architecture + design portfolio smrithi m kulkarni
CONTENTS
Hello, My name is Smrithi Madhu Kulkarni, an architect, graduated from Meenakshi College of Engineering, Chennai, in 2018 Architecture is the work of both the hand and the mind. This portolfio, a little fictional and a little practical, is a short compilation of that architecture, produced between 2013 and 2020, as a student and a professional.
02
Curriculum Vitae
04
Ayodhya - An Introspective Social Space Experiment, Thesis Project, Bachelors’ Level
16
Residential Project, 2nd Semester
20
National Institure of Fashion Technology, 3rd Semester
26
Internship Experience
36
Work Experience
48
Furniture Design
52
Photography
PERSONAL DETAILS Name Nationality Date of Birth
HONOURS Smrithi M Kulkarni
2014
SIDC, Citation Award
Indian
2015
ANDC, Shortlist
11th May, 1995
2018
Represented College at the National Awards for Excellence in Architectural Thesis (NIASA)
EDUCATION 2001-2013
Indian School Muscat, Oman
2013-2018
Department of Architecture, Meenakshi College of Engineering, Chennai, Tamilnadu
PUBLICATIONS July 2017
Photographs of ‘Seraulim House’ - Asian Paints Colour Quotient website
Nov’ 2019
Write up for ‘Homes Around Trees’ (under the guidance of Suprio Bhattacharjee) - Indian Institute of Architects Awards 2018 Shortlisted Projects
Dec’ 2019
Write up for ‘Crescent School of Architecture, BSA University’ (under the guidance of Suprio Bhatacharjee) + Photgraphs Archdaily Website
Jan’ 2020
Photographs of ‘Crescent School of Architecture, BSA University’ - Domus India magazine
Jan’ 2020
Write up for ‘Crescent School of Architecture, BSA University’ (under the guidance of Suprio Bhatacharjee) + Photographsarchitecturelive! website
Feb’ 2020
Write up for ‘The Gavel’ (under the guidance of Suprio Bhattacharjee) - India: Unbuilt Architecture
INTERNSHIP Aug’ 2016 - Nov’ 2016 Dec’ 2016 - June’ 2017
FOAID Design Studio, Chennai Studio Matter, Goa
WORK EXPERIENCE Nov’ 2018 - Jan’ 2020
architectureRED, Chennai
SOFTWARE SKILLS AutoCAD Sketchup V-Ray for Sketchup Adobe Photoshop Adobe Illustrator Adobe InDesign MS Office
LANGUAGE Spoken Written
CONTACT DETAILS Marathi, English, Hindi, Tamil English
Current Location Phone Number E-Mail ID
Chennai +91 9629556686 smadhu2361@gmail.com
THESIS - AYODHYA: AN INTROSPECTIVE SOCIAL SPACE EXPERIMENT Architecture has been used to influence the lives of people or showcase the power of an individual. In history, architecture has also been used to disintegrate society, while bringing it together at the same time. Taking India, the Hindu-Muslim clash has been going on for quite a while. Communal violence is a term that is pretty infamous in this developing country. The root cause is not the result of one factual incident, but a product of a lot of issues that run deep in the history of India. Can architecture aid in the process of their possible co-existence? Architects have a responsibility to society. There is a dire need for a structure that calls out to these communities by bringing them together under one shelter to co-operate, co-exist and love.
WHAT IS COMMUNAL VIOLENCE?
based on: hatred enmity revenge beliefs
1949 In the night, an idol of Rama was placed by the Hindus inside the mosque. The Government proclaims the premises as disputed area and locks the gates.
why is it caused? divide and rule socio - economic factors religious causes extent of ayodhya - town
on a global scale : India is ranked No. 4. It is one of the highest rated places where communal violence occurs due to religious sentiments
chowk ayodhya main road
Some large scale violences to have been recorded throughout history include the : Kashmir Unrest, Nazi Germany and The Crusades
STATISTICS
SITE BORDER
no. of incidents (recorded)
1857 Maulavi Muhammad Asghar submits a petition to the magistrate complaining that the Bairagis have built a chabutra close to the mosque
disputed land 2.77acres
total site area 67.3acres
VEGETATION
disputed site
rise of factionalised elites -0 - 1 - 30 - 31 - 100 - 101 - 300 - 301 - 700
military boundary
2012 - 15
1859 The British Govt. erects a fence to seprate the places of worship for the Hindus and Muslims. The Hindus enter from the East gate and the Muslims from the North
ayodhyÄ is an ancient city of india, the old capital of awadh, in the current faizabad district of uttar pradesh. the number of tourists visiting ayodhya anually are around 1.5 crores, most of them being domestic tourists.
8 acre vegetation
trees
2016 - 18
1525 The Mughal Emperor Babur came from Kabul to invade India, he defeated Ibrahim Lodi in the battle of Panipat. 1528 His general, Mir Baqi, visited Ayodhya and after allegedly destroying a Hindu Temple, built a Janmasthan Masjid - Babri Masjid 1855 A Hindu - Muslim conflict at the gates of the Hanuman Garhi temple took place as a consequence to oust the Hindu Bairagis from the temple premises
encompasses : communal attitudes symbolic violence structural violence physical attacks
THE SITE
ghagri river / sarju ghat
wikipedia : communal violence is a form of violence that is perpetrated across ethnic or communal lines, the violent parties feel solidarity for their respective groups, and victims are chosen based upon group membership but, laymen have defined communal violence as mostly religious conflicts.
India has been ranked 63, on the threat to minority 1951 group scale dropping 16 places from last year The Civil Judge orders that the idol should remain. The High Court confirms this order on 26 April 1955 zone wise analysis 1984 uttar pradesh incidents - 697 To create national awareness in support of NORTH - 42 killed - 154 the liberation of the Bhumi the VHP organinjured - 1641 izes a rath yatra of Sri Rama Janaki Virajman karnataka on a motorized chariot from Bihar, 25 Sept WEST 12 incidents - 352 1984, to reach Ayodhya on 6 October killed 27 1984, but was later cancelled due to Indira injured - 997 Gandhi’s Assasination SOUTH - 4 maharashtra 1986 incidents - 358 Political leaders and other parties organised killed - 44 EAST - 4 a Puja to symbolicaly start construction at injured - 1107 the site 12:15 pm - Assualt on Structure From the result of statistics - Uttar Pradesh has the 1:55pm - First dome was pulled down most no. of incidents taking place in a year. Also, the 3:30pm - Commencement of Communal major issue that has caused riots and agitations, Violence in Ayodhya not only in one place, but all over india, is the babri 7:30pm - Construction of a makeshift masjid conflict temple had begun
site border
NEIGHBOURHOOD
CONTOURS
neighbouring buildings
military buildings
highest contour - +50m lowest contour - +32.5m
concept
INFERENCES
the world, the space and the universe is made up of two major entities : the manifest & the non - manifest the manifest includes all things materialistic and the non-manifest includes things like religion, arts and philosophy and it is all expressed through one entitiy architecture Positivity And Negativity
Journey (Start And End)
Subterranean
but architecture never remained constant
in the vedic times : man was influenced by and influenced his context, that is his immediate surrounding with the coming of islam : a judgemental contract with an all powerful divinity & a social contract with the arrival of the europeans : science rationality technology
Going Into The Dark And Coming Out Into The Light
Feeling Of Being Small
india is the land that once concieved of architecture as a model of the cosmos. throughout the history of indian architecture, there have always been changes, these so called entities, known as myths, kept changing and kept on transforming according to the tradition and culture of that time period. each of these changes is known as “vistara� narration and journey The narrative on the other hand starts with a dialogue about communal violence. Hence, the structures have been laid in accordance with this dialogue
Long And Narrow Corridors
Staircase Leading To A Void
Importance Of An Axis
1. what is communal violence? 2. can we trace its history or obtain a timeline? 3. do you know how many people have been affected due to this? 4. have you come across anyone who works towards improving community integration and educating masses about tolerance? 5. are you aware about the causes of communal violence? 6. is there any structure that commemorates those who died?
narrative to form Different Points Of Entry
Looking Into A Void
Importance Of Rest Spaces
1. space
4. attraction point
7. mandala
everything & nothing square shaped plan
2. square shaped plan Arched Gateway/ Entrance
air
earth
Integrating The Landscape
aether
water
fire Five Elements of Nature
5. finding commonalities
Viewing Platform Narrowing down on spaces with reference from the programme and case studies : 1. Museum 2. Memorial 3. Community Centre 4. Tourist Information Centre Spaces Defined
8. islam
5 elements of nature acts of kindness community integration double-axis participation in dialogue symmetry
3. form evolution
6. merge steps 4&5
9. manthana
one element in the centre spaces relevant around it
mix of culture and traditions
THE EVOLUTION
defining the main axis
total site area : 67.3 acres disputed site : 2.77 acres military : 5.77 acres boundary 1. air 2. earth 3. aether 4. water 5. fire spaces have also been alloted for tourist information centres and the urban haat
distributing spaces along the axis
breaking the monotony
The plans for each block have been conceptualized and developed them according to : 1. Relevance to the narrative of communal violence 2. Inferences from the case studies 3. Development of form from the concept
FIRE
WATER
AETHER
Lastly, the visitors reach Next, visitors walk through The third element, aether, this level first and experi- a series of the causes of occupies the centre of the ence the heat. The memo- communal violence, in the site, both geometrically rial, is placed on top of this form of roofing systems and elementally with differwhich take the visitors and can be viewed from ent meanings in different the bottom giving viewers through different experireligions. a different ences. perspective.
landscaping
main axis on site. moves from the lowest contour (air/entry) to the highest contour. (fire/memorial).
vehicular entry and exit width of 16m
5
4 entry to the tourist information centre
2
exit from memorial museum
1
entry into the memorial museum
3
major proposal concentrated in this area and the disputed site has not been disturbed
both pedestrian and vehicular entry with a width of 6m each
EARTH
AIR
In the 2nd block visitors find themselves in front of a tree symbolising the block. This structure is associated with the destructive and reformative forces of communalism.
