URBAN
24
CAPACITY 40,000
BALIKPAPAN STADIUM BALIKPAPAN, INDONESIA
25
BAO’AN STADIUM SHENZHEN, CHINA
12
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE 2011 SUMMER UNIVERSIADE CONSTRUCTION COST N/A COMPLETION DATE 2011 SETTING URBAN
26
CAPACITY 40,500
BAO’AN STADIUM SHENZHEN, CHINA
27
BASRA SPORTS CITY BASRA, IRAQ
13
ARCHITECT 360 ARCHITECTURE / NEWPORT GLOBAL TENANT/USAGE 2014 GULF CUP OF NATIONS CONSTRUCTION COST $350 MILLION COMPLETION DATE 2013 SETTING RURAL
28
CAPACITY 85,000
BASRA SPORTS CITY BASRA, IRAQ
29
BAYARENA LEVERKUSEN, GERMANY
14
ARCHITECT MAX BOGL TENANT/USAGE BAYER 04 LEVERKUSEN (GERMAN 1. BUNDESLIGA) CONSTRUCTION COST $95 MILLION COMPLETION DATE 2009 SETTING URBAN
30
CAPACITY 30,000
BAYARENA LEVERKUSEN, GERMANY
31
BBVA COMPASS STADIUM HOUSTON, TEXAS
15
ARCHITECT POPULOUS TENANT/USAGE HOUSTON DYNAMO (MLS) CONSTRUCTION COST $95 MILLION COMPLETION DATE 2012 SETTING URBAN
32
CAPACITY 22,309
BBVA COMPASS STADIUM HOUSTON, TEXAS
33
BC PLACE STADIUM VANCOUVER, CANADA
16
ARCHITECT STANTEC ARCHITECTURE LTD. TENANT/USAGE 2010 WINTER OLYMPICS CONSTRUCTION COST $125 MILLION COMPLETION DATE 2010 SETTING URBAN
34
CAPACITY 54,320
BC PLACE STADIUM VANCOUVER, CANADA
35
BEIJING NATIONAL STADIUM BEIJING, CHINA
17
ARCHITECT HERZOG & DE MEURON TENANT/USAGE 2008 SUMMER OLYMPICS CONSTRUCTION COST $423 MILLION COMPLETION DATE 2008 SETTING URBAN
36
CAPACITY 91,000
BEIJING NATIONAL STADIUM BEIJING, CHINA
37
CAPE TOWN STADIUM CAPE TOWN, SOUTH AFRICA
18
ARCHITECT GERKAN, MARG, & PARTNERS / POINT ARCHITECTS TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $600 MILLION COMPLETION DATE 2009 SETTING URBAN
38
CAPACITY 69,700
CAPE TOWN STADIUM CAPE TOWN, SOUTH AFRICA
39
CITI FIELD QUEENS, NEW YORK
19
ARCHITECT POPULOUS / JACK L. GORDON ARCHITECTS TENANT/USAGE NEW YORK METS (MLB) CONSTRUCTION COST $900 MILLION COMPLETION DATE 2009 SETTING URBAN
40
CAPACITY 45,000
CITI FIELD QUEENS, NEW YORK
41
COFACE ARENA MAINZ, GERMANY
20
AGN NIEDERBERGHAUS & PARTNER GMBH / ARCHITECT HBM STADIEN UND SPORTSTATTENBAU
TENANT/USAGE FSV MAINZ 05 (GERMAN 1. BUNDESLIGA) CONSTRUCTION COST $60 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
42
CAPACITY 34,340
COFACE ARENA MAINZ, GERMANY
43
DIALOG ARENA LUBIN, POLAND
21
ARCHITECT MIERZWA ARCHITECKTEN TENANT/USAGE EURO2012 CONSTRUCTION COST $38.5 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
44
CAPACITY 16,300
DIALOG ARENA LUBIN, POLAND
45
DUBAI SPORTS CITY STADIUM DUBAI, UNITED ARAB EMIRATES
22
ARCHITECT MAX BOGL TENANT/USAGE DUBAI NATIONAL STADIUM CONSTRUCTION COST $226 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
46
CAPACITY 60,000
DUBAI SPORTS CITY STADIUM DUBAI, UNITED ARAB EMIRATES
47
ESTADIO BEIRA-RIO PORTO ALEGRE, BRAZIL
23
ARCHITECT HYPE STUDIO TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $135 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
48
CAPACITY 60,000
ESTADIO BEIRA-RIO PORTO ALEGRE, BRAZIL
49
ESTADIO INDEPENDENCIA BELO HORIZONTE, BRAZIL
24
ARCHITECT MISSYOR ARQUITETOS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $57 MILLION COMPLETION DATE 2011 SETTING URBAN
50
CAPACITY 33,000
ESTADIO INDEPENDENCIA BELO HORIZONTE, BRAZIL
51
ESTADIO MINEIRAO BELO HORIZONTE, BRAZIL
25
ARCHITECT BCMF ARQUITECTOS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $348 MILLION COMPLETION DATE 2013 SETTING URBAN
52
CAPACITY 62,160
ESTADIO MINEIRAO BELO HORIZONTE, BRAZIL
53
ESTADIO NACIONAL MANE GARRINCHA BRASILIA, BRAZIL
26
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $336 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
54
CAPACITY 71,500
ESTADIO NACIONAL MANE GARRINCHA BRASILIA, BRAZIL
55
ETO PARK GYOR, HUNGARY
27
ARCHITECT MARCEL HARTMANN TENANT/USAGE GYORI ETO FC (HUNGARIAN OTP BANK LIGA) CONSTRUCTION COST $103 MILLION COMPLETION DATE 2008 SETTING SUB-URBAN
56
CAPACITY 20,000
ETO PARK GYOR, HUNGARY
57
FISHT OLYMPIC STADIUM SOCHI, RUSSIA
28
ARCHITECT POPULOUS / BURO HAPPOLD TENANT/USAGE 2014 WINTER OLYMPICS CONSTRUCTION COST $603 MILLION COMPLETION DATE 2013 SETTING URBAN
58
CAPACITY 47,659
FISHT OLYMPIC STADIUM SOCHI, RUSSIA
59
FRIENDS ARENA STOCKHOLM, SWEDEN
29
ARCHITECT POPULOUS (AND OTHERS) TENANT/USAGE SWEDISH NATIONAL STADIUM CONSTRUCTION COST $298 MILLION COMPLETION DATE 2012 SETTING SUB-URBAN
60
CAPACITY 65,000
FRIENDS ARENA STOCKHOLM, SWEDEN
61
GEDEBAGE STADIUM BANDUNG, INDONESIA
30
ARCHITECT PENTA ARCHITECTURE / ARKONIN TENANT/USAGE PERSIB BANDUNG (INDONESIA SUPER LEAGUE) CONSTRUCTION COST $48 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
62
CAPACITY 38,000
GEDEBAGE STADIUM BANDUNG, INDONESIA
63
GHELAMCO ARENA GHENT, BELGUIM
31
ARCHITECT BONTINCK ARCHITECTURE AND ENGINEERING TENANT/USAGE KAA GHENT (BELGIAN PRO LEAGUE) CONSTRUCTION COST $68 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
64
CAPACITY 22,500
GHELAMCO ARENA GHENT, BELGIUM
65
GLUCKSGAS STADIUM DRESDEN, GERMANY
32
ARCHITECT B+P PROJEKT TENANT/USAGE DYNAMO DRESDEN (GERMAN 2. BUNDESLIGA) CONSTRUCTION COST $61 MILLION COMPLETION DATE 2009 SETTING URBAN
66
CAPACITY 32,296
GLUCKSGAS STADIUM DRESDEN, GERMANY
67
HANGZHOU SPORTSPARK STADIUM HANGZHOU, CHINA
33
ARCHITECT NBBJ / CCDI TENANT/USAGE CHINESE NATIONAL STADIUM CONSTRUCTION COST N/A COMPLETION DATE 2013 SETTING URBAN
68
CAPACITY 80,000
HANGZHOU SPORTSPARK STADIUM HANGZHOU, CHINA
69
INVESTOR’S GROUP FIELD WINNIPEG, CANADA
34
ARCHITECT RAYMONND SC WAN ARCHITECT, INC. / HOK SPORT TENANT/USAGE WINNIPEG BLUE BOMBERS (CANADIAN FOOTBALL LEAGUE) CONSTRUCTION COST $195 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
70
CAPACITY 33,000
INVESTOR’S GROUP FIELD WINNIPEG, CANADA
71
JABER AL-AHMAD INTERNATIONAL STADIUM AL-ARDIYA, KUWAIT
35
ARCHITECT AL-KHARAFI GROUP TENANT/USAGE KUWAITI NATIONAL STADIUM CONSTRUCTION COST $220 MILLION COMPLETION DATE 2010 SETTING SUB-URBAN
72
CAPACITY 64,000
JABER AL-AHMAD INTERNATIONAL STADIUM AL-ARDIYA, KUWAIT
73
JUVENTUS STADIUM TURIN, ITALY
36
ARCHITECT STUDIO SHESA / STUDIO GAU TENANT/USAGE JUVENTUS AC (ITALIAN SERIE A) CONSTRUCTION COST $165 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
74
CAPACITY 41,254
JUVENTUS STADIUM TURIN, ITALY
75
KADIR HAS SEHIR STADYUMU KAYSERI, TURKEY
37
ARCHITECT OFISS MIMARCA TENANT/USAGE KAYSERISPOR KS (TURKISH SUPER LIG) CONSTRUCTION COST $38 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
76
CAPACITY 32,864
KADIR HAS SEHIR STADYUMU KAYSERI, TURKEY
77
KAOHSIUNG NATIONAL STADIUM KAOHSIUNG, TAIWAN
38
ARCHITECT TOYO ITO TENANT/USAGE WORLD GAMES 2009 CONSTRUCTION COST $150 MILLION COMPLETION DATE 2009 SETTING URBAN
78
CAPACITY 55,000
