Seattle Nordic heritage Museum
02
Detroit Urban Agriculture Center
03
Yakima Urban Winery
1
Public Architecture
01
Seattle Net-Zero Nordic Heritage Museum with Professors GZ Brown and John Rowell Site: Brownfield site along the shipping canal in the Ballard Neighborhood of Seattle Programs: ArchiCAD, Artlantis, Indesign, Illustrator, Photoshop, hand-built models
Circulation and Mechanical
64,000 ft 2
2
Circulation + Mechanical
Gathering
Lobby + Retail + Cafe
Facilities
Education
Library
Operations
Temporary Galleries
Collection Storage + Preparation
Permanent Collection Galleries
49,000 ft 2
existing museum
Mechanical Circulation and Mechanical
49,000 ft
existing museum
Lobby Retail Cafe Gathering Education Facilities Operations Library Collection Storage and Preparation
64,000 ft 2
new museum Gallery Hallway from Entry Lobby
Temporary Galleries Permanent Collection Galleries
new museum
Seattle, Washington
Copenhagen, Denmark
Stockholm, Sweden
F i v e Elements o f N o r d i c
stone
wood
light
heat
C u l t u re
I began this project with a reflection on Nordic culture. As much as it is a heritage museum in Seattle, it has to represent the Nordic people and their immigration journey to America. I kept coming back to the same premise: that their culture began by coping with the elements they were given: stone, ice, fire, wood, and light. I further thought about the formation of both the nordic countries and Seattle, by glacial carving. This building is a manifestation of the four elements in a form shaped by wind erosion and glacial carving of the strata that compose the earth.
ice
Circulation
Transition
Circulation
Transition
Community
Museum
Storage
[Public]
[Semi-Public]
[Private]
Residential Neighborhood
30’ Low Rise Residential Height Limit
West Context Elevation
NW Market Street
65’ Industrial Buffer Zone Height Limit 40’ Low Rise Residential Height Limit
Circulation
Transitio
Transiti
Circulation
Community
Museum
Storage
[Public]
[Semi-Public]
[Private]
Nordic Heritage Museum
Burke Gilman Trail
Working Industrial Waterfront
Ballard Locks and Gardens
Salmon Habitat
Bus Stop
Outdoor Theatre
Parking Garage Entry
Living Machine Wetlands
Loading Dock Sculpture Garden Bioswale lma Burke Gi
n Trail
The buliding is conceived of as strata of earth, pierced by three glaciers that serve as the circulation and transition space between the elements of the program. The three masses move across the site from the Public (community) to Private (Storage). The west side of the site is the park allowing for both a pedestrian connection through the site to the water, and a greenspace with living machine wetlands serving as a demonstration of water management for the community.
North Entry from NW Market Street
PRES SECOND FLOOR PLAN SCALE: 1:256
Outdoor Theatre
Living Machine Wetlands
Living Machine Lobby
Temporary Exhibit Gallery
Auditorium
Store
Back of House Shipping and Receiving
Entry Lobby Cafe
2
Dream of America Exhibit
Parking Garage Entry Loading Dock
OPERABLE SKYLIGHT NORTH FACING CLERESTORY
LOUVERS
For stack ventilation
Mitigates direct light in circulation spaces
Gallery toplighting
PHOTOVOLTAIC PANELS Energy production
RAINWATER COLLECTION
Large gutters maximize collection from the whole roof
THERMAL MASS
Reduces diurnal temperature swings
DAYLIT OPEN OFFICE Promotes interaction and saves energy
BELOW GRADE PARKING
Allows for more green space at grade
RAIN WATER CISTERNS
and Living Machine Mechanical Space
CHANNEL GLASS
Clerestory providing diffuse light into gallery spaces
0’
10’
20’
30’
40’
45,000 kWh
10000 Gal
35,000 kWh
2000 Gal
2000 Gal 3000 Gal
PV Energy Production
4000 Gal
29,150 kWh Avg
25,000 kWh
January February March April May June July August September October November December
Supplied by Water Cistern
Bldg Use
6000 Gal
January February March April May June July August September October November December
Blg Use Rainwater Collection
8000 Gal
Dream of America Gallery
July
Supplied by Water Cistern
35,000 ft² Photovoltaic Panels produces
Around the World
Can power an Electric Mini Cooper
15,000 kWh
5,000 kWh
159,000 miles
349,600 kWh/year
20,000 kWh
The central glacier is the entry lobby, with the main ciruclation branching from it towards the auditorium and the galleries. The Dream of America Gallery is on the first floor, ideally placed for the 10,000+ school children who visit it every year. The main structure is heavy timber, and the ceilings are tongue and groove, adding warmth to the white gallery walls. The roof is covered with solar panels, providing 349,000kWh of power, and the ability to support an EUI of 18.6 kBtu/sf/yr.
6.3x
02
Detroit Urban Agriculture Center with Professor Melinda Nettles
Site: Retired Detroit Tigers Stadium site in the Corktown Neighborhood, currently maintained by people in the community, it serves as a major community gathering point in an otherwise desolate place Programs: ArchiCAD, Artlantis, Indesign, Illustrator, Photoshop
Education Building as an intersection between two landscapes, original meadows and futuristic aquaponics
Site Narrative: A Journey through Historical Landscapes
The Education Building lies at an intersection between landscapes. It strives to explore a new typology of building integration in the landscape in which the modern Aquaponic Landscape and the Original Meadow Landscape of Detroit come together.
The program is from the NOMA competition, to create a new Urban Agriculture hub on this brownfield site. There is currently a lot of urban agriculture in Detroit, but there are not many resources for the larger community for techniques, sharing of equipment, and new technologies in farming. I began this project by thinking about the context of the site and the site narrative. With the mix of agriculture and industry in Detroit, I decided the narrative would be a journey through the history of agriculture. Counter clockwise around the site, beginning on the Southeast main entry corner, (1) there are open fields, which progress into (2) strip farming inspired by farming along the Detroit river, then into (3) landscape restoration and outdoor urban agriculture, and finally into (4) indoor farming and the aquaponic greenhouse.
The greenhouses are pyramidal, reminiscent of the pyramids of Egypt. They are designed as temples to the modern agriculture process. In Detroit the winters are brutal, making outdoor farming nearly impossible year round. However, with indoor farming and aquaponics, year-round food production is possible. The education building is at the intersection of the new and old landscapes, and is where the community programs and research are based. This building is embedded in the landscape, intersecting it in different ways then the other buildings on the site.