The air is one of the main reasons for spread of hate and anger. visitors come through a small opening and fall into a big room, a “collection point�.
INDIVIDUAL BLOCKS AIR
EARTH
AETHER
WATER
AIR
WATER
Cement plastered finish has been used to express a feeling of being single minded in a dark place.
Red sandstone being the go-to material for the kund since time immemorial has been retained Pathway of Causes Positive
Air Element Courtyard
30m lvl Earth Element Exising tree on Site Hall for CSSS
Hall of Infinity Mirrors
40m lvl
FIRE
35m lvl
Cement symbolises the rational whereas steel goes hand-in hand with the new-age technology
AETHER
42.5m lvl 37.5m lvl 32.5m lvl
Pathway of Causes Negative
37.5m lvl 35m lvl
EARTH
Here, the use of cement finish comes to give a solemn output and contrast with the green surroundings
Water Element Kund
Ramp - Entry
35m lvl 32.5m lvl 30m lvl
Exposed brick has been used to symbolise the Earthen colour, that is a dusty red and brown with a tree to stand in contrast in the centre of this element
FIRE
The Void
Fire Element Positive - Memorial Fire Element Negative
Aether Element Spiral Staircase Storage
42.5m lvl 40m lvl
NARRATIVE THROUGH LANDSCAPE AND INSTALLATIONS
VIEWS
05
05
Before entering the fifth block Fire,
Upon entering
04
04
Before entering the fourth block Water,
Upon entering
Pathway of Causes
05
social repression
political progroms AIR PLAZA
04
religious causes
03
03
Before entering the third block Aether,
Upon entering
Centre 03
02
02
Before entering the second block Earth,
Upon entering Infinity Mirror Room
EARTH BLOCK WITH ENTRANCE
AETHER BLOCK WITH ENTRANCE
KUND
WATER BLOCK
FIRE BLOCK WITH ENTRANCE (Memorial)
FIRE BLOCK (Memorial View from Bottom)
Hall For Csss
02
01
01
01
Before entering the first block Air,
Upon entering
2.2
courtyard
post-colonial colonial
0.3
pre-colonial
4.55 5
30.28
46.6
RESIDENTIAL PROJECT Being the first year of experiencing design and drafting, the brief submitted to us by college was relatively relatable - we were to design a residence for a family of four. The site given to us was in Pallikaranai, Chennai, with a built area of 300sqm. Pallikaranai (a marsh land) hosts a variety of views and wildlife in and around the site. With the contemporary style growing in popularity, this structure exhibits Indian architectural elements while keeping in mind the necessity of open spaces - hosting an inside out concept. The main exercise was to develop concepts and have atleast one unique element in the design
The zoning has been done in such a way that each of the spaces inside the house is accompanied with a transition space in between to separate, majorly, the public and private areas
DINING AREA
FLOOR PLANS
GROUND FLOOR
Foyer Living Room Dining Area Kitchen Reading Room Guest Bedroom Master Bedroom FIRST FLOOR
pergola
Conceptual Section first floor mezzanine ground floor
LIVING AREA
Elements some elements that have been included :
jali wall
louvers
Mezannine Bedroom 01 Bedroom 02
sloped roof
The mezzanine is placed in such a way that it ventilates the living area by acting like a wind tunnel
VIEW 2
VIEW 3
VIEWS
VIEW 1
INSTITUTIONAL PROJECT: NATIONAL INSTITUTE OF FASHION TECHNOLOGY Keeping in mind the necessity of open spaces in a design institute, the National Institute of Fashion Technology, Yelagiri, portrays some of the traditional architecture found within its context, being responsive to its climate and integrating itself with its surrounding. The design focuses on the interspersion of the open and closed spaces leading to the use of both rectilinear and curvilinear structures. This project was carried out in the 3rd year, and taught us the importance of providing the necessary spaces and solving working drawings.
SITE PLAN
FORM EVOLUTION The curved elements in the Resource Centre and the Ramp Walk along with the Student Facility Centre which is a curved building, compliments the Circular Open Air Theatre which sits at the centre of the site.
BLOCKS
Ramp Walk and Ancillary Spaces
Linear arrangement of blocks
Legend
Location : Yelagiri Site Area : 16 acres
1. Administration Building 2. Ramp Walk and Exhibition 3. Ancillary Block 4. Academic Block 1 5. Academic Block 2 6. Resource Centre 7. Student Facility Centre 8. Auditorium 9. Hostel-Girls 10. Hostel - Boys 11. Open Air Theatre
The blocks have been arranged in a linear fashion. Each block is a level higher than the one below, starting from right to left. Typical Plan - Classroom and Artroom
Resource Centre First Floor Plan
9 6 Classrooms without walls
7 11
The Art Studios for each programme have been designed in rooms without walls creating an integration between the spaces and nature
10
5 8 3
2
1 4
A big curved wall built with brick has been used to visually block the students from viewing the academic block as they enter into the resource centre. This Wall, henceforth treats the resource centre as a students-only zone
HOSTEL - TYPICAL
SECTIONS ACADEMIC BLOCK 2
An open viva centre sits on top of Academic Block - 1 with exposed columns and parapet walls and a flat roof shading it
textile design fashion design clothing management
RAMP WALK AND ANCILLARY SPACES
A Bowstring Steel Truss, providing support over a span of 40m for the Ancillary block, connects the Academic blocks on one side and the ramp walk on the other. academic block - 1 academic block - 2 ancillary block ramp walk
ACADEMIC BLOCK 1 apparel production knitwear design leather design
Conceptual View of the Institution
INTERNSHIP EXPERIENCE The year 2016-2017 was a year of internship. In the first semester, I worked at FOAID Design Studio, Chennai, for a period of 4 months, from August 2016 to November 2016, under Ekta Agarwal and Suny Akber For the next semester, I worked at Studio Matter, Goa, for a period of 6 months, between December 2016 and June 2017, under Maanasi Hattangadi and Ruturaj Parikh Areas that were the main focus of improvement were, Spatial Planning, Interiors, Detailing, Renovations, Graphic Design, and Photography.
9"
DAY ROOM / LAUNDRY 8'-0"X11'-3"
LIFT 6'-0"X6'-0"
$
Type : Architectural Interior Time-Period : Designing of interiors, working drawings and 3D Visualization
CROCKERY
PANTRY
$
$
GUEST ROOM 16'-0"X11'-0"
ENTRY FOR LABOUR
LIVING 14'-1.5"X11'-0"
TOILET 6'-6"X11'-0"
TOILET 6'-8.5"X4'-0"
2'-9 " 1 2
SUMP LOCATION
+1'0"Lvl
5'-6"
Below beam lvl
+1'0"Lvl CAR PARKING 19'-7"X18'-0"
B$
$
$
+1'6"Lvl
$ $
$
PLAN
MAID'S ROOM 7'-6.5"X6'-3"
STORAGE
3'-0"
The first step was to design a bedroom on the first floor for a 1st year college boy. Since the plan had already been laid out, the interiors had to be worked on. The brief was to be inspired by a sports car, the Lamborghini.
$
$
UP
KITCHEN 11'-3"X15'-7.5"
PUJA 6'-0"X4'-6"
DINING 14'-9"X12'-10.5"
PANTRY 10'-5.5"X15'-6"
5'-6"
2'-0"
The Millers Road project is a residential project in Chennai.
PLUMBING AND ELECTRICAL , MILLER’S ROAD FOAID
1' HT RAMP TO CAR PARKK
6'-0"
RESIDENCE, MILLER’S ROAD FOAID
16'-0" WIDE ROAD LIFT 6'-0"X6'-0"
ELECTRICAL POINT DRAWING TITLE:-
E S
Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com
4'-7" 2'-5"
8'-9"
1'-8"
3'-2"
6'-5"
6'-5"
6'-5"
7'
2'-912"
6'-6"
5'-6"
6'-1"
1'-7" 2'-5"
3'-9"
3'-3"
7'-1"
SUMP LOCATION
3'-0"
7'-9"
6'-6"
2'-0"
5'-6"
+1'0"Lvl
TOILET 6'-8.5"X4'-0"
4'-9"
6'-9" 1'-7"
5'-6"
6'-5"
6'-5"
2'-6" 2'-3"
5'-1"
8'-10"
6'-1"
1'-8"
1'-2" 1'-2" 1'-2"
2'-3"
1'-2"
2'
+1'0"Lvl CAR PARKING 19'-7"X18'-0"
6'-9"
2'-10"
5'-6"
Below beam lvl
TOILET 6'-6"X11'-0"
MAID'S ROOM 7'-6.5"X6'-3"
7'
2'-6"
9"
2'-2"
2'-6"
2'-3"
2'-8" 2'-8"
2'-2"
9'-3"
7'-1"
3'-5"
+1'6"Lvl
LIVING 14'-1.5"X11'-0"
3'-9"
6'-6"
6'-1"
1'-4"
2'-3"
STORAGE
7'-1"
6'-5"
4'-5"
6'-2"
3'-3"
2'-2"
2'-2"
WALK-INWARDROBE 7'-4"X17'-10"
ENTRY FOR LABOUR
1'-7" 4'-4"
GUEST ROOM 16'-0"X11'-0"
2'-6"
STORAGE
1'-7" 6'-7"
1'-8"
2'-6"
1'-10" 2'-6"
2'-2"
5'-8"
2'
6'-6"
2'
6'-9"
2'-11"
2'-5"
1'-10"
4'-11"
2'-5"
6'-7"
DINING 14'-9"X12'-10.5"
2'-6"
1'-8"
2'-5"
4'
PANTRY 10'-5.5"X15'-6"
1'-6"
2'
UP
PUJA 6'-0"X4'-6"
6'-7"
5'-8"
2'-2" 2'-10"
1'-10"
2'-10"
2'-10"
KITCHEN 11'-3"X15'-7.5"
7'
7'-6"
CROCKERY
7'-10"
2'-10"
2'-10" 2'-10"
5'-8"
4'-5"
PANTRY
2'
2'-1"
2' 2'-5" 2'-10"
2'-5"
2'-10"
2'-5"
LIFT 6'-0"X6'-0"
6'-6"
$
D 2'
6'-5"
4'-1"
MASTER BED ROOM 2 12'-3"x17'-10"
BALCONY 10'-6"x4'-7"
4'-1"
9"
THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY DAY ROOM / LAUNDRY OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED 8'-0"X11'-3"
1' HT RAMP TO CAR PARKK
6'-0"
Miller's Road
N W
Date :03-10-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Drawn by: SMRITHI Dealt by : Suny
TOILET 7'-2"X17'-9"
16'-0" WIDE ROAD
CONDUIT DRAWING STORAGE
STORAGE
PLUMBING DRAWINGS
Miller's Road
6'
TITLE:-
N
Date :03-10-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Drawn by: SMRITHI Dealt by : Suny
E
W S
Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com
THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED
7'-7"
6"
FALSE CEILING DESIGN
94.22°
" -11
56 .34 °
3 3'-
5'
1' 2.96"
"
STORAGE
1'-2"
STORAGE
STORAGE
58 .89 °
12
1.1
1° 7'-6"
3'-4" D
0° .0 90
9" 6'-
9" 6'-
2'-11"
8'-1"
0° .0 90
3'-1"
8'
1'-9"
°
0° .0 90
3'-5"
.23
3'-4"
5'
" 10 4'-
1°
31.1
127
3'-10"
PLAN
9'-10"
A
C
1' 0.2"
5'
2" 3'-
.77° 142
127 .88 °
" -10
1' 9.65"
5'-10"
4'-2"
6'-5"
127 .88 °
STORAGE
6'-5"
4'-6"
6°
° .60 56
1"
STORAGE
STORAGE
TOILET 7'-2"X17'-9"
3'-
1' 1.77"
1'-7"
7'-5"
3'1" 98.81°
" 11 3'-
4'-1"
7'1"
" 11 3'-
12 3.6
3'-1"
4° 5.6 11
90
.3
4°
7'
39.7 7°
2' 1.59"
90
TOILET 7'-2"X17'-9"
.0
0°
23° 50.