KAOHSIUNG NATIONAL STADIUM KAOHSIUNG, TAIWAN
79
KAZAN ARENA KAZAN, RUSSIA
39
ARCHITECT POPULOUS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $450 MILLION COMPLETION DATE 2013 SETTING URBAN
80
CAPACITY 45,150
KAZAN ARENA KAZAN, RUSSIA
81
KING ABDULLAH SPORTS CITY JEDDAH, SAUDI ARABIA
40
ARCHITECT ARUP ASSOCIATES TENANT/USAGE SAUDI ARABIAN NATIONAL STADIUM CONSTRUCTION COST $560 MILLION COMPLETION DATE 2013 SETTING RURAL
82
CAPACITY 60,000
KING ABDULLAH SPORTS CITY JEDDAH, SAUDI ARABIA
83
LUCAS OIL STADIUM INDIANAPOLIS, INDIANA
41
ARCHITECT HKS, INC. TENANT/USAGE INDIANAPOLIS COLTS (NFL) CONSTRUCTION COST $750 MILLION COMPLETION DATE 2008 SETTING URBAN
84
CAPACITY 63,000
LUCAS OIL STADIUM INDIANAPOLIS, INDIANA
85
MARACANA RIO DE JANEIRO, BRAZIL
42
ARCHITECT EMOP TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $466 MILLION COMPLETION DATE 2013 SETTING URBAN
86
CAPACITY 82,238
MARACANA RIO DE JANEIRO, BRAZIL
87
MARLINS PARK MIAMI, FLORIDA
43
ARCHITECT POPULOUS TENANT/USAGE MIAMI MARLINS (MLB) CONSTRUCTION COST $634 MILLION COMPLETION DATE 2012 SETTING URBAN
88
CAPACITY 36,742
MARLINS PARK MIAMI, FLORIDA
89
MBOMBELA STADIUM NELSPRUIT, SOUTH AFRICA
44
ARCHITECT R&L ARCHITECTS TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $140 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
90
CAPACITY 45,000
MBOMBELA STADIUM NELSPRUIT, SOUTH AFRICA
91
MERCEDES-BENZ ARENA STUTTGART, GERMANY
45
ARCHITECT ASP ARCHITEKTEN TENANT/USAGE VFB STUTTGART (GERMAN 1. BUNDESLIGA) CONSTRUCTION COST $170.5 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
92
CAPACITY 60,000
MERCEDES-BENZ ARENA STUTTGART, GERMANY
93
METLIFE STADIUM EAST RUTHERFORD, NEW JERSEY
46
ARCHITECT 360 ARCHITECTURE / EWING COLE / ROCKWELL GROUP / BRUCE MAU DESIGN TENANT/USAGE NEW YORK GIANTS / NEW YORK JETS (NFL) CONSTRUCTION COST $1.6 BILLION COMPLETION DATE 2010 SETTING URBAN
94
CAPACITY 82,566
METLIFE STADIUM EAST RUTHERFORD, NEW JERSEY
95
MINAA STADIUM MINAA, IRAQ
47
ARCHITECT 360 ARCHITECTURE TENANT/USAGE AL MINAA FC (TURKISH SUPER LIG) CONSTRUCTION COST $86 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
96
CAPACITY 30,000
MINAA STADIUM MINAA, IRAQ
97
MOLINEUX STADIUM WOLVERHAMPTON, UK
48
ARCHITECT AFL ARCHITECTS TENANT/USAGE WOLVERHAMPTON WANDERERS (ENGLISH LEAGUE CHAMPIONSHIP) CONSTRUCTION COST $64 MILLION COMPLETION DATE 2013 SETTING URBAN
98
CAPACITY 37,500
MOLINEUX STADIUM WOLVERHAMPTON, UNITED KINGDOM
99
MOSES MABHIDA STADIUM DURBAN, SOUTH AFRICA
49
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $450 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
100
CAPACITY 70,000
MOSES MABHIDA STADIUM DURBAN, SOUTH AFRICA
101
MOTOARENA TORUN TORUN, POLAND
50
ARCHITECT ATJ ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $26 MILLION COMPLETION DATE 2009 SETTING RURAL
102
CAPACITY 15,000
MOTOARENA TORUN TORUN, POLAND
103
NATIONALS PARK WASHINGTON, DC
51
ARCHITECT HOK SPORT / DEVROUAX & PURNELL ARCHITECTS TENANT/USAGE WASHINGTON NATIONALS (MLB) CONSTRUCTION COST $693 MILLION COMPLETION DATE 2008 SETTING URBAN
104
CAPACITY 45,966
NATIONALS PARK WASHINGTON, DC
105
NELSON MANDELA BAY STADIUM PORT ELIZABETH, SOUTH AFRICA
52
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $150 MILLION COMPLETION DATE 2009 SETTING URBAN
106
CAPACITY 46,500
NELSON MANDELA BAY STADIUM PORT ELIZABETH, SOUTH AFRICA
107
NOU MESTALLA VALENCIA, SPAIN
53
ARCHITECT ARUP SPORT / REID FENWICK ASSOCIATES TENANT/USAGE VALENCIA CF (SPANISH LA LIGA) CONSTRUCTION COST $406 MILLION COMPLETION DATE 2013 SETTING URBAN
108
CAPACITY 75,100
NOU MESTALLA VALENCIA, SPAIN
109
NOVO ESTADIO PLACIDO ADERALDO CASTELAO FORTALEZA, BRAZIL
54
ARCHITECT VIGILIECCA ARQUITECTOS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $260 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
110
CAPACITY 63,903
NOVO ESTADIO PLACIDO ADERALDO CASTELAO FORTALEZA, BRAZIL
111
OLYMPIC STADIUM AT QUEEN ELIZABETH PARK LONDON, UNITED KINGDOM
55
ARCHITECT POPULOUS TENANT/USAGE 2012 SUMMER OLYMPICS CONSTRUCTION COST $800 MILLION COMPLETION DATE 2012 SETTING URBAN
112
CAPACITY 80,000
OLYMPIC STADIUM AT QUEEN ELIZABETH PARK LONDON, UNITED KINGDOM
113
PETER MOKABA STADIUM POLOKWANE, SOUTH AFRICA
56
ARCHITECT PRISM ARCHITECTS TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $120 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
114
CAPACITY 41,733
PETER MOKABA STADIUM POLOKWANE, SOUTH AFRICA
115
PGE ARENA GDANSK GDANSK, POLAND
57
ARCHITECT RHODE-KELLERMAN-WAWROWSKY TENANT/USAGE EURO2012 CONSTRUCTION COST $276 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
116
CAPACITY 43,615
PGE ARENA GDANSK GDANSK, POLAND
117
PPL PARK CHESTER, PENNSYLVANIA
58
ARCHITECT ROSSETTI / ICON VENUE GROUP TENANT/USAGE PHILADELPHIA UNION (MLS) CONSTRUCTION COST $120 MILLION COMPLETION DATE 2010 SETTING SUB-URBAN
118
CAPACITY 18,500
PPL PARK CHESTER, PENNSYLVANIA
119
RECTANGULAR STADIUM MELBOURNE, AUSTRALIA
59
ARCHITECT COX ARCHITECTS / ARUP SPORT TENANT/USAGE MELBOURNE VICTORY (AUSTRALIAN A-LEAGUE) CONSTRUCTION COST $253 MILLION COMPLETION DATE 2010 SETTING URBAN
120
CAPACITY 30,500
RECTANGULAR STADIUM MELBOURNE, AUSTRALIA
121
RED BULL ARENA HARRISON, NEW JERSEY
60
ARCHITECT ROSSETTI TENANT/USAGE NEW YORK RED BULLS (MLS) CONSTRUCTION COST $200 MILLION COMPLETION DATE 2010 SETTING SUB-URBAN
122
CAPACITY 25,189
RED BULL ARENA HARRISON, NEW JERSEY
123
RIO TINTO STADIUM SALT LAKE CITY, UTAH
61
ARCHITECT ROSSETTI TENANT/USAGE REAL SALT LAKE (MLS) CONSTRUCTION COST $110 MILLION COMPLETION DATE 2008 SETTING SUB-URBAN
124
CAPACITY 20,213
RIO TINTO STADIUM SALT LAKE CITY, UTAH
125
SAMMY OFER STADIUM HAIFA, ISRAEL
62
ARCHITECT KSS DESIGN GROUP TENANT/USAGE MACCABI HAIFA (ISRAELI PREMIER LEAGUE) CONSTRUCTION COST $150 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
126
CAPACITY 30,820
SAMMY OFER STADIUM HAIFA, ISRAEL
127
SOCCER CITY JOHANNESBURG, SOUTH AFRICA
63
ARCHITECT BOOGERTMAN + PARTNERS / HOK SPORT / SBP TENANT/USAGE FIFA WORLD CUP 2010 CONSTRUCTION COST $440 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
128
CAPACITY 91,141
SOCCER CITY JOHANNESBURG, SOUTH AFRICA
129
SPARDA-BANK-HESSEN STADION OFFENBACH AM MAIN, GERMANY
64
ARCHITECT BREMER AG TENANT/USAGE KICKERS OFFENBACH (GERMAN REGIONALLIGA) CONSTRUCTION COST $36.5 MILLION COMPLETION DATE 2012 SETTING SUB-URBAN
130
CAPACITY 20,600
SPARDA-BANK-HESSEN STADION OFFENBACH AM MAIN, GERMANY
131
SPORTING PARK KANSAS CITY, MO
65
ARCHITECT POPULOUS TENANT/USAGE SPORTING KC (MLS) CONSTRUCTION COST $200 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
132