ape
dsc
Lan
Living Roof RECY
CO
MPO
CLIN
ST
Impermeable Membrane
G
OUT DO OR RA GE YARD
WO
STO
OD
3/4" Tongue and Groove
SHO
P
Steel C-Channel Header 2" Rigid Insulation URBA
Cellulose Insulation
N FA
RM
Metal Studs Interior Gyp Bd STO
RM WAT PO ND ER
Exterior Glass, Painted Black Water Wall ST WA E
TER WA
Concrete Floor Slab
Corten Steel Panel Air Gap
GRE
ENHO
USES
2" Rigid Insulation Steel Stud Structure OFF
ICE
GY
ENER GAL
LERY
CLAS
SRO
OM CO STO
RA
GE
FO OD ER SEED VING ING /
PRES
MM MEE UNITY TIN G
EXHI
BIT
LECT
SUNS
PACE
URE
CA
FE
SUNS
PACE
Corten Steel Panel
#DrgID #LayID
#DrgID #LayID Classroom Food Processing Classroom [Open to Below] Classroom Food Processing Classroom [Open to Below]
#DrgID #LayID
Classroom
#DrgID #LayID
Classroom
Classroom
Classroom
Classroom
Classroom
GREENHOUSES
#DrgID #LayID
GREENHOUSES +8'-8 1/2"
BATH
#DrgID #LayID
#DrgID #LayID
Theatre
+8'-8 1/2"
BATH
UP
COMMUNITY MEETING ROOM
#DrgID #LayID
Theatre
#DrgID #LayID
UP
COMMUNITY MEETING ROOM Classroom Food Processing Classroom
Market
#DrgID #LayID
Market
#DrgID #LayID
COMMUNITY MEETING ROOM
COMMUNITY MEETING ROOM
COMMUNITY MEETING ROOM
Classroom Food Processing Classroom
#DrgID #LayID
STORAGE/ MECH
COMMUNITY MEETING ROOM
SUNSPACE STORAGE/ MECH
BATH
SUNSPACE
SUNSPACE
BATH
Garden Classroom Local Business
Mech
Local Business
Local Business Mech
Garden Classroom
SUNSPACE Cafe Storage
Storage
Storage
Storage
Local Business
Cafe
#DrgID #LayID
#DrgID #LayID
MAIN LEVEL FLOOR PLAN
1
MAIN LEVEL FLOOR PLAN
1
SCALE: 1/16" =
The education building has three landscape courtyards, two as fingers intersection the building, and one as a vertical garden in the center. The black panels on the East, West, and South facade of the education building are water walls integrated with the window system, which in this climate work perfectly to absorb the heat on cold winter days and re-radiate it back into the classroom and research spaces behind.
SCALE: 1/16" =
1'-0"
1'-0"
03
Yakima Urban Winery with Professor Dan Stettler
Site: decommissioned sawmill site in an under utilized part of Yakima Programs: Sketch-up, V-Ray, Indesign, Illustrator, Photoshop, hand-built and laser cut models
The project was about thinking about a multitude of scales, from the urban site program to the wall section of the building. Over the course of the term we spent 1 week on site and precedents, 2 weeks on the urban design, 4 weeks on the building design, and 1 week on the wall section development before bringing everything together for the final presentation. The site is about creating a connection through the site, connection the residential neighborhood to the new commercial development area. The scale of the streets off of the plaza are small, modeled after pedestrian streets in Italian hillside towns, with low-rise mixed use developments to infuse residents into the new commercial area.
The winery building is organize around a central exterior courtyard at which point the solid, rammed earth production areas intersect the light wood frame and glass public spaces. From the courtyard, visitors can look down into the barrel storage area, as well as into in the fermentation and grape pressing areas. The private tasting room hovers above the barrels as a glass room inside the solid volume. The simple plan allows the spaces to be adaptable to changes and future needs of the winery. The production areas are composed of insulated rammed earth walls, from on-site ground that was removed for the spaces to be below grade.
04
Martis Camp Residence
05
The Piper Residence
05
Oregon BILDS
2
Housing
04
Martis Camp Residence with Kelly and Stone Architects Site: single family home site in Placer County, CA
Programs: ArchiCAD, Permit and Construction Document Sets
SO D
PLAN NOTES:
D
1. THE CONDITIONS OF APPROVAL AND THE CC&R'S FOR THE PROJECT SHALL EXPLICITLY FORBID THE INSTALLATION OF ANY NON-EPA PHASE 2 CERTIFIED WOOD BURNING DEVICES OR MASONRY FIREPLACES THAT DO NOT HAVE A UL APPROVED DECORATIVE GAS BURNING
15
4
20
131
8
3
EXISTING GRADE SHOWN AS DASHED
ELEC METER
130
18
16
ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, DOOR CLADDIGN TO MATCH COLOR AND PATTERN OF ADJACENT METAL PANEL
EL 6048' T.O. CAP
21'-4 1/2
EXISTING GRADE 9'-0 SHOWN AS DASHED
CUSTOM STEEL CHIMNEY SHROUD
PROPOSED 7'-4 GRADE
5'-6
EL 6045.25' T.O. RIDGE
9'-7 1/2
EL 6044.25' T.O. RIDGE
11'-4 1/2
19
7
115
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
1
9
120
BATTER 1/2 PER FT
9'-0
5'-6
7'-4
9'-7 1/2
CHIMNEY CURB AND FLASHING AS REQ'D
14
6
5
11
10
14'-0
2 2
206
EL 6035' T.O. RIDGE
133
101
0
1'-0
131
SCALE: 3/16 =
0
1'-0
128
127
120
115
15
4
20
8
3
18
16
19
EL 6048' T.O. CAP
EXISTING GRADE
7
1 SHOWN AS DASHED
6
5'-6
5
11
7'-4
10
2
9'-7 1/2
11'-4 1/2
1
2
4
BATTER 1/2 PER FT
17
18
11
4
3
7
2
5
20
8
1
16
15
EL 6047' T.O. CAP 207 EL 6048' T.O. CAP
CUSTOM STEEL CHIMNEY SURROUND
6
14
10
12
9
101
101
4 5
EL 6045.25 T.O. RIDGE
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
132
8 4 3 9
107'-6 T.O. CAP
6
119 131
ELEC METER
130
128
127
120
115
208
17 EXISTING GRADE SHOWN AS DASHED
105 21'-4 1/2
9'-0
18
11
4
3
7
PROPOSED GRADE
209
2
20
8
1
16
9'-7 1/2
11'-4 1/2
14'-0
14
100'-0 (E 12 L 6020') MAIN LEVEL T.O. PLY
10
EL 6045.5 T.O. RIDGE
2
128SCALE: 3/16 =
1'-0
0
4'
8'
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
8'
5
7
4
EXISTING GRADE VENEER 6" DRYSTACK STONE
5
CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR APP'D EQUIVALENT
12'
127
HORIZONTAL WOOD SIDING, SPECIES TBD
7
GRADE PAINTED METALEXISTING CLAD WOOD WINDOWS, TYP. TEMPERED 100'-0 (E L 6020') SHOWN AS DASHED GLAZING AS REQ' D BY CODE, MAX AVG AS MAIN LEVEL T.O. U-FACTOR PLY REQ'D PER TITLE 24
9
METAL WRAPPED FASCIA W/ METAL DRIP EDGE FLASHING 111'-0 (EL 6031') TO MATCH METAL ROOFING UPPER LEVEL T.O. PLY
A3.1 ELEVATIONS : Printed on 2/24/2014 at 9:03 AM
2
5
20
8
1
16
13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS
15
6
14
10
12
0
SCALE: 3/16 =
1'-0
9
14 2X2 SQ WINDOW TRIM AT VERTICAL 4' STEEL WRAPPED 8' 12' SIDING 100'-0 (E L 6020') 0 4' 8' 12' MAIN LEVEL T.O. PLY 15 BOARD FORMED CONCRETE SITE WALLS W/ 8 BOARDS AND 1/2 GAPS (SAMPLE REQ'D FOR OWNER/ARCHITECT APPROVAL PRIOR TO EXCAVATION)
C
16 VENEERED BOARD FORMED WALLS AT ENTRY 17 STEEL COLUMNS PER STRUCTURAL
EL 6048' T.O. CAP EL 6045.25 T.O. RIDGE
1
19 CORNER TRIM AT HORIZONTAL WOOD SIDING SOUTH ELEVATION 20 BREAK METAL TRIM AT WINDOW WALLS
SCALE: 3/16 =
1'-0
0
4'
8'
12'
ISSUE:
DATE:
PROGRESS SET CONCEPTUAL SUBMITTAL PROGRESS & ENGINEERING PROPOSAL SET
208 209
PRELIMINARY SUBMITTAL 104
11.07.2013 11.15.2013 12.16.2013
12.19.2013
103
111'-0 (EL 6031') UPPER LEVEL T.O. PLY EL 6029.5' T.O. PLATE
129
128
127
A3.1 ELEVATIONS : Printed on 2/24/2014 at 9:03 AM
EXISTING GRADE SHOWN AS DASHED
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
BATTER FIREPLACE 1/2 PER FT
PROJECT NUMBER:
#Pln
SHEET TITLE: ELEVATIONS SHEET NUMBER:
1
SOUTH ELEVATION SCALE: 3/16 =
1'-0
0
4'
8'
A3.1
12'
1'-6 118
1'-6
14'-0
128
4'-0 4'-0
115 130 8'-6
121 130
122 6'-1 131 4'-5
7'-47'-4
SLOPE
2'-0
2'-0
SLOPE
SLOPE
4'-0 MIN.