3'-5"
4'-11"
7'-6"
B 4'
5'-3"
2'-6"
The false ceiling has also been designed following the lines found in the lamborghini
6'-5"
PLUMBING LAYOUT
TILE LAYOUT
WARDROBES, MILLER’S ROAD FOAID
3D VISUALIZATION FOAID
All wardrobe units have been designed, given below is one designed for a young couple.
Project: Dr. Narotham Reddy’s Residence Time-Period : Design and 3D Visualization
NO STRINGS ATTACHED FOAID 2'-8" 8'-1"
2'
cashier machine
PLAN
OF AND FOR ANY PURPOSE OTHER THAN FOR WHICHIT HAS BEEN LOANED
S W
TITLE:-
Date :26-08-16 Scale-NTS :--- D No. - O1/GF Rev No. - 00 Dealt by : Suny Drawn by: Smrithi
No Strings Attached
THIS DRAWING IS THE PROPERTY OF THE CONSULTANT AND IS NOT TO BE REPRODUCED,COPIED,HANDED OVER TO A THIRD PARTY
N
E
LVL 0.00
LVL +1'.30"
14'-9"
SEATING AREA
2'-3"
8'-1"
6'-9"
KITCHEN
This project was a restoration of an old building, just outside, but within the premises of a theatre complex in Adyar. Being a very small restaurant, 1/3rd of the structure was used for the kitchen and the rest for the seating area. The colour scheme used was beige and deep pink with an art installation made with thread
8'-1"
Type : Restaurant Interiors Duration : Conceptualization and Design
Harrington road, Chetpet, Chennai-600 031, Ph : 044-28363018 E-mail - foaid@foaid.com / foaidmail@gmail.com | www.foaid.com
A 21sq.ft restaurant in Adyar with a quirky name .
The house in Seraulim, Goa, is a workspace and a small training centre for an NGO working with childdevelopment.
SERAULIM HOUSE STUDIO MATTER
LANDSCAPE (Completed)
Type : Restoration Time-Period : Post-Construction stage Since major planning and restoration had already been achieved, Seraulim House was coming into its final stages, which left only laying of the floor and landscaping.
PHOTOGRAPHY : AFTER SHOTS, WITH POST PROCESSING AND COMPARISON
Published in the Asian Paints Colour Quotient Website. Link - https://www.asianpaints.com/colourquotient/workspace/repurposed-seraulim-house-by-studio-matter-a-sixdecadeold-portuguese-bungalow/
Thinkering campus is a small learning by making schools tucked in a tiny village of Goa.
THINKERING CAMPUS
STUDIO MATTER
Following the elements of a typical Goan house, all the public zones were designated toward the front of the existing house and the wet areas were located towards the back. Designing for a learning by making school, all the new additions were designed using steel as the main material.
Type : Restoration Time Period : Conceptualization and Design Phase The first step was to document the existing structure measuring every nook and corner. Next, was deciding what to retain and what to remove. Maintaining the proportions of the existing house was largely observed. The modification was to introduce a steel insert into the structure, a mezzanine and a new roof.
Ground Floor Plan
Mezzanine Floor Plan
Section BB’
East Elevation
WORK EXPERIENCE at architectureRED, under Biju Kuriakose, Kishore Panikkar and Suprio Bhattacharjee, I was awarded the opportunity to work on research, deviating a little from the usual role of a junior-architect. I have listed down all that I have worked on since I joined there in November 2019, and have chosen to present a few selected works. PHOTOGRAPHY
WRITE-UP’s
Aeronautical Department School of Life Sciences Crescent School of Architecture Kommune
The Gavel Kenbridge School Crescent School of Architecture Homes around Trees Law Office Aeronautical Department Hindustan School of Law DupleXS Kommune The Court Office
RESEARCH + PUBLICATION Research on Smart Cities and it’s relation to the Housing sector Master Planning and Insititutional Volume - Compilation of all the institutional projects done by aRED Housing Volume - Compilation of all the housing projects done by aRED DESIGNING EXHIBITION PANELS Seoul Biennale Exhibition held in Aug’2019 JK AYA Awards IIA Awards
DRAWINGS Begur - Sales Lounge Exhibition Door VOLUNTEERING WITH THE CHENNAI ARCHITECTURE FOUNDATION (Including but not limited to) Portfolio ‘19 Synergies Exhibition
CRESCENT SCHOOL OF ARCHITECTURE
DEPARTMENT OF AERONAUTICS
SCHOOL OF LIFE SCIENCES
ARCHDAILY - Photographs, Graphics, Content
DOMUS - Photographs, Graphics
PHOTOGRAPHS (on archdaily, architecturelive and domus) PUBLICATIONS
DRAWINGS
EXHIBITION DOOR
Drawings for the Toilets of the Sales Lounge of a large-scale housing project in Begur, Bangalore
Type : Design and Detail Time Period : Conceptualization, Design Phase and Detailing
EQ
295
EQ
EQ EQ
600 EQ
600 600600 600
1 FULL TILE
600
S
EQ
EQ
FC LVL +2.50M
EQ
600 600600
EQ EQ EQ EQ
EQ
1 FULL TILE
600
S
C
Possibility 03 - When doors are pivoted and flaps closed
Possibility 04 - When both doors and flaps are pivoted
1 FULL TILE
600
S
EQ
FC LVL +2.50M
3 FULL TILES 3 FULL 3 FULL TILES TILES
R R
R
R R 3 FULL TILES
R D
F F
DD
E E E LEGEND LEGEND LEGEND : : : WALLWALL SCHEDULE: WALL SCHEDULE: SCHEDULE:
D
F
REFELCTED REFELCTED REFELCTED CEILING CEILING CEILING PLAN PLAN PLAN - FALSE - -FALSE FALSE CEILING CEILING CEILING LAYOUT LAYOUT LAYOUT SCALE-1:50 SCALE-1:50 SCALE-1:50 REFELCTED CEILING PLAN - FALSE CEILING LAYOUT
SCALE-1:50
CC
FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M
E
TILE TILE TILE LAYOUT LAYOUT LAYOUT TILE LAYOUT
Possibility 02 - When doors are closed and flaps open up
600 600600
S S
F
SCALE-1:50 SCALE-1:50 SCALE-1:50
Possibility 01 - When doors and flaps remain closed
C
EQ EQ S
1 FULL TILE 1 FULL 1 TILE FULL TILE EQ
B
FC LVL +2.50M
E E
D
B B
600 600600
S S
R
F
B
600
FC LVL +2.50M
R E
S
1 FULL TILE
600
S S
EQ EQ
EQ
1 FULL TILE 1 FULL 1 TILE FULL TILE
S
R 1 FULL TILE DD
STORE ROOM
FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M
C
EQ EQ
600
95.79 M LVL FFL
A STORE STORE STORE ROOMROOM ROOM
FC LVL +2.50M
EQ EQ
EQ
S
A A
600
1 FULL TILE
EQ EQ EQ EQ
EQ S
A
EQ EQ
1 FULL TILE 1 FULL 1 TILE FULL TILE EQ EQ
EQ
EQ
C
265
1 FULL 1 FULL 1 FULL 1 FULL 1 FULL 1 FULL EQ EQEQ EQ EQEQ R R R R R TILE TILE TILE TILE TILE TILE 1 FULL EQ EQ R TILE D F F F
600
FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M
EQ EQ CC
EQ
C
EQ
265 265265
S
B
2 FULL TILES
260
3 FULL TILES
R
S
FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M
B
2 FULL TILES
EQ EQ
EQ EQ
EQ
2 FULL TILES 2 FULL 2TILES FULL 140 TILES
EQ EQ
CC
The garage at office was envsioned to become an exhibition area for all the work carried out by the studio. This door, designed with a series of flaps and pivots, was to enhance the entrance of the office.