CAPACITY 25,000
SPORTING PARK KANSAS CITY, MISSOURI
133
STADE OCEANE LE HAVRE, FRANCE
66
ARCHITECT KSS GROUP / SCAU TENANT/USAGE EURO2016 CONSTRUCTION COST $137 MILLION COMPLETION DATE 2012 SETTING SUB-URBAN
134
CAPACITY 25,000
STADE OCEANE LE HAVRE, FRANCE
135
STADE PIERRE-MAUROY LILLE, FRANCE
67
ARCHITECT PIERRE FERRET, DENIS VALODE, & JEAN PISTRE TENANT/USAGE EURO2016 CONSTRUCTION COST $382 MILLION COMPLETION DATE 2012 SETTING SUB-URBAN
136
CAPACITY 50,186
STADE PIERRE-MAUROY LILLE, FRANCE
137
STADION BATE BORISOV BORISOV, BELARUS
68
ARCHITECT OFIS AHITEKTI TENANT/USAGE FC BATE BORISOV (BELARUSIAN PREMIER LEAGUE) CONSTRUCTION COST $54 MILLION COMPLETION DATE 2013 SETTING URBAN
138
CAPACITY 12,896
STADION BATE BORISOV BORISOV, BELARUS
139
STADION CHERNOMORETS ODESSA, UKRAINE
69
ARCHITECT FIEBIGER GMBH ARCHITEKTEN TENANT/USAGE EURO2012 CONSTRUCTION COST $294 MILLION COMPLETION DATE 2011 SETTING URBAN
140
CAPACITY 34,164
STADION CHERNOMORETS ODESSA, UKRAINE
141
STADION CRACOVII KRAKOW, POLAND
70
ARCHITECT ESTUDIO LAMELA / SENER TENANT/USAGE EURO2012 CONSTRUCTION COST $50 MILLION COMPLETION DATE 2010 SETTING SUB-URBAN
142
CAPACITY 15,160
STADION CRACOVII KRAKOW, POLAND
143
STADION EDEN PRAGUE, CZECH REPUBLIC
71
ARCHITECT MARTIN KOTIK (OMICRON-K) / ARCADIS PROJECT MANAGEMENT TENANT/USAGE SK SLAVIA PRAHA (CZECH GAMBRINUS LIGA) CONSTRUCTION COST $47.5 MILLION COMPLETION DATE 2008 SETTING URBAN
144
CAPACITY 21,000
STADION EDEN PRAGUE, CZECH REPUBLIC
145
STADION ESSEN ESSEN, GERMANY
72
ARCHITECT W+GESELLSCHAFT FUR PROJEKTABWICKLUNG MBH TENANT/USAGE ROT-WEISS ESSEN (GERMAN REGIONALLIGA) CONSTRUCTION COST $58 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
146
CAPACITY 20,650
STADION ESSEN ESSEN, GERMANY
147
STADION GOSIR W GDYNI GDYNIA, POLAND
73
ARCHITECT STUDIO PROJEKTOWE SPAK TENANT/USAGE EURO2012 CONSTRUCTION COST $25 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
148
CAPACITY 15,139
STADION GOSIR W GDYNI GDYNIA, POLAND
149
STADION MIEJSKI IM HENRYKA REYMANA KRAKOW, POLAND
74
ARCHITECT WOJCIECH OBTULOWICZ TENANT/USAGE EURO2012 CONSTRUCTION COST $192 MILLION COMPLETION DATE 2011 SETTING URBAN
150
CAPACITY 33,326
STADION MIEJSKI IM HENRYKA REYMANA KRAKOW, POLAD
151
STADION MIEJSKI POZNAN POZNAN, POLAND
75
ARCHITECT MODERN CONSTRUCTION SYSTEMS TENANT/USAGE EURO2012 CONSTRUCTION COST $228 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
152
CAPACITY 43,980
STADION MIEJSKI POZNAN POZNAN, POLAND
153
STADION MIEJSKI WE WROCLAWIU WROCLAW, POLAND
76
ARCHITECT JSK ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $274 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
154
CAPACITY 44,416
STADION MIEJSKI WE WROCLAWIU WROCLAW, POLAND
155
STADION NARODOWY WARSAW, POLAND
77
ARCHITECT JSK ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $612 MILLION COMPLETION DATE 2011 SETTING URBAN
156
CAPACITY 58,145
STADION NARODOWY WARSAW, POLAND
157
STADION OLIMPIJSKI KIEV, UKRAINE
78
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE EURO2012 CONSTRUCTION COST $534 MILLION COMPLETION DATE 2011 SETTING URBAN
158
CAPACITY 70,500
STADION OLIMPIJSKI KIEV, UKRAINE
159
STADION PIAST GLIWICE, POLAND
79
ARCHITECT BREMER AG TENANT/USAGE EURO2012 CONSTRUCTION COST $17.25 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
160
CAPACITY 10,370
STADION PIAST GLIWICE, POLAND
161
STADION STALI RZESZOW RZESZOW, POLAND
80
ARCHITECT ATJ ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $48 MILLION COMPLETION DATE 2011 SETTING URBAN
162
CAPACITY 20,150
STADION STALI RZESZOW RZESZOW, POLAND
163
STADION WOJSKA POLSKIEGO WARSAW, POLAND
81
ARCHITECT JSK ARCHITEKCI TENANT/USAGE EURO2012 CONSTRUCTION COST $147 MILLION COMPLETION DATE 2011 SETTING URBAN
164
CAPACITY 31,103
STADION WOJSKA POLSKIEGO WARSAW, POLAND
165
STADION ZDZISLAWA KRZYSZKOWIAKA BYDGOSZCZ, POLAND
82
ARCHITECT GRZEGORZ JAWORSKI TENANT/USAGE EURO2012 CONSTRUCTION COST $22.5 MILLION COMPLETION DATE 2008 SETTING SUB-URBAN
166
CAPACITY 20,247
STADION ZDZISLAWA KRZYSZKOWIAKA BYDGOSZCZ, POLAND
167
TARGET FIELD MINNEAPOLIS, MINNESOTA
83
ARCHITECT POPULOUS / HAMMEL, GREEN, AND ABRAHAMSON TENANT/USAGE MINNESOTA TWINS (MLB) CONSTRUCTION COST $545 MILLION COMPLETION DATE 2010 SETTING URBAN
168
CAPACITY 39,504
TARGET FIELD MINNEAPOLIS, MINNESOTA
169
TELE2 ARENA STOCKHOLM, SWEDEN
84
ARCHITECT WHITE ARKITEKTUR / ARUP SPORT TENANT/USAGE HAMMARBY IF (SWEDISH SUPERETTAN) CONSTRUCTION COST $392.5 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
170
CAPACITY 30,000
TELE2 ARENA STOCKHOLM, SWEDEN
171
TIMSAH ARENA BURSA, TURKEY
85
ARCHITECT SOZUNERI MIMARLIK TENANT/USAGE BURSASPOR (TURKISH SUPER LIG) CONSTRUCTION COST $95 MILLION COMPLETION DATE 2013 SETTING SUB-URBAN
172
CAPACITY 45,000
TIMSAH ARENA BURSA, TURKEY
173
TIVOLI AACHEN, GERMANY
86
ARCHITECT AGN NIEDERBERGHAUS & PARTNER GMBH TENANT/USAGE ALEMANNIA AACHEN (GERMAN REGIONALLIGA) CONSTRUCTION COST $68 MILLION COMPLETION DATE 2009 SETTING SUB-URBAN
174
CAPACITY 32,900
TIVOLI AACHEN, GERMANY
175
TURK TELEKOM ARENA ISTANBUL, TURKEY
87
ARCHITECT ARCHITEKTEN STUTTGART / OBERMEYER PANEN + BERATEN TENANT/USAGE GALATASARAY SC (TURKISH SUPER LIG) CONSTRUCTION COST $162.5 MILLION COMPLETION DATE 2011 SETTING SUB-URBAN
176
CAPACITY 52,695
TURK TELEKOM ARENA ISTANBUL, TURKEY
177
YANKEE STADIUM SOUTH BRONX, NEW YORK
88
ARCHITECT POPULOUS TENANT/USAGE NEW YORK YANKEES (MLB) CONSTRUCTION COST $1.5 BILLION COMPLETION DATE 2009 SETTING URBAN
178
CAPACITY 50,287
YANKEE STADIUM SOUTH BRONX, NEW YORK
179
YONGIN SPORTS PARK YONGIN, SOUTH KOREA
89
ARCHITECT N/A TENANT/USAGE MULTI-USE NATIONAL STADIUM CONSTRUCTION COST N/A COMPLETION DATE 2013 SETTING SUB-URBAN
180
CAPACITY 37,155
YONGIN SPORTS PARK YONGIN, SOUTH KOREA
181
IN-PROGRESS STADIUM PROJECTS
