architecture+design portfolio

Page 1

architecture + design portfolio smrithi m kulkarni


CONTENTS

Hello, My name is Smrithi Madhu Kulkarni, an architect, graduated from Meenakshi College of Engineering, Chennai, in 2018 Architecture is the work of both the hand and the mind. This portolfio, a little fictional and a little practical, is a short compilation of that architecture, produced between 2013 and 2020, as a student and a professional.

02

Curriculum Vitae

04

Ayodhya - An Introspective Social Space Experiment, Thesis Project, Bachelors’ Level

16

Residential Project, 2nd Semester

20

National Institure of Fashion Technology, 3rd Semester

26

Internship Experience

36

Work Experience

48

Furniture Design

52

Photography


PERSONAL DETAILS Name Nationality Date of Birth

HONOURS Smrithi M Kulkarni

2014

SIDC, Citation Award

Indian

2015

ANDC, Shortlist

11th May, 1995

2018

Represented College at the National Awards for Excellence in Architectural Thesis (NIASA)

EDUCATION 2001-2013

Indian School Muscat, Oman

2013-2018

Department of Architecture, Meenakshi College of Engineering, Chennai, Tamilnadu

PUBLICATIONS July 2017

Photographs of ‘Seraulim House’ - Asian Paints Colour Quotient website

Nov’ 2019

Write up for ‘Homes Around Trees’ (under the guidance of Suprio Bhattacharjee) - Indian Institute of Architects Awards 2018 Shortlisted Projects

Dec’ 2019

Write up for ‘Crescent School of Architecture, BSA University’ (under the guidance of Suprio Bhatacharjee) + Photgraphs Archdaily Website

Jan’ 2020

Photographs of ‘Crescent School of Architecture, BSA University’ - Domus India magazine

Jan’ 2020

Write up for ‘Crescent School of Architecture, BSA University’ (under the guidance of Suprio Bhatacharjee) + Photographsarchitecturelive! website

Feb’ 2020

Write up for ‘The Gavel’ (under the guidance of Suprio Bhattacharjee) - India: Unbuilt Architecture

INTERNSHIP Aug’ 2016 - Nov’ 2016 Dec’ 2016 - June’ 2017

FOAID Design Studio, Chennai Studio Matter, Goa

WORK EXPERIENCE Nov’ 2018 - Jan’ 2020

architectureRED, Chennai

SOFTWARE SKILLS AutoCAD Sketchup V-Ray for Sketchup Adobe Photoshop Adobe Illustrator Adobe InDesign MS Office

LANGUAGE Spoken Written

CONTACT DETAILS Marathi, English, Hindi, Tamil English

Current Location Phone Number E-Mail ID

Chennai +91 9629556686 smadhu2361@gmail.com


THESIS - AYODHYA: AN INTROSPECTIVE SOCIAL SPACE EXPERIMENT Architecture has been used to influence the lives of people or showcase the power of an individual. In history, architecture has also been used to disintegrate society, while bringing it together at the same time. Taking India, the Hindu-Muslim clash has been going on for quite a while. Communal violence is a term that is pretty infamous in this developing country. The root cause is not the result of one factual incident, but a product of a lot of issues that run deep in the history of India. Can architecture aid in the process of their possible co-existence? Architects have a responsibility to society. There is a dire need for a structure that calls out to these communities by bringing them together under one shelter to co-operate, co-exist and love.


WHAT IS COMMUNAL VIOLENCE?

based on: hatred enmity revenge beliefs

1949 In the night, an idol of Rama was placed by the Hindus inside the mosque. The Government proclaims the premises as disputed area and locks the gates.

why is it caused? divide and rule socio - economic factors religious causes extent of ayodhya - town

on a global scale : India is ranked No. 4. It is one of the highest rated places where communal violence occurs due to religious sentiments

chowk ayodhya main road

Some large scale violences to have been recorded throughout history include the : Kashmir Unrest, Nazi Germany and The Crusades

STATISTICS

SITE BORDER

no. of incidents (recorded)

1857 Maulavi Muhammad Asghar submits a petition to the magistrate complaining that the Bairagis have built a chabutra close to the mosque

disputed land 2.77acres

total site area 67.3acres

VEGETATION

disputed site

rise of factionalised elites -0 - 1 - 30 - 31 - 100 - 101 - 300 - 301 - 700

military boundary

2012 - 15

1859 The British Govt. erects a fence to seprate the places of worship for the Hindus and Muslims. The Hindus enter from the East gate and the Muslims from the North

ayodhyÄ is an ancient city of india, the old capital of awadh, in the current faizabad district of uttar pradesh. the number of tourists visiting ayodhya anually are around 1.5 crores, most of them being domestic tourists.

8 acre vegetation

trees

2016 - 18

1525 The Mughal Emperor Babur came from Kabul to invade India, he defeated Ibrahim Lodi in the battle of Panipat. 1528 His general, Mir Baqi, visited Ayodhya and after allegedly destroying a Hindu Temple, built a Janmasthan Masjid - Babri Masjid 1855 A Hindu - Muslim conflict at the gates of the Hanuman Garhi temple took place as a consequence to oust the Hindu Bairagis from the temple premises

encompasses : communal attitudes symbolic violence structural violence physical attacks

THE SITE

ghagri river / sarju ghat

wikipedia : communal violence is a form of violence that is perpetrated across ethnic or communal lines, the violent parties feel solidarity for their respective groups, and victims are chosen based upon group membership but, laymen have defined communal violence as mostly religious conflicts.

India has been ranked 63, on the threat to minority 1951 group scale dropping 16 places from last year The Civil Judge orders that the idol should remain. The High Court confirms this order on 26 April 1955 zone wise analysis 1984 uttar pradesh incidents - 697 To create national awareness in support of NORTH - 42 killed - 154 the liberation of the Bhumi the VHP organinjured - 1641 izes a rath yatra of Sri Rama Janaki Virajman karnataka on a motorized chariot from Bihar, 25 Sept WEST 12 incidents - 352 1984, to reach Ayodhya on 6 October killed 27 1984, but was later cancelled due to Indira injured - 997 Gandhi’s Assasination SOUTH - 4 maharashtra 1986 incidents - 358 Political leaders and other parties organised killed - 44 EAST - 4 a Puja to symbolicaly start construction at injured - 1107 the site 12:15 pm - Assualt on Structure From the result of statistics - Uttar Pradesh has the 1:55pm - First dome was pulled down most no. of incidents taking place in a year. Also, the 3:30pm - Commencement of Communal major issue that has caused riots and agitations, Violence in Ayodhya not only in one place, but all over india, is the babri 7:30pm - Construction of a makeshift masjid conflict temple had begun

site border

NEIGHBOURHOOD

CONTOURS

neighbouring buildings

military buildings

highest contour - +50m lowest contour - +32.5m


concept

INFERENCES

the world, the space and the universe is made up of two major entities : the manifest & the non - manifest the manifest includes all things materialistic and the non-manifest includes things like religion, arts and philosophy and it is all expressed through one entitiy architecture Positivity And Negativity

Journey (Start And End)

Subterranean

but architecture never remained constant

in the vedic times : man was influenced by and influenced his context, that is his immediate surrounding with the coming of islam : a judgemental contract with an all powerful divinity & a social contract with the arrival of the europeans : science rationality technology

Going Into The Dark And Coming Out Into The Light

Feeling Of Being Small

india is the land that once concieved of architecture as a model of the cosmos. throughout the history of indian architecture, there have always been changes, these so called entities, known as myths, kept changing and kept on transforming according to the tradition and culture of that time period. each of these changes is known as “vistara� narration and journey The narrative on the other hand starts with a dialogue about communal violence. Hence, the structures have been laid in accordance with this dialogue

Long And Narrow Corridors

Staircase Leading To A Void

Importance Of An Axis

1. what is communal violence? 2. can we trace its history or obtain a timeline? 3. do you know how many people have been affected due to this? 4. have you come across anyone who works towards improving community integration and educating masses about tolerance? 5. are you aware about the causes of communal violence? 6. is there any structure that commemorates those who died?

narrative to form Different Points Of Entry

Looking Into A Void

Importance Of Rest Spaces

1. space

4. attraction point

7. mandala

everything & nothing square shaped plan

2. square shaped plan Arched Gateway/ Entrance

air

earth

Integrating The Landscape

aether

water

fire Five Elements of Nature

5. finding commonalities

Viewing Platform Narrowing down on spaces with reference from the programme and case studies : 1. Museum 2. Memorial 3. Community Centre 4. Tourist Information Centre Spaces Defined

8. islam

5 elements of nature acts of kindness community integration double-axis participation in dialogue symmetry

3. form evolution

6. merge steps 4&5

9. manthana

one element in the centre spaces relevant around it

mix of culture and traditions


THE EVOLUTION

defining the main axis

total site area : 67.3 acres disputed site : 2.77 acres military : 5.77 acres boundary 1. air 2. earth 3. aether 4. water 5. fire spaces have also been alloted for tourist information centres and the urban haat

distributing spaces along the axis

breaking the monotony

The plans for each block have been conceptualized and developed them according to : 1. Relevance to the narrative of communal violence 2. Inferences from the case studies 3. Development of form from the concept

FIRE

WATER

AETHER

Lastly, the visitors reach Next, visitors walk through The third element, aether, this level first and experi- a series of the causes of occupies the centre of the ence the heat. The memo- communal violence, in the site, both geometrically rial, is placed on top of this form of roofing systems and elementally with differwhich take the visitors and can be viewed from ent meanings in different the bottom giving viewers through different experireligions. a different ences. perspective.

landscaping

main axis on site. moves from the lowest contour (air/entry) to the highest contour. (fire/memorial).

vehicular entry and exit width of 16m

5

4 entry to the tourist information centre

2

exit from memorial museum

1

entry into the memorial museum

3

major proposal concentrated in this area and the disputed site has not been disturbed

both pedestrian and vehicular entry with a width of 6m each

EARTH

AIR

In the 2nd block visitors find themselves in front of a tree symbolising the block. This structure is associated with the destructive and reformative forces of communalism.

