“The skill of an exceptional planner is in their level of knowledge, experience and expertise in determining the quality and proficiency of construction programmes. Colin Battley
Welcome
Battley is a construction, infrastructure and heavy industry planning agency with highly experienced planning engineers developing schedules to deliver optimum results and best possible project outcomes.
“The skill of an exceptional planner is in their level of knowledge, experience and expertise in determining the quality and proficiency of construction programmes. Colin Battley
Welcome
Battley is a construction, infrastructure and heavy industry planning agency with highly experienced planning engineers developing schedules to deliver optimum results and best possible project outcomes.
Metropolis Tower – planned by Battley
Welcome to the Battley planning experience Battley Consultant Planning Engineers are expert in programme development, analysis and interrogation, and testing the voracity of timelines, activities and events to validate proposed schedules. As independent consultants we bring a unique perspective to each project, with onsite monitoring and extensive reporting confidently steering construction towards planned objectives. Engaging Battley is a guarantee of establishing robust procedures and disciplines to minimise time delays, avoid cost overruns and ensure expectations are matched with actual outcomes.
SkyCity Casino – planned by Battley
Metropolis Tower – planned by Battley
Welcome to the Battley planning experience Battley Consultant Planning Engineers are expert in programme development, analysis and interrogation, and testing the voracity of timelines, activities and events to validate proposed schedules. As independent consultants we bring a unique perspective to each project, with onsite monitoring and extensive reporting confidently steering construction towards planned objectives. Engaging Battley is a guarantee of establishing robust procedures and disciplines to minimise time delays, avoid cost overruns and ensure expectations are matched with actual outcomes.
SkyCity Casino – planned by Battley
What we bring to plannin g
/
over thirty years programming for construction, infrastructure and heavy industry
/
team of Planning Engineers with minimum engineering degree qualifications
/
latest planning software and up to date planning methods and disciplines
/
valuable construction insight and problem solving to expedite the best outcomes
/
programmes for most major and signature construction projects in New Zealand
/
professional planning at a moments notice, where and when it is needed
Britomart Train Station – planned by Battley
What we bring to plannin g
/
over thirty years programming for construction, infrastructure and heavy industry
/
team of Planning Engineers with minimum engineering degree qualifications
/
latest planning software and up to date planning methods and disciplines
/
valuable construction insight and problem solving to expedite the best outcomes
/
programmes for most major and signature construction projects in New Zealand
/
professional planning at a moments notice, where and when it is needed
Britomart Train Station – planned by Battley
Colin
BE
Frans Huysmans
Dip Com
PLANNING DIRECTOR
BUSINESS DEVELOPMENT / MANAGER
Planning pioneer of signature construction projects in New Zealand. Batman to his mates.
Building Battley’s planning capability with plans to take the brand and business to the next level.
Huntly Power Station – planned by Battley
Kyle Walton BE
Hassan Eliwa
SENIOR PLANNER
PLANNING ENGINEER
PLANNING ENGINEER
Expat Kiwi home for good having planned signature projects including high rise buildings in London.
A wealth of international construction and infrastructure project management and planning experience.
Multi discipline international planning experience and innovative scheduling methodology.
BE (HONS)
Linghao Hu
BE
Colin
BE
Frans Huysmans
Dip Com
PLANNING DIRECTOR
BUSINESS DEVELOPMENT / MANAGER
Planning pioneer of signature construction projects in New Zealand. Batman to his mates.
Building Battley’s planning capability with plans to take the brand and business to the next level.
Huntly Power Station – planned by Battley
Kyle Walton BE
Hassan Eliwa
SENIOR PLANNER
PLANNING ENGINEER
PLANNING ENGINEER
Expat Kiwi home for good having planned signature projects including high rise buildings in London.
A wealth of international construction and infrastructure project management and planning experience.
Multi discipline international planning experience and innovative scheduling methodology.
BE (HONS)
Linghao Hu
BE
Our planning services WestPac Stadium Wellington – planned by Battley
/
planning and programme development
/
monitoring, interrogation and reporting
/
programme peer review
/
forensic analysis of time extension claims
/
expert litigation consultants
Our planning services WestPac Stadium Wellington – planned by Battley
/
planning and programme development
/
monitoring, interrogation and reporting
/
programme peer review
/
forensic analysis of time extension claims
/
expert litigation consultants
Victoria Park Tunnel – planned by Battley
1. PLAN/ REPLAN
4. AGREE/ CORRECT
Battley planning cycle
3. REVIEW/ REPORT
2. ACTION/ MONITOR
Our planning approach 1. Build a baseline programme, which captures and schedules likely project activities and events 2. Regularly monitor, interrogate and report on progress, testing project assumptions to ensure clarity of required actions 3. Recommend corrective measures to mitigate problems before they occur 4. Incorporate agreed corrective measures back into the programme.
Victoria Park Tunnel – planned by Battley
1. PLAN/ REPLAN
4. AGREE/ CORRECT
Battley planning cycle
3. REVIEW/ REPORT
2. ACTION/ MONITOR
Our planning approach 1. Build a baseline programme, which captures and schedules likely project activities and events 2. Regularly monitor, interrogate and report on progress, testing project assumptions to ensure clarity of required actions 3. Recommend corrective measures to mitigate problems before they occur 4. Incorporate agreed corrective measures back into the programme.
