construction programme experts


“The skill of an exceptional planner is in their level of knowledge, experience and expertise in determining the quality and proficiency of construction programmes. Colin Battley

Welcome

Battley is a construction, infrastructure and heavy industry planning agency with highly experienced planning engineers developing schedules to deliver optimum results and best possible project outcomes.


“The skill of an exceptional planner is in their level of knowledge, experience and expertise in determining the quality and proficiency of construction programmes. Colin Battley

Welcome

Battley is a construction, infrastructure and heavy industry planning agency with highly experienced planning engineers developing schedules to deliver optimum results and best possible project outcomes.


Metropolis Tower – planned by Battley

Welcome to the Battley planning experience Battley Consultant Planning Engineers are expert in programme development, analysis and interrogation, and testing the voracity of timelines, activities and events to validate proposed schedules. As independent consultants we bring a unique perspective to each project, with onsite monitoring and extensive reporting confidently steering construction towards planned objectives. Engaging Battley is a guarantee of establishing robust procedures and disciplines to minimise time delays, avoid cost overruns and ensure expectations are matched with actual outcomes.

SkyCity Casino – planned by Battley


Metropolis Tower – planned by Battley

Welcome to the Battley planning experience Battley Consultant Planning Engineers are expert in programme development, analysis and interrogation, and testing the voracity of timelines, activities and events to validate proposed schedules. As independent consultants we bring a unique perspective to each project, with onsite monitoring and extensive reporting confidently steering construction towards planned objectives. Engaging Battley is a guarantee of establishing robust procedures and disciplines to minimise time delays, avoid cost overruns and ensure expectations are matched with actual outcomes.

SkyCity Casino – planned by Battley


What we bring to plannin g

/

over thirty years programming for construction, infrastructure and heavy industry

/

team of Planning Engineers with minimum engineering degree qualifications

/

latest planning software and up to date planning methods and disciplines

/

valuable construction insight and problem solving to expedite the best outcomes

/

programmes for most major and signature construction projects in New Zealand

/

professional planning at a moments notice, where and when it is needed

Britomart Train Station – planned by Battley


What we bring to plannin g

/

over thirty years programming for construction, infrastructure and heavy industry

/

team of Planning Engineers with minimum engineering degree qualifications

/

latest planning software and up to date planning methods and disciplines

/

valuable construction insight and problem solving to expedite the best outcomes

/

programmes for most major and signature construction projects in New Zealand

/

professional planning at a moments notice, where and when it is needed

Britomart Train Station – planned by Battley


Colin

BE

Frans Huysmans

Dip Com

PLANNING DIRECTOR

BUSINESS DEVELOPMENT / MANAGER

Planning pioneer of signature construction projects in New Zealand. Batman to his mates.

Building Battley’s planning capability with plans to take the brand and business to the next level.

Huntly Power Station – planned by Battley

Kyle Walton BE

Hassan Eliwa

SENIOR PLANNER

PLANNING ENGINEER

PLANNING ENGINEER

Expat Kiwi home for good having planned signature projects including high rise buildings in London.

A wealth of international construction and infrastructure project management and planning experience.

Multi discipline international planning experience and innovative scheduling methodology.

BE (HONS)

Linghao Hu

BE


Colin

BE

Frans Huysmans

Dip Com

PLANNING DIRECTOR

BUSINESS DEVELOPMENT / MANAGER

Planning pioneer of signature construction projects in New Zealand. Batman to his mates.

Building Battley’s planning capability with plans to take the brand and business to the next level.

Huntly Power Station – planned by Battley

Kyle Walton BE

Hassan Eliwa

SENIOR PLANNER

PLANNING ENGINEER

PLANNING ENGINEER

Expat Kiwi home for good having planned signature projects including high rise buildings in London.

A wealth of international construction and infrastructure project management and planning experience.

Multi discipline international planning experience and innovative scheduling methodology.

BE (HONS)

Linghao Hu

BE


Our planning services WestPac Stadium Wellington – planned by Battley

/

planning and programme development

/

monitoring, interrogation and reporting

/

programme peer review

/

forensic analysis of time extension claims

/

expert litigation consultants


Our planning services WestPac Stadium Wellington – planned by Battley

/

planning and programme development

/

monitoring, interrogation and reporting

/

programme peer review

/

forensic analysis of time extension claims

/

expert litigation consultants


Victoria Park Tunnel – planned by Battley

1. PLAN/ REPLAN

4. AGREE/ CORRECT

Battley planning cycle

3. REVIEW/ REPORT

2. ACTION/ MONITOR

Our planning approach 1. Build a baseline programme, which captures and schedules likely project activities and events 2. Regularly monitor, interrogate and report on progress, testing project assumptions to ensure clarity of required actions 3. Recommend corrective measures to mitigate problems before they occur 4. Incorporate agreed corrective measures back into the programme.


Victoria Park Tunnel – planned by Battley

1. PLAN/ REPLAN

4. AGREE/ CORRECT

Battley planning cycle

3. REVIEW/ REPORT

2. ACTION/ MONITOR

Our planning approach 1. Build a baseline programme, which captures and schedules likely project activities and events 2. Regularly monitor, interrogate and report on progress, testing project assumptions to ensure clarity of required actions 3. Recommend corrective measures to mitigate problems before they occur 4. Incorporate agreed corrective measures back into the programme.