The air is one of the main reasons for spread of hate and anger. visitors come through a small opening and fall into a big room, a “collection point�.


INDIVIDUAL BLOCKS AIR

EARTH

AETHER

WATER

AIR

WATER

Cement plastered finish has been used to express a feeling of being single minded in a dark place.

Red sandstone being the go-to material for the kund since time immemorial has been retained Pathway of Causes Positive

Air Element Courtyard

30m lvl Earth Element Exising tree on Site Hall for CSSS

Hall of Infinity Mirrors

40m lvl

FIRE

35m lvl

Cement symbolises the rational whereas steel goes hand-in hand with the new-age technology

AETHER

42.5m lvl 37.5m lvl 32.5m lvl

Pathway of Causes Negative

37.5m lvl 35m lvl

EARTH

Here, the use of cement finish comes to give a solemn output and contrast with the green surroundings

Water Element Kund

Ramp - Entry

35m lvl 32.5m lvl 30m lvl

Exposed brick has been used to symbolise the Earthen colour, that is a dusty red and brown with a tree to stand in contrast in the centre of this element

FIRE

The Void

Fire Element Positive - Memorial Fire Element Negative

Aether Element Spiral Staircase Storage

42.5m lvl 40m lvl


NARRATIVE THROUGH LANDSCAPE AND INSTALLATIONS

VIEWS

05

05

Before entering the fifth block Fire,

Upon entering

04

04

Before entering the fourth block Water,

Upon entering

Pathway of Causes

05

social repression

political progroms AIR PLAZA

04

religious causes

03

03

Before entering the third block Aether,

Upon entering

Centre 03

02

02

Before entering the second block Earth,

Upon entering Infinity Mirror Room

EARTH BLOCK WITH ENTRANCE

AETHER BLOCK WITH ENTRANCE

KUND

WATER BLOCK

FIRE BLOCK WITH ENTRANCE (Memorial)

FIRE BLOCK (Memorial View from Bottom)

Hall For Csss

02

01

01

01

Before entering the first block Air,

Upon entering

2.2

courtyard

post-colonial colonial

0.3

pre-colonial

4.55 5

30.28

46.6


RESIDENTIAL PROJECT Being the first year of experiencing design and drafting, the brief submitted to us by college was relatively relatable - we were to design a residence for a family of four. The site given to us was in Pallikaranai, Chennai, with a built area of 300sqm. Pallikaranai (a marsh land) hosts a variety of views and wildlife in and around the site. With the contemporary style growing in popularity, this structure exhibits Indian architectural elements while keeping in mind the necessity of open spaces - hosting an inside out concept. The main exercise was to develop concepts and have atleast one unique element in the design


The zoning has been done in such a way that each of the spaces inside the house is accompanied with a transition space in between to separate, majorly, the public and private areas

DINING AREA

FLOOR PLANS

GROUND FLOOR

Foyer Living Room Dining Area Kitchen Reading Room Guest Bedroom Master Bedroom FIRST FLOOR

pergola

Conceptual Section first floor mezzanine ground floor

LIVING AREA

Elements some elements that have been included :

jali wall

louvers

Mezannine Bedroom 01 Bedroom 02

sloped roof

The mezzanine is placed in such a way that it ventilates the living area by acting like a wind tunnel

VIEW 2

VIEW 3

VIEWS

VIEW 1


INSTITUTIONAL PROJECT: NATIONAL INSTITUTE OF FASHION TECHNOLOGY Keeping in mind the necessity of open spaces in a design institute, the National Institute of Fashion Technology, Yelagiri, portrays some of the traditional architecture found within its context, being responsive to its climate and integrating itself with its surrounding. The design focuses on the interspersion of the open and closed spaces leading to the use of both rectilinear and curvilinear structures. This project was carried out in the 3rd year, and taught us the importance of providing the necessary spaces and solving working drawings.


SITE PLAN

FORM EVOLUTION The curved elements in the Resource Centre and the Ramp Walk along with the Student Facility Centre which is a curved building, compliments the Circular Open Air Theatre which sits at the centre of the site.

BLOCKS

Ramp Walk and Ancillary Spaces

Linear arrangement of blocks

Legend

Location : Yelagiri Site Area : 16 acres

1. Administration Building 2. Ramp Walk and Exhibition 3. Ancillary Block 4. Academic Block 1 5. Academic Block 2 6. Resource Centre 7. Student Facility Centre 8. Auditorium 9. Hostel-Girls 10. Hostel - Boys 11. Open Air Theatre

The blocks have been arranged in a linear fashion. Each block is a level higher than the one below, starting from right to left. Typical Plan - Classroom and Artroom

Resource Centre First Floor Plan

9 6 Classrooms without walls

7 11

The Art Studios for each programme have been designed in rooms without walls creating an integration between the spaces and nature

10

5 8 3

2

1 4

A big curved wall built with brick has been used to visually block the students from viewing the academic block as they enter into the resource centre. This Wall, henceforth treats the resource centre as a students-only zone


HOSTEL - TYPICAL

SECTIONS ACADEMIC BLOCK 2

An open viva centre sits on top of Academic Block - 1 with exposed columns and parapet walls and a flat roof shading it

textile design fashion design clothing management

RAMP WALK AND ANCILLARY SPACES

A Bowstring Steel Truss, providing support over a span of 40m for the Ancillary block, connects the Academic blocks on one side and the ramp walk on the other. academic block - 1 academic block - 2 ancillary block ramp walk

ACADEMIC BLOCK 1 apparel production knitwear design leather design

Conceptual View of the Institution


INTERNSHIP EXPERIENCE The year 2016-2017 was a year of internship. In the first semester, I worked at FOAID Design Studio, Chennai, for a period of 4 months, from August 2016 to November 2016, under Ekta Agarwal and Suny Akber For the next semester, I worked at Studio Matter, Goa, for a period of 6 months, between December 2016 and June 2017, under Maanasi Hattangadi and Ruturaj Parikh Areas that were the main focus of improvement were, Spatial Planning, Interiors, Detailing, Renovations, Graphic Design, and Photography.


9"

DAY ROOM / LAUNDRY 8'-0"X11'-3"

LIFT 6'-0"X6'-0"

$

Type : Architectural Interior Time-Period : Designing of interiors, working drawings and 3D Visualization

CROCKERY

PANTRY

$

$

GUEST ROOM 16'-0"X11'-0"

ENTRY FOR LABOUR

LIVING 14'-1.5"X11'-0"

TOILET 6'-6"X11'-0"

TOILET 6'-8.5"X4'-0"

2'-9 " 1 2

SUMP LOCATION

+1'0"Lvl

5'-6"

Below beam lvl

+1'0"Lvl CAR PARKING 19'-7"X18'-0"

B$

$

$

+1'6"Lvl

$ $

$

PLAN

MAID'S ROOM 7'-6.5"X6'-3"

STORAGE

3'-0"

The first step was to design a bedroom on the first floor for a 1st year college boy. Since the plan had already been laid out, the interiors had to be worked on. The brief was to be inspired by a sports car, the Lamborghini.

$

$

UP

KITCHEN 11'-3"X15'-7.5"

PUJA 6'-0"X4'-6"

DINING 14'-9"X12'-10.5"

PANTRY 10'-5.5"X15'-6"

5'-6"

2'-0"

The Millers Road project is a residential project in Chennai.

PLUMBING AND ELECTRICAL , MILLER’S ROAD FOAID

1' HT RAMP TO CAR PARKK

6'-0"

RESIDENCE, MILLER’S ROAD FOAID

16'-0" WIDE ROAD LIFT 6'-0"X6'-0"

ELECTRICAL POINT DRAWING TITLE:-

E S

Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com

4'-7" 2'-5"

8'-9"

1'-8"

3'-2"

6'-5"

6'-5"

6'-5"

7'

2'-912"

6'-6"

5'-6"

6'-1"

1'-7" 2'-5"

3'-9"

3'-3"

7'-1"

SUMP LOCATION

3'-0"

7'-9"

6'-6"

2'-0"

5'-6"

+1'0"Lvl

TOILET 6'-8.5"X4'-0"

4'-9"

6'-9" 1'-7"

5'-6"

6'-5"

6'-5"

2'-6" 2'-3"

5'-1"

8'-10"

6'-1"

1'-8"

1'-2" 1'-2" 1'-2"

2'-3"

1'-2"

2'

+1'0"Lvl CAR PARKING 19'-7"X18'-0"

6'-9"

2'-10"

5'-6"

Below beam lvl

TOILET 6'-6"X11'-0"

MAID'S ROOM 7'-6.5"X6'-3"

7'

2'-6"

9"

2'-2"

2'-6"

2'-3"

2'-8" 2'-8"

2'-2"

9'-3"

7'-1"

3'-5"

+1'6"Lvl

LIVING 14'-1.5"X11'-0"

3'-9"

6'-6"

6'-1"

1'-4"

2'-3"

STORAGE

7'-1"

6'-5"

4'-5"

6'-2"

3'-3"

2'-2"

2'-2"

WALK-INWARDROBE 7'-4"X17'-10"

ENTRY FOR LABOUR

1'-7" 4'-4"

GUEST ROOM 16'-0"X11'-0"