SOUTH - Southbound traffic to new Sthbd alignment
SOUTH - Nthbd Stage 2 Complete
Rimu Rd Bridge traffic to final alignment
NORTH - Sthbd traffic to new Sthbd alignment
MHPL
Walmsley Rd Off Ramp Tra Traffic to new alignment
Rimu Rd Bridge traffic to Stage 1
NORTH - Nthb to new alignme
Battley is committed to improving standards of construction planning and programming in New Zealand, advocating its development and value as a unique and Hastie Hast tie Footbridge stand alone industry profession. Tararata Creek reek Bridge Widening - West Side
Waterfront Reserve Stage SOUTH - OGPA Overlays
Rimu Rd Bridge Stage 2 Main Alignment - Nthbd
Lower Ramp
Walmsley Footbrid Walms hbd shoulder der widening 430-700 Walmsley Bottleneck Walmsle
P6 finger er
Staging Nth Abutment - P5
Walkway / pipeline supports
Pier 6 (bal)
Install Watercare pipeline
mber / Sth Abutment / settlement slab pile cap / column
Pier Table 1 Pier 2 - pile cap / column
e cap / column n
Pier 1 - landspan segments
Pier 5 - deck segments
Spa
Span 1 closing pour Pier 2 - deck segments
Pier 2 Table
Pier 3 table Pier 4 table
Thank you
/ P2 finger
Span 4 closing p
Pier 3 - deck segments
6 / 192 Victoria Street, Auckland 1010
Pier 4 - deck dec ck segments
e frans@battley.co.nz Barrie Span 5 closing pour m 021 76 59 59 6 table t Pier 09 354 3309 Pier 6 - deck segments S centrobrand Pier Table 7 Pierr 7 - landspan segments In Frans Huysmans
e colin@battley.co.nz m 027 485 3309 Pier 6t- pile09 cap354 / column 3309 S Colin Battley Pier 7 - pile cap In/ column Colin Battley
Sp
Watercare chamber / North abutment / existing abutment ound widening 3400-3800
Queenstown Rd Off Ramp Cycleway
Move Sthbd lanes westwards Widening in median 3350-3750
Nthbd Drainage 3800-4900 Sthbd Alignment (Causeway) 3300-4900
t 3200-3400 / Sthbd hbd On Ramp New Gas Main
Stage 3 Nth Complete
Nthbd lanes 3800-4900
Sthbd lanes 3400-3800
Median 4900-5280
Median 3300-3600
Onehunga Bay Rd / Nthbd Off Ramp & g
unga Nthbd Off Ramp shoulder lder widening Beechcroft Ave footbridge
SOUTH - Southbound traffic to new Sthbd alignment
SOUTH - Nthbd Stage 2 Complete
Rimu Rd Bridge traffic to final alignment
NORTH - Sthbd traffic to new Sthbd alignment
MHPL
Walmsley Rd Off Ramp Tra Traffic to new alignment
Rimu Rd Bridge traffic to Stage 1
NORTH - Nthb to new alignme
Battley is committed to improving standards of construction planning and programming in New Zealand, advocating its development and value as a unique and Hastie Hast tie Footbridge stand alone industry profession. Tararata Creek reek Bridge Widening - West Side
Waterfront Reserve Stage SOUTH - OGPA Overlays
Rimu Rd Bridge Stage 2 Main Alignment - Nthbd
Lower Ramp
Walmsley Footbrid Walms hbd shoulder der widening 430-700 Walmsley Bottleneck Walmsle
P6 finger er
Staging Nth Abutment - P5
Walkway / pipeline supports
Pier 6 (bal)
Install Watercare pipeline
mber / Sth Abutment / settlement slab pile cap / column
Pier Table 1 Pier 2 - pile cap / column
e cap / column n
Pier 1 - landspan segments
Pier 5 - deck segments
Spa
Span 1 closing pour Pier 2 - deck segments
Pier 2 Table
Pier 3 table Pier 4 table
Thank you
/ P2 finger
Span 4 closing p
Pier 3 - deck segments
6 / 192 Victoria Street, Auckland 1010
Pier 4 - deck dec ck segments
e frans@battley.co.nz Barrie Span 5 closing pour m 021 76 59 59 6 table t Pier 09 354 3309 Pier 6 - deck segments S centrobrand Pier Table 7 Pierr 7 - landspan segments In Frans Huysmans
e colin@battley.co.nz m 027 485 3309 Pier 6t- pile09 cap354 / column 3309 S Colin Battley Pier 7 - pile cap In/ column Colin Battley
Sp
Watercare chamber / North abutment / existing abutment ound widening 3400-3800
Queenstown Rd Off Ramp Cycleway
Move Sthbd lanes westwards Widening in median 3350-3750
Nthbd Drainage 3800-4900 Sthbd Alignment (Causeway) 3300-4900
t 3200-3400 / Sthbd hbd On Ramp New Gas Main
Stage 3 Nth Complete
Nthbd lanes 3800-4900
Sthbd lanes 3400-3800
Median 4900-5280
Median 3300-3600
Onehunga Bay Rd / Nthbd Off Ramp & g
unga Nthbd Off Ramp shoulder lder widening Beechcroft Ave footbridge