EMOC Community Project Presentation and Charrette Office of Planning and Development Department of General Services Montgomery County, Maryland Baker and Associates
June 29, 2009 June 29, 2009
Project Team Montgomery County, Office of Planning and Development David Dise- Director Hamid Omidvar – Chief Rassa Davoodpour – Manager Baker & Design Team Peter Schmidt, AIA, LEED AP – Project Manager Greg Shipley, AIA, LEEP AP – Project Architect Shawn Benjaminson, PE, LEEP AP – Civil Engineer Michele Monde, PE, Environmental John F. Parker, RLA Landscape Architect
June 29, 2009
2
Design Team Organization
June 29, 2009
3
MONTGOMERY COUNTY, MARYLAND PROJECT MANAGEMENT QUALITY ASSURANCE/TECHNICAL REVIEW QC Executive – Nelson Cragg, AIA (Baker)
Principal-in-Charge Carl F. Kemp, AIA (Baker) Project Manager Peter Schmidt, AIA (Baker) Project Director Paul Cook AIA (Baker)
ENGINEERING Structural Mechanical/Plumbing Cindy Ponafala, PE (Adtek) Mel Straus, PE (S3E) Mahendra Shah, PE (Adtek) Jeff Engel, PE, John Frankhouser, PE (Adtek) LEED AP (S3E) Civil Elec/Telecom/IT Shawn Benjaminson, PE, Bhupinder Sohi, PE (EPCM) LEED AP (Adtek) Dave Vancott, PE (EPCM) Ken Ellis, PE (Adtek) Geotechnical Sunny Kim, PE President (Kim Eng.)
PLANNING / ARCHITECTURE Project Architect Greg Shipley, AIA, LEED AP (Baker) Architecture Greg Shipley, AIA, LEED AP (Baker) Architecture Brent Camp, AIA (Baker) Interior Design Carin Kinn, NCIDQ (Baker) Landscape Architecture Oliver Boehm, RLA, LEED AP (Baker) John F. Parker, RLA (Baker) Sustainable Design/LEED Leslie Crowder, LEED AP (Baker)
SPECIALTY DISCIPLINES Survey Planning & Equipment James Afful, President Don Leidy, Principal (MDG) (AULtec) Steve Radomski, AIA, Mark Sagaral, Survey Coord. LEED AP (MDG) (AULtec) John Wellington (MDG) Barry Newton (MDG) Cost Fire/Life Safety/Code/Commissioning Charles Kumi, President (Kumi) Lester Stephens, Chief Cost Jawahar Chaudary, PE (NIKA) Est. (Kumi) Environmental/Wetlands Fueling Systems Michele Monde, PE (Baker) Reb Guthrie (FSD) Cultural Resources Tim Zinn (Baker)
Design Team
June 29, 2009
Baker and Associates / MDG Combined Experience on More Than 350 Similar
Maintenance Facilities for Transit and Municipal Clients Have Successfully Delivered Similar Bus Maintenance Facilities in the DC Area
4
Design Team
June 29, 2009
5
Project Scope
June 29, 2009
EMOC Facility – Casey 7 Proposed Location 200 Bus Capacity
Heavy Equipment Fleet Approximately 110,000 SF
Highway Service Facilities – Casey 6 & R.O.
Proposed Location Salt Storage Covered Equipment Sheds
Materials, Soil & Gravel Storage
6
Project Major Goals
June 29, 2009
Design a functional, state of the art facility Design a Green/Sustainable facility
Design a project that fits best in the fabric of
community Traffic
Sound Pollution Architecture
Deliver the project on time and within budget
7
Schedule Two Projects – Schedule Overview EMOC – Casey 7 Design Complete – June 9, 2010 Construction Complete – January 18, 2012 Highway Services – Casey 6 Design Complete – March 3, 2010 Construction Complete – June 1, 2011
June 29, 2009
8
Design Considerations
June 29, 2009
Sustainable Design – LEED Silver or better Integrated Design Process Environmental and Energy Quality Improvements
Site Constraints Relationship to Surrounding Developments Terrain, Wetlands, Noise & Odor Control Access & Traffic (Equipment, Automobile, Pedestrian)
Aesthetic Considerations Visibility Washington Grove
9
Sustainable/ Green Design
June 29, 2009
Site Planning to Maximize Natural Resources Minimize Footprint
Stormwater Management
Facility and Site Design Less Dependence on Fossil Fuel Energy
Sources Conserve Water Resources Operational Efficiencies
Minimize Impact to Community Healthy and High Performance Workspaces
10
Casey 7, Casey 6 and Roberts Oxygen Sites
June 29, 2009
11
Roberts Oxygen – Aerial Photo
June 29, 2009
12
Sector Plan
June 29, 2009
13
Zoning
June 29, 2009
14
Transportation
June 29, 2009
15
Environmental
June 29, 2009
16
Site Area
June 29, 2009
17
Setbacks
June 29, 2009
18
Site Elevation
June 29, 2009
19
Site Slope Analysis
June 29, 2009
20
Site Aspect
June 29, 2009
21
June 29, 2009
Proposed Site Allocation Washington Grove
Highway Services - Laydown Area - Intermittent Use & Movements
Highway Services
Roberts Oxygen
- Salt Storage -Covered Equipment -Materials / Soil / Gravel
CASEY 6
State Hwy
EMOC Facility -200 Buses -Heavy Equipment Fleet -Employee Parking -Fleet, Transit & Hwy. Offices
CASEY 7
22
June 29, 2009
Pedestrian Linkage Washington Grove
Pedestrian Walkway
Roberts Oxygen
Potential Access Road to Roberts Oxygen
Buffer CASEY 6
CASEY 7
23
Potential Elevation
June 29, 2009
24
Discussion
June 29, 2009
25