78'78' -2 1/2 -2 1/2
3'-8
SLOPE
2'-0
2'-0
124
5'-5'6-6 133
HIGH WINDOW
HIGH WINDOW
103
21'-0 21'-0
4'-1 1/2
124 123
123
9'-2
11'-5 1/2
3'-8
132
0 9'-0
101
UP 3 EQ. EQ. RISERS RISERS
123
103
102
101
DN 3 EQ. RISERS
2'-2
14'-0
10'-0
119
124
CD
CD
7'-3 1'-10
4'-1 1/2
CARPET WOOD
R/S
121
CLOS.
121
R/S
CLOS.
DESK
4'-5
120
120
7'-9 1/2
DN 3 EQ. RISERS
10'-0
127
117
TILE
14'-0
R/S
6'-7
1'-10
114
114
HE AR TH +12
117
1'-6
7'-3 1/2
7'-3 1/2
7'-4 1/2
1'-6
18 EXPOSED STEEL BEAMS PER STRUCTURAL EL 6045.5 T.O. RIDGE
105
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
with K
21'-4 1/21/2 21'-4
13'-7 101
12.19.2013
DATE:
SHEET TITLE:
PRELIMINARY SUBMITTAL
12.19.2013
#Pln
ELEVATIONS
12'-6 1/2
A2.1 A2.1
11'-0
12'-6 1/2
A3.1 #Pln
SHEET TITLE:
ELEVATIONS SHEET NUMBER: C COPYRIGHT
J
H
C
K
J
K
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
COPYRIGHT KS|a INC. DO YOUR PART C COPYRIGHT PLEASE RECYCLE KS|a INC.
DO YOUR PART PLEASE RECYCLE
2 4
20
8
5
3
1
18
16
ELEVATION NOTES:
7
1
EL 6046.25 T.O. RIDGE
EL 6045.25' T.O. RIDGE
EL 6044.25' T.O. RIDGE
3 19
9
14
6
5
11
CUSTOM STEEL CHIMNEY SHROUD
10
2
EL 6044.25' T.O. RIDGE
A3.1
1. ALL EXTERIOR MATERIALS TO COMPLY WITH 2010 CRC SECTI
2. ALL EXPOSED MECHANICAL AND PLUMBING VENTING LOCA BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTAL SPRINGS, ANDSTEAMBOAT PAINTED A COLORArchitecture THAT COMPLEMENTS THE SURROUND COLORADO MATERIAL (ROOF/SIDING). Planning LAKE TAHOE,
EL 6045' T.O. RIDGE
Strategy
Interiors 3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST O www.ksaarch.com FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF 855.415.4093 MATERIALS. CALIFORNIA
EL 6045.5' T.O. RIDGE
EL 6045.25' T.O. RIDGE
Kelly &MUST Stone Architects, Inc. GLAZING THAT PROJEC 4. SKYLIGHTS HAVE TINTED, FLAT ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL. FR SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PR THE LEAST CONTRAST POSSIBLE REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
to collab
5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MAS BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SP CANNOT PASS THROUGH THE OPENING.
204 REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
207
206
6) ADDRESS NUMBERS TO BE MIN 4 IN HEIGHT, ILLUMINATE AT N MUST MEET CRCR319.1 111'-0 (EL 6031') UPPER LEVEL T.O. PLY
133
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
132
8 4 3 9
101
9) GAS METER TO CONFORM TO ALL SOUTHWEST GAS SNOWL REQ'S. FOOTINGS FOR GAS METER NOT TO BE SONOTUBE PE MARTIS CAMP REQ'S
119 131
130
the 3D m
ELEC METER 128
127
120
** SOLID SAWN TOUNGE & GROOVE (1/8 SQ EDGE REVEAL) WOO SIDING W/ NO THROUGH HOLES OR LOOSE KNOTS, INSTALLE STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN ACCORDANCE WITH THE WUI PRODUCTS GUIDE DATED JULY
115
100'-0 (E L 6020') MAIN LEVEL T.O. PLY EXISTING GRADE SHOWN AS DASHED
ELECTRIC METER CLOSET TO CONFORM TO LIBERTY PROPOSED REQ'S, DOOR CLADDIGN TO MATCH COLOR AND GRADEPATTERN OF ADJACENT METAL PANEL
EXISTING GRADE SHOWN AS DASHED
9'-0
21'-4 1/2
on the p
7) ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, D CLADDING TO MATCH COLOR AND PATTERN OF ADJACENT M PANEL 8) TRASH ROOM TO MEET ALL PALCER COUNTY REQUIRMENTS
8 4 3 9
101
5'-6
7'-4
9'-0
9'-7 1/2 7'-4
5'-6
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
TRASH ROOM TO MEET ALL PLACER COUNTY REQ'S
9'-711'-4 1/2 1/2
11'-4 1/2
14'-0
2
EAST ELEVATION EAST ELEVATION
2
SCALE: 3/16 =
0 3/16 = 4' 1'-0 1'-0 SCALE:
08'
12' 4'
8'
SQ EDGE 6 SHIP LAP VERTICAL BARN WOOD SIDING W/ 1/4 REVEALS
2
BLACKENED HEAT PATINA STEEL PANEL CLADDING W/ 1/2 SQUARE HEAD EXPOSED FASTNERS W/ NEOPRENE WASHERS
3
4" CAST CONCRETE CAP AT STONE VENEER (U.O.N)
4
6" DRYSTACK STONE VENEER
5
CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR APP'D EQUIVALENT
12'
6
HORIZONTAL WOOD SIDING, SPECIES TBD
7
PAINTED METAL CLAD WOOD WINDOWS, TYP. TEMPERED GLAZING AS REQ'D BY CODE, MAX AVG U-FACTOR AS REQ'D PER TITLE 24
ELEVATION NOTES: 1. ALL EXTERIOR MATERIALS TO COMPLY WITH 2010 CRC SECTION 5327 2. ALL EXPOSED MECHANICAL AND PLUMBING VENTING LOCATIONS TO BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING MATERIAL (ROOF/SIDING).