600 600600
EQ EQ
S S
EQ 2 FULL TILES
2 FULL TILES 2 FULL 2TILES FULL 110 TILES EQ
EQ EQ
B B
EQ EQ
2 FULL TILES 2 FULL 2TILES FULL 140 TILES
S
EQ EQ
EQ 600 600
3 FULL 3 FULL 3 FULL TILESTILES TILES
95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
E
SCALE-1:50
B
S
C
TOILET O1 R
EQ
EQ EQ
EQ 110 110
110
140
R R
600
R
95.79 M LVL FFL
2 FULL TILES
140 140
140
STAFF TOILET O1
200
200 200
135 200
S
200
240 S B B S
240
S 95.79 S S M LVL FFL
S S
R
135 135
135
R
R R
2 FULL TILES 2 FULL 2TILES FULL TILES
140 140
150 200 200
200
135
200
CORSA CREMA 260300X300 260 S260 S S 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
STAFFSTAFF STAFF TOILET O1O1 TOILET O1 TOILET
200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
B
S 95.79 S S M LVL FFL STAFF TOILET O2
CORSA CREMA CORSA CORSA CREMA CREMA 300X300 300X300 300X300
95.79 M LVL FFL
S
D16
S
1 FULL TILE 1 FULL 1 TILE FULL TILE
135 150 150
150
2 FULL TILES R
135
S
200
2 FULL TILES
V1
1200 475 1150
D
CHANGING ROOM
STAFFSTAFF STAFF TOILET O2O2 TOILET O2 TOILET
S S
TOILET O2
TOILET O1O1 TOILET O1 TOILET
1 FULL TILE 1 FULL 1 TILE FULL TILE
135
2 FULL TILES 135
135 135 R 2 FULL TILES R
110
110
CHANGING CHANGING CHANGING ROOMROOM ROOM
95.79 M LVL FFL
200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
C
295 295
295
135 135
R 455
C O2O2 TOILET TOILET O2 TOILET
1220
2700
S
200
E E E
FC LVL FC+2.50M FC LVLLVL +2.50M +2.50M
4 FULL TILES
95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL S240 S S 240 240 95.79 S SMSLVL FFL
240 240 S240 S S 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
R R
2 FULL TILES 2 FULL 2TILES FULL TILES
CC
5200
C
D16 D16 D16
E E
110 110
R
R R
F16 380
2 FULL TILES 2 FULL 2TILES FULL TILES
1100 1200
5200 5200
V1
5200 V1 V1
455 455
E
8050
EQ
135 135 R
135
R R
R R
R R
2 FULL TILES 2 FULL 2TILES FULL TILES F16 F16
380 380 F16
380
170
1100 D4 1100 1100 1200 D4 1200
12201220 1220 2700 27002700 D3
R S S
S
1200 D4 1200 1200
1000
CC
A
STORE ROOM
R 4R FULL 4 FULL TILES TILES 4 FULL TILES
R
TOILET O3
PLAN
SCALE-1:50 SCALE-1:50 SCALE-1:50
1095
3700
3500
V1a DD
D
95.79 M LVL FFL 95.76 M LVL SSL
D3 D3D3 D15
8050 80508050 5350 F F F
F
PLAN PLAN PLAN
2 FULL TILES 2 FULL 2TILES FULL TILES
1095 V1a
3900
470
455
95.76 M95.76 LVLMSSL M LVLLVL SSL SSL 100095.76
D15 D15 D15 10001000 1000
5350 53505350
1150
1575
1575
1575 1575
95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
D4
39003900 3900
C 1350
D4 D4 475 1150 1150 475 475 200 1200
200
200 200
D4
D4 895
D4 D4
D4
TOILET TOILET O1 O1O1 TOILET
TOILET O3O3 TOILET O3 TOILET
S S
95.79 M LVL FFL
200 200200 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
B
S
S
S
B
D4 D4
D4
470
1575470 470
1575 1575
1575
895 D4 D4 895 895
STAFF TOILET O1
CL 300 300 350 300 350350 EQ EQEQ EQ EQEQEQ EQEQEQ EQEQEQ EQEQ EQ EQEQ 300 350 1000 850 850850 10001000 875 875875 EQ EQ EQ EQ EQ EQ 2750 27502750 1000 10001000 850 1000 875 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 2750 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL TOILET O1 95.76 M LVL SSL
B B
A A
160
TOILET O4
CL
CL CLCL 895
13501350 1350
STAFFSTAFF STAFF TOILET TOILET O1 O1O1 TOILET
3750
B
A
S S
160 160160
1350
STAFF TOILET O2
CL CL
D4
95.7995.79 M95.79 LVLMFFL M LVLLVL FFL FFL 1 DETAIL
95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL 37503750 3750 95.76 M LVL SSL TOILET O2
95.78 M BLVL FFL B B 95.76 M LVL SSL
470
4701550 470
470
D4
D4 170 170 D4 D4
170 1550
1550 1550
920
D4 D4
CHANGING ROOM 13501350 1350
CL
C
S
A A
A STORE STORE STORE ROOMROOM ROOM
95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
1350
95.7895.78 M95.78 LVLMFFL M LVLLVL FFLFFL 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL
CHANGING CHANGING CHANGING ROOMROOM ROOM
895 895
895
DETAIL DETAIL DETAIL 1 1 1
CC
1520
A
TOILET O5
1675
D5
STAFF STAFFSTAFF TOILET TOILET O2 O2O2 TOILET
TOILET TOILET O2 O2O2 TOILET
A
TOILET O4O4 TOILET O4 TOILET
13501350 1350
S 160 95.79 M LVL FFL
E D
600
EQ
S S
160 160160 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL
V1a V1a
96.79 M LVL FFL 96.76 M LVL SSL
15201520 1520
95.76 M LVL SSL
TOILET O3
C
A A
TOILET O5O5 TOILET O5 TOILET
1675 1675
1675 D4
D5 D5D5
95.76 M LVL SSL 2900
B
TOILET TOILET O3 O3O3 TOILET
A
3700 3700
STORE ROOM
995 D4 D4
D4
95.79 M LVL FFL
37503750 3750 DETAIL DETAIL 2 2 2 DETAIL 3750 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL DETAIL 2 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL
B B D4
B
3700
3500 3500
D4
STORE STORE STORE ROOMROOM ROOM
96.7996.79 M96.79 LVLMFFL M LVLLVL FFLFFL 96.7696.76 M96.76 LVLMSSL M LVLLVL SSL SSL
920 920
920
TOILET TOILET O4 O4O4 TOILET
A A
A
950
95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 2900 29002900 TOILET O4
S
1095 1095
1675
A
3500
1675
845
300 300 350 300 350350 EQ EQEQ EQ EQEQEQ EQEQEQ EQEQ 300 350 850 850850 925 925925 950 950950 EQ EQ EQ EQ A 2750 27502750 850 925 95.7995.79 M95.79 LVLMFFL M LVLLVL FFLFFL 2750 95.7695.76 M95.76 LVLMSSL M LVLLVL SSL SSL 95.79 M LVL FFL TOILET O5 95.76 M LVL SSL
995 995
995
TOILET TOILET O5 O5O5 TOILET
2500
1675 1675
845 845
845 D4
A A D4 D4
A
25002500 2500
DD
600
2900
R
CL CLCL CL
D
F F
F 600MM 600MM X 600MM X 600MM PVC PVC GRID GRID CEILING CEILING 600MM X 600MM PVC GRID CEILING WITH SILHOUETTE SILHOUETTE GRID WITH WITH WITHWITH SILHOUETTE GRID GRID WITH 600MM X 600MM PVC GRID CEILING SHADOW SHADOW CHANNELS CHANNELS ONON THE THE EDGES EDGES SHADOW CHANNELS ON THE EDGES WITH SILHOUETTE GRID WITH 2 FULL 2 FULL 2 FULL SHADOW CHANNELS ON THE EDGES R R TILESTILES TILES 2 FULL R TILES
600
800
F E
600 600
8050
1 FULL 1 FULL 1GREY FULL ZURICH (EXARO) EQ EQEQEQ EQEQ TILE TILE TILE 600X600 1 FULL TILE
E E
600 600
29002900 2900
4350
E D
600 600
800 800800
DD
600 600
43504350 4350
D
F F
F ZURICH (EXARO) ZURICH ZURICH GREYGREY (EXARO) GREY (EXARO) 600X600 600X600 600X600
600
F E
600 600
E E
600
E D
F
EQ
DD
EQ
D
F F
80508050 8050
600
F
E
LEGEND :
WALL SCHEDULE: 200MM 200MM 200MM THK BLOCKWORK THK THK BLOCKWORK BLOCKWORK
200MM THK BLOCKWORK 100MM 100MM 100MM THK BLOCKWORK THK THK BLOCKWORK BLOCKWORK
SCALE-1:50
100MM THK BLOCKWORK 150MM 150MM THK THK BLOCKWORK BLOCKWORK 150MM THK BLOCKWORK 150MM THK BLOCKWORK 15MM 15MM THK 15MM MORTAR THK THK MORTAR MORTAR 10MM THK 10MM TILE THK TILE TILE 15 10MM 15 10THK
40 20 40 20 40 20
150
50 5050 40 4040 90 9090
LAMINATED LAMINATED LAMINATED FINISH FINISH ON FINISH HONEY ONON HONEY HONEY COMBCOMB SHUTTERS COMB SHUTTERS SHUTTERS LAMINATED FINISH ON HONEY TILE FINISH TILE TILE FINISH AT FINISH ATAT COMB SHUTTERS +95.79M +95.79M +95.79M LVL LVLLVL ZURICH ZURICH ZURICH GREYGREY GREY (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 ZURICH GREY (EXARO) 600X600
15MM THK MORTAR 10MM THK TILE
40 20
90X60MM 90X60MM 90X60MM THK WOODEN THK THK WOODEN WOODEN OUT OUT OUT DOORDOOR JAMB DOOR JAMB FINISHED JAMB FINISHED FINISHED 90X60MM THK WOODEN WITHWITH DUCCO WITH DUCCO DUCCO PAINTPAINT TO PAINT TOTO DOOR JAMB FINISHED MATCH MATCH MATCH THE SHUTTER THE THE SHUTTER SHUTTER WITH DUCCO PAINT TO 50 40 90 MATCH THE SHUTTER
60
60 60
60
15 1515 15 1510 15 1010 15MM 15MM THK 15MM THK THK 150 150150 PLASTER PLASTER PLASTER 15MM THK PLASTER
IN
IN IN IN
OUT
43 MM 4343 XMM 15 MM XMM 15 X 15 MDF MMMM MDF MDF TRANSITION TRANSITION TRANSITION PROFILE PROFILE PROFILE
DETAIL DETAIL DETAIL 3 33
IN
DETAIL 3
IN IN
OUT OUT OUT