1 19 MAYIS STADIUM SAMSUN, TURKEY 2 AKYAKI STADIUM TRABZON, TURKEY 3 AL-GHARAFA STADIUM DOHA, QATAR 4 AL-KHOR STADIUM AL-KHOR, QATAR 5 AL-NAJAF STADIUM NAJAF, IRAQ 6 AL-SHAMAL STADIUM ASH-SHAMAL, QATAR 7 ALANIA STADION VLADIKAVKAZ, RUSSIA 8 AMERICAN EXPRESS COMMUNITY STADIUM BRIGHTON, UNITED KINGDOM 9 ARENA92 NANTERRE, FRANCE 10 ARENA COMMUNITY STADIUM BRIGHTON, UNITED KINGDOM 11 ARENA DA AMAZONIA MANAUS, BRAZIL 12 ARENA DAS DUNAS NATAL, BRAZIL 13 ARENA DO SPORT RECIFE, BRAZIL 14 ARENA PANTANAL CUIABA, BRAZIL 15 ATLANTA FALCONS NEW STADIUM ATLANTA, GA 16 BAKU OLYMPIC STADIUM BAKU, AZERBAIJAN 17 BALTIC ARENA KALININGRAD, RUSSIA 18 BAYLOR STADIUM WACO, TX 19 BB&T BALLPARK CHARLOTTE, NC 20 BE’ER SHEVA BEERSHEBA, ISRAEL 21 BRISTOL CITY STADIUM BRISTOL, UNITED KINGDOM 22 BUFFALO BILLS NEW STADIUM BUFFALO, NY 23 CISCO FIELD SAN JOSE, CA 24 CITY OF BIRMINGHAM STADIUM BIRMINGHAM, UNITED KINGDOM 25 CSKA MOSCOW STADIUM MOSCOW, RUSSIA 26 DC UNITED STADIUM WASHINGON, DC 27 DE NIEUWE KUIP ROTTERDAM, NETHERLANDS 28 DOHA PORT STADIUM DOHA, QATAR 29 EDUCATION CITY STADIUM AL-RAYYAN, QATAR 30 ELMONT TOWN CROSSINGS ELMONT, NY 31 ESTADIO BBVA BANCOMER GUADELOUPE, MEXICO 32 ESTADIO LA PEINETA MADRID, SPAIN 33 FARMER’S FIELD LOS ANGELES, CA 34 FRANK CLAIR STADIUM OTTAWA, CANADA 35 GAMBA OSAKA STADIUM OSAKA, JAPAN 36 GOLDEN STATE WARRIORS NEW WATERFRONT ARENA SAN FRANCISCO, CA 37 GRAND STADE D’ALGER ALGIERS, ALGERIA 38 GRAND STADE DE CASABLANCA CASABLANCA, MOROCCO 39 GRAND STADE FFR EVRY, FRANCE 40 INCHEON ASIAD MAIN STADIUM INCHEON, SOUTH KOREA 41 KRASNODAR STADIUM KRASNODAR, RUSSIA 42 KYLE FIELD COLLEGE STATION, TX 43 LEVI’S STADIUM SAN FRANCISCO, CA 44 LUSAIL ICONIC STADIUM AL-DAYYEN, QATAR 45 MALATYA ARENA MALATYA, TURKEY 46 MINNESOTA VIKINGS NEW STADIUM MINNEAPOLIS, MN 47 NAGYERDEI STADION DEBRECEN, HUNGARY 48 NEW ANTALYA STADIUM ANTALYA, TURKEY 49 NEW CASTLEFORD STADIUM CASTLEFORD, UNITED KINGDOM 50 NEW EL PASO CHIHUAHUAS BALLPARK EL PASO, TX 51 NEW ESKISEHIR STADIUM ESKISEHIR, TURKEY 52 NEW REGINA STADIUM REGINA, CANADA
186 188 190 192 194 196 198 200 202 204 206 208 210 212 214 216 218 220 222 224 226 228 230 232 234 236 238 240 242 244 246 248 250 252 254 256 258 260 262 264 266 268 270 272 274 276 278 280 282 284 286 288
53 NEW SINGAPORE NATIONAL STADIUM KALLANG, SINGAPORE 54 NEWMARKET STADIUM WAKEFIELD, UNITED KINGDOM 55 NIZHNY NOVGOROD STADIUM NIZHNY NOVGOROD, RUSSIA 56 NORTHUMBERLAND DEVELOPMENT PROJECT LONDON, UNITED KINGDOM 57 OLYMPIASTADION HELSINKI, FINLAND 58 OTKRITIE ARENA (SPARTAK STADIUM) MOSCOW, RUSSIA 59 PERTH STADIUM PERTH, AUSTRALIA 60 QATAR UNIVERSITY STADIUM DOHA, QATAR 61 RED STAR CITY BELGRAD, SERBIA 62 RIVER PLATE FORUM BUENOS AIRES, ARGENTINA 63 SAKARYA STADI SAKARYA, TURKEY 64 SAN DIEGO CHARGERS NEW STADIUM SAN DIEGO, CA 65 SAN JOSE EARTHQUAKES STADIUM SAN JOSE, CA 66 SAN MAMES BARRIA BILBAO, SPAIN 67 SAOUD BIN ABDULRAHMAN STADIUM AL-WAKRAH, QATAR 68 SPORTS CITY STADIUM DOHA, QATAR 69 STADE BORDEAUX ATLANTIQUE BORDEAUX, FRANCE 70 STADE DES LUMIERES LYON, FRANCE 71 STADE GEOFFROY-GUICHARD ST. ETIENNE, FRANCE 72 STADE VELODROME MARSEILLE, FRANCE 73 STADIO FRIULI UDINE, ITALY 74 STADION ERNESTA POHLA ZABRZE, POLAND 75 STADION GEORGI ASPARUHOV SOFIA, BULGARIA 76 STADION MIEJSKI W BIALYMSTOKU BIALYSTOK, POLAND 77 STADION MIEJSKI W BIELSKU-BIALEJ BIELSKO-BIALA, POLAND 78 STADION MIEJSKI W LUBLINIE LUBLIN, POLAND 79 STADION MIEJSKI W TYCHACH TYCHY, POLAND 80 STADION SAMARA SAMARA, RUSSIA 81 STADION SLASKI (SILESIAN STADIUM) CHORZOW, POLAND 82 STADION STALI STALOWA WOLA STALOWA WOLA, POLAND 83 STADION TICHA VARNA, BULGARIA 84 STADION W ROSTOWIE ROSTOV-ON-DON, RUSSIA 85 STADION YUBILEYNIY SARANSK SARANSK, RUSSIA 86 TEHELNE POLE BRATISLAVA, SLOVAKIA 87 TIM HORTON’S FIELD HAMILTON, CANADA 88 UC SAMPDORIA NEW STADIUM GENOA, ITALY 89 UMM SLAL STADIUM UMM SLAL, QATAR 90 UNIVERSITY OF HOUSTON STADIUM HOUSTON, TX 91 VODAFONE ARENA ISTABUL, TURKEY 92 VOTANIKOS ARENA ATHENS, GREECE 93 VTB ARENA MOSCOW, RUSSIA 94 YULMAN STADIUM NEW ORLEAN, LA 95 ZENIT ST. PETERSBURG NEW STADIUM ST. PETERSBURG, RUSSIA
290 292 294 296 298 300 302 304 306 308 310 312 314 316 318 320 322 324 326 328 330 332 334 336 338 340 342 344 346 348 350 352 354 356 358 360 362 364 366 368 370 372 374
XX IN PROGRESS NEW CONSTRUCTION PROJECT XX IN PROGRESS RENOVATION PROJECT
19 MAYIS STADIUM SAMSUN, TURKEY
1
ARCHITECT JSK ARCHITEKCI TENANT/USAGE SAMSUNSPOR (TURKISH SUPER LIG) CONSTRUCTION COST N/A COMPLETION DATE 2015 SETTING URBAN
186
CAPACITY 33,919
19 MAYIS STADIUM SAMSUN, TURKEY
187
AKYAZI STADI TRABZON, TURKEY
2
ARCHITECT YAPI PROJE UYGULAMA TENANT/USAGE TRABZONSPOR (TURKISH SUPER LIG) CONSTRUCTION COST $135 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
188
CAPACITY 41,565
AKYAZI STADI TRABZON, TURKEY
189
AL-GHARAFA STADIUM DOHA, QATAR
3
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST N/A COMPLETION DATE 2020 SETTING URBAN
190
CAPACITY 44,740
AL-GHARAFA STADIUM DOHA, QATAR
191
AL-KHOR STADIUM AL-KHOR, QATAR
4
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $250 MILLION COMPLETION DATE 2021 SETTING SUB-URBAN
192
CAPACITY 45,330
AL-KHOR STADIUM AL-KHOR, QATAR
193
AL-NAJAF STADIUM NAJAF, IRAQ
5
ARCHITECT 360 ARCHITECTURE TENANT/USAGE AL-NAJAF FC (IRAQI PREMIER LEAGUE) CONSTRUCTION COST $84 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
194
CAPACITY 30,000
AL-NAJAF STADIUM NAJAF, IRAQ
195
AL-SHAMAL STADIUM ASH-SHAMAL, QATAR
6
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $250 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
196
CAPACITY 45,120
AL-SHAMAL STADIUM ASH-SHAMAL, QATAR
197
ALANIA STADION VLADIKAVKAZ, RUSSIA
7
ARCHITECT IDK DESIGN GROUP TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $186 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
198
CAPACITY 32,000
ALANIA STADION VLADIKAVKAZ, RUSSIA
199
AMERICAN EXPRESS COMMUNITY STADIUM BRIGHTON, UNITED KINGDOM
8
ARCHITECT KSS DESIGN GROUP TENANT/USAGE IRB RUGBY WORLD CUP 2015 CONSTRUCTION COST $168 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
200
CAPACITY 30,250
AMERICAN EXPRESS COMMUNITY STADIUM BRIGHTON, UNITED KINGDOM
201
ARENA 92 NANTERRE, FRANCE
9
ARCHITECT CHRISTIAN DE PORTZAMPARC TENANT/USAGE RACING METRO 92 (FRENCH NATIONAL RUGBY UNION) CONSTRUCTION COST $433 MILLION COMPLETION DATE 2014 SETTING URBAN
202
CAPACITY 32,000
ARENA 92 NANTERRE, FRANCE
203
ARENA COMMUNITY STADIUM ABERDEEN, SCOTLAND
10
ARCHITECT THE MILLER PARTNERSHIP TENANT/USAGE ABERDEEN FC (SCOTTISH PREMIERSHIP) CONSTRUCTION COST $80 MILLION COMPLETION DATE TBA SETTING SUB-URBAN
204
CAPACITY 22,000
ARENA COMMUNITY STADIUM ABERDEEN, SCOTLAND
205
ARENA DA AMAZONIA MANAUS, BRAZIL
11
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $266 MILLION COMPLETION DATE 2014 SETTING RURAL
206
CAPACITY 46,000
ARENA DA AMAZONIA MANAUS, BRAZIL
207
ARENA DAS DUNAS NATAL, BRAZIL
12
ARCHITECT POPULOUS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $200 MILLION COMPLETION DATE 2014 SETTING URBAN
208
CAPACITY 45,000
ARENA DAS DUNAS NATAL, BRAZIL
209
ARENA DO SPORT RECIFE, BRAZIL
13
ARCHITECT PONTUAL ARQUITETURA, TOMAS TAVIERA TENANT/USAGE SPORT CLUB DO RECIFE (BRASILEIRAO) CONSTRUCTION COST $275 MILLION COMPLETION DATE 2016 SETTING URBAN
210
CAPACITY 46,000
ARENA DO SPORT RECIFE, BRAZIL
211
ARENA PANTANAL CUIABA, BRAZIL
14