2'-6"

STORAGE

1'-7" 6'-7"

1'-8"

2'-6"

1'-10" 2'-6"

2'-2"

5'-8"

2'

6'-6"

2'

6'-9"

2'-11"

2'-5"

1'-10"

4'-11"

2'-5"

6'-7"

DINING 14'-9"X12'-10.5"

2'-6"

1'-8"

2'-5"

4'

PANTRY 10'-5.5"X15'-6"

1'-6"

2'

UP

PUJA 6'-0"X4'-6"

6'-7"

5'-8"

2'-2" 2'-10"

1'-10"

2'-10"

2'-10"

KITCHEN 11'-3"X15'-7.5"

7'

7'-6"

CROCKERY

7'-10"

2'-10"

2'-10" 2'-10"

5'-8"

4'-5"

PANTRY

2'

2'-1"

2' 2'-5" 2'-10"

2'-5"

2'-10"

2'-5"

LIFT 6'-0"X6'-0"

6'-6"

$

D 2'

6'-5"

4'-1"

MASTER BED ROOM 2 12'-3"x17'-10"

BALCONY 10'-6"x4'-7"

4'-1"

9"

THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY DAY ROOM / LAUNDRY OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED 8'-0"X11'-3"

1' HT RAMP TO CAR PARKK

6'-0"

Miller's Road

N W

Date :03-10-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Drawn by: SMRITHI Dealt by : Suny

TOILET 7'-2"X17'-9"

16'-0" WIDE ROAD

CONDUIT DRAWING STORAGE

STORAGE

PLUMBING DRAWINGS

Miller's Road

6'

TITLE:-

N

Date :03-10-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Drawn by: SMRITHI Dealt by : Suny

E

W S

Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com

THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED

7'-7"

6"

FALSE CEILING DESIGN

94.22°

" -11

56 .34 °

3 3'-

5'

1' 2.96"

"

STORAGE

1'-2"

STORAGE

STORAGE

58 .89 °

12

1.1

1° 7'-6"

3'-4" D

0° .0 90

9" 6'-

9" 6'-

2'-11"

8'-1"

0° .0 90

3'-1"

8'

1'-9"

°

0° .0 90

3'-5"

.23

3'-4"

5'

" 10 4'-

31.1

127

3'-10"

PLAN

9'-10"

A

C

1' 0.2"

5'

2" 3'-

.77° 142

127 .88 °

" -10

1' 9.65"

5'-10"

4'-2"

6'-5"

127 .88 °

STORAGE

6'-5"

4'-6"

° .60 56

1"

STORAGE

STORAGE

TOILET 7'-2"X17'-9"

3'-

1' 1.77"

1'-7"

7'-5"

3'1" 98.81°

" 11 3'-

4'-1"

7'1"

" 11 3'-

12 3.6

3'-1"

4° 5.6 11

90

.3

7'

39.7 7°

2' 1.59"

90

TOILET 7'-2"X17'-9"

.0

23° 50.

3'-5"

4'-11"

7'-6"

B 4'

5'-3"

2'-6"

The false ceiling has also been designed following the lines found in the lamborghini

6'-5"

PLUMBING LAYOUT

TILE LAYOUT


WARDROBES, MILLER’S ROAD FOAID

3D VISUALIZATION FOAID

All wardrobe units have been designed, given below is one designed for a young couple.

Project: Dr. Narotham Reddy’s Residence Time-Period : Design and 3D Visualization

NO STRINGS ATTACHED FOAID 2'-8" 8'-1"

2'

cashier machine

PLAN

OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED

S W

TITLE:-

Date :26-08-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Dealt by : Suny Drawn by: Smrithi

No Strings Attached

THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY

N

E

LVL 0.00

LVL +1'.30"

14'-9"

SEATING AREA

2'-3"

8'-1"

6'-9"

KITCHEN

This project was a restoration of an old building, just outside, but within the premises of a theatre complex in Adyar. Being a very small restaurant, 1/3rd of the structure was used for the kitchen and the rest for the seating area. The colour scheme used was beige and deep pink with an art installation made with thread

8'-1"

Type : Restaurant Interiors Duration : Conceptualization and Design

Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com

A 21sq.ft restaurant in Adyar with a quirky name .


The house in Seraulim, Goa, is a workspace and a small training centre for an NGO working with childdevelopment.

SERAULIM HOUSE STUDIO MATTER

LANDSCAPE (Completed)

Type : Restoration Time-Period : Post-Construction stage Since major planning and restoration had already been achieved, Seraulim House was coming into its final stages, which left only laying of the floor and landscaping.

PHOTOGRAPHY : AFTER SHOTS, WITH POST PROCESSING AND COMPARISON

Published in the Asian Paints Colour Quotient Website. Link - https://www.asianpaints.com/colourquotient/workspace/repurposed-seraulim-house-by-studio-matter-a-sixdecadeold-portuguese-bungalow/


Thinkering campus is a small learning by making schools tucked in a tiny village of Goa.

THINKERING CAMPUS

STUDIO MATTER

Following the elements of a typical Goan house, all the public zones were designated toward the front of the existing house and the wet areas were located towards the back. Designing for a learning by making school, all the new additions were designed using steel as the main material.

Type : Restoration Time Period : Conceptualization and Design Phase The first step was to document the existing structure measuring every nook and corner. Next, was deciding what to retain and what to remove. Maintaining the proportions of the existing house was largely observed. The modification was to introduce a steel insert into the structure, a mezzanine and a new roof.

Ground Floor Plan

Mezzanine Floor Plan

Section BB’

East Elevation


WORK EXPERIENCE at architectureRED, under Biju Kuriakose, Kishore Panikkar and Suprio Bhattacharjee, I was awarded the opportunity to work on research, deviating a little from the usual role of a junior-architect. I have listed down all that I have worked on since I joined there in November 2019, and have chosen to present a few selected works. PHOTOGRAPHY

WRITE-UP’s

Aeronautical Department School of Life Sciences Crescent School of Architecture Kommune

The Gavel Kenbridge School Crescent School of Architecture Homes around Trees Law Office Aeronautical Department Hindustan School of Law DupleXS Kommune The Court Office

RESEARCH + PUBLICATION Research on Smart Cities and it’s relation to the Housing sector Master Planning and Insititutional Volume - Compilation of all the institutional projects done by aRED Housing Volume - Compilation of all the housing projects done by aRED DESIGNING EXHIBITION PANELS Seoul Biennale Exhibition held in Aug’2019 JK AYA Awards IIA Awards

DRAWINGS Begur - Sales Lounge Exhibition Door VOLUNTEERING WITH THE CHENNAI ARCHITECTURE FOUNDATION (Including but not limited to) Portfolio ‘19 Synergies Exhibition


CRESCENT SCHOOL OF ARCHITECTURE


DEPARTMENT OF AERONAUTICS

SCHOOL OF LIFE SCIENCES


ARCHDAILY - Photographs, Graphics, Content

DOMUS - Photographs, Graphics

PHOTOGRAPHS (on archdaily, architecturelive and domus) PUBLICATIONS


DRAWINGS

EXHIBITION DOOR

Drawings for the Toilets of the Sales Lounge of a large-scale housing project in Begur, Bangalore

Type : Design and Detail Time Period : Conceptualization, Design Phase and Detailing

EQ

295

EQ

EQ EQ

600 EQ

600 600600 600

1 FULL TILE

600

S

EQ

EQ

FC LVL +2.50M

EQ

600 600600

EQ EQ EQ EQ

EQ

1 FULL TILE

600

S

C

Possibility 03 - When doors are pivoted and flaps closed

Possibility 04 - When both doors and flaps are pivoted

1 FULL TILE

600

S

EQ

FC LVL +2.50M

3 FULL TILES 3 FULL 3 FULL TILES TILES

R R

R

R R 3 FULL TILES

R D

F F

DD

E E E LEGEND LEGEND LEGEND : : : WALLWALL SCHEDULE: WALL SCHEDULE: SCHEDULE:

D

F

REFELCTED REFELCTED REFELCTED CEILING CEILING CEILING PLAN PLAN PLAN - FALSE - -FALSE FALSE CEILING CEILING CEILING LAYOUT LAYOUT LAYOUT SCALE-1:50 SCALE-1:50 SCALE-1:50 REFELCTED CEILING PLAN - FALSE CEILING LAYOUT

SCALE-1:50

CC

FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M

E

TILE TILE TILE LAYOUT LAYOUT LAYOUT TILE LAYOUT

Possibility 02 - When doors are closed and flaps open up

600 600600

S S

F

SCALE-1:50 SCALE-1:50 SCALE-1:50

Possibility 01 - When doors and flaps remain closed

C

EQ EQ S

1 FULL TILE 1 FULL 1 TILE FULL TILE EQ

B

FC LVL +2.50M

E E

D

B B

600 600600

S S

R

F

B

600

FC LVL +2.50M

R E

S

1 FULL TILE

600

S S

EQ EQ

EQ

1 FULL TILE 1 FULL 1 TILE FULL TILE

S

R 1 FULL TILE DD

STORE ROOM

FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M

C

EQ EQ

600

95.79 M LVL FFL

A STORE STORE STORE ROOMROOM ROOM

FC LVL +2.50M

EQ EQ

EQ

S

A A

600

1 FULL TILE

EQ EQ EQ EQ

EQ S

A

EQ EQ

1 FULL TILE 1 FULL 1 TILE FULL TILE EQ EQ

EQ

EQ

C

265

1 FULL 1 FULL 1 FULL 1 FULL 1 FULL 1 FULL EQ EQEQ EQ EQEQ R R R R R TILE TILE TILE TILE TILE TILE 1 FULL EQ EQ R TILE D F F F

600

FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M

EQ EQ CC

EQ

C

EQ

265 265265

S

B

2 FULL TILES

260

3 FULL TILES

R

S

FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M

B

2 FULL TILES

EQ EQ

EQ EQ

EQ

2 FULL TILES 2 FULL 2TILES FULL 140 TILES

EQ EQ

CC

The garage at office was envsioned to become an exhibition area for all the work carried out by the studio. This door, designed with a series of flaps and pivots, was to enhance the entrance of the office.