- 01 - 01 TILE -TILE 01TILE 600 XBLOCKWORK 600 X 600 ZURICH ZURICH 600 X600 600 ZURICH 20MM THK GREY FROM FROM EXARO EXARO GREYGREY FROM EXARO
TILE FINISH AT +95.79M LVL
10MM 10MM THK 10MM TILE THK THK TILE TILE 300X300 300X300 300X300 CORSA CORSA CORSA CREMA CREMA CREMA TILE -TILE 02TILE -TILE 02 - 02 10MM THK 300 X300 300 300 XCORSA 300 X 300 CORSA CORSA 300X300 CORSA CREMA CREMA CREMA CREMA 20 MM 2020 THK MMMM ENG THK THK MARBLE ENG ENG MARBLE MARBLE
20MM EXTERNAL PLASTER FINISH
FFL
SSL SSL SSL
BOTTOM BOTTOM BOTTOM FC LVL FCFC +2400 LVLLVL +2400 +2400 MM MMMM FROMFROM FROM BOTTOM FC LVL +2400 MM FROM 10MM 10MM ALUMINUM 10MM ALUMINUM ALUMINUM CHANNEL CHANNEL CHANNEL TO BETOFIXED TO BEBE FIXED TO FIXED THE TOTO WALL THE THE WALL WALL 10MM ALUMINUM CHANNEL TO BE FIXED TO THE WALL D4 D4D4
5MM GROOVE
20MM 20MM EXTERNAL 20MM EXTERNAL EXTERNAL PLASTER PLASTER PLASTER FINISH FINISH FINISH
OUT
TRANSITION PROFILE
SSL
SCREED SCREED SCREED LAID LAID TOLAID SLOPE TOTO SLOPE SLOPE SCREED LAID TO SLOPE
DETAIL DETAIL DETAIL 1 11
DETAIL DETAIL DETAIL 2 22
DETAIL 1
SCALE-1:20 SCALE-1:20 SCALE-1:20
DETAIL DETAIL DETAIL 3 33
DETAIL 2
SCALE-1:20 SCALE-1:20 SCALE-1:20
SCALE-1:20
SCALE-1:5 SCALE-1:5 SCALE-1:5
SCALE-1:20
D4
DETAIL DETAIL DETAIL 4 44
DETAIL 3
project name ASSETZ ASSETZ ASSETZ BEGUR BEGUR BEGUR
1801118011 18011
project number
Assetz Property Group
18011
RR R R
FULL 1111FULL FULL FULL TILE TILE TILE TILE
EQ EQ 1 FULL EQ REQ TILE
SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT 1 FULL TO DETAIL TODETAIL DETAIL TO DETAIL TO R TILE
1111FULL FULL FULL FULL RR TILE TILE EQ RR TILE TILE
SKYLIGHT TO DETAIL
POSITION
TOILETS 1 - 6, STAFF TOILETS 1-2& CHANGING ROOM
- NAHANI TRAP
SCALE-1:5
drawingdrawing title drawing titletitle
BGR-SL-GROUND BGR-SL-GROUND BGR-SL-GROUND FLOOR FLOOR PLAN FLOOR PLAN PLAN
GP-02-01 GP-02-01 GP-02-01
projectproject number project number number
client AssetzAssetz Property Assetz Property Property GroupGroup Group
STAFF TOILETS 1 - 2, CHANGING ROOM
structural structural consultant structural consultant consultant
DTC Consultants DTC DTC Consultants Consultants
RED RED RED
review review onlyreview onlyonly structural consultant north drawingrevision title revision purpose of release drawingdrawing number drawing number number revision client approval client client approval approval mep consultant mepmep consultant consultant BGR-SL-GROUND FLOOR PLAN DTC Consultants review only statutory statutory approval statutory approval approval research+design research+design research+design DTCrevision Consultants DTC DTC Consultants Consultants drawing number client approval date datedate sheet number sheet sheet number number tender tender tender mep consultant 04/05/2020 04/05/2020 1/1 1/11/1 villa b, villa sai villa anugraha, b, sai b, anugraha, sai 27/1, anugraha, rukmani 27/1, 27/1, rukmani street rukmani ext., street street ext.,ext., statutory approval04/05/2020 good for good construction good for construction for construction landscape landscape landscape consultant consultant consultant research+design SKYLIGHT SKYLIGHT besant besant nagar, besant chennai nagar, nagar, chennai - 60090. chennai - 60090. t:-044.430.33669 60090. t: 044.430.33669 t: 044.430.33669 date sheet number SKYLIGHT DTC Consultants SKYLIGHT tender drawn by SKYLIGHT drawn drawn by by scale scale scale checkedchecked by checked by by 28-09-18 28-09-18 28-09-18 as builtas built as built Design Design Milieu Design Milieu Milieu 04/05/2020 1/1 www.architecturered.com www.architecturered.com www.architecturered.com villa b, sai anugraha, 27/1, rukmani street ext., TO DETAIL TO DETAIL FULL TILES FULL TILES FULL TILES 222FULL FULL TILES FULL TILES FULL TILES RR RR RR good for construction 1:150 SMK KPKP TODETAIL DETAIL date2 date date TILES FULL TILESR FULL TILESSMK FULL TILESR R R 1:150 R TILESKP TO landscape consultant 22221:150 FULL TILES 2222FULL TILES R R R TO DETAIL 2 FULL TILES 2 FULL 2 FULL TILES R SMK besant nagar, chennai - 60090. t: 044.430.33669 drawn by scale checked by 28-09-18 as built Design Milieu www.architecturered.com 1:150 SMK KP revisions/submissions date c copyright c copyright c 2018 copyright architectureRED 2018 2018 architectureRED architectureRED all rights allreserved rights all rights reserved reserved
ASSETZ BEGUR
client client client
north north north
POSITION
TOILETS 1 - 6
- START TILE
DETAIL 6
SCALE-1:5 SCALE-1:5 SCALE-1:5
SCALE-1:5
purposepurpose ofpurpose release of release of release
DESCRIPTION TOILETS TOILETS TOILETS 1 - 6 1 -16- 6 TILE - 01 600 X 600 ZURICH STAFF STAFF TOILETS STAFF TOILETS TOILETS GREY FROM EXARO 1 - 2,1 -12,- 2, TILE - 02 CHANGING CHANGING CHANGING ROOMROOM ROOM 300 X 300 CORSA CREMA
- NAHANI - NAHANI - NAHANI TRAPTRAP TRAPS
DETAIL DETAIL DETAIL 6 66
DETAIL 5
SCALE-1:5 SCALE-1:5 SCALE-1:5
SCALE-1:5
generalgeneral notes: general notes: 1- these notes: 1- drawings these 1- these drawings drawings may not may be may not used, not be duplicated, used, be used, duplicated, duplicated, modified modified or modified changed or changed or inchanged any in manner any in any manner without manner without thewithout written the the written consent written consent ofconsent architecturered. of architecturered. of architecturered. the user the&the user its user agents & its & agents its willagents be will liable will befor liable be any liable for unauthorized for anyany unauthorized unauthorized use, duplication, use,use, duplication, duplication, modification modification modification or change. or change. or2-change. the 2drawings the 2- the drawings drawings & dimensions & dimensions & dimensions are to be areread are to be to&read be notread measured. & not & not measured. measured. 3- any 3discrepancies any 3- any discrepancies discrepancies noticednoticed innoticed the in the in the d r ad wrd iar nw a gw i sni gns sgh sas l hsl ah lba l el l b bebr eob urb gor huo tgu hgt tho t t t oth oe t htneho e tn i onc toe i t cioecf e ot foh fe t hta ehr eca hra i crt hce ihc t it ets ce' tc sot 'sf f' oi foc f fe i f cif eco er f ofc rol ra c r lci alf rai icr f ai i ft cii aco tani tsoi . no sn4 .s- . 4 a -4l -l a lda l rl lad wrd iar nw a gw i ni ugn n g i u t nus in t ai str sea rai ern e i t nih ne t htmeh ee tm r m ei tec r t i rs cic cas l cse ac la el e general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architecturered. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the d r a w i n g s s h a l l b e b r o u g h t t o t h e n o t i c e o f t h e a r c h i t e c t s ' o f f i c e f o r c l a r i f i c a t i o n s . 4 a l l d r a w i n g u n i t s a r e i n t h e m e t r i c s c a l e
projectproject name project name name
DETAIL DETAIL DETAIL 5 55
DETAIL 4
SCALE-1:5 SCALE-1:5 SCALE-1:5
SCALE-1:5
POSITION POSITION POSITION TILES