ARCHITECT GCP ARQUITECTOS TENANT/USAGE FIFA WORLD CUP 2014 CONSTRUCTION COST $210 MILLION COMPLETION DATE 2014 SETTING URBAN
212
CAPACITY 42,500
ARENA PANTANAL CUIABA, BRAZIL
213
ATLANTA FALCONS NEW STADIUM ATLANTA, GEORGIA
15
ARCHITECT 360 ARCHITECTURE TENANT/USAGE ATLANTA FALCONS (NFL) CONSTRUCTION COST $1 BILLION COMPLETION DATE 2017 SETTING URBAN
214
CAPACITY 65,000
ATLANTA FALCONS NEW STADIUM ATLANTA, GEORGIA
215
BAKU OLYMPIC STADIUM BAKU, AZERBAIJAN
16
ARCHITECT TOCA + HEERIM TENANT/USAGE AZERBAIJANI NATIONAL STADIUM CONSTRUCTION COST $640 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
216
CAPACITY 68,700
BAKU OLYMPIC STADIUM BAKU, AZERBAIJAN
217
BALTIC ARENA KALININGRAD, RUSSIA
17
ARCHITECT NPO MOSTOVIK / WILMOTTE & ASSOCIATES TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $210 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
218
CAPACITY 45,015
BALTIC ARENA KALININGRAD, RUSSIA
219
BAYLOR STADIUM WACO, TEXAS
18
ARCHITECT POPULOUS TENANT/USAGE BAYLOR UNIVERSITY BEARS (NCAAF) CONSTRUCTION COST $250 MILLION COMPLETION DATE 2014 SETTING URBAN
220
CAPACITY 55,000
BAYLOR STADIUM WACO, TEXAS
221
BB&T BALLPARK CHARLOTTE, NORTH CAROLINA
19
ARCHITECT O’DELL ASSOCIATES, INC. TENANT/USAGE CHARLOTTE KNIGHTS (AAA BASEBALL) CONSTRUCTION COST $54 MILLION COMPLETION DATE 2014 SETTING URBAN
222
CAPACITY 10,000
BB&T BALLPARK CHARLOTTE, NORTH CAROLINA
223
BE’ER SHEVA STADIUM BEERSHEBA, ISRAEL
20
ARCHITECT GAB ARCHITECTS TENANT/USAGE HAPOEL BE’ER SHEVA (ISRAELI PREMIER LEAGUE) CONSTRUCTION COST $50 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
224
CAPACITY 32,000
BE’ER SHEVA STADIUM BEERSHEBA, ISRAEL
225
BRISTOL CITY STADIUM BRISTOL, UNITED KINGDOM
21
ARCHITECT HOK TENANT/USAGE BRISTOL CITY FC (ENGLISH LEAGUE ONE) CONSTRUCTION COST $46 MILLION COMPLETION DATE N/A SETTING SUB-URBAN
226
CAPACITY 30,000
BRISTOL CITY STADIUM BRISTOL, UNITED KINGDOM
227
BUFFALO BILLS NEW STADIUM BUFFALO, NEW YORK
22
ARCHITECT HKS, INC. TENANT/USAGE BUFFALO BILLS (NFL) CONSTRUCTION COST $1.5 BILLION COMPLETION DATE N/A SETTING SUB-URBAN
228
CAPACITY 72,000
BUFFALO BILLS NEW STADIUM BUFFALO, NEW YORK
229
CISCO FIELD SAN JOSE, CALIFORNIA
23
ARCHITECT 360 ARCHITECTURE / GENSLER TENANT/USAGE OAKLAND ATHLETICS (MLB) CONSTRUCTION COST $400 MILLION COMPLETION DATE 2016 SETTING URBAN
230
CAPACITY 32,000
CISCO FIELD SAN JOSE, CALIFORNIA
231
CITY OF BIRMINGHAM STADIUM BIRMINGHAM, UNITED KINGDOM
24
ARCHITECT POPULOUS TENANT/USAGE BIRMINGHAM CITY FC (ENGLISH LEAGUE CHAMPIONSHIP) CONSTRUCTION COST $480 MILLION COMPLETION DATE N/A SETTING URBAN
232
CAPACITY 55,000
CITY OF BIRMINGHMAM STADIUM BIRMINGHAM, UNITED KINGDOM
233
CSKA MOSCOW STADIUM MOSCOW, RUSSIA
25
ARCHITECT N/A TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $270 MILLION COMPLETION DATE 2015 SETTING URBAN
234
CAPACITY 30,000
CSKA MOSCOW STADIUM MOSCOW, RUSSIA
235
DC UNITED STADIUM WASHINGTON, DC
26
ARCHITECT N/A TENANT/USAGE DC UNITED (MLS) CONSTRUCTION COST $195 MILLION COMPLETION DATE N/A SETTING URBAN
236
CAPACITY 24,000
DC UNITED STADIUM WASHINGTON DC
237
DE NIEUWE KUIP ROTTERDAM, NETHERLANDS
27
ARCHITECT N/A TENANT/USAGE FEYENOORD ROTTERDAM (DUTCH EREDIVISIE) CONSTRUCTION COST $429 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
238
CAPACITY 80,000
DE NIEUWE KUIP ROTTERDAM, NETHERLANDS
239
DOHA PORT STADIUM DOHA, QATAR
28
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $202 MILLION COMPLETION DATE 2020 SETTING URBAN
240
CAPACITY 44,950
DOHA PORT STADIUM DOHA, QATAR
241
EDUCATION CITY STADIUM AL-RAYYAN, QATAR
29
ARCHITECT RFA FENWICK IRIBARREN ARCHITECTS TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $286 MILLION COMPLETION DATE 2021 SETTING SUB-URBAN
242
CAPACITY 45,350
EDUCATION CITY STADIUM AL-RAYYAN, QATAR
243
ELMONT TOWN CROSSINGS ELMONT, NEW YORK
30
ARCHITECT POPULOUS / SPECTORGROUP TENANT/USAGE NEW YORK COSMOS (MLS) CONSTRUCTION COST $400 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
244
CAPACITY 25,000
ELMONT TOWN CROSSINGS ELMONT, NEW YORK
245
ESTADIO BBVA BANCOMER GUADELUPE, MEXICO
31
ARCHITECT POPULOUS / VFO ARQUITECTOS TENANT/USAGE CF MONTEREY (MEXICAN LIGA MX) CONSTRUCTION COST $400 MILLION COMPLETION DATE 2014 SETTING URBAN
246
CAPACITY 50,000
ESTADIO BBVA BANCOMER GUADELUPE, MEXICO
247
ESTADIO LA PEINETA MADRID, SPAIN
32
ARCHITECT ANTONIO CRUZ & ANTONIO ORTIZ TENANT/USAGE ATLETICO MADRID (SPANISH LA LIGA) CONSTRUCTION COST $325 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
248
CAPACITY 73,729
ESTADIO LA PEINETA MADRID, SPAIN
249
FARMER’S FIELD LOS ANGELES, CALIFORNIA
33
ARCHITECT GENSLER TENANT/USAGE FUTURE NFL FRANCHISE CONSTRUCTION COST $1.2 BILLION COMPLETION DATE 2016 SETTING URBAN
250
CAPACITY 76,000
FARMER’S FIELD LOS ANGELES, CALIFORNIA
251
FRANK CLAIR STADIUM OTTAWA, CANADA
34
ARCHITECT PHILIPS FAREVAAG SMALLENBERG TENANT/USAGE OTTAWA FURY (CFL) CONSTRUCTION COST $245 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
252
CAPACITY 24,000
FRANK CLAIR STADIUM OTTAWA, CANADA
253
GAMBA OSAKA STADIUM OSAKA, JAPAN
35
ARCHITECT N/A TENANT/USAGE GAMBA OSAKA (JAPANESE J-LEAGUE) CONSTRUCTION COST $150 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
254
CAPACITY 32,000
GAMBA OSAKA STADIUM OSAKA, JAPAN
255
GOLDEN STATE WARRIORS NEW ARENA SAN FRANCISCO, CALIFORNIA
36
ARCHITECT SNOHETTA / AECOM TENANT/USAGE GOLDEN STATE WARRIORS (NBA) CONSTRUCTION COST $1 BILLION COMPLETION DATE 2017 SETTING URBAN
256
CAPACITY 17,500
GOLDEN STATE WARRIORS NEW ARENA SAN FRANCISCO, CALIFORNIA
257
GRAND STADE D’ALGER ALGIERS, ALGERIA
37
ARCHITECT HEINER BABON ARCHITEKT TENANT/USAGE ALGERIAN NATIONAL STADIUM CONSTRUCTION COST $135 MILLION COMPLETION DATE 2015 SETTING RURAL
258
CAPACITY 60,000
GRAND STADE D’ALGER ALGIERS, ALGERIA
259
GRAND STADE DE CASABLANCA CASABLANCA, MOROCCO
38
ARCHITECT SPACE GROUP CO, LTD TENANT/USAGE 2015 AFRICAN CUP OF NATIONS CONSTRUCTION COST $245 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
260
CAPACITY 81,000
GRAND STADE DE CASABLANCA CASABLANCA, MOROCCO
261
GRAND STADE FFR EVRY, FRANCE
39
ARCHITECT POPULOUS / ATELIER 2/3/4 TENANT/USAGE FRENCH NATIONAL RUGBY UNION STADIUM CONSTRUCTION COST $677 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
262
CAPACITY 82,000
GRAND STADE FFR EVRY, FRANCE
263
INCHEON ASIAD MAIN STADIUM INCHEON, SOUTH KOREA
40
ARCHITECT POPULOUS TENANT/USAGE SOUTH KOREAN NATIONAL STADIUM CONSTRUCTION COST $400 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
264
CAPACITY 60,000
INCHEON ASIAD MAIN STADIUM INCHEON, SOUTH KOREA
265
KRASNODAR STADIUM KRASNODAR, RUSSIA
41
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST N/A COMPLETION DATE 2017 SETTING RURAL