600 600600

EQ EQ

S S

EQ 2 FULL TILES

2 FULL TILES 2 FULL 2TILES FULL 110 TILES EQ

EQ EQ

B B

EQ EQ

2 FULL TILES 2 FULL 2TILES FULL 140 TILES

S

EQ EQ

EQ 600 600

3 FULL 3 FULL 3 FULL TILESTILES TILES

95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

E

SCALE-1:50

B

S

C

TOILET O1 R

EQ

EQ EQ

EQ 110 110

110

140

R R

600

R

95.79 M LVL FFL

2 FULL TILES

140 140

140

STAFF TOILET O1

200

200 200

135 200

S

200

240 S B B S

240

S 95.79 S S M LVL FFL

S S

R

135 135

135

R

R R

2 FULL TILES 2 FULL 2TILES FULL TILES

140 140

150 200 200

200

135

200

CORSA CREMA 260300X300 260 S260 S S 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

STAFFSTAFF STAFF TOILET O1O1 TOILET O1 TOILET

200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

B

S 95.79 S S M LVL FFL STAFF TOILET O2

CORSA CREMA CORSA CORSA CREMA CREMA 300X300 300X300 300X300

95.79 M LVL FFL

S

D16

S

1 FULL TILE 1 FULL 1 TILE FULL TILE

135 150 150

150

2 FULL TILES R

135

S

200

2 FULL TILES

V1

1200 475 1150

D

CHANGING ROOM

STAFFSTAFF STAFF TOILET O2O2 TOILET O2 TOILET

S S

TOILET O2

TOILET O1O1 TOILET O1 TOILET

1 FULL TILE 1 FULL 1 TILE FULL TILE

135

2 FULL TILES 135

135 135 R 2 FULL TILES R

110

110

CHANGING CHANGING CHANGING ROOMROOM ROOM

95.79 M LVL FFL

200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

C

295 295

295

135 135

R 455

C O2O2 TOILET TOILET O2 TOILET

1220

2700

S

200

E E E

FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M

4 FULL TILES

95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL S240 S S 240 240 95.79 S SMSLVL FFL

240 240 S240 S S 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

R R

2 FULL TILES 2 FULL 2TILES FULL TILES

CC

5200

C

D16 D16 D16

E E

110 110

R

R R

F16 380

2 FULL TILES 2 FULL 2TILES FULL TILES

1100 1200

5200 5200

V1

5200 V1 V1

455 455

E

8050

EQ

135 135 R

135

R R

R R

R R

2 FULL TILES 2 FULL 2TILES FULL TILES F16 F16

380 380 F16

380

170

1100 D4 1100 1100 1200 D4 1200

12201220 1220 2700 27002700 D3

R S S

S

1200 D4 1200 1200

1000

CC

A

STORE ROOM

R 4R FULL 4 FULL TILES TILES 4 FULL TILES

R

TOILET O3

PLAN

SCALE-1:50 SCALE-1:50 SCALE-1:50

1095

3700

3500

V1a DD

D

95.79 M LVL FFL 95.76 M LVL SSL

D3 D3D3 D15

8050 80508050 5350 F F F

F

PLAN PLAN PLAN

2 FULL TILES 2 FULL 2TILES FULL TILES

1095 V1a

3900

470

455

95.76 M95.76 LVLMSSL M LVLLVL SSL SSL 100095.76

D15 D15 D15 10001000 1000

5350 53505350

1150

1575

1575

1575 1575

95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

D4

39003900 3900

C 1350

D4 D4 475 1150 1150 475 475 200 1200

200

200 200

D4

D4 895

D4 D4

D4

TOILET TOILET O1 O1O1 TOILET

TOILET O3O3 TOILET O3 TOILET

S S

95.79 M LVL FFL

200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

B

S

S

S

B

D4 D4

D4

470

1575470 470

1575 1575

1575

895 D4 D4 895 895

STAFF TOILET O1

CL 300 300 350 300 350350 EQ EQEQ EQ EQEQEQ EQEQEQ EQEQEQ EQEQ EQ EQEQ 300 350 1000 850 850850 10001000 875 875875 EQ EQ EQ EQ EQ EQ 2750 27502750 1000 10001000 850 1000 875 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 2750 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL TOILET O1 95.76 M LVL SSL

B B

A A

160

TOILET O4

CL

CL CLCL 895

13501350 1350

STAFFSTAFF STAFF TOILET TOILET O1 O1O1 TOILET

3750

B

A

S S

160 160160

1350

STAFF TOILET O2

CL CL

D4

95.7995.79 M95.79 LVLMFFL M LVLLVL FFL FFL 1 DETAIL

95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL 37503750 3750 95.76 M LVL SSL TOILET O2

95.78 M BLVL FFL B B 95.76 M LVL SSL

470

4701550 470

470

D4

D4 170 170 D4 D4

170 1550

1550 1550

920

D4 D4

CHANGING ROOM 13501350 1350

CL

C

S

A A

A STORE STORE STORE ROOMROOM ROOM

95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

1350

95.7895.78 M95.78 LVLMFFL M LVLLVL FFLFFL 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL

CHANGING CHANGING CHANGING ROOMROOM ROOM

895 895

895

DETAIL DETAIL DETAIL 1 1 1

CC

1520

A

TOILET O5

1675

D5

STAFF STAFFSTAFF TOILET TOILET O2 O2O2 TOILET

TOILET TOILET O2 O2O2 TOILET

A

TOILET O4O4 TOILET O4 TOILET

13501350 1350

S 160 95.79 M LVL FFL

E D

600

EQ

S S

160 160160 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL

V1a V1a

96.79 M LVL FFL 96.76 M LVL SSL

15201520 1520

95.76 M LVL SSL

TOILET O3

C

A A

TOILET O5O5 TOILET O5 TOILET

1675 1675

1675 D4

D5 D5D5

95.76 M LVL SSL 2900

B

TOILET TOILET O3 O3O3 TOILET

A

3700 3700

STORE ROOM

995 D4 D4

D4

95.79 M LVL FFL

37503750 3750 DETAIL DETAIL 2 2 2 DETAIL 3750 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL DETAIL 2 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL

B B D4

B

3700

3500 3500

D4

STORE STORE STORE ROOMROOM ROOM

96.7996.79 M96.79 LVLMFFL M LVLLVL FFLFFL 96.7696.76 M96.76 LVLMSSL M LVLLVL SSL SSL

920 920

920

TOILET TOILET O4 O4O4 TOILET

A A

A

950

95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 2900 29002900 TOILET O4

S

1095 1095

1675

A

3500

1675

845

300 300 350 300 350350 EQ EQEQ EQ EQEQEQ EQEQEQ EQEQ 300 350 850 850850 925 925925 950 950950 EQ EQ EQ EQ A 2750 27502750 850 925 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 2750 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL TOILET O5 95.76 M LVL SSL

995 995

995

TOILET TOILET O5 O5O5 TOILET

2500

1675 1675

845 845

845 D4

A A D4 D4

A

25002500 2500

DD

600

2900

R

CL CLCL CL

D

F F

F 600MM 600MM X 600MM X 600MM PVC PVC GRID GRID CEILING CEILING 600MM X 600MM PVC GRID CEILING WITH SILHOUETTE SILHOUETTE GRID WITH WITH WITHWITH SILHOUETTE GRID GRID WITH 600MM X 600MM PVC GRID CEILING SHADOW SHADOW CHANNELS CHANNELS ONON THE THE EDGES EDGES SHADOW CHANNELS ON THE EDGES WITH SILHOUETTE GRID WITH 2 FULL 2 FULL 2 FULL SHADOW CHANNELS ON THE EDGES R R TILESTILES TILES 2 FULL R TILES

600

800

F E

600 600

8050

1 FULL 1 FULL 1GREY FULL ZURICH (EXARO) EQ EQEQEQ EQEQ TILE TILE TILE 600X600 1 FULL TILE

E E

600 600

29002900 2900

4350

E D

600 600

800 800800

DD

600 600

43504350 4350

D

F F

F ZURICH (EXARO) ZURICH ZURICH GREYGREY (EXARO) GREY (EXARO) 600X600 600X600 600X600

600

F E

600 600

E E

600

E D

F

EQ

DD

EQ

D

F F

80508050 8050

600

F

E

LEGEND :

WALL SCHEDULE: 200MM 200MM 200MM THK BLOCKWORK THK THK BLOCKWORK BLOCKWORK

200MM THK BLOCKWORK 100MM 100MM 100MM THK BLOCKWORK THK THK BLOCKWORK BLOCKWORK

SCALE-1:50

100MM THK BLOCKWORK 150MM 150MM THK THK BLOCKWORK BLOCKWORK 150MM THK BLOCKWORK 150MM THK BLOCKWORK 15MM 15MM THK 15MM MORTAR THK THK MORTAR MORTAR 10MM THK 10MM TILE THK TILE TILE 15 10MM 15 10THK