SOUTH - Southbound traffic to new Sthbd alignment

SOUTH - Nthbd Stage 2 Complete

Rimu Rd Bridge traffic to final alignment

NORTH - Sthbd traffic to new Sthbd alignment

MHPL

Walmsley Rd Off Ramp Tra Traffic to new alignment

Rimu Rd Bridge traffic to Stage 1

NORTH - Nthb to new alignme

Battley is committed to improving standards of construction planning and programming in New Zealand, advocating its development and value as a unique and Hastie Hast tie Footbridge stand alone industry profession. Tararata Creek reek Bridge Widening - West Side

Waterfront Reserve Stage SOUTH - OGPA Overlays

Rimu Rd Bridge Stage 2 Main Alignment - Nthbd

Lower Ramp

Walmsley Footbrid Walms hbd shoulder der widening 430-700 Walmsley Bottleneck Walmsle

P6 finger er

Staging Nth Abutment - P5

Walkway / pipeline supports

Pier 6 (bal)

Install Watercare pipeline

mber / Sth Abutment / settlement slab pile cap / column

Pier Table 1 Pier 2 - pile cap / column

e cap / column n

Pier 1 - landspan segments

Pier 5 - deck segments

Spa

Span 1 closing pour Pier 2 - deck segments

Pier 2 Table

Pier 3 table Pier 4 table

Thank you

/ P2 finger

Span 4 closing p

Pier 3 - deck segments

6 / 192 Victoria Street, Auckland 1010

Pier 4 - deck dec ck segments

e frans@battley.co.nz Barrie Span 5 closing pour m 021 76 59 59 6 table t Pier 09 354 3309 Pier 6 - deck segments S centrobrand Pier Table 7 Pierr 7 - landspan segments In Frans Huysmans

e colin@battley.co.nz m 027 485 3309 Pier 6t- pile09 cap354 / column 3309 S Colin Battley Pier 7 - pile cap In/ column Colin Battley

Sp

Watercare chamber / North abutment / existing abutment ound widening 3400-3800

Queenstown Rd Off Ramp Cycleway

Move Sthbd lanes westwards Widening in median 3350-3750

Nthbd Drainage 3800-4900 Sthbd Alignment (Causeway) 3300-4900

t 3200-3400 / Sthbd hbd On Ramp New Gas Main

Stage 3 Nth Complete

Nthbd lanes 3800-4900

Sthbd lanes 3400-3800

Median 4900-5280

Median 3300-3600

Onehunga Bay Rd / Nthbd Off Ramp & g

unga Nthbd Off Ramp shoulder lder widening Beechcroft Ave footbridge


SOUTH - Southbound traffic to new Sthbd alignment

SOUTH - Nthbd Stage 2 Complete

Rimu Rd Bridge traffic to final alignment

NORTH - Sthbd traffic to new Sthbd alignment

MHPL

Walmsley Rd Off Ramp Tra Traffic to new alignment

Rimu Rd Bridge traffic to Stage 1

NORTH - Nthb to new alignme

Battley is committed to improving standards of construction planning and programming in New Zealand, advocating its development and value as a unique and Hastie Hast tie Footbridge stand alone industry profession. Tararata Creek reek Bridge Widening - West Side

Waterfront Reserve Stage SOUTH - OGPA Overlays

Rimu Rd Bridge Stage 2 Main Alignment - Nthbd

Lower Ramp

Walmsley Footbrid Walms hbd shoulder der widening 430-700 Walmsley Bottleneck Walmsle

P6 finger er

Staging Nth Abutment - P5

Walkway / pipeline supports

Pier 6 (bal)

Install Watercare pipeline

mber / Sth Abutment / settlement slab pile cap / column

Pier Table 1 Pier 2 - pile cap / column

e cap / column n

Pier 1 - landspan segments

Pier 5 - deck segments

Spa

Span 1 closing pour Pier 2 - deck segments

Pier 2 Table

Pier 3 table Pier 4 table

Thank you

/ P2 finger

Span 4 closing p

Pier 3 - deck segments

6 / 192 Victoria Street, Auckland 1010

Pier 4 - deck dec ck segments

e frans@battley.co.nz Barrie Span 5 closing pour m 021 76 59 59 6 table t Pier 09 354 3309 Pier 6 - deck segments S centrobrand Pier Table 7 Pierr 7 - landspan segments In Frans Huysmans

e colin@battley.co.nz m 027 485 3309 Pier 6t- pile09 cap354 / column 3309 S Colin Battley Pier 7 - pile cap In/ column Colin Battley

Sp

Watercare chamber / North abutment / existing abutment ound widening 3400-3800

Queenstown Rd Off Ramp Cycleway

Move Sthbd lanes westwards Widening in median 3350-3750

Nthbd Drainage 3800-4900 Sthbd Alignment (Causeway) 3300-4900

t 3200-3400 / Sthbd hbd On Ramp New Gas Main

Stage 3 Nth Complete

Nthbd lanes 3800-4900

Sthbd lanes 3400-3800

Median 4900-5280

Median 3300-3600

Onehunga Bay Rd / Nthbd Off Ramp & g

unga Nthbd Off Ramp shoulder lder widening Beechcroft Ave footbridge


battley.co.nz

construction programme experts


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.