20 MM THK ENG MARBLE FALSEFALSE CEILING FALSE CEILING CEILING LEDGE LEDGE LEDGE WALLWALL FFL WALL AT FFLFFL ATAT DESCRIPTION DESCRIPTION DESCRIPTION FALSE POSITION POSITION POSITION CEILING +1200MM +1200MM +1200MM FROMFROM FFL FROM FFLFFL 150 600MM 600MM 600MM X WALL 600MM X 600MM XFFL 600MM PVC PVC TOILETS TOILETS TOILETS 1 - 6,1 -16,- 6, LEDGE ATPVC DESCRIPTION GRID GRID CEILING GRID CEILING CEILING WITH WITH WITH STAFFSTAFF TOILETS STAFF TOILETS TOILETS +1200MM FROM FFL 15MM 15MM THK 15MM MORTAR THK THK MORTAR MORTAR 600MM X 600MM PVC SILHOUETTE SILHOUETTE SILHOUETTE GRID GRID WITH GRID WITH WITH 1 - 2 1&-12-&2 & GRID CEILING WITH 10MM 10MM THK 10MM TILE THK THK TILE TILE SHADOW SHADOW SHADOW CHANNELS CHANNELS CHANNELS ON ONCHANGING ON CHANGING CHANGING ROOMROOM ROOM 15MM THK MORTAR SILHOUETTE GRID WITH 300X300 300X300 300X300 CORSA CORSA CORSA CREMA CREMA CREMA THE EDGES THE THE EDGES EDGES 10MM THK TILE SHADOW CHANNELS ON 150MM 150MM 150MM THK LEDGE THK THK LEDGE WALL LEDGE WALL WALL 300X300 CORSA CREMA THE EDGES - START -WALL START - TILE START TILE TILE S THK S SLEDGE 150MM
150 150150
GRADE GRADE GRADE SLABSLAB SLAB GRADE SLAB
DESCRIPTION DESCRIPTION DESCRIPTION
20MM 20MM THK 20MM BLOCKWORK THK THK BLOCKWORK BLOCKWORK
5MM5MM GROOVE 5MM GROOVE GROOVE
43 MM X 15 MM MDF TRANSITION PROFILE
FFL FFLFFL
IN
TRANSITION TRANSITION TRANSITION PROFILE PROFILE PROFILE
TILESTILES TILES
R0 Date R0 R0 ofDate First Date ofIssue First of First Issue Issue no no no revisions/submissions revisions/submissions revisions/submissions R0 Date of First Issue no
architecture architecture architecture
R0 R0R0 GP-02-01
architecture
R0
RED
c copyright 2018 architectureRED all rights reserved
S
450
550
710 350
450 450 450 450 450
550 550 550 850 550 550
FLUSH FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL PLUMBING PLUMBING PLUMBING PLUMBING SHAFT SHAFT SHAFT SHAFT
PLUMBING SHAFT
SS S S
SS S S
S
SS S S
S
FLUSH VALVE HEIGHT FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH FROM FFL AT +.9M LVL FROM FFL AT +.9M LVL FROMFFL FFLAT AT+.9M +.9MLVL LVL FROM FROM FFL AT +.9M LVL
S
FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED FIXED SEATING AT +.45M LVL FROM FFL LVL FROM FFL LVLFROM FROMFFL FFL LVL LVL FROM FFL
FIXED FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M LVL LVLFROM FROMFFL FFL LVL FROM FFL LVL FROM FFL LVL FROM FFL STORE STORE ROOM STOREROOM ROOM STORE ROOM
PLUMBING SHAFT PLUMBING SHAFT PLUMBINGSHAFT SHAFT PLUMBING
TOILET TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET SSL SSL+95.76M +95.76MLVL LVL SSL +95.76M LVL SSL +95.76M LVL SSL +95.76M LVL
STORE ROOM
CORRIDOR CORRIDOR CORRIDOR CORRIDOR
PLUMBING SHAFT
PLAN A
6MM THK MS FLAT STOPPER WELDED TO MAIN
SCALE-1:5
DETAIL B SCALE-1:5
6
5
365
610
CENTRELINE OF PIVOT HINGE POSITION FOR DOOR
40MM X 20MM MS BOX SECTION
5 6MM THK MS FLAT STOPPER
5
5
5
600M X 600MM FLIP PANEL 600
600 6
STAFF STAFF TOILETFFL FFLAT AT+95.78M +95.78M LVL LVLFFL AT +95.78M LVL STAFFTOILET TOILET FFL AT +95.78M LVL STAFF TOILET FFL AT +95.78M LVL STAFF TOILET SSL SSLAT AT+95.76M +95.76MLVL LVLSSL AT +95.76M LVL SSL AT +95.76M LVL SSL AT +95.76M LVL
405
5MM GAP BETWEEN FLIP PANEL AND MAIN DOOR
6MM THK BISON BOARD
DETAIL B
16MM DIA ROD
52MM THK DOOR 2775
710 710 710 710 710 850 850 850 850 850
589
6MM THK MS FLAT AS OUTER FRAME
600M X 600MM FLIP PANEL
600MM X 600MM FLIP PANEL
DETAIL A
FIXED FIXED SEATING SEATING AT AT +.45M +.45M FIXEDSEATING SEATINGAT AT+.45M +.45M FIXED SEATING AT +.45M FIXED LVL LVL FROM FROM FFL FFL LVLFROM FROMFFL FFL LVL LVL FROM FFL
5MM GAP BETWEEN FLIP PANEL AND MAIN DOOR
16MM DIA ROD FOR SUPPORTING PIVOT HINGE OF FLIP PANEL
5
LEDGE LEDGE WALL WALL HEIGHT HEIGHT AT AT LEDGEWALL WALLHEIGHT HEIGHT LEDGE AT WALL HEIGHT AT LEDGE AT +1.2M +1.2M LVL FROM FFL +1.2MLVL LVLFROM FROMFFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL FLUSH FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9M LVL FROM FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL
S
450
DETAIL A
2775
SS S S
3270
1100
1100 1100 1100 1100 1100
S 1200
S
150 150 150 150 150
SS S S
350 550
S
SS SS S
M
CORSA CREMA 300X300
2763
DETAIL 4
SS S S
STORE ROOM
S
450 900 450 450 450 450 450 1200 1200 1200 1200 1200
STORE STOREROOM ROOM ROOM STORE ROOM STORE
S FFL TOILET TOILET FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET FFL +95.79M LVL TOILET SSL SSL +95.76M LVL SSL+95.76M +95.76MLVL LVL SSL +95.76M LVL SSL +95.76M LVL
SS S S
550 350 350 350 350 350 550 550 550 550 550
FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL
SS S S
DETAIL DETAIL4444 DETAIL DETAIL
SS S S
FLUSH FLUSH VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSHVALVE VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+.9M LVL FROM FFL AT+.9M AT+.9M LVL FROM FFL
450 450 450 450 450 900 900 900 900 350 900
D5
MM M M
550 550 550 550 550
S
600X600 TILES PAPER JOINT LAID STRAIGHT
350 350 350 350 350
S
600
CORSA CORSACREMA CREMA CREMA CORSA CREMA CORSA 300X300 300X300 300X300 300X300
2390
SS S S
3720
3720 3720 3720 3720 3720
600X600 600X600TILES TILES TILES 600X600 TILES 600X600 PAPER PAPERJOINT JOINT JOINTLAID LAID LAID PAPER JOINT LAID PAPER STRAIGHT STRAIGHT STRAIGHT STRAIGHT
V1
1170
V1 V1 V1 V1
V1a
CENTRELINE OF PIVOT HINGE POSITION FOR DOOR
5
700
V1
V1 V1 V1 V1 V1
V1a V1a V1a V1a
SCALE-1:20
EQ
STORE STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL LVL FROM FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL
LEDGE LEDGEWALL WALL WALLHEIGHT HEIGHT HEIGHTAT AT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT LEDGE +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M
2390 2390 2390 2390 2390
SS S S
D4
S
D4
S
D5 D5 D5 D5
440710 710 710 710 710 350 350 350 350 350
850 850 850 850 850
440 440 440 440 440
MS S SS
D4 D4 D4 D4 D4
LOW HEIGHT WALL
S S SS
600
LOW LOW HEIGHT LOWHEIGHT HEIGHT LOW HEIGHT WALL WALL WALL WALL
MM M M
1200
SEATER
450
SEATER SEATER SEATER SEATER
550 600 600 600 600 600
ZURICH GREY (EXARO) 600X600
450 450 450 450 450 710 350 1200 1200 1200 1200 1200
ZURICH ZURICHGREY GREY GREY ZURICH GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600
2 FULL TILES
STORE STORE ROOMROOF ROOFLVL LVL STOREROOM ROOM ROOF LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265MLVL LVL LVLFROM FROM FROM FFL FFL AT+3.265M LVL FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL
BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING BOTTOM AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL
850 550 550 550 550 550
FALSE CEILING
D4 D4 D4 D4 D4
FALSE FALSE CEILING CEILING FALSECEILING CEILING FALSE
2222FULL FULL FULL FULL FULL FULL FULL EQ FULL FULL FULL 2222FULL 2222FULL EQ EQ EQEQ EQ 2 FULL EQ EQ2 FULL EQ EQ EQ EQ EQ2 FULL EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ TILES TILES TILES TILESEQ EQ TILES TILESEQ EQ TILES EQ TILES TILES TILES TILES TILES TILES TILESTILES
6MM THK MS FLAT STOPPER WELDED TO MAIN FRAME
PIVOT HINGE
2775
SKYLIGHT TO DETAIL
FULL FULL FULL 2222FULL TILES TILES TILES TILES
100
SCALE-1:50
365
EQ EQ EQ EQ
150
EQ
RR R R SKYLIGHT SKYLIGHT R SKYLIGHT 3 FULL TILES SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL TO
FULL FULL TILES TILES FULL TILES EQ TILES 3333FULL
3270 3270 3270 3270 3270
1 EQ FULL EQ EQ EQ TILE
710 850
EQ EQ EQR EQ
SCALE-1:50
5MM GAP BETWEEN FLIP PANEL AND OUTER FRAME
PLAN B
SCALE-1:20
SECTION SECTION DD DD SECTION DD SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50
SCALE-1:50
1170 1170 1170 1170 1170
FULL FULL FULL 1111FULL TILE TILE TILE TILE
SCALE-1:50
700 700 700 700 700
R R RR
SECTION SECTION AA AA SECTION AA SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50
CENTRELINE OF PIVOT HINGE CONNECTED TO 16MM DIA ROD
600MM X 600MM FLIP PANEL LINED WITH 6MM THK MS FLAT