266
CAPACITY 50,015
KRASNODAR STADIUM KRASNODAR, RUSSIA
267
KYLE FIELD COLLEGE STATION, TEXAS
42
ARCHITECT POPULOUS TENANT/USAGE TEXAS A&M AGGIES (NCAAF) CONSTRUCTION COST $425 MILLION COMPLETION DATE 2016 SETTING SUB-URBAN
268
CAPACITY 102,500
KYLE FIELD COLLEGE STATION, TEXAS
269
LEVI’S STADIUM SAN FRANCISCO, CALIFORNIA
43
ARCHITECT HNTB TENANT/USAGE SAN FRANCISCO 49ERS (NCAAF) CONSTRUCTION COST $1.2 BILLION COMPLETION DATE 2014 SETTING URBAN
270
CAPACITY 75,000
LEVI’S STADIUM SAN FRANCISCO, CALIFORNIA
271
LUSAIL ICONIC STADIUM AL-DAYYEN, QATAR
44
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $125 MILLION COMPLETION DATE 2019 SETTING SUB-URBAN
272
CAPACITY 45,330
LUSAIL ICONIC STADIUM AL-DAYYEN, QATAR
273
MALATYA ARENA MALATYA, TURKEY
45
ARCHITECT ALP ARCHITECTS & PLANNERS LTD TENANT/USAGE YENI MALATYASPOR (TURKISH SUPER LIG) CONSTRUCTION COST $38 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
274
CAPACITY 25,000
MALATYA ARENA MALATYA, TURKEY
275
MINNESOTA VIKINGS NEW STADIUM MINNEAPOLIS, MINNESOTA
46
ARCHITECT HKS, INC. TENANT/USAGE MINNESOTA VIKINGS (NFL) CONSTRUCTION COST $975 MILLION COMPLETION DATE 2016 SETTING URBAN
276
CAPACITY 73,000
MINNESOTA VIKINGS NEW STADIUM MINNEAPOLIS, MINNESOTA
277
NAGYERDEI STADION DEBRECEN, HUNGARY
47
ARCHITECT BOYD ARCHITECTURAL STUDIO TENANT/USAGE DEBRECENI VSC (HUNGARIAN OTP BANK LIGA) CONSTRUCTION COST $59 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
278
CAPACITY 20,020
NAGYERDEI STADION DEBRECEN, HUNGARY
279
NEW ANTALYA STADIUM ANTALYA, TURKEY
48
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE ANTALYASPOR (TURKISH SUPER LIG) CONSTRUCTION COST $40 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
280
CAPACITY 41,703
NEW ANTALYA STADIUM ANTALYA, TURKEY
281
NEW CASTLEFORD STADIUM CASTLEFORD, UNITED KINGDOM
49
ARCHITECT RAMSDEN AND PARTNERS TENANT/USAGE CASTLEFORD TIGERS (EUROPEAN RUGBY SUPER LEAGUE) CONSTRUCTION COST $24 MILLION COMPLETION DATE TBA SETTING SUB-URBAN
282
CAPACITY 13,300
NEW CASTLEFORD STADIUM CASTLEFORD, UNITED KINGDOM
283
NEW EL PASO BALLPARK EL PASO, TEXAS
50
ARCHITECT POPULOUS TENANT/USAGE EL PASO CHIHUAHUAS (AAA BASEBALL) CONSTRUCTION COST $64 MILLION COMPLETION DATE 2014 SETTING URBAN
284
CAPACITY 10,500
NEW EL PASO BALLPARK EL PASO, TEXAS
285
NEW ESKISEHIR STADIUM ESKISEHIR, TURKEY
51
ARCHITECT ADD/IAA ARCHITEKTEN TENANT/USAGE ESKISEHIRSPOR (TURKISH SUPER LIG) CONSTRUCTION COST $108 MILLION COMPLETION DATE 2015 SETTING URBAN
286
CAPACITY 34,930
NEW ESKISEHIR STADIUM ESKISEHI, TURKEY
287
NEW REGINA STADIUM REGINA, CANADA
52
ARCHITECT DOUGLAS CARDINAL TENANT/USAGE SASKATCHEWAN ROUGHRIDERS (CANADIAN FOOTBALL LEAGUE) CONSTRUCTION COST $278 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
288
CAPACITY 33,000
NEW REGINA STADIUM REGINA, CANADA
289
NEW SINGAPORE NATIONAL STADIUM KALLANG, SINGAPORE
53
ARCHITECT DP ARCHITECTS / CICADA / ARUP SPORT TENANT/USAGE SINGAPORE NATIONAL STADIUM CONSTRUCTION COST $1.5 BILLION COMPLETION DATE 2014 SETTING URBAN
290
CAPACITY 55,000
NEW SINGAPORE NATIONAL STADIUM KALLANG, SINGAPORE
291
NEWMARKET STADIUM WAKEFIELD, UNITED KINGDOM
54
ARCHITECT N/A TENANT/USAGE WAKEFIELD TRINITY WILDCATS (EUROPEAN RUGBY SUPER LEAGUE) CONSTRUCTION COST $192 MILLION COMPLETION DATE TBA SETTING SUB-URBAN
292
CAPACITY 12,000
NEWMARKET STADIUM WAKEFIELD, UNITED KINGDOM
293
NIZHNY NOVGOROD STADIUM NIZHNY NOVGOROD, RUSSIA
55
ARCHITECT POPULOUS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $240 MILLION COMPLETION DATE 2017 SETTING URBAN
294
CAPACITY 44,899
NIZHNY NOVGOROD STADIUM NIZHNY NOVGOROD, RUSSIA
295
NORTHUMBERLAND DEVELOPMENT PROJECT LONDON, UNITED KINGDOM
56
ARCHITECT MAKE ARCHITECTS / KSS DESIGN GROUP TENANT/USAGE TOTTENHAM HOTSPUR FC (ENGLISH PREMIER LEAGUE) CONSTRUCTION COST $641 MILLION COMPLETION DATE TBA SETTING URBAN
296
CAPACITY 56,250
NORTHUMBERLAND DEVELOPMENT PROJECT LONDON, UNITED KINGDOM
297
OLYMPIASTADION HELSINKI, FINLAND
57
ARCHITECT ARKKITEHITOIMISTO K2S TENANT/USAGE FINLAND NATIONAL STADIUM CONSTRUCTION COST $328 MILLION COMPLETION DATE 2018 SETTING URBAN
298
CAPACITY 38,000
OLYMPIASTADION HELSINKI, FINLAND
299
OTKRYTIE ARENA MOSCOW, RUSSIA
58
ARCHITECT AIKOM RUSSIA TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $340 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
300
CAPACITY 44,000
OTKRYTIE ARENA MOSCOW, RUSSIA
301
PERTH STADIUM PERTH, AUSTRALIA
59
ARCHITECT POPULOUS FREMANTLE FOOTBALL CLUB / TENANT/USAGE WEST COAST EAGLES (AUSTRAILIAN FOOTBALL LEAGUE)
CONSTRUCTION COST $700 MILLION COMPLETION DATE 2018 SETTING URBAN
302
CAPACITY 60,000
PERTH STADIUM PERTH, AUSTRALIA
303
QATAR UNIVERSITY STADIUM DOHA, QATAR
60
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $300 MILLION COMPLETION DATE 2021 SETTING URBAN
304
CAPACITY 43,520
QATAR UNIVERSITY STADIUM DOHA, QATAR
305
RED STAR CITY BELGRADE, SERBIA
61
ARCHITECT SUA KAY ARQUITECTOS TENANT/USAGE FK CRVENA ZVEZDA CONSTRUCTION COST $165 MILLION COMPLETION DATE 2016 SETTING URBAN
306
CAPACITY 60,000
RED STAR CITY BELGRADE, SERBIA
307
RIVER PLATE FORUM BUENOS AIRES, ARGENTINA
62
ARCHITECT GRUPO TORCELLO TENANT/USAGE CLUB ATLETICO RIVER PLATE CONSTRUCTION COST $250 MILLION COMPLETION DATE TBA SETTING URBAN
308
CAPACITY 75,000
RIVER PLATE FORUM BUENOS AIRES, ARGENTINA
309
SAKARYA STADI SAKARYA, TURKEY
63
ARCHITECT ALPER AKSOY ARCHITECTS TENANT/USAGE SAKARYASPOR (TURKISH SUPER LIG) CONSTRUCTION COST $53.5 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
310
CAPACITY 28,710
SAKARYA STADI SAKARYA, TURKEY
311
SAN DIEGO CHARGERS NEW STADIUM SAN DIEGO, CALIFORNIA
64
ARCHITECT POPULOUS TENANT/USAGE SAN DIEGO CHARGERS (NFL) CONSTRUCTION COST UP TO $2.5 BILLION COMPLETION DATE TBA SETTING URBAN
312
CAPACITY 62,000
SAN DIEGO CHARGERS NEW STADIUM SAN DIEGO, CALIFORNIA
313
SAN JOSE EARTHQUAKES STADIUM SAN JOSE, CALIFORNIA
65
ARCHITECT 360 ARCHITECTURE TENANT/USAGE SAN JOSE EARTHQUAKES (MLS) CONSTRUCTION COST $67 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
314
CAPACITY 18,000
SAN JOSE EARTHQUAKES STADIUM SAN JOSE, CALIFORNIA
315
SAN MAMES BARRIA BILBAO, SPAIN
66
ARCHITECT CESAR AZKARATE & MIKEL SANZ DE PRIT TENANT/USAGE ATHLETIC BILBAO (SPANISH LA LIGA) CONSTRUCTION COST $286 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
316
CAPACITY 53,332
SAN MAMES BARRIA BILBAO, SPAIN
317
SAOUD BIN ABDULRAHMAN STADIUM AL-WAKRAH, QATAR
67
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $286 MILLION COMPLETION DATE 2021 SETTING SUB-URBAN
318
CAPACITY 45,120
SAOUD BIN ABDULRAHMAN STADIUM AL-WAKRAH, QATAR