40 20 40 20 40 20

150

50 5050 40 4040 90 9090

LAMINATED LAMINATED LAMINATED FINISH FINISH ON FINISH HONEY ONON HONEY HONEY COMBCOMB SHUTTERS COMB SHUTTERS SHUTTERS LAMINATED FINISH ON HONEY TILE FINISH TILE TILE FINISH AT FINISH ATAT COMB SHUTTERS +95.79M +95.79M +95.79M LVL LVLLVL ZURICH ZURICH ZURICH GREYGREY GREY (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 ZURICH GREY (EXARO) 600X600

15MM THK MORTAR 10MM THK TILE

40 20

90X60MM 90X60MM 90X60MM THK WOODEN THK THK WOODEN WOODEN OUT OUT OUT DOORDOOR JAMB DOOR JAMB FINISHED JAMB FINISHED FINISHED 90X60MM THK WOODEN WITHWITH DUCCO WITH DUCCO DUCCO PAINTPAINT TO PAINT TOTO DOOR JAMB FINISHED MATCH MATCH MATCH THE SHUTTER THE THE SHUTTER SHUTTER WITH DUCCO PAINT TO 50 40 90 MATCH THE SHUTTER

60

60 60

60

15 1515 15 1510 15 1010 15MM 15MM THK 15MM THK THK 150 150150 PLASTER PLASTER PLASTER 15MM THK PLASTER

IN

IN IN IN

OUT

43 MM 4343 XMM 15 MM XMM 15 X 15 MDF MMMM MDF MDF TRANSITION TRANSITION TRANSITION PROFILE PROFILE PROFILE

DETAIL DETAIL DETAIL 3 33

IN

DETAIL 3

IN IN

OUT OUT OUT

- 01 - 01 TILE -TILE 01TILE 600 XBLOCKWORK 600 X 600 ZURICH ZURICH 600 X600 600 ZURICH 20MM THK GREY FROM FROM EXARO EXARO GREYGREY FROM EXARO

TILE FINISH AT +95.79M LVL

10MM 10MM THK 10MM TILE THK THK TILE TILE 300X300 300X300 300X300 CORSA CORSA CORSA CREMA CREMA CREMA TILE -TILE 02TILE -TILE 02 - 02 10MM THK 300 X300 300 300 XCORSA 300 X 300 CORSA CORSA 300X300 CORSA CREMA CREMA CREMA CREMA 20 MM 2020 THK MMMM ENG THK THK MARBLE ENG ENG MARBLE MARBLE

20MM EXTERNAL PLASTER FINISH

FFL

SSL SSL SSL

BOTTOM BOTTOM BOTTOM FC LVL FCFC +2400 LVLLVL +2400 +2400 MM MMMM FROMFROM FROM BOTTOM FC LVL +2400 MM FROM 10MM 10MM ALUMINUM 10MM ALUMINUM ALUMINUM CHANNEL CHANNEL CHANNEL TO BETOFIXED TO BEBE FIXED TO FIXED THE TOTO WALL THE THE WALL WALL 10MM ALUMINUM CHANNEL TO BE FIXED TO THE WALL D4 D4D4

5MM GROOVE

20MM 20MM EXTERNAL 20MM EXTERNAL EXTERNAL PLASTER PLASTER PLASTER FINISH FINISH FINISH

OUT

TRANSITION PROFILE

SSL

SCREED SCREED SCREED LAID LAID TOLAID SLOPE TOTO SLOPE SLOPE SCREED LAID TO SLOPE

DETAIL DETAIL DETAIL 1 11

DETAIL DETAIL DETAIL 2 22

DETAIL 1

SCALE-1:20 SCALE-1:20 SCALE-1:20

DETAIL DETAIL DETAIL 3 33

DETAIL 2

SCALE-1:20 SCALE-1:20 SCALE-1:20

SCALE-1:20

SCALE-1:5 SCALE-1:5 SCALE-1:5

SCALE-1:20

D4

DETAIL DETAIL DETAIL 4 44

DETAIL 3

project name ASSETZ ASSETZ ASSETZ BEGUR BEGUR BEGUR

1801118011 18011

project number

Assetz Property Group

18011

RR R R

FULL 1111FULL FULL FULL TILE TILE TILE TILE

EQ EQ 1 FULL EQ REQ TILE

SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT 1 FULL TO DETAIL TODETAIL DETAIL TO DETAIL TO R TILE

1111FULL FULL FULL FULL RR TILE TILE EQ RR TILE TILE

SKYLIGHT TO DETAIL

POSITION

TOILETS 1 - 6, STAFF TOILETS 1-2& CHANGING ROOM

- NAHANI TRAP

SCALE-1:5

drawingdrawing title drawing titletitle

BGR-SL-GROUND BGR-SL-GROUND BGR-SL-GROUND FLOOR FLOOR PLAN FLOOR PLAN PLAN

GP-02-01 GP-02-01 GP-02-01

projectproject number project number number

client AssetzAssetz Property Assetz Property Property GroupGroup Group

STAFF TOILETS 1 - 2, CHANGING ROOM

structural structural consultant structural consultant consultant

DTC Consultants DTC DTC Consultants Consultants

RED RED RED

review review onlyreview onlyonly structural consultant north drawingrevision title revision purpose of release drawingdrawing number drawing number number revision client approval client client approval approval mep consultant mepmep consultant consultant BGR-SL-GROUND FLOOR PLAN DTC Consultants review only statutory statutory approval statutory approval approval research+design research+design research+design DTCrevision Consultants DTC DTC Consultants Consultants drawing number client approval date datedate sheet number sheet sheet number number tender tender tender mep consultant 04/05/2020 04/05/2020 1/1 1/11/1 villa b, villa sai villa anugraha, b, sai b, anugraha, sai 27/1, anugraha, rukmani 27/1, 27/1, rukmani street rukmani ext., street street ext.,ext., statutory approval04/05/2020 good for good construction good for construction for construction landscape landscape landscape consultant consultant consultant research+design SKYLIGHT SKYLIGHT besant besant nagar, besant chennai nagar, nagar, chennai - 60090. chennai - 60090. t:-044.430.33669 60090. t: 044.430.33669 t: 044.430.33669 date sheet number SKYLIGHT DTC Consultants SKYLIGHT tender drawn by SKYLIGHT drawn drawn by by scale scale scale checkedchecked by checked by by 28-09-18 28-09-18 28-09-18 as builtas built as built Design Design Milieu Design Milieu Milieu 04/05/2020 1/1 www.architecturered.com www.architecturered.com www.architecturered.com villa b, sai anugraha, 27/1, rukmani street ext., TO DETAIL TO DETAIL FULL TILES FULL TILES FULL TILES 222FULL FULL TILES FULL TILES FULL TILES RR RR RR good for construction 1:150 SMK KPKP TODETAIL DETAIL date2 date date TILES FULL TILESR FULL TILESSMK FULL TILESR R R 1:150 R TILESKP TO landscape consultant 22221:150 FULL TILES 2222FULL TILES R R R TO DETAIL 2 FULL TILES 2 FULL 2 FULL TILES R SMK besant nagar, chennai - 60090. t: 044.430.33669 drawn by scale checked by 28-09-18 as built Design Milieu www.architecturered.com 1:150 SMK KP revisions/submissions date c copyright c copyright c 2018 copyright architectureRED 2018 2018 architectureRED architectureRED all rights allreserved rights all rights reserved reserved

ASSETZ BEGUR

client client client

north north north

POSITION

TOILETS 1 - 6

- START TILE

DETAIL 6

SCALE-1:5 SCALE-1:5 SCALE-1:5

SCALE-1:5

purposepurpose ofpurpose release of release of release

DESCRIPTION TOILETS TOILETS TOILETS 1 - 6 1 -16- 6 TILE - 01 600 X 600 ZURICH STAFF STAFF TOILETS STAFF TOILETS TOILETS GREY FROM EXARO 1 - 2,1 -12,- 2, TILE - 02 CHANGING CHANGING CHANGING ROOMROOM ROOM 300 X 300 CORSA CREMA

- NAHANI - NAHANI - NAHANI TRAPTRAP TRAPS

DETAIL DETAIL DETAIL 6 66

DETAIL 5

SCALE-1:5 SCALE-1:5 SCALE-1:5

SCALE-1:5

generalgeneral notes: general notes: 1- these notes: 1- drawings these 1- these drawings drawings may not may be may not used, not be duplicated, used, be used, duplicated, duplicated, modified modified or modified changed or changed or inchanged any in manner any in any manner without manner without thewithout written the the written consent written consent ofconsent architecturered. of architecturered. of architecturered. the user the&the user its user agents & its & agents its willagents be will liable will befor liable be any liable for unauthorized for anyany unauthorized unauthorized use, duplication, use,use, duplication, duplication, modification modification modification or change. or change. or2-change. the 2drawings the 2- the drawings drawings & dimensions & dimensions & dimensions are to be areread are to be to&read be notread measured. & not & not measured. measured. 3- any 3discrepancies any 3- any discrepancies discrepancies noticednoticed innoticed the in the in the d r ad wrd iar nw a gw i sni gns sgh sas l hsl ah lba l el l b bebr eob urb gor huo tgu hgt tho t t t oth oe t htneho e tn i onc toe i t cioecf e ot foh fe t hta ehr eca hra i crt hce ihc t it ets ce' tc sot 'sf f' oi foc f fe i f cif eco er f ofc rol ra c r lci alf rai icr f ai i ft cii aco tani tsoi . no sn4 .s- . 4 a -4l -l a lda l rl lad wrd iar nw a gw i ni ugn n g i u t nus in t ai str sea rai ern e i t nih ne t htmeh ee tm r m ei tec r t i rs cic cas l cse ac la el e general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architecturered. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the d r a w i n g s s h a l l b e b r o u g h t t o t h e n o t i c e o f t h e a r c h i t e c t s ' o f f i c e f o r c l a r i f i c a t i o n s . 4 a l l d r a w i n g u n i t s a r e i n t h e m e t r i c s c a l e