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
8 2X STAINED CLEAR CEDAR FASCIA W/ METAL DRIP EDGE FLASHING TO MATCH METAL ROOFING 9
4. SKYLIGHTS MUST HAVE TINTED, FLAT GLAZING THAT PROJECTS ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL. FRAMES SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE THE LEAST CONTRAST POSSIBLE
17
3
18
11
1
4
3
7
2
2
5
20 5
4
8
1
16
15
6
14
10
12
9
EL 6048' T.O. CAP
104
13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS 14 2X2 STEEL WRAPPED SQ WINDOW TRIM AT VERTICAL SIDING 15 BOARD FORMED CONCRETE SITE WALLS W/ 8 BOARDS AND 1/2 GAPS (SAMPLE REQ'D FOR OWNER/ARCHITECT APPROVAL PRIOR TO EXCAVATION)
EL 6046.25 T.O. RIDGE
EL 6045.5 T.O. RIDGE
EL 6045.25 T.O. RIDGE
EL 6045.25 T.O. RIDGE
1
VERTICAL WOOD SIDING
17 STEEL COLUMNS PER STRUCTURAL
2
METAL PANEL
18 EXPOSED STEEL BEAMS PER STRUCTURAL
BOARD FORM CONCRETE
19 CORNER TRIM AT HORIZONTAL WOOD SIDING
3
20 BREAK METAL TRIM AT WINDOW WALLS
4
STONE VENEER
5
COMPOSITE SHINGLE ROOF
ISSUE:
6
HORIZONTAL WOOD SIDING
PROGRESS SET CONCEPTUAL SUBMITTAL PROGRESS & ENGINEERING PROPOSAL SET
208
105
METAL RIDGE CAP TO MATCH METAL ROOFING
12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT
16 VENEERED BOARD FORMED WALLS AT ENTRY
CUSTOM STEEL CHIMNEY SURROUND
EL 6047' T.O. CAP
5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOT PASS THROUGH THE OPENING.
METAL WRAPPED FASCIA W/ METAL DRIP EDGE FLASHING TO MATCH METAL ROOFING
10 HEAVY TIMBER BEAM W/ CAP FLASHING PER DETAIL 11
3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST OCCUR FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF MATERIALS.
documen
1
14'-0
KS|a INC. DO YOUR PART PLEASE RECYCLE
C
#Pln
11'-0
H
G
21'-4 1/2
PROJECT NUMBER:
#Pln
SHEET MAIN TITLE: LEVEL FLOOR PLANFLOOR MAIN LEVEL PLAN SHEET NUMBER: SHEET NUMBER:
Camp D
METAL CRICKET TO
PROGRESS 11.07.2013 SET CONCEPTUAL 11.15.2013 SUBMITTAL PROGRESS & 12.16.2013 PROJECT NUMBER: ENGINEERING PROPOSAL SET
DATE: DATE:
PROGRESS PROGRESS 11.07.2013 11.07.2013 SET SET CONCEPTUAL 11.15.2013 CONCEPTUAL 11.15.2013 SUBMITTAL SUBMITTAL PROGRESS & 12.16.2013 PROGRESS & 12.16.2013 ENGINEERING ENGINEERING PROPOSAL SET SET PROPOSAL
209
C
ISSUE:ISSUE:
Site: Sing
PROGRESS BATTER 1/2 11.07.2013 PER FT SET CONCEPTUAL 11.15.2013 CHIMNEY CURB AND FLASHING AS SUBMITTAL REQ'D PROGRESS & 12.16.2013 EL 6035' ENGINEERING RIDGE PROPOSALT.O. SET
SHEET NUMBER:
A3.1
EXISTING GRADE SHOWN AS DASHED
37'-0
13'-5 1/2
F74'-9 1/2 G
15
SHEET NUMBER:
METAL RIDGE CAP TO MATCH METAL ROOFING
12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT
CUSTOM STEEL CHIMNEY SURROUND
#Pln
ELEVATIONS
S.F.S.F.
13
13'-5 1/274'-9 1/2
F
MATCH METAL ROOFING ISSUE: DATE:
107'-6 ISSUE:T.O. CAP
SHEET TITLE:
127
1 1
BATTER FIREPLACE 1/2 PER FT
7
4'-9
PROJECT NUMBER:
4881 4881
SHEETPROJECT TITLE: NUMBER:
4'-1
A3.1
19 CORNER TRIM AT HORIZONTAL WOOD SIDING
100'-0 (E L 6020') MAIN FASCIA LEVEL W/ T.O.METAL PLY DRIP EDGE 8 2X STAINED CLEAR CEDAR FLASHING TO MATCH METAL ROOFING
TOTALFINISHED FINISHED TOTAL
37'-0
Interiors
18 EXPOSED STEEL BEAMS PER STRUCTURAL
20 BREAK METAL TRIM AT WINDOW WALLS
1629 S.F.S.F. 1629
1 A4.2
103'-6 T.O. WALL 104'-8 T.O. WALL
E Architecture 2 Planning
CALIFORNIA
PRELIMINARY SUBMITTAL
17 STEEL COLUMNS PER STRUCTURAL
EL 6029.5'
3
2'-11
16 VENEERED BOARD FORMED WALLS AT ENTRY
SHOWN AS DASHED
6
11
4
DATE:
SUBMITTAL
SQ EDGE 6 SHIP LAP VERTICAL BARN WOOD SIDING W/ 1/4 REVEALS
SEE CIVIL FOR PLANTER ELEVATION
4'-1
CUSTOM STEEL CHIMNEY SHROUD
10 HEAVY TIMBER BEAM W/ CAP FLASHING PER DETAIL BATTER 1/2
PROGRESS 11.07.2013PER FT 20 BREAK METAL TRIM AT WINDOW WALLS 8) TRASH ROOM TO MEET ALL PALCER COUNTY REQUIRMENTS 11 METAL RIDGE SET CAP TO MATCH METAL ROOFING 9) GAS METER TO CONFORM TO ALL SOUTHWEST GAS SNOWLOAD 12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT CONCEPTUAL 11.15.2013 REQ'S. FOOTINGS FOR GAS METER NOT TO BE SONOTUBE PER SUBMITTAL MARTIS CAMP REQ'S 13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS PROGRESS & 12.16.2013 ** SOLID SAWN TOUNGE & GROOVE (1/8 SQ EDGE REVEAL) WOOD 14 2X2 STEEL WRAPPED SQ WINDOW TRIM AT VERTICAL ENGINEERING SIDING W/ NO THROUGH HOLES OR LOOSE KNOTS, INSTALLED OVER SIDING STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN PROPOSAL SET EL 6035' ACCORDANCE WITH THE WUI PRODUCTS GUIDE DATED JULY 11, 2011
3252 S.F.S.F. 3252 888 S.F.S.F. 888
UPPERLEVEL LEVELFINISHED FINISHED UPPER
13
EL 6048' T.O. CAP
T.O. CAP
METAL WRAPPED FASCIA W/ METAL DRIP EDGE FLASHING TO MATCH METAL ROOFING
ISSUE:WOOD SIDING CORNER TRIM AT HORIZONTAL
HORIZONTAL WOOD SIDING
10 HEAVY TIMBER BEAMT.O. W/PLATE CAP FLASHING PER DETAIL
11
2'-6
REQ'D PER TITLE 24
FLASHING TO MATCH METAL ROOFING
EXPOSED STEEL BEAMS PER STRUCTURAL
15 BOARD FORMED CONCRETE SITE WALLS W/ 8 T.O. BOARDS RIDGE AND 1/2 GAPSPRELIMINARY (SAMPLE REQ'D FOR OWNER/ARCHITECT 12.19.2013 APPROVAL PRIOR TO EXCAVATION)
208
128
PAINTED METAL CLAD WOOD WINDOWS, TYP. TEMPERED
GLAZINGFORMED AS REQ'D BY CODE,AT MAX AVG U-FACTOR AS VENEERED BOARD WALLS ENTRY EL 6047'
9
PLANTER
103 ABV
4
CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR
www.ksaarch.com 855.415.4093
17 STEEL COLUMNS PER CLEAR STRUCTURAL 8 2X STAINED CEDAR FASCIA W/ METAL DRIP EDGE
SOUTH ELEVATION ELEVATION SCALE:SOUTH 3/16 = 1'-0
18
1 A4.1LAKE TAHOE,
E
APP'D EQUIVALENT 15 BOARD FORMED CONCRETE SITE WALLS W/ 8 BOARDS AND 1/2 GAPS (SAMPLE REQ' FOR OWNER/ARCHITECT Kelly Stone Architects, Inc.D 6 & HORIZONTAL WOOD SIDING, SPECIES TBD APPROVAL PRIOR TO EXCAVATION)
PANEL 5)METAL AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER 16 BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOTFORM PASS THROUGH THE OPENING. BOARD CONCRETE
2 A4.1
MAINLEVEL LEVELFINISHED FINISHED MAIN GARAGE/STORAGE GARAGE/STORAGE
PROJECT NUMBER:
www.ksaarch.com 855.415.4093 2 A3.1 Kelly & Stone Architects, Inc.