319
SPORTS CITY STADIUM DOHA, QATAR
68
ARCHITECT DAN MEIS TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $250 MILLION COMPLETION DATE 2021 SETTING SUB-URBAN
320
CAPACITY 47,560
SPORTS CITY STADIUM DOHA, QATAR
321
STADE BORDEAUX ATLANTIQUE BORDEAUX, FRANCE
69
ARCHITECT HERZOG & DE MEURON TENANT/USAGE EURO2016 CONSTRUCTION COST $234 MILLION COMPLETION DATE 2015 SETTING URBAN
322
CAPACITY 42,052
STADE BORDEAUX ATLANTIQUE BORDEAUX, FRANCE
323
STADE DE LUMIERES LYON, FRANCE
70
ARCHITECT POPULOUS TENANT/USAGE EURO2016 CONSTRUCTION COST $609 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
324
CAPACITY 61,556
STADE DE LUMIERES LYON, FRANCE
325
STADE GEOFFROY-GUICHARD ST. ETIENNE, FRANCE
71
ARCHITECT ATELIER CHAIX & MOREL ET ASSOCIES TENANT/USAGE EURO2016 CONSTRUCTION COST $78.5 MILLION COMPLETION DATE 2014 SETTING URBAN
326
CAPACITY 41,138
STADE GEOFFROY-GUICHARD ST. ETIENNE, FRANCE
327
STADE VELODROME MARSEILLE, FRANCE
72
ARCHITECT SCAU / ATELIER 9 TENANT/USAGE EURO2016 CONSTRUCTION COST $369 MILLION COMPLETION DATE 2014 SETTING URBAN
328
CAPACITY 67,117
STADE VELODROME MARSEILLE, FRANCE
329
STADIO FRIULI UDINE, ITALY
73
ARCHITECT LORENZO GIACOMUZZI MOORE TENANT/USAGE UDINESE CALCIO (ITALIAN SERIE A) CONSTRUCTION COST $34 MILLION COMPLETION DATE 2014 SETTING URBAN
330
CAPACITY 29,884
STADIO FRIULI UDINE, ITALY
331
STADION ERNESTA POHLA ZABRZE, POLAND
74
ARCHITECT GMT LTD TENANT/USAGE GORNIK ZABRZE (POLISH EKSTRAKLASA) CONSTRUCTION COST $62 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
332
CAPACITY 31,871
STADION ERNESTA POHLA ZABRZE, POLAND
333
STADION GEORGI ASPARUHOV SOFIA, BULGARIA
75
ARCHITECT LAZAR PARASHKEVANOV TENANT/USAGE PFC LEVSKI SOFIA (BULGARIAN A FOOTBALL GROUP) CONSTRUCTION COST N/A COMPLETION DATE 2017 SETTING SUB-URBAN
334
CAPACITY 28,000
STADION GEORGI ASPARUHOV SOFIA, BULGARIA
335
STADION MIEJSKI W BIALYMSTOKU BIALYSTOK, POLAND
76
ARCHITECT PA KURYLOWICZ & ASSOCIATES TENANT/USAGE JAGIELLONIA BIALYSTOK (POLISH EKSTRAKLASA) CONSTRUCTION COST $81 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
336
CAPACITY 22,400
STADION MIEJSKI W BIALYMSTOKU BIALYSTOK, POLAND
337
STADION MIEJSKI W BIELSKU-BIALEJ BIELSKO-BIALA, POLAND
77
ARCHITECT ATJ ARCHITEKCI TENANT/USAGE BKS STAL / PODBESKIDZIE (POLISH EKSTRAKLASA) CONSTRUCTION COST $30 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
338
CAPACITY 15,292
STADION MIEJSKI W BIELSKU-BIALI BIELSKO-BIALA, POLAND
339
STADION MIEJSKI W LUBLINIE LUBLIN, POLAND
78
ARCHITECT ESTUDIO LAMELA TENANT/USAGE MOTOR LUBLIN (POLISH EKSTRAKLASA) CONSTRUCTION COST $48 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
340
CAPACITY 15,500
STADION MIEJSKI W LUBLINE LUBLIN, POLAND
341
STADION MIEJSKI W TYCHACH TYCHY, POLAND
79
ARCHITECT PERBO-PROJEKT TENANT/USAGE GKS TYCHY (POLISH EKSTRAKLASA) CONSTRUCTION COST $41 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
342
CAPACITY 15,300
STADION MIEJSKI W TYCHACH TYCHY, POLAND
343
STADION SAMARA SAMARA, RUSSIA
80
ARCHITECT POPULOUS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $320 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
344
CAPACITY 44,918
STADION SAMARA SAMARA, RUSSIA
345
STADION SLASKI CHORZOW, POLAND
81
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE POLISH NATIONAL STADIUM AND MOTOR SPEEDWAY CONSTRUCTION COST $187 MILLION COMPLETION DATE 2015 SETTING SUB-URBAN
346
CAPACITY 55,200
STADION SLASKI CHORZOW, POLAND
347
STADION STALI STALOWA WOLA STALOWA WOLA, POLAND
82
ARCHITECT MAREK GIERULSKI TENANT/USAGE STAL STALOWA WOLA (POLISH EKSTRAKLASA) CONSTRUCTION COST $16 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
348
CAPACITY 10,149
STADION STALI STALOWA WOLA STALOWA WOLA, POLAND
349
STADION TICHA VARNA, BULGARIA
83
ARCHITECT GERKAN, MARG, & PARTNERS TENANT/USAGE PFC CHERNO MORE VARNA (BULGARIAN A FOOTBALL GROUP) CONSTRUCTION COST $108 MILLION COMPLETION DATE TBA SETTING SUB-URBAN
350
CAPACITY 30,000
STADION TICHA VARNA, BULGARIA
351
STADION W ROSTOWIE ROSTOV-ON-DON, RUSSIA
84
ARCHITECT POPULOUS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $220 MILLION COMPLETION DATE 2017 SETTING SUB-URBAN
352
CAPACITY 43,702
STADION W ROSTOWIE ROSTOV-ONDON, RUSSIA
353
STADION YUBILEYNIY SARANSK SARANSK, RUSSIA
85
ARCHITECT SARANSKGRAZHDANPROEKT TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $300 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
354
CAPACITY 44,000
STADION YUBILEYNIY SARANSK SARANSK, RUSSIA
355
TEHELNE POLE BRATISLAVA, SLOVAKIA
86
ARCHITECT CUBE DESIGN TENANT/USAGE SK SLOVAN BRATISLAVA (SLOVAK SUPER LIGA) CONSTRUCTION COST $95 MILLION COMPLETION DATE 2016 SETTING URBAN
356
CAPACITY 20,500
TEHELNE POLE BRATISLAVA, SLOVAKIA
357
TIM HORTON’S FIELD HAMILTON, CANADA
87
ARCHITECT CANNON DESIGN TENANT/USAGE HAMILTON TIGER-CATS (CANADIAN FOOTBALL LEAGUE) CONSTRUCTION COST $146 MILLION COMPLETION DATE 2014 SETTING SUB-URBAN
358
CAPACITY 24,000
TIM HORTON’S FIELD HAMILTON, CANADA
359
UC SAMPDORIA NEW STADIUM GENOA, ITALY
88
ARCHITECT N/A TENANT/USAGE UC SAMPDORIA (ITALIAN SERIE A) CONSTRUCTION COST $270 MILLION COMPLETION DATE 2016 SETTING URBAN
360
CAPACITY 30,000
UC SAMPDORIA NEW STADIUM GENOA, ITALY
361
UMM SALAL STADIUM UMM SALAL, QATAR
89
ARCHITECT ALBERT SPEER + PARTNER GMBH TENANT/USAGE FIFA WORLD CUP 2022 CONSTRUCTION COST $250 MILLION COMPLETION DATE 2021 SETTING SUB-URBAN
362
CAPACITY 45,120
UMM SALAL STADIUM UMM SALAL, QATAR
363
UNIVERSITY OF HOUSTON STADIUM HOUSTON, TEXAS
90
ARCHITECT DLR GROUP / PAGESOUTHERLANDPAGE / SMITH& CO TENANT/USAGE HOUSTON UNIVERSITY COUGARS (NCAAF) CONSTRUCTION COST $120 MILLION COMPLETION DATE 2014 SETTING URBAN
364
CAPACITY 40,000
UNIVERSITY OF HOUSTON STADIUM HOUSTON, TEXAS
365
VODAFONE ARENA ISTANBUL, TURKEY
91
ARCHITECT BENYAMIN DERMAN / DB ARCHITECTS TENANT/USAGE BESIKTAS JK (TURKISH SUPER LIG) CONSTRUCTION COST $95 MILLION COMPLETION DATE 2014 SETTING URBAN
366
CAPACITY 41,903
VODAFONE ARENA ISTANBUL, TURKEY
367
VOTANIKOS ATHENS, GREECES
92
ARCHITECT MANUEL SALGADO TENANT/USAGE PANATHINAIKOS FC CONSTRUCTION COST $110 MILLION COMPLETION DATE TBA SETTING URBAN
368
CAPACITY 42,000
VOTANIKOS ATHENS, GREECE
369
VTB ARENA MOSCOW, RUSSIA
93
ARCHITECT MANICA ARCHITECTURE / ERICK CAN EGERAAT / MOSPROEKT 2 TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $750 MILLION COMPLETION DATE 2017 SETTING URBAN
370
CAPACITY 27,268
VTB ARENA MOSCOW, RUSSIA
371
YULMAN STADIUM
NEW ORLEANS, LOUISIANA
94
ARCHITECT GOULD EVANS / LEE LEDBETTER TENANT/USAGE TULANE GREEN WAVE (NCAAF) CONSTRUCTION COST $70 MILLION COMPLETION DATE 2014 SETTING URBAN
