1 minute read
SITE PHASING
Removed site infrastructures, such as lamposts and bollards, are to be reused elsewhere within the new civic functions of the proposed scheme.
Advertisement
Transplantation of specific trees.
Asphalt removed to be used within gabion-carts in the construction of the material library.
A total of one building is demolished in order to enable lorry access to the recalibrated lorry route.
Any paving removed to be used within gabion-carts in the construction of my project.
Paving is added around the lorry circulation space for staff to commute across schemes, as well as in the market square.