CLADDING TO MATCH COLOR AND PATTERN OF ADJACENT METAL
111'-0 (EL 6031') 2 BLACKENED HEAT PATINA CLADDING W/ 1/2 UPPERSTEEL LEVELPANEL T.O. PLY SQUARE HEAD EXPOSED FASTNERS W/ NEOPRENE EL 6029.5' WASHERS 111'-0 (EL 6031') T.O. PLATE UPPER LEVEL T.O. PLY EL 6029.5' 3 4" CAST CONCRETE CAP AT STONE VENEER (U.O.N) T.O. PLATE
103
129
17
1'-2 2'-0
HORIZONTAL WOOD SIDING, SPECIES TBD PANEL
6) ADDRESS NUMBERS TO BE MIN 4 IN HEIGHT, ILLUMINATE AT NIGHT, STONE VENEER MUST MEET CRCR319.1 18
209
104
3'-0
DW
7'-2 1/2
MUST MEET CRCR319.1 CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR APP'D EQUIVALENT 7) ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, DOOR
6
7)COMPOSITE ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, DOOR SHINGLE ROOF CLADDING TO MATCH COLOR AND PATTERN OF ADJACENT METAL 19 PANEL
1
BATTER FIREPLACE 1/2 PER FT 105
DW
111
5 12'
12' 12'
SUBMITTAL
13'-8 STEAMBOAT SPRINGS, COLORADO
BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOT PASS THROUGH THE OPENING.
9
EL 6045.25 T.O. RIDGE
EAST ELEVATION
BATTER FIREPLACE 1/2 PER FT
A3.1 ELEVATIONS : Printed on 2/24/2014 at 9:03 AM
6
EL 6048' T.O. CAP
103 7'-4
129
A3.1 ELEVATIONS : Printed on 1/3/2014 at 4:34 PM
15
CUSTOM STEEL CHIMNEY SURROUND
104 5'-6
5
6" DRYSTACK STONE VENEER
a
8'
PRELIMINARY 12.19.2013 PRELIMINARY 12.19.2013 SUBMITTAL
BATTER 1/2 PER FT ON SOUTH AND WEST FACES OF13'-8 CHIMENY
29'-3
6) ADDRESS NUMBERS TO BE MIN 4 IN HEIGHT, ILLUMINATE AT NIGHT,
4'
3 EL 6045.25 T.O. RIDGE
EL 6045.5 T.O. RIDGE
4
a
4'
TV NICHE
8' 12' ABOVE PRACTICAL. FRAMES SCALE: 3/16 = THE 1'-0 ROOF0PLANE THE4' LEAST AMOUNT SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE 1 VERTICAL WOOD SIDING THE LEAST CONTRAST POSSIBLE
206
133
104 ABV
TRASHCLAD ROOM TO MEET WINDOWS, ALL PALCER COUNTY REQUIRMENTS 1. ALL EXTERIOR MATERIALS TO COMPLY WITH 2010 CRC SECTION 7 PAINTED 8)METAL WOOD TYP. TEMPERED 5327 GLAZING9)AS REQ' D BY MAX U-FACTOR GAS AS SNOWLOAD 119 GAS METER TOCODE, CONFORM TOAVG ALL SOUTHWEST REQ'D PER TITLE REQ'S. 24 FOOTINGS FOR GAS METER NOT TO BE SONOTUBE PER 2. ALL EXPOSED MECHANICAL AND PLUMBING VENTING LOCATIONS MARTIS CAMP REQ'S 8 2X STAINED CLEAR CEDAR FASCIA W/ METAL DRIP EDGE TO BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION SAWN TOUNGE & GROOVE (1/8 SQ EDGE REVEAL) WOOD FLASHING** SOLID TO MATCH METAL ROOFING AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING SIDING W/ NO THROUGH HOLES OR LOOSE KNOTS, INSTALLED OVER MATERIAL (ROOF/SIDING). STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN ACCORDANCE WITH WUI PRODUCTS GUIDE DATED JULY 11, 2011 9 METAL WRAPPED FASCIA W/THE METAL DRIP EDGE FLASHING MATCH METAL ROOFING 3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST TO OCCUR 100'-0 (E L 6020')OF MATERIALS. FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING MAIN LEVEL T.O. PLY 10 HEAVY TIMBER BEAM W/ CAP FLASHING PER DETAIL ELEVATION NOTES: 1 SQ EDGE 6 SHIP LAP VERTICAL BARN WOOD SIDING W/ 1/4 REVEALS 4. SKYLIGHTS MUST HAVE TO TINTED, FLAT THAT PROJECTS 1. ALL EXTERIOR MATERIALS COMPLY WITHGLAZING 2010 CRC SECTION 5327 METAL RIDGE CAP TO MATCH METAL ROOFING ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL.11FRAMES 2 BLACKENED HEAT PATINA STEEL PANEL CLADDING W/ 1/2 2. ALL EXPOSED MECHANICAL VENTINGSO LOCATIONS SHALL COMPLIMENT THE HUEAND OFPLUMBING THE ROOFING, AS TO TO PROVIDE SQUARE HEAD EXPOSED FASTNERS W/ NEOPRENE 12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT BE APPROVED BY ARCHITECTURAL WASHERS THE LEAST CONTRAST POSSIBLE REVIEW PRIOR TO INSTALLATION
2
EL 6046.25 T.O. RIDGE
5) AWNING WINDOWS AT GREAT ROOM WINDOW 4" CAST CONCRETE CAP AT STONE VENEER (U.O.N)103 AND MASTER
12'
EAST ELEVATION 4. SKYLIGHTS MUST HAVE TINTED, FLAT GLAZING THAT PROJECTS
2 204
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
EL 6035' T.O. RIDGE
ON-SITE OF BARN ALL EXTERIOR MUST OCCUR SQ EDGE3.6AN SHIP LAP MOCK-UP VERTICAL WOODMATERIALS SIDING W/ FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF 1/4 REVEALS MATERIALS.
