Rasmussen Gas Logs

Page 1

V17 MANUAL VALVE General Assembly Instructions. FOR NATURAL GAS APPLICATION ONLY ®

THE GAS LOG COMPANY

12028 E. PHILADELPHIA ST. WHITTIER, CA 90601 U.S.A.

www.rasmussen.biz

REV: V17 0709 Last Printed: 7/14/2009 3:40 PM

PARTS LIST A.

A) 3/8” MIP x 3/8” MIP Valve (V17)

B.

B) 3/8” x 3/8” Street Elbow C.

C) 9” long Key (K2)

V17B MANUAL VALVE ASSEMBLY NOTE: If fittings do not come pre-wrapped with Teflon threaded tape, pipe compound MUST be applied to all tapered pipe threads (except in Step 2 ) to prevent gas leaks. DO NOT use Teflon tape or pipe compound on any flared fitting threads. 1. Thread 3/8” Street Elbow (Figure 1A) into Burner Gas Input and wrench tighten into position shown. 2. Thread Orifice Spud (Figure 1B, not supplied with valve) (Without using pipe compound or Teflon tape) into 3/8” V-17 Valve (Figure 1C), then 3. Thread Valve into 3/8” Elbow and wrench tighten. 4. Insert Key Sleeve (Figure 1D) over V-17 Valve Stem (1E)

C) 3/8” V-17 Valve E) Valve Stem

D) Key Sleeve

Apply pipe compound If not pre-wrapped with Teflon Tape B) Orifice Spud (not supplied with valve) (requires no pipe compound or Teflon tape)

A) 3/8” Street Elbow


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.