projectproject name project name name

DETAIL DETAIL DETAIL 5 55

DETAIL 4

SCALE-1:5 SCALE-1:5 SCALE-1:5

SCALE-1:5

POSITION POSITION POSITION TILES

20 MM THK ENG MARBLE FALSEFALSE CEILING FALSE CEILING CEILING LEDGE LEDGE LEDGE WALLWALL FFL WALL AT FFLFFL ATAT DESCRIPTION DESCRIPTION DESCRIPTION FALSE POSITION POSITION POSITION CEILING +1200MM +1200MM +1200MM FROMFROM FFL FROM FFLFFL 150 600MM 600MM 600MM X WALL 600MM X 600MM XFFL 600MM PVC PVC TOILETS TOILETS TOILETS 1 - 6,1 -16,- 6, LEDGE ATPVC DESCRIPTION GRID GRID CEILING GRID CEILING CEILING WITH WITH WITH STAFFSTAFF TOILETS STAFF TOILETS TOILETS +1200MM FROM FFL 15MM 15MM THK 15MM MORTAR THK THK MORTAR MORTAR 600MM X 600MM PVC SILHOUETTE SILHOUETTE SILHOUETTE GRID GRID WITH GRID WITH WITH 1 - 2 1&-12-&2 & GRID CEILING WITH 10MM 10MM THK 10MM TILE THK THK TILE TILE SHADOW SHADOW SHADOW CHANNELS CHANNELS CHANNELS ON ONCHANGING ON CHANGING CHANGING ROOMROOM ROOM 15MM THK MORTAR SILHOUETTE GRID WITH 300X300 300X300 300X300 CORSA CORSA CORSA CREMA CREMA CREMA THE EDGES THE THE EDGES EDGES 10MM THK TILE SHADOW CHANNELS ON 150MM 150MM 150MM THK LEDGE THK THK LEDGE WALL LEDGE WALL WALL 300X300 CORSA CREMA THE EDGES - START -WALL START - TILE START TILE TILE S THK S SLEDGE 150MM

150 150150

GRADE GRADE GRADE SLABSLAB SLAB GRADE SLAB

DESCRIPTION DESCRIPTION DESCRIPTION

20MM 20MM THK 20MM BLOCKWORK THK THK BLOCKWORK BLOCKWORK

5MM5MM GROOVE 5MM GROOVE GROOVE

43 MM X 15 MM MDF TRANSITION PROFILE

FFL FFLFFL

IN

TRANSITION TRANSITION TRANSITION PROFILE PROFILE PROFILE

TILESTILES TILES

R0 Date R0 R0 ofDate First Date ofIssue First of First Issue Issue no no no revisions/submissions revisions/submissions revisions/submissions R0 Date of First Issue no

architecture architecture architecture

R0 R0R0 GP-02-01

architecture

R0

RED

c copyright 2018 architectureRED all rights reserved

S

450

550

710 350

450 450 450 450 450

550 550 550 850 550 550

FLUSH FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL PLUMBING PLUMBING PLUMBING PLUMBING SHAFT SHAFT SHAFT SHAFT

PLUMBING SHAFT

SS S S

SS S S

S

SS S S

S

FLUSH VALVE HEIGHT FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH FROM FFL AT +.9M LVL FROM FFL AT +.9M LVL FROMFFL FFLAT AT+.9M +.9MLVL LVL FROM FROM FFL AT +.9M LVL

S

FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED FIXED SEATING AT +.45M LVL FROM FFL LVL FROM FFL LVLFROM FROMFFL FFL LVL LVL FROM FFL

FIXED FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M LVL LVLFROM FROMFFL FFL LVL FROM FFL LVL FROM FFL LVL FROM FFL STORE STORE ROOM STOREROOM ROOM STORE ROOM

PLUMBING SHAFT PLUMBING SHAFT PLUMBINGSHAFT SHAFT PLUMBING

TOILET TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET SSL SSL+95.76M +95.76MLVL LVL SSL +95.76M LVL SSL +95.76M LVL SSL +95.76M LVL

STORE ROOM

CORRIDOR CORRIDOR CORRIDOR CORRIDOR

PLUMBING SHAFT

PLAN A

6MM THK MS FLAT STOPPER WELDED TO MAIN

SCALE-1:5

DETAIL B SCALE-1:5

6

5

365

610

CENTRELINE OF PIVOT HINGE POSITION FOR DOOR

40MM X 20MM MS BOX SECTION

5 6MM THK MS FLAT STOPPER

5

5

5

600M X 600MM FLIP PANEL 600

600 6

STAFF STAFF TOILETFFL FFLAT AT+95.78M +95.78M LVL LVLFFL AT +95.78M LVL STAFFTOILET TOILET FFL AT +95.78M LVL STAFF TOILET FFL AT +95.78M LVL STAFF TOILET SSL SSLAT AT+95.76M +95.76MLVL LVLSSL AT +95.76M LVL SSL AT +95.76M LVL SSL AT +95.76M LVL

405

5MM GAP BETWEEN FLIP PANEL AND MAIN DOOR

6MM THK BISON BOARD

DETAIL B

16MM DIA ROD

52MM THK DOOR 2775

710 710 710 710 710 850 850 850 850 850

589

6MM THK MS FLAT AS OUTER FRAME

600M X 600MM FLIP PANEL

600MM X 600MM FLIP PANEL

DETAIL A

FIXED FIXED SEATING SEATING AT AT +.45M +.45M FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED SEATING AT +.45M FIXED LVL LVL FROM FROM FFL FFL LVLFROM FROMFFL FFL LVL LVL FROM FFL

5MM GAP BETWEEN FLIP PANEL AND MAIN DOOR

16MM DIA ROD FOR SUPPORTING PIVOT HINGE OF FLIP PANEL

5

LEDGE LEDGE WALL WALL HEIGHT HEIGHT AT AT LEDGEWALL WALLHEIGHT HEIGHT LEDGE AT WALL HEIGHT AT LEDGE AT +1.2M +1.2M LVL FROM FFL +1.2MLVL LVLFROM FROMFFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL FLUSH FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9M LVL FROM FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL

S

450

DETAIL A

2775

SS S S

3270

1100

1100 1100 1100 1100 1100

S 1200

S

150 150 150 150 150

SS S S

350 550

S

SS SS S

M

CORSA CREMA 300X300

2763

DETAIL 4

SS S S

STORE ROOM

S

450 900 450 450 450 450 450 1200 1200 1200 1200 1200

STORE STOREROOM ROOM ROOM STORE ROOM STORE

S FFL TOILET TOILET FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET SSL SSL +95.76M LVL SSL+95.76M +95.76MLVL LVL SSL +95.76M LVL SSL +95.76M LVL

SS S S

550 350 350 350 350 350 550 550 550 550 550

FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL

SS S S

DETAIL DETAIL4444 DETAIL DETAIL

SS S S

FLUSH FLUSH VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSHVALVE VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+.9M LVL FROM FFL AT+.9M AT+.9M LVL FROM FFL

450 450 450 450 450 900 900 900 900 350 900

D5

MM M M

550 550 550 550 550

S

600X600 TILES PAPER JOINT LAID STRAIGHT

350 350 350 350 350

S

600

CORSA CORSACREMA CREMA CREMA CORSA CREMA CORSA 300X300 300X300 300X300 300X300

2390

SS S S

3720

3720 3720 3720 3720 3720

600X600 600X600TILES TILES TILES 600X600 TILES 600X600 PAPER PAPERJOINT JOINT JOINTLAID LAID LAID PAPER JOINT LAID PAPER STRAIGHT STRAIGHT STRAIGHT STRAIGHT

V1

1170

V1 V1 V1 V1

V1a

CENTRELINE OF PIVOT HINGE POSITION FOR DOOR

5

700

V1

V1 V1 V1 V1 V1

V1a V1a V1a V1a

SCALE-1:20

EQ

STORE STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL LVL FROM FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL

LEDGE LEDGEWALL WALL WALLHEIGHT HEIGHT HEIGHTAT AT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT LEDGE +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M

2390 2390 2390 2390 2390

SS S S

D4

S

D4

S

D5 D5 D5 D5

440710 710 710 710 710 350 350 350 350 350

850 850 850 850 850

440 440 440 440 440

MS S SS

D4 D4 D4 D4 D4

LOW HEIGHT WALL

S S SS

600

LOW LOW HEIGHT LOWHEIGHT HEIGHT LOW HEIGHT WALL WALL WALL WALL

MM M M

1200

SEATER

450

SEATER SEATER SEATER SEATER

550 600 600 600 600 600

ZURICH GREY (EXARO) 600X600

450 450 450 450 450 710 350 1200 1200 1200 1200 1200

ZURICH ZURICHGREY GREY GREY ZURICH GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600

2 FULL TILES

STORE STORE ROOMROOF ROOFLVL LVL STOREROOM ROOM ROOF LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265MLVL LVL LVLFROM FROM FROM FFL FFL AT+3.265M LVL FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL

BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING BOTTOM AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL

850 550 550 550 550 550

FALSE CEILING

D4 D4 D4 D4 D4

FALSE FALSE CEILING CEILING FALSECEILING CEILING FALSE

2222FULL FULL FULL FULL FULL FULL FULL EQ FULL FULL FULL 2222FULL 2222FULL EQ EQ EQEQ EQ 2 FULL EQ EQ2 FULL EQ EQ EQ EQ EQ2 FULL EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ TILES TILES TILES TILESEQ EQ TILES TILESEQ EQ TILES EQ TILES TILES TILES TILES TILES TILES TILESTILES