BLACKENED HEAT PATINA PANEL CLADDING W/PROJECTS 1/2 4. SKYLIGHTS MUST STEEL HAVE TINTED, FLAT GLAZING THAT ABOVE THE ROOFFASTNERS PLANE THE LEAST AMOUNT PRACTICAL. FRAMES SQUARE HEAD EXPOSED W/ NEOPRENE WASHERS SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE
3
0
1'-0
N
8'
FLOORAREA AREA FLOOR
AUTO COURT AUTO COURT
BATTER 1/2 PER FT ON SOUTH AND WEST FACES OF CHIMNEY
MATERIAL (ROOF/SIDING). 13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS 3 4" CAST CONCRETE CAP AT STONE VENEER (U.O.N) STEAMBOAT SPRINGS, 5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER Architecture COLORADO 3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO MUST THATOCCUR A 4 SPHERE Planning 14 2X2 STEEL SQ WINDOW TAHOE, " DRYSTACK STONE VENEERTRIM AT VERTICAL 4LAKEWRAPPED 6 FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF CANNOT PASS THROUGH THE OPENING. Interiors MATERIALS. SIDING CALIFORNIA
5
METAL CRICKET TO MATCH METAL ROOFING
CHIMNEY CURB AND FLASHING AS REQ'D
D.5
1 2
SCALE: 3/16 =
4'
9'-0
AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING
14'-0
EL 6045.5' T.O. RIDGE
EL 6045.25' T.O. RIDGE
EL 6044.25' T.O. RIDGE
3
14
CUSTOM 9'-0 STEEL CHIMNEY SHROUD
21'-4 1/2
CUSTOM STEEL CHIMNEY SHROUD
PROPOSED GRADE
9
8'
ELEVATION NOTES:
ELEC METER
130
4'
EAST ELEVATION
132
8 4 3 9
101
204
SCALE: 3/16 =
WET BAR
+18 HEARTH, MAT'L TBD
THE LEAST CONTRAST POSSIBLE
EAST ELEVATION
10 10
0
12 12
+18 HEARTH, MAT'L TBD
BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING MATERIAL (ROOF/SIDING).
EL 6045.5' T.O. RIDGE
14'-0
207
107'-6 T.O. CAP
106
103
** SOLID SAWN TOUNGE & GROOVE SQFIREPLACE EDGE REVEAL) WOOD VENT(1/8 GAS 20'-1/2 SIDING W/1. NO HOLES OR INSTALLED OVER ALLTHROUGH EXTERIOR MATERIALS TOLOOSE COMPLY KNOTS, WITH 2010 CRC SECTION 5327 STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN 2. ALLWITH EXPOSED AND PLUMBING VENTING LOCATIONS ACCORDANCE THEMECHANICAL WUI PRODUCTS GUIDE 15'-7 DATED JULY 11, 2011 TO 4'-5 1/2
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
APRON SLAB
WET BAR
2 A8.1
3'-1
6) ADDRESS NUMBERS TO BE MIN 4 IN HEIGHT, ILLUMINATE AT NIGHT, MUST MEET CRCR319.1
ELEVATION NOTES: HEAT N GLO TRU 50 DIRECT
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
2
CUSTOM STEEL CHIMNEY SHROUD
11'-4 1/2
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
LAKE TAHOE, CALIFORNIA
FIREPLACE
TRASH ROOM TO MEET ALL PLACER COUNTY REQ'S
N
MAINLEVEL LEVELFLOOR FLOORPLAN PLAN MAIN SCALE: 3/16 = 1'-0
11
1 A3.1
107'-6 T.O. WALL
8) TRASH ROOM TO MEET ALL PALCER COUNTY REQUIRMENTS
127
CL
100'-0 (EL: 6020') T.O. SLAB
102'-6 102'-6 T.O. WALL T.O. WALL
www.ksaarch.com 855.415.4093
9) GAS METER TO CONFORM TO ALL SOUTHWEST GAS SNOWLOAD REQ'S. FOOTINGS FORTOWN GAS METER NOT TOTC54 BE SONOTUBE PER AND COUNTRY DIRECT VENT GAS MARTIS CAMP REQ'S
119
128
9
5'-7
1111
101
Architecture Planning Interiors
STEAMBOAT SPRINGS, COLORADO
7) ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, DOOR CLADDING TO MATCH COLOR AND PATTERN105 OF ADJACENT METAL 4'-5 1/2 ABV PANEL
METAL CRICKET TO MATCH METAL ROOFING
21'-4 1/2
DESK
4'-8
13
13
Kelly & Stone Architects, Inc.
3. ANA8.1 ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST OCCUR FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF MATERIALS.
103'-0 T.O. WALL
2 A4.2
9
5'-5
M PRELIMINARY - NOT FOR CONSTRUCTION
132
8 4 3 9
101
103'-0 T.O. WALL
1 A3.1
11'-10 1/2
5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOT PASS THROUGH THE OPENING.
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
CL
STAINED CONCRETE STEPS AND SLAB
101'-6 (EL:101'-6 6021.5') (EL: 6021.5') T.O. SLAB T.O. SLAB
BEV. REF
ICE BEV. MAKER REF
107'-6 T.O. WALL
PRELIMINARY - NOT FOR CONSTRUCTION
133
101
107'-6 T.O. CAP
101
8 8
STAINED CONCRETE STEPS AND SLAB
105
ENTRY ENTRY
102
100'-0 (EL: 6020') T.O. SLAB7'-3
11'-6
STONE VENEER ON BOTH SIDES OF DOOR 122 TO BE NO GREATER THAN 4 THK.
1'-1
PDR
5'-9 1/2
128
CL
1'-1 7'-4 1/2
105
GREAT ROOM 4. SKYLIGHTS MUST HAVE TINTED, FLAT GLAZING THAT PROJECTS GREAT ROOM103 ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL. FRAMES Kelly & Stone Architects, Inc. SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE 103 THE LEAST CONTRAST POSSIBLE
204
127
7'-3
15. UNVENTRED CRAWLPACE TO BE MECHANICALLY VENTILATED AT A RATE OF 1 CFM FOR EACH 50 S.F. OF CRAWLSPACE AREA, INSUL & VAPOR BARRIER REQ'D AS SET FORTH PER CRC R408.3 CRAWL SPACE AREA - 2,700 SF TOTAL CFM (VIF) - 54 CFM
MARTIS CAMP LOT 443 PLACER COUNTY, CA
8 4 3 9
206
102
MARTIS CAMP LOT 443 PLACER COUNTY, CA
207
GAS FIRE
102'-0 (EL: 6022') PIT T.O. WALL
3
SLOPE
128 129
+18 BENCH +18 BENCH+18 BENCH +18 BENCH
3'-2
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
EL 6035' T.O. RIDGE
GAS FIRE PIT
122
FD
11'-0
129
2'-1/2 CL
4'-4
16'-7
MARTIS CAMP LOT 443
A2.1 MAIN LEVEL FLOOR PLAN : Printed on 1/3/2014 at 4:34 PM
BATTER 1/2 PER FT CHIMNEY CURB AND FLASHING AS REQ'D
BOARD FORMED CONCRETE WALL
FD
127
GARDEN
PDR
2'-6
ICE MAKER
ELECTRIC METER RECESSED ELECTRIC METER W/ DOOR TO MEET LIBERTY'S REQ.