372
CAPACITY 30,000
YULMAN STADIUM NEW ORLEANS, LOUISIANA
373
ZENIT ST. PETERSBURG NEW STADIUM ST. PETERSBURG, RUSSIA
95
ARCHITECT KISHO KUROKAWA ARCHITECTS TENANT/USAGE FIFA WORLD CUP 2018 CONSTRUCTION COST $1.2 BILLION COMPLETION DATE 2015 SETTING SUB-URBAN
374
CAPACITY 69,501
ZENIT ST. PETERSBURG NEW STADIUM ST. PETERSBURG, RUSSIA
375
UNBUILT STADIUM PROJECTS
1 2 3 4 5 6 7 8
CHELSEA FC BATTERSEA POWER STADIUM LONDON, UNITED KINGDOM EVERTON FC KIRKBY STADIUM KIRKBY, UNITED KINGDOM LIVERPOOL FC STANLEY PARK STADIUM LIVERPOOL, UNITED KINGDOM NEW FENWAY PARK BOSTON, MA NEW RAYS BALLPARK TAMPA BAY, FL PORTSMOUTH FC DOCKLAND STADIUM PORTSMOUTH, UNITED KINGDOM STADION KAJZERICA ZAGREB, CROATIA WEST SIDE STADIUM NEW YORK CITY, NY
380 382 384 386 388 390 392 394
XX UNBUILT NEW CONSTRUCTION PROJECT XX UNBUILT RENOVATION PROJECT
CHELSEA FC BATTERSEA POWER STADIUM LONDON, UNITED KINGDOM
1
ARCHITECT KOHN PEDERSEN FOX TENANT/USAGE CHELSEA FC (ENGLISH PREMIER LEAGUE) CONSTRUCTION COST $1.5 BILLION COMPLETION DATE UNBUILT SETTING URBAN
380
CAPACITY 60,000
CHELSEA FC BATTERSEA POWER STADIUM LONDON, UNITED KINGDOM
381
EVERTON FC KIRKBY STADIUM KIRKBY, UNITED KINGDOM
2
ARCHITECT BARR CONSTRUCTION TENANT/USAGE EVERTON FC (ENGLISH PREMIER LEAGUE) CONSTRUCTION COST $240 MILLION COMPLETION DATE UNBUILT SETTING SUB-URBAN
382
CAPACITY 50,401
EVERTON FC KIRKBY STADIUM KIRKBY, UNITED KINGDOM
383
LIVERPOOL FC STANLEY PARK STADIUM LIVERPOOL, UNITED KINGDOM
3
ARCHITECT HKS, INC. TENANT/USAGE LIVERPOOL FC (ENGLISH PREMIER LEAGUE) CONSTRUCTION COST $640 MILLION COMPLETION DATE UNBUILT SETTING SUB-URBAN
384
CAPACITY 60,000
LIVERPOOL FC STANLEY PARK STADIUM LIVERPOOL, UNITED KINGDOM
385
NEW FENWAY PARK BOSTON, MASSACHUSETTS
4
ARCHITECT HOK SPORT TENANT/USAGE BOSTON RED SOX (MLB) CONSTRUCTION COST $545 MILLION COMPLETION DATE UNBUILT SETTING URBAN
386
CAPACITY 44,130
NEW FENWAY PARK BOSTON, MASSACHUSETTS
387
NEW RAYS BALLPARK TAMPA BAY, FLORIDA
5
ARCHITECT POPULOUS TENANT/USAGE TAMPA BAY DEVIL RAYS (MLB) CONSTRUCTION COST $450 MILLION COMPLETION DATE UNBUILT SETTING URBAN
388
CAPACITY 35,000
NEW RAYS BALLPARK TAMPA BAY, FLORIDA
389
PORTSMOUTH FC DOCKLAND STADIUM PORTSMOUTH, UNITED KINGDOM
6
ARCHITECT HERZOG AND DE MEURON TENANT/USAGE PORTSMOUTH FC (ENGLISH PREMIER LEAGUE) CONSTRUCTION COST $960 MILLION COMPLETION DATE UNBUILT SETTING URBAN
390
CAPACITY 36,000
PORTSMOUTH FC DOCKLAND STADIUM PORTSMOUTH, UNITED KINGDOM
391
STADION KAJZERICA ZAGREB, CROATIA
7
ARCHITECT HRVOJE NJIRIC TENANT/USAGE NK DINAMO ZAGREB (CROATIAN PRVA HNL) CONSTRUCTION COST $233 MILLION COMPLETION DATE UNBUILT SETTING SUB-URBAN
392
CAPACITY 55,000
STADION KAJZERICA ZAGREB, CROATIA
393
WESTSIDE STADIUM NEW YORK, NEW YORK
8
ARCHITECT N/A TENANT/USAGE NEW YORK JETS (NFL) CONSTRUCTION COST $1 BILLION COMPLETION DATE UNBUILT SETTING URBAN
394
CAPACITY 85,000
WESTSIDE STADIUM NEW YORK, NEW YORK
395
DIAGRAMS
(89 TOTAL)
PROJECTS IN-PROGRESS
(95 TOTAL)
PROJECTS UNBUILT
(8 TOTAL)
399
PROJECTS COMPLETED
N TW R TU U KR U AE GBR USA DZA ARG AU S AZ BL E R
S VK ZAF KO ES R SW P E
NATIONS
AT Q S RU S AU S CO SR B SGP
N ID IRQ IRL IS R IT A JPN K WT MEX MA NL R PO D L
L BE A BR BGR CAN CHN CZE FIN FR A DEU GR HU C N
8
16
24
TX
NUMBER OF STADIUM PROJECTS BY LOCATION
UT CA DC
32
FL GA
STATES
IN LA
MN MO NC
2
PA NJ NY
4
400
6 8
N TW R TU U KR U AE GBR USA DZA ARG AU S AZ BL E R
S VK ZAF KO ES R SW P E
NATIONS
AT Q S RU S AU S CO SR B SGP
N ID IRQ IRL IS R IT A JPN K WT MEX MA NL R PO D L
L BE A BR BGR CAN CHN CZE FIN FR A DEU GR HU C N
20,000
40,000
60,000
TX
AVERAGE STADIUM CAPACITY BY LOCATION
UT CA DC
80,000
FL GA
STATES
IN LA
MN MO NC
$ 6,000 $12,000 60,000
401
80,000
PA NJ NY
N TW R TU U KR U AE GBR USA DZA ARG AU S AZ BL E R
$20B
S VK ZAF KO ES R SW P E
NATIONS
AT Q S RU S AU S CO SR B SGP
N ID IRQ IRL IS R IT A JPN K WT MEX MA NL R PO D L
L BE A BR BGR CAN CHN CZE FIN FR A DEU GR HU C N
$1B
$ 5B
$2B
$3B
$4B
TX
TOTAL PROJECT COST BY LOCATION
UT CA DC
$6.3B
FL GA
STATES
IN LA
MN MO NC
$1B
PA NJ NY
$2B
402
$3B $4B
N TW R TU U KR U AE GBR USA DZA ARG AU S AZ BL E R
N ID IRQ IRL IS R IT A JPN K WT MEX MA NL R PO D L
AT Q S RU S AU S CO SR B SGP
$3,000
$6,000
$9,000
TX
AVERAGE COST PER CAPITA BY LOCATION
UT CA DC
$12,000
PA
FL GA
STATES
IN LA
MN MO NC
NJ NY
$27,273
S VK ZAF KO ES R SW P E
NATIONS
L BE A BR BGR CAN CHN CZE FIN FR A DEU GR HU C N
$ 6,000 $12,000 $18,000
403
$24,000
5
16
2014
201
12 20 3 201
20
201
7
20
2018
11
2010
YEAR
10
2009
21
TBA
20
2006 20 07
201 9 20 20
20
08
20 30 40
5
16
20
2014
201
12 20 3 201
NUMBER OF STADIUM PROJECTS BY YEAR
201
7
20
2018
11
2010
YEAR
201
2009
20
9
21
TBA
20
2006 20 07
20
20,000
20
08
40,000 60,000 80,000
404
AVERAGE STADIUM CAPACITY BY YEAR
5
16
2014
201
12 20 3 201
20
201
7
20
2018
YEAR
201
11
2010 2009
20
9
$2B
21
TBA
20
2006 20 07
20
20
08
$4B
$6B
$8B
5
16
20
2014
201
12 20 3 201
TOTAL PROJECT COST BY YEAR
201
7
20
2018
YEAR
201
11
2010 2009
20
9
21
TBA
20
2006 20 07
20
2,500
20
08
5,000 $7,500
$10,000
AVERAGE COST PER CAPITA BY YEAR
405
BELOW $2.5 BILLION BELOW $2 BILLION BELOW $1.5 BILLION BELOW $1.25 BILLION BELOW $1 BILLION BELOW $900 MILLION BELOW $800 MILLION BELOW $700 MILLION BELOW $600 MILLION BELOW $500 MILLION BELOW $400 MILLION BELOW $300 MILLION BELOW $250 MILLION BELOW $200 MILLION BELOW $150 MILLION BELOW $100 MILLION BELOW $75 MILLION BELOW $50 MILLION BELOW $25 MILLION DATA NOT AVAILABLE 0
5
10
15
20
25
30
NUMBER OF STADIUM PROJECTS BY COST
ABOVE 100,000 BELOW 100,000 BELOW 90,000 BELOW 80,000 BELOW 70,000 BELOW 60,000 BELOW 50,000 BELOW 40,000 BELOW 30,000 BELOW 20,000 BELOW 10,000 0
10
20
406
NUMBER OF STADIUM PROJECTS BY CAPACITY
30
40
COUNTRY CODES
DZA ARG AUS AZE BLR BEL BRA BGR CAN CHN CZE FIN FRA DEU GRC HUN IDN IRQ IRL ISR ITA JPN KWT MEX MAR NLD POL QAT RUS SAU SCO SRB SGP SVK ZAF KOR ESP SWE TWN TUR UKR UAE GBR USA
STATE CODES
CALIFORNIA WASHINGTON, DC FLORIDA GEORGIA INDIANA LOUISIANA MINNESOTA MISSOURI NORTH CAROLINA NEW JERSEY NEW YORK PENNSYLVANIA TEXAS UTAH
CA DC FL GA IN LA MN MO NC NJ NY PA TX UT
407
ALGERIA ARGENTINA AUSTRALIA AZERBAIJAN BELARUS BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REPUBLIC FINLAND FRANCE GERMANY GREECE HUNGARY INDONESIA IRAQ IRELAND ISRAEL ITALY JAPAN KUWAIT MEXICO MOROCCO NETHERLANDS POLAND QATAR RUSSIA SAUDI ARABIA SCOTLAND SERBIA SINGAPORE SLOVAKIA SOUTH AFRICA SOUTH KOREA SPAIN SWEDEN TAIWAN TURKEY UKRAINE UNITED ARAB EMIRATES UNITED KINGDOM UNITED STATES OF AMERICA
STATISTICS
410
411
412
413
414
415
416
417
418
419
SUMMARY CHARTS
422
423
424
425
426
427