6MM THK MS FLAT STOPPER WELDED TO MAIN FRAME

PIVOT HINGE

2775

SKYLIGHT TO DETAIL

FULL FULL FULL 2222FULL TILES TILES TILES TILES

100

SCALE-1:50

365

EQ EQ EQ EQ

150

EQ

RR R R SKYLIGHT SKYLIGHT R SKYLIGHT 3 FULL TILES SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL TO

FULL FULL TILES TILES FULL TILES EQ TILES 3333FULL

3270 3270 3270 3270 3270

1 EQ FULL EQ EQ EQ TILE

710 850

EQ EQ EQR EQ

SCALE-1:50

5MM GAP BETWEEN FLIP PANEL AND OUTER FRAME

PLAN B

SCALE-1:20

SECTION SECTION DD DD SECTION DD SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50

SCALE-1:50

1170 1170 1170 1170 1170

FULL FULL FULL 1111FULL TILE TILE TILE TILE

SCALE-1:50

700 700 700 700 700

R R RR

SECTION SECTION AA AA SECTION AA SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50

CENTRELINE OF PIVOT HINGE CONNECTED TO 16MM DIA ROD

600MM X 600MM FLIP PANEL LINED WITH 6MM THK MS FLAT

TOILET FFL AT+95.79M LVL TOILET FFL AT+95.79M LVL TOILETFFL FFLAT+95.79M AT+95.79M LVL FFL AT+95.79M LVL CORRIDOR TOILET TOILET LVL SSL AT 95.76M LVL SSL AT 95.76M LVL SSLAT AT95.76M 95.76MLVL LVL SSL AT 95.76M LVL SSL

CENTRE OF PIVOT HINGE 26

S

40MM X 20MM MS BOX SECTION

131 105

SS S S

40MM X 20MM MS BOX SECTION

365

SS S S

A'

B'

LEDGE LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVLFROM FROMFFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M LVL FROM FFL

500

S

6MM THK MS FLAT AS OUTER FRAME

5 16MM DIA ROD FOR SUPPORTING PIVOT HINGE OF FLIP PANEL

100

S

A

B

ZURICH GREY (EXARO) 600X600

6MM THK MS FLAT AS OUTER FRAME

5

SS S MS

D4

SS S S

710 710 710 710 710 350 350 350 350 350

LOW HEIGHT WALL

850 850 850 850 850

LOW LOWHEIGHT HEIGHT HEIGHT LOW HEIGHT LOW WALL WALL WALL WALL

M M MM D4 D4 D4 D4 D4

SEATER

ZURICH GREY ZURICH GREY ZURICHGREY GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600

600MM X 600MM FLIP PANEL

600MM X 600MM FLIP PANEL

26

ZURICH GREY (EXARO) 600X600

SEATER SEATER SEATER SEATER

BOTTOM OF FALSE CEILING LVL BOTTOM OF FALSE CEILING LVL BOTTOMOF OFFALSE FALSECEILING CEILING LVLOF FALSE CEILING LVL BOTTOM LVL BOTTOM AT +2.4M LVL FROM FFL AT +2.4M LVL FROM FFL AT+2.4M +2.4MLVL LVLFROM FROMFFL FFL+2.4M LVL FROM FFL AT AT

BOTTOM BOTTOMOF OFFALSE FALSECEILING CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING AT+2.4M AT+2.4MLVL LVLFROM FROMFFL FFL AT+2.4M LVL FROM FFL AT+2.4M LVL FROM FFL AT+2.4M LVL FROM FFL

DETAIL 6

6MM THK BISON BOARD

365

DETAIL6666 DETAIL DETAIL DETAIL

FALSE CEILING

ZURICH GREY ZURICH GREY ZURICHGREY GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600

6MM THK BISON BOARD

131 105

845

845 845 845 845 845 FALSE CEILING FALSECEILING CEILING FALSE CEILING FALSE

6MM THK MS FLAT AS OUTER FRAME

STORE ROOM ROOF LVL STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE AT +3.265M LVL FROM FFL AT +3.265M LVL FROM FFL AT+3.265M +3.265MLVL LVLFROM FROM FFL AT ATFFL +3.265M LVL FROM FFL

STORE STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL

600MM X 600MM FLIP PANEL

SCALE-1:50

RR FULL FULL FULLRR 11R11FULL TILE TILE TILE TILE

1 FULLR TILE

FULL FULL FULL 1111FULL TILE TILE TILE TILE

RR R R

1 FULL TILE

R

FULL FULL FULL 1111FULL TILE TILE TILE TILE

RR R R

1 FULL TILE

SCALE-1:50 SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL RTO

SECTION SECTION EESECTION EE EE SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50 SCALE-1:50

SKYLIGHT CORSA CORSACREMA CREMA CREMA CORSA CREMA TO DETAIL CORSA 300X300 300X300 300X300 300X300

CORSA CREMA RR R 300X300 R FULL FULLTILES TILES TILES FULL TILES 3333FULL

R

RR R 3 FULL TILES R

R

RR R R

R FULL FULLTILES TILES TILES FULL TILES 3333FULL

SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL TO

EQ EQ EQ 3 FULLEQ TILES

SKYLIGHT TO DETAIL FULL FULL FULL 1111FULL EQ EQ EQ EQ EQ TILE TILE TILE TILE

RR REQ R

1 FULL TILE

SCALE-1:50 LEGEND LEGEND:::: LEGEND LEGEND WALL WALLSCHEDULE: SCHEDULE: SCHEDULE: WALL SCHEDULE: WALL

R

LEGEND : WALL SCHEDULE:

1800

1 FULL TILE

1800

RR R R

FULL FULL FULL 11R11FULL TILE TILE TILE TILE

1800

1 FULL TILE

SECTION EE

1800

SECTION SECTION BB BB SECTION BB SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50 RR R R

1111FULL FULL FULL FULL TILE TILE TILE TILE

SECTION SECTIONEE EE SECTION EE SECTION EE SECTION EE

40MM X 20MM MS BOX SECTION

700 700 700 700 700

700

V1 V1 V1 V1 V1

V1

200MM 200MM THK BLOCKWORK 200MMTHK THKBLOCKWORK BLOCKWORK 200MM THK BLOCKWORK 200MM THK BLOCKWORK

STORE STORE ROOM ROOM ROOF ROOF LVL LVL STOREROOM ROOMROOF ROOFLVL LVL STORE STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL LVL FROM FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL

SS S S

D4 D4 D4 D4 S

S S SS

3730

3730 3730 3730 3730 3730

LEDGE LEDGE WALL WALL HEIGHT HEIGHT AT AT LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M

D4

D3a D3a D3a DETAIL 5D3a

DETAIL DETAIL5555 DETAIL DETAIL

FLUSH FLUSH VALVE VALVE HEIGHT HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT S FLUSH AT+.9M AT+.9M LVL LVL FROM FROM FFL FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M AT+.9M LVL FROM FFL

450 450 450 450 450

FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED FIXED SEATING AT +.45M LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL TOILET TOILET FFL FFL +95.79M +95.79M LVL LVL TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET TOILET SSL SSL+95.76M +95.76M +95.76MLVL LVL LVL SSL +95.76M LVL SSL +95.76M LVL SSL

D3a

ZURICH ZURICH GREY ZURICHGREY GREY ZURICH GREY (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600

FALSE CEILING

ZURICH GREY (EXARO) 600X600

LEDGE LEDGE WALL HEIGHT AT LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M FLUSH FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9M LVL FROM FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL

SS S S

S

SS S S

SS S S

S

TILE TILE 02 TILE----02 02 TILE 02 300 300XXXX300 300 300CORSA CORSA CORSA 300 300 CORSA 300 CREMA CREMA CREMA CREMA

SCALE-1:50

ASSETZ BEGUR ASSETZ BEGUR BEGURASSETZ BEGUR ASSETZ

SCALE-1:50

purpose purpose release purposeof ofrelease release purpose ofof release review review only reviewonly only review only client clientapproval approval approval client approval client