FD
100'-0 (EL:110 6020') T.O. SLAB 100'-0 (EL: 6020') T.O. SLAB
14. PROVIDE MIN. 100 SQ. IN OP ENING FOR DRYER MAKEUP AIR IN LAUNDRY ROOM PER CMC504.3.2
111
BEAR PROOF TRASH ENCLOSURE TO MEET ALL PLACER COUNTY REQ'S BEAR PROOF TRASH ENCLOSURE TO MEET ALL PLACER COUNTY REQ'S
CL
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
1 A4.2
EL 6045.5' T.O. RIDGE
BOARD FORMED CONCRETE WALL
21'-4 1/2
EL 6044.25' T.O. RIDGE
A2.1 MAIN LEVEL FLOOR PLAN : Printed on 2/24/2014 at 9:03 AM
CUSTOM STEEL CHIMNEY SHROUD
DW
DW
8'-3 1/2 105
105
CL 110 ABV
6'-2 1/2
EL 6045' T.O. RIDGE
EL 6045.25' T.O. RIDGE
108
4'-5 1/2
STEAMBOAT SPRINGS, Architecture 122 COLORADO 1. ALL EXTERIOR MATERIALSCONCRETE TO COMPLY WITH 2010 CRC SECTION 5327 WOOD Planning LAKE TAHOE, CALIFORNIA 2. ALL EXPOSED MECHANICAL AND PLUMBING Interiors VENTING LOCATIONS TO www.ksaarch.com BE OUTDOOR APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION 855.415.4093 AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING LIVING MATERIALFD(ROOF/SIDING).
2
126
7'-9 1/2
10
125
13. ALL STAIR TREDS SHALL BE A MINIMUM OF 10 AND DEPTH SHAL BE A MINIMUM OF 7.75
TRASH 7 ENCLOSURE 111 TRASH ENCLOSURE
101
11
126
FD
2'-1/2
GARDEN
PRELIMINARY - NOT FOR CONSTRUCTION
5
WOOD
104
5'-6
25'-6 1/2
122
LOCKERS
FOYERFOYER CONCRETE
18'-5 1/2
6
CUSTOM STEEL CHIMNEY SHROUD
METAL CRICKET TO MATCH METAL ROOFING
EL 6035' T.O. RIDGE
14
PRELIMINARY - NOT FOR CONSTRUCTION
EL 6048' T.O. CAP
9
2'-0
5'-6 STORAGE 125
109 122
+18 BENCH
LOCKERS
PREP SINK
100'-0 (EL: 6020') 100'-0 (EL: 6020') T.O. PLY T.O. PLY
109 ABV
ELEVATION NOTES: LIVING
EL 6046.25 1 RIDGE T.O.
7
+18 BENCH
107
106
10'-3
19
FD
7
STORAGE
+18 BENCH
9'-8
CL
16
FD
MUD ROOM 12'-9 109 MUD ROOM
5 SHELVES
BREAKFAST BREAKFAST NOOK 106 NOOK
10'-8 106 107 ABV ABV 104
EL 6044.25' T.O. RIDGE BATTER 1/2 PER FT
18
EL 6045.25' T.O. RIDGE
112
7'-4 1/2
RANGE W/ HOOD ABV
104
104
3
PANTRY 5'-0 107 PANTRY
LINE OF CABINETS BELOW
BEV BEV REF REF +42 BAR W/ +42 BAR W/ STORAGE BELOW STORAGE BELOW
MARTIS CAMP LOT 443 PLACER COUNTY, CA
8
21'-4 1/2
20
+36 PASS THROUGH COUNTER
+36 PASS THROUGH COUNTER CL
6'-8
106
CL 3'-1
16'-11 1/2
16'-11 1/2
14'-6
14'-6 52'-10
52'-10
4
BARN DOOR
3'-0
5 SHELVES
3'-0
DINING DINING
102
15
108
CONCRETE WOOD
OUTDOOR
EL 6047' T.O. CAP
KITCHEN
12
12
3
OVENS
19'-4 1/2
WORKBENCH/STORAGE
3 CAR GARAGE 1103 CAR GARAGE
MECH
CHASE LOCKERS
+18 BENCHLOCKERS
12. COPY OF OPERATION AND MAINTENANCE MANUAL ADDRESSING ITEMS 1 THROUGH 10 OF 13)SECTION ALL STAIR TREDS SHALL BE A MINIMUM OF 10 OCCUPANT AND DEPTHOR SHAL BE A MINIMUM OF 7.75 4.410.1 MUST BE PROVIDED TO BUILDING OWNER
CL
1
REF/FR
119
HVAC SYSTEM INSTALLER MUST BE TRAINED AND CERTIFIED AND SPECIAL INSPECTORS
EMPLOYED THE ENFORCING AGENCY MUST BE QUALIFIED. 11. DUCT SYSTEMSBY ARE SIZED, DESIGNED, AND EQUIPMENT IS SELECTED PER SECTION 4.507.2. HVAC SYSTEM INSTALLER MUST BE TRAINED AND CERTIFIED AND SPECIAL INSPECTORS 12)EMPLOYED COPY OF OPERATION AND MAINTENANCE MANUAL ADDRESSING ITEMS 1 THROUGH 10 OF BY THE ENFORCING AGENCY MUST BE QUALIFIED. SECTION 4.410.1 MUST BE PROVIDED TO BUILDING OCCUPANT OR OWNER
PROVIDE OUTLET FOR ELECTRIC VEHICLE
112
10. EGRESS WINDOWS MUST BE NO MORE THAN 44 ABOVE F.F.; OPENINGS SHAL HAVE MIN 11) CLEAR DUCT SYSTEMS ARE AND IS SELECTED OPENING OF 5.7SIZED, SQFT; DESIGNED, MIN CLEAR HT OFEQUIPMENT 24 ; MIN CLEAR WIDTH OF PER 20 SECTION 4.507.2.