TOILET FFL AT+95.79M LVL TOILET FFL AT+95.79M LVL TOILETFFL FFLAT+95.79M AT+95.79M LVL FFL AT+95.79M LVL CORRIDOR TOILET TOILET LVL SSL AT 95.76M LVL SSL AT 95.76M LVL SSLAT AT95.76M 95.76MLVL LVL SSL AT 95.76M LVL SSL
CENTRE OF PIVOT HINGE 26
S
40MM X 20MM MS BOX SECTION
131 105
SS S S
40MM X 20MM MS BOX SECTION
365
SS S S
A'
B'
LEDGE LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVLFROM FROMFFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M LVL FROM FFL
500
S
6MM THK MS FLAT AS OUTER FRAME
5 16MM DIA ROD FOR SUPPORTING PIVOT HINGE OF FLIP PANEL
100
S
A
B
ZURICH GREY (EXARO) 600X600
6MM THK MS FLAT AS OUTER FRAME
5
SS S MS
D4
SS S S
710 710 710 710 710 350 350 350 350 350
LOW HEIGHT WALL
850 850 850 850 850
LOW LOWHEIGHT HEIGHT HEIGHT LOW HEIGHT LOW WALL WALL WALL WALL
M M MM D4 D4 D4 D4 D4
SEATER
ZURICH GREY ZURICH GREY ZURICHGREY GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600
600MM X 600MM FLIP PANEL
600MM X 600MM FLIP PANEL
26
ZURICH GREY (EXARO) 600X600
SEATER SEATER SEATER SEATER
BOTTOM OF FALSE CEILING LVL BOTTOM OF FALSE CEILING LVL BOTTOMOF OFFALSE FALSECEILING CEILING LVLOF FALSE CEILING LVL BOTTOM LVL BOTTOM AT +2.4M LVL FROM FFL AT +2.4M LVL FROM FFL AT+2.4M +2.4MLVL LVLFROM FROMFFL FFL+2.4M LVL FROM FFL AT AT
BOTTOM BOTTOMOF OFFALSE FALSECEILING CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING BOTTOM OF FALSE CEILING AT+2.4M AT+2.4MLVL LVLFROM FROMFFL FFL AT+2.4M LVL FROM FFL AT+2.4M LVL FROM FFL AT+2.4M LVL FROM FFL
DETAIL 6
6MM THK BISON BOARD
365
DETAIL6666 DETAIL DETAIL DETAIL
FALSE CEILING
ZURICH GREY ZURICH GREY ZURICHGREY GREY ZURICH (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600
6MM THK BISON BOARD
131 105
845
845 845 845 845 845 FALSE CEILING FALSECEILING CEILING FALSE CEILING FALSE
6MM THK MS FLAT AS OUTER FRAME
STORE ROOM ROOF LVL STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE AT +3.265M LVL FROM FFL AT +3.265M LVL FROM FFL AT+3.265M +3.265MLVL LVLFROM FROM FFL AT ATFFL +3.265M LVL FROM FFL
STORE STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL
600MM X 600MM FLIP PANEL
SCALE-1:50
RR FULL FULL FULLRR 11R11FULL TILE TILE TILE TILE
1 FULLR TILE
FULL FULL FULL 1111FULL TILE TILE TILE TILE
RR R R
1 FULL TILE
R
FULL FULL FULL 1111FULL TILE TILE TILE TILE
RR R R
1 FULL TILE
SCALE-1:50 SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL RTO
SECTION SECTION EESECTION EE EE SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50 SCALE-1:50
SKYLIGHT CORSA CORSACREMA CREMA CREMA CORSA CREMA TO DETAIL CORSA 300X300 300X300 300X300 300X300
CORSA CREMA RR R 300X300 R FULL FULLTILES TILES TILES FULL TILES 3333FULL
R
RR R 3 FULL TILES R
R
RR R R
R FULL FULLTILES TILES TILES FULL TILES 3333FULL
SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT TO TODETAIL DETAIL DETAIL TO DETAIL TO
EQ EQ EQ 3 FULLEQ TILES
SKYLIGHT TO DETAIL FULL FULL FULL 1111FULL EQ EQ EQ EQ EQ TILE TILE TILE TILE
RR REQ R
1 FULL TILE
SCALE-1:50 LEGEND LEGEND:::: LEGEND LEGEND WALL WALLSCHEDULE: SCHEDULE: SCHEDULE: WALL SCHEDULE: WALL
R
LEGEND : WALL SCHEDULE:
1800
1 FULL TILE
1800
RR R R
FULL FULL FULL 11R11FULL TILE TILE TILE TILE
1800
1 FULL TILE
SECTION EE
1800
SECTION SECTION BB BB SECTION BB SECTION SCALE-1:50 SCALE-1:50 SCALE-1:50 RR R R
1111FULL FULL FULL FULL TILE TILE TILE TILE
SECTION SECTIONEE EE SECTION EE SECTION EE SECTION EE
40MM X 20MM MS BOX SECTION
700 700 700 700 700
700
V1 V1 V1 V1 V1
V1
200MM 200MM THK BLOCKWORK 200MMTHK THKBLOCKWORK BLOCKWORK 200MM THK BLOCKWORK 200MM THK BLOCKWORK
STORE STORE ROOM ROOM ROOF ROOF LVL LVL STOREROOM ROOMROOF ROOFLVL LVL STORE STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL LVL FROM FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M FFL AT+3.265M LVL FROM FFL
SS S S
D4 D4 D4 D4 S
S S SS
3730
3730 3730 3730 3730 3730
LEDGE LEDGE WALL WALL HEIGHT HEIGHT AT AT LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M
D4
D3a D3a D3a DETAIL 5D3a
DETAIL DETAIL5555 DETAIL DETAIL
FLUSH FLUSH VALVE VALVE HEIGHT HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT S FLUSH AT+.9M AT+.9M LVL LVL FROM FROM FFL FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M AT+.9M LVL FROM FFL
450 450 450 450 450
FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED FIXED SEATING AT +.45M LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL TOILET TOILET FFL FFL +95.79M +95.79M LVL LVL TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL TOILET TOILET SSL SSL+95.76M +95.76M +95.76MLVL LVL LVL SSL +95.76M LVL SSL +95.76M LVL SSL
D3a
ZURICH ZURICH GREY ZURICHGREY GREY ZURICH GREY (EXARO) (EXARO) (EXARO) (EXARO) 600X600 600X600 600X600 600X600
FALSE CEILING
ZURICH GREY (EXARO) 600X600
LEDGE LEDGE WALL HEIGHT AT LEDGEWALL WALLHEIGHT HEIGHTAT AT LEDGE WALL HEIGHT AT LEDGE WALL HEIGHT AT +1.2M +1.2MLVL LVL LVLFROM FROM FROMFFL FFL FFL+1.2M LVL FROM FFL +1.2M LVL FROM FFL +1.2M FLUSH FLUSH VALVE HEIGHT FLUSHVALVE VALVEHEIGHT HEIGHTFLUSH VALVE HEIGHT FLUSH VALVE HEIGHT AT+.9M AT+.9M LVL FROM FFL AT+.9MLVL LVLFROM FROMFFL FFL AT+.9M LVL FROM FFL AT+.9M LVL FROM FFL
SS S S
S
SS S S
SS S S
S
TILE TILE 02 TILE----02 02 TILE 02 300 300XXXX300 300 300CORSA CORSA CORSA 300 300 CORSA 300 CREMA CREMA CREMA CREMA
SCALE-1:50
ASSETZ BEGUR ASSETZ BEGUR BEGURASSETZ BEGUR ASSETZ
SCALE-1:50
purpose purpose release purposeof ofrelease release purpose ofof release review review only reviewonly only review only client clientapproval approval approval client approval client
north north northof release purpose north review only client approval
drawing drawing title drawingtitle title drawing title north
drawing title
drawing drawingnumber number drawing number drawing number
drawing number
client START STARTTILE TILE TILE START TILE ----START S
----NAHANI NAHANI TRAP NAHANITRAP TRAP NAHANI TRAP
SECTION CC SECTION CC SECTION CC SCALE-1:50 SCALE-1:50 SCALE-1:50
SCALE-1:50
general general notes:11-these thesedrawings drawingsmay maynot notbe beused, used,duplicated, duplicated,modified modifiedor orchanged changedin inany anymanner mannerwithout withoutthe thewritten writtenconsent consentof ofarchitecturered. architecturered.the theuser user& &its itsagents agentswill willbe beliable liablefor forany anyunauthorized unauthorizeduse, use,duplication, duplication,modification modificationor orchange. change.22-the thedrawings drawings& &dimensions dimensionsare areto tobe beread read& &not notmeasured. measured.33-any anydiscrepancies discrepanciesnoticed noticedin inthe the generalnotes: notes: 1these drawings may not be used, duplicated, modified changed any manner without the written consent architecturered. the user its agents will be liable for any unauthorized use, duplication, modification change. 2the drawings dimensions are to be read not measured. 3any discrepancies noticed the general notes: 1these drawings may not be modified changed inin any manner without the written architecturered. user && agents will be liable for any duplication, modification oror change. 2the drawings && todrawings be read && not measured. any discrepancies noticed the general notes: 1-used, theseduplicated, drawings may not beororused, duplicated, modified or changed in anyconsent mannerofof without the writtenthe consent ofits architecturered. the user & itsunauthorized agents will beuse, liable for any unauthorized use, duplication, modification ordimensions change. 2-are the & dimensions are3to be read & not measured. 3-ininany discrepancies noticed in the dd r r aa ww i i nn gg ss ss hh aa l l l l bb ee bb r r oo uu gg hh t t t t oo t t hh ee nn oo t t i i cc ee oo f f t t hh ee aa r r cc hh i i t t ee cc t t ss ' ' oo f f f f i i cc ee f f oo r r cc l l aa r r i i f f i i cc aa t t i i oo nn ss . . 44 -- aa l l l l dd r r aa ww i i nn gg uu nn i i t t ss aa r r ee i i nn t t hh ee mm m ee t t r r i i cc ss cc aa l l ee a reeet t r r i i i ncc tsshcceaa l lmee e t r i c s c a l e dd r r aa ww i i nn gg ss ss hdh ara lal l lw ibbnee g sbb r r soo huu agg lhhl t t b t t eoo bt t rhh oee u gnn hoo t t i i ct c oee toohf f e t t hnh eoe t ai a cr r ecc hh oi i tf t ee tccht t ess ' ' a oro cf f fhf i ii cct eee c f ft oos r r' coc l fl afa ri r ci i fef i i ccf aoa t rt i i ooc nnl sas .r. i 4f4 i-- c aa tl l il l o dnd rsr aa. ww 4i i n-n gga luul nn i di t tr ssa waa ir r nee g i i nun n t ti hth ese m