north north northof release purpose north review only client approval

drawing drawing title drawingtitle title drawing title north

drawing title

drawing drawingnumber number drawing number drawing number

drawing number

client START STARTTILE TILE TILE START TILE ----START S

----NAHANI NAHANI TRAP NAHANITRAP TRAP NAHANI TRAP

SECTION CC SECTION CC SECTION CC SCALE-1:50 SCALE-1:50 SCALE-1:50

SCALE-1:50

general general notes:11-these thesedrawings drawingsmay maynot notbe beused, used,duplicated, duplicated,modified modifiedor orchanged changedin inany anymanner mannerwithout withoutthe thewritten writtenconsent consentof ofarchitecturered. architecturered.the theuser user& &its itsagents agentswill willbe beliable liablefor forany anyunauthorized unauthorizeduse, use,duplication, duplication,modification modificationor orchange. change.22-the thedrawings drawings& &dimensions dimensionsare areto tobe beread read& &not notmeasured. measured.33-any anydiscrepancies discrepanciesnoticed noticedin inthe the generalnotes: notes: 1these drawings may not be used, duplicated, modified changed any manner without the written consent architecturered. the user its agents will be liable for any unauthorized use, duplication, modification change. 2the drawings dimensions are to be read not measured. 3any discrepancies noticed the general notes: 1these drawings may not be modified changed inin any manner without the written architecturered. user && agents will be liable for any duplication, modification oror change. 2the drawings && todrawings be read && not measured. any discrepancies noticed the general notes: 1-used, theseduplicated, drawings may not beororused, duplicated, modified or changed in anyconsent mannerofof without the writtenthe consent ofits architecturered. the user & itsunauthorized agents will beuse, liable for any unauthorized use, duplication, modification ordimensions change. 2-are the & dimensions are3to be read & not measured. 3-ininany discrepancies noticed in the dd r r aa ww i i nn gg ss ss hh aa l l l l bb ee bb r r oo uu gg hh t t t t oo t t hh ee nn oo t t i i cc ee oo f f t t hh ee aa r r cc hh i i t t ee cc t t ss ' ' oo f f f f i i cc ee f f oo r r cc l l aa r r i i f f i i cc aa t t i i oo nn ss . . 44 -- aa l l l l dd r r aa ww i i nn gg uu nn i i t t ss aa r r ee i i nn t t hh ee mm m ee t t r r i i cc ss cc aa l l ee a reeet t r r i i i ncc tsshcceaa l lmee e t r i c s c a l e dd r r aa ww i i nn gg ss ss hdh ara lal l lw ibbnee g sbb r r soo huu agg lhhl t t b t t eoo bt t rhh oee u gnn hoo t t i i ct c oee toohf f e t t hnh eoe t ai a cr r ecc hh oi i tf t ee tccht t ess ' ' a oro cf f fhf i ii cct eee c f ft oos r r' coc l fl afa ri r ci i fef i i ccf aoa t rt i i ooc nnl sas .r. i 4f4 i-- c aa tl l il l o dnd rsr aa. ww 4i i n-n gga luul nn i di t tr ssa waa ir r nee g i i nun n t ti hth ese m

10MM DIA SS CYLINDER DOOR STOPPER

POSITION

TOILETS 1 - 6 STAFF TOILETS 1 - 2, CHANGING ROOM

ELEVATION A

POSITION

structural structural consultant structuralconsultant consultant structural consultant

revision mep mepconsultant consultant consultant mep consultant mep

SECTION AA'

SCALE-1:20

general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architecturered. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. 4- all drawing u n i t s a r e i n t h e m e t r i c s c a l e

- NAHANI TRAP

19001

01 Review no

revisions/submissions

SECTION BB'

SCALE-1:20

purpose of release

project number

- START TILE

aRED

06-03-19 date

review only client approval statutory approval tender good for construction as built

north

drawing title

drawing number date scale

1:20

drawn by

SCALE-1:20

DOOR

xx-xx-xx

06/03/2019 SM

xxxx Consultants revision sheet number checked by

OV

Rx

1/1

xxxx Consultants xxxx Consultants

architecture

RED research+design

villa b, sai anugraha, 27/1, rukmani street ext., besant nagar, chennai - 60090. t: 044.430.33669 www.architecturered.com c copyright 2018 architectureRED all rights reserved

SCALE-1:50

structural consultant

BGR-SL-GROUND BGR-SL-GROUND FLOOR PLAN PLAN DTCConsultants Consultants BGR-SL-GROUNDFLOOR FLOOR PLAN DTC Consultants BGR-SL-GROUND FLOOR PLAN DTC BGR-SL-GROUND FLOOR PLAN DTC Consultants revision revision revision revision

ELEVATION B

SCALE-1:20

TOILETS 1 - 6, STAFF TOILETS 1-2& CHANGING ROOM

Model Space

SECTION SECTION FF FFSECTION FF SECTION FF SCALE-1:50 SCALE-1:50 SCALE-1:50 project name

POSITION POSITION POSITION DESCRIPTION POSITION

FALSE FALSECEILING CEILING CEILING FALSE CEILING FALSE FALSE CEILING FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED DESCRIPTION DESCRIPTION POSITION POSITION DESCRIPTION POSITION DESCRIPTION POSITION DESCRIPTION LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL 600MM 600MM 600MM PVC TOILETS TOILETS 6,6, 6, 600MMXXXX600MM 600MMPVC PVC600MM XTOILETS TOILETS 600MM 600MM PVC ----6, 600MM1111PVC TOILET TOILET FFL FFL +95.79M +95.79M LVL LVL GRID GRIDCEILING CEILING CEILINGWITH WITH WITH GRID STAFF STAFF TOILETS TOILETS TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL GRID GRID CEILING WITH STAFF TOILETS project name TOILET TOILET CEILING WITH STAFF TOILETS SILHOUETTE SILHOUETTE GRID GRID WITH WITH ----2222& SSL SSL+95.76M +95.76M +95.76MLVL LVL LVL SSL +95.76M LVL SILHOUETTEGRID GRIDWITH WITH &WITH SSL +95.76M LVL SILHOUETTE && SSL SILHOUETTE1111GRID SHADOW SHADOW CHANNELS CHANNELS ON ON CHANGING CHANGING ROOM ROOM SHADOWCHANNELS CHANNELSON ON CHANGING CHANGING ROOM SHADOW ROOM SHADOW CHANNELS ON THE THE EDGES EDGES THEEDGES EDGES THE EDGES THE

S

SS S S

project project name projectname name project name

TILES

TILE - 01 TOILETS TOILETS TOILETS 600 X 600TOILETS ZURICH1111----6666 GREY FROM EXARO STAFF STAFFTOILETS TOILETS TOILETS STAFF TOILETS STAFF TILE - 02 2,2, 2, 1111----2, 300 X 300 CORSA CHANGING CHANGINGROOM ROOM ROOM CHANGING ROOM CHANGING CREMA

6

D4

D4

D4 D4 D4 D4 S

D4 D4 D4 D4 D4

D4

450

SS S S

2400

D4 D4 D4 D4 S

FALSE FALSECEILING CEILING CEILING FALSE CEILING FALSE

BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING TILES BOTTOM OF FALSE CEILINGTILES BOTTOM TILES TILES AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION TILE TILE----01 01 01 TILE 01 TILE 600 600XXXX600 600 600ZURICH ZURICH ZURICH 600 600 ZURICH 600 GREY GREYFROM FROM FROMEXARO EXARO EXARO GREY FROM EXARO GREY

1200

D4

2400 2400 2400 2400 2400

SS S S

1055 1055 1055 1055 1055 25

450

D4 D4 D4 D4 S

ZURICH GREY (EXARO) 600X600

1200 1200 1200 1200 1200

D4

1055

SS S S

1200 850

4 FULL TILES

2400

2400 2400 2400 2400 2400

FULL TILES 44444FULL FULL TILES FULL FULLTILES TILES TILES 25 25 25 25 25

1200 1200 1200 1200 1200 850 850 850 850 850 450 450 450 450 450

D4 D4 D4 D4

100MM 100MMTHK THK THKBLOCKWORK BLOCKWORK BLOCKWORK 100MM THK BLOCKWORK 100MM THK BLOCKWORK 100MM 150MM 150MMTHK THK THKBLOCKWORK BLOCKWORK BLOCKWORK 150MM THK BLOCKWORK 150MM THK BLOCKWORK 150MM

FALSE FALSECEILING CEILING FALSE CEILING FALSE CEILING FALSE CEILING BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING BOTTOM BOTTOM OF FALSE CEILING AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL ZURICH ZURICHGREY GREY ZURICH GREY ZURICH GREY (EXARO) (EXARO)600X600 600X600 600X600 (EXARO) 600X600 (EXARO)

STORE STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL

DTC Consultants

RED

architecture architecture


PARTICIPANTS MANUAL CAF

SYNERGIES EXHIBITION CAF

Design of the Participants Manual for Portfolio 19 - an exhibition hosted by CAF presenting different portfolios of colleges in Tamil Nadu

The Synergies Exhibition is a travelling exhibit presented by Opolis Mumbai.

THE EXHIBITION LAYOUT

AV1

POSTER DESIGN FOR THE EXHIBITION

DESIGN OWL VIDEO

IMAGE CANOPY

AV2

IMAGES GRID

1

2

AMARAVATI VIDEO

P8b

P8c IMAGE LOBBY

P9a

6

1 3

2 8

SYNERGIES IMAGE CLOISTER

P9c

P4

P1

P11

_OPOLIS 02

ENTRANCE CANOPY

CHILDRENS GALLERY

9

CLOISTERS CONNECTORS

P2

P3

GALLERIES

COURTYARDS LANDSCAPE

4

P8a IMAGE AERIAL TIMELINE

P7

P10

_OPOLIS 01

3

4

10

5 P6

P5

2

5

IMAGE LOUNGE

7

BIHAR GOV VIDEO

P9b

AV3

EXHIBITION LAYOUT PLAN

P9a

P1

P8c

P7

P2

P3

P4

P9c

24 25

1

26

1

ELEVATION 1

2

P5

P6

4

ELEVATION 4

EXHIBITION LAYOUT SCALE 1:100

12

13

14

15

21

2

3

17

18

4

19

ELEVATION 2

3

P10

P8a 20

11

29

27

P11

5

6

7

8

9

10

ELEVATION 3

P8b

22

23

16

30

5

31

32

33

34

35

ELEVATION 5

SYNERGIES IITM RESEARCH PARK, CHENNAI

15-10-2019 _OPOLIS


FURNITURE DESIGN Two pieces of furniture designed for a family of three moving into their new house


THE LITTLE CABINET

SHOERACK

Medium - V-Ray Render Design Stage Designed for a house recently renovated, the little cabinet will occupy a small corner of the living room, for additional storage

Medium - V-Ray Render Design Stage Without any complicated mechanisms and taking the advantage of the wicker trend in the market, the shoerack is designed for a family of three.


PHOTOGRAPHY A compilation of photographs, taken in the last 3 years, of travel and internships



smadhu2361@gmail.com +91 9629556686


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.