10MM DIA SS CYLINDER DOOR STOPPER
POSITION
TOILETS 1 - 6 STAFF TOILETS 1 - 2, CHANGING ROOM
ELEVATION A
POSITION
structural structural consultant structuralconsultant consultant structural consultant
revision mep mepconsultant consultant consultant mep consultant mep
SECTION AA'
SCALE-1:20
general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architecturered. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. 4- all drawing u n i t s a r e i n t h e m e t r i c s c a l e
- NAHANI TRAP
19001
01 Review no
revisions/submissions
SECTION BB'
SCALE-1:20
purpose of release
project number
- START TILE
aRED
06-03-19 date
review only client approval statutory approval tender good for construction as built
north
drawing title
drawing number date scale
1:20
drawn by
SCALE-1:20
DOOR
xx-xx-xx
06/03/2019 SM
xxxx Consultants revision sheet number checked by
OV
Rx
1/1
xxxx Consultants xxxx Consultants
architecture
RED research+design
villa b, sai anugraha, 27/1, rukmani street ext., besant nagar, chennai - 60090. t: 044.430.33669 www.architecturered.com c copyright 2018 architectureRED all rights reserved
SCALE-1:50
structural consultant
BGR-SL-GROUND BGR-SL-GROUND FLOOR PLAN PLAN DTCConsultants Consultants BGR-SL-GROUNDFLOOR FLOOR PLAN DTC Consultants BGR-SL-GROUND FLOOR PLAN DTC BGR-SL-GROUND FLOOR PLAN DTC Consultants revision revision revision revision
ELEVATION B
SCALE-1:20
TOILETS 1 - 6, STAFF TOILETS 1-2& CHANGING ROOM
Model Space
SECTION SECTION FF FFSECTION FF SECTION FF SCALE-1:50 SCALE-1:50 SCALE-1:50 project name
POSITION POSITION POSITION DESCRIPTION POSITION
FALSE FALSECEILING CEILING CEILING FALSE CEILING FALSE FALSE CEILING FIXED FIXEDSEATING SEATING SEATINGAT AT AT+.45M +.45M +.45M FIXED SEATING AT +.45M FIXED SEATING AT +.45M FIXED DESCRIPTION DESCRIPTION POSITION POSITION DESCRIPTION POSITION DESCRIPTION POSITION DESCRIPTION LVL LVLFROM FROM FROMFFL FFL FFL LVL FROM FFL LVL LVL FROM FFL 600MM 600MM 600MM PVC TOILETS TOILETS 6,6, 6, 600MMXXXX600MM 600MMPVC PVC600MM XTOILETS TOILETS 600MM 600MM PVC ----6, 600MM1111PVC TOILET TOILET FFL FFL +95.79M +95.79M LVL LVL GRID GRIDCEILING CEILING CEILINGWITH WITH WITH GRID STAFF STAFF TOILETS TOILETS TOILETFFL FFL+95.79M +95.79MLVL LVL FFL +95.79M LVL GRID GRID CEILING WITH STAFF TOILETS project name TOILET TOILET CEILING WITH STAFF TOILETS SILHOUETTE SILHOUETTE GRID GRID WITH WITH ----2222& SSL SSL+95.76M +95.76M +95.76MLVL LVL LVL SSL +95.76M LVL SILHOUETTEGRID GRIDWITH WITH &WITH SSL +95.76M LVL SILHOUETTE && SSL SILHOUETTE1111GRID SHADOW SHADOW CHANNELS CHANNELS ON ON CHANGING CHANGING ROOM ROOM SHADOWCHANNELS CHANNELSON ON CHANGING CHANGING ROOM SHADOW ROOM SHADOW CHANNELS ON THE THE EDGES EDGES THEEDGES EDGES THE EDGES THE
S
SS S S
project project name projectname name project name
TILES
TILE - 01 TOILETS TOILETS TOILETS 600 X 600TOILETS ZURICH1111----6666 GREY FROM EXARO STAFF STAFFTOILETS TOILETS TOILETS STAFF TOILETS STAFF TILE - 02 2,2, 2, 1111----2, 300 X 300 CORSA CHANGING CHANGINGROOM ROOM ROOM CHANGING ROOM CHANGING CREMA
6
D4
D4
D4 D4 D4 D4 S
D4 D4 D4 D4 D4
D4
450
SS S S
2400
D4 D4 D4 D4 S
FALSE FALSECEILING CEILING CEILING FALSE CEILING FALSE
BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING TILES BOTTOM OF FALSE CEILINGTILES BOTTOM TILES TILES AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION TILE TILE----01 01 01 TILE 01 TILE 600 600XXXX600 600 600ZURICH ZURICH ZURICH 600 600 ZURICH 600 GREY GREYFROM FROM FROMEXARO EXARO EXARO GREY FROM EXARO GREY
1200
D4
2400 2400 2400 2400 2400
SS S S
1055 1055 1055 1055 1055 25
450
D4 D4 D4 D4 S
ZURICH GREY (EXARO) 600X600
1200 1200 1200 1200 1200
D4
1055
SS S S
1200 850
4 FULL TILES
2400
2400 2400 2400 2400 2400
FULL TILES 44444FULL FULL TILES FULL FULLTILES TILES TILES 25 25 25 25 25
1200 1200 1200 1200 1200 850 850 850 850 850 450 450 450 450 450
D4 D4 D4 D4
100MM 100MMTHK THK THKBLOCKWORK BLOCKWORK BLOCKWORK 100MM THK BLOCKWORK 100MM THK BLOCKWORK 100MM 150MM 150MMTHK THK THKBLOCKWORK BLOCKWORK BLOCKWORK 150MM THK BLOCKWORK 150MM THK BLOCKWORK 150MM
FALSE FALSECEILING CEILING FALSE CEILING FALSE CEILING FALSE CEILING BOTTOM BOTTOMOF OF OFFALSE FALSE FALSECEILING CEILING CEILING BOTTOM OF FALSE CEILING BOTTOM BOTTOM OF FALSE CEILING AT+2.4M AT+2.4MLVL LVL LVLFROM FROM FROMFFL FFL FFL AT+2.4M LVL FROM FFL AT+2.4M AT+2.4M LVL FROM FFL ZURICH ZURICHGREY GREY ZURICH GREY ZURICH GREY (EXARO) (EXARO)600X600 600X600 600X600 (EXARO) 600X600 (EXARO)
STORE STORE ROOM ROOF LVL STOREROOM ROOMROOF ROOFLVL LVL STORE ROOM ROOF LVL STORE ROOM ROOF LVL AT+3.265M AT+3.265M LVL FROM FFL FFL AT+3.265MLVL LVLFROM FROM FFL AT+3.265M LVL FROM FFL AT+3.265M LVL FROM FFL
DTC Consultants
RED
architecture architecture
PARTICIPANTS MANUAL CAF
SYNERGIES EXHIBITION CAF
Design of the Participants Manual for Portfolio 19 - an exhibition hosted by CAF presenting different portfolios of colleges in Tamil Nadu
The Synergies Exhibition is a travelling exhibit presented by Opolis Mumbai.
THE EXHIBITION LAYOUT
AV1
POSTER DESIGN FOR THE EXHIBITION
DESIGN OWL VIDEO
IMAGE CANOPY
AV2
IMAGES GRID
1
2
AMARAVATI VIDEO
P8b
P8c IMAGE LOBBY
P9a
6
1 3
2 8
SYNERGIES IMAGE CLOISTER
P9c
P4
P1
P11
_OPOLIS 02
ENTRANCE CANOPY
CHILDRENS GALLERY
9
CLOISTERS CONNECTORS
P2
P3
GALLERIES
COURTYARDS LANDSCAPE
4
P8a IMAGE AERIAL TIMELINE
P7
P10
_OPOLIS 01
3
4
10
5 P6
P5
2
5
IMAGE LOUNGE
7
BIHAR GOV VIDEO
P9b
AV3
EXHIBITION LAYOUT PLAN
P9a
P1
P8c
P7
P2
P3
P4
P9c
24 25
1
26
1
ELEVATION 1
2
P5
P6
4
ELEVATION 4
EXHIBITION LAYOUT SCALE 1:100
12
13
14
15
21
2
3
17
18
4
19
ELEVATION 2
3
P10
P8a 20
11
29
27
P11
5
6
7
8
9
10
ELEVATION 3
P8b
22
23
16
30
5
31
32
33
34
35
ELEVATION 5
SYNERGIES IITM RESEARCH PARK, CHENNAI
15-10-2019 _OPOLIS
FURNITURE DESIGN Two pieces of furniture designed for a family of three moving into their new house
THE LITTLE CABINET
SHOERACK
Medium - V-Ray Render Design Stage Designed for a house recently renovated, the little cabinet will occupy a small corner of the living room, for additional storage
Medium - V-Ray Render Design Stage Without any complicated mechanisms and taking the advantage of the wicker trend in the market, the shoerack is designed for a family of three.
PHOTOGRAPHY A compilation of photographs, taken in the last 3 years, of travel and internships
smadhu2361@gmail.com +91 9629556686