120
CL
5
AC COND. (DETAILS TBD)
WORKBENCH/STORAGE
+24 DOG WASH
CHASE
119
R = 49'-0
SLOPE
CONCRETE JOINT LINES
129
18 X 24 CRAWLSPACE ACCESS
MECH
2 A4.3
CL
2 A4.1
2
118 WOOD CONCRETE
BARN DOOR
19'-8 1/2
PROVIDE 3/4 GAS LINE FOR BBQ
118
UP 17 EQ. RISERS
INLAID STEEL TRANSITION
OVENS
108
113
B) 15 ON EITHER SIDE FROM CENTER OF A WATER CLOSET, 24 CLEARANCE IN FRONT OF
9. ALL NEWCLOSET BATHS SHALL HAVE WATER PER CPC 407.5 A)C)MAX 1.28 GAL/FLUSH TOILET, SHOWER MAX ARE 2.5GPM, FAUCETS GPM MAX PER CPCOF 402 SHOWER STALS SHALL HAVE SHOWER OF 1024 SQ.IN2.2MIN AND CAPABLE B)ENCOMPASSING 15 ON EITHER SIDE FROM CENTER A WATER A 30 CIRCLE PEROF CPC 411.7 CLOSET, 24 CLEARANCE IN FRONT OF WATER CLOSET PER CPC 407.5 C) EGRESS SHOWERWINDOWS STALS SHALL HAVE OF 1024 SQ.IN MIN CAPABLE OF HAVE MIN 10) MUST BESHOWER NO MOREARE THAN 44 ABOVE F.F.;AND OPENINGS SHAL ENCOMPASSING A 30 PERMIN CPCCLEAR 411.7 HT OF 24 ; MIN CLEAR WIDTH OF 20 CLEAR OPENING OFCIRCLE 5.7 SQFT;
6
CL
BBQ WITH NONREFLECTIVE36 GAS BBQ WITH COVER PER NON-REFLECTIVE COVER PER MARTIS MARTIS CAMP CAMP REQ'S REQ'S
11
6
PROVIDE OUTLET FOR ELECTRIC VEHICLE
LAUNDRY
4'-4
RISERS
DN 3 EQ. RISERS
STAIR
17'-4 1/2
HB
CL
2'-8
2'-8
11
REF/FR
CONCRETE WOOD
10
117
8.9.ALL LANDINGS TO BE LOCATED NO MORE THEN 7.75 BELOW A DOOR'S ALLEXTERIOR NEW BATHS SHALLARE HAVE THRESHOLD A) MAX 1.28 GAL/FLUSH TOILET, SHOWER MAX 2.5GPM, FAUCETS 2.2 GPM MAX PER CPC 402
WINDOWS TTS
CL HB
121
SLOPE
10
4'-UP 5 17 EQ.
119
KITCHEN
113
CL
COVERED PATIO 121 COVERED PATIO
2 A3.2
WC
DOG WASH
R/S
LAUNDRYLINE OF UPPERS
W
107
EDGE OF PATIO
2 A3.2
116
116 117
Kelly &
PRIVATE GARAGE IS PROTECTED BY A RESIDENTIAL FIRE SPRINKLER, THE OPENINGS NEED ONLY
GAS METER ENCLOSURE TO HAVE INDEPENDANT FOUNDATION AND SLAB PER SOUTHWEST GAS REQ'S FACE OF BOARD FORM GAS METER ENCLOSURE TO MEET ALL CONCRETE WALL TO BE 2 SOUTHWEST GAS REQ'S AND TO HAVE +6FURRED CURB OUTSIDE GRID LINE INDEPENDANT FOUNDATION AND SLAB AC CONDENSOR CL FENCE TO MATCH ADJACENT METAL CL PANEL 6'120 -3 1/4 6'-3 1/4
WC
LINE OF UPPERS
113
W
. 3 EQ DN ERS RIS
121
EDGE OF PATIO
126
4'-1
SH.
115116
115
W.I.C.
120
DN 3 EQ. RISERS
FULL HT. CAB
COVERED PATIO
9
118
116
LAKE TAHOE, CALIFORNIA
www.ksaarch.com 855.415.4093
BE SELF-CLOSING SLEF-LATCHING CRC R302.5.1 7. DOOR 123 SHALL BE AAND 20 MIN - A SELF CLOSING AND SELF LATCHING, 1 3/8 THICK SOLID WOOD OR HONEYCOMB CORE STEEL DOOR IS REQ'D. EXCEPT WHERE THE RESIDENCE AND 8.PRIVATE ALL EXTERIOR AREBY TOABE LOCATED NO THEN 7.75 BELOW A DOOR'S RESIDENTIAL FIREMORE SPRINKLER, THE OPENINGS NEED ONLY GARAGELANDINGS IS PROTECTED THRESHOLD BE SELF-CLOSING AND SLEF-LATCHING CRC R302.5.1
11'-0
Architecture Planning Stone Architects, Inc. Interiors
Kelly & Stone Architects, Inc.
DOOR 123 SHALL BE A 20 - ASURFACE SELF CLOSING AND SELF 1 3/8 THICKTHE SOLID 6.7. LOTS SHALL BE GRADED TO MIN DRAIN WATER AWAY FROMLATCHING, FOUNDATION WALLS. WHERE THE RESIDENCE AND WOODSHALL OR HONEYCOMB CORE STEELTHE DOOR IS 10' REQ'D. GRADE FALL A MIN. OF 6 WITHIN FIRST PER EXCEPT CRC R401.3
CL
DN
107
2 A4.2
9
JR MASTER BATH
TILE
115
W.I.C. [KING]
119
FULL HT.
LINE OF DECK ABOVE
CARPET
114
[KING]
READING 98'-2 (EL: 6018.25') T.O. PLY 113 NOOK 120 READING NOOK
STAIR
WINDOW SILL TOEBE FLUSH WITH OP INTERIORSLCOUNTER SURFACE WINDOW SILL TO BE FLUSH WITH INTERIOR COUNTER SURFACE
115
www.ksaarch.com
STEAMBOAT SPRINGS,855.415.4093 COLORADO
5.6.MAX. HOT WATER DISCHARGE FROM BATHTUB AND AWAY WHIRLPOOL FILTERS SHALL BE THE LOTS SHALL BETEMP. GRADED TO DRAIN SURFACE WATER FROM TUB FOUNDATION WALLS. LIMITED TO 120 DEGREES. THE WATER HEATER THERMOSTAT SHALL NOT BE CONSIDERED A GRADE SHALL FALL A MIN. 6 WITHINPER THECFC414.5 FIRST 10' PER CRC R401.3 CONTROL FOR MEETING THISOF PROVISION
PROVIDE CONCRETE PAD FOR AC UNIT
118
8 8
SH.BENCH
JR MASTER BATH 8'-11
4'-0
8'-9
101'-0 (EL: 6021') T.O. SPA
22째
AC AC BENCH COND. COND. (DETAILS (DETAILS TBD) TBD)
HIGH WINDOW
JR MASTER
112째
1/2 202 13'-3
112
22째
5
8'-7 3/4
121
CL
104 8'-9
17'-6
HB
11'-0 11'-0
+42 AC CONDENSOR FENCE TO MATCH ADJACENT METAL PANEL
117
125
CL
114
CL
ISOKERN MAGNUM 42 GAS FIREPLACE ISOKERN TH D MAGNUM 42 HEAR WOO GAS FIREPLACE +18 RETE 4 CONC FD A8.1
TH HEAR
+18
11'-0
12'-6 1/2 CL 1'-8 1/2
CL
6'-11 1/2
116
CL
1/2 12'-6
CL
108
4. SEE TITLE TO 24 120 ENERGY CALCULATION REPORT ISSUED BY WOODSSHALL ENERGY CONSULTANTS FOR A LIMITED DEGREES. THE WATER HEATER THERMOSTAT NOT BE CONSIDERED MINIMUM R-VALUE AND U-VALUE CONSTRUCTION ASSEMBLIES. CONTROL FOR MEETING THISREQUIREMENTS PROVISION PERFOR CFC414.5
K
12'-6 1/2
12'-6 1/2 12'-6 1/2
13'-5 1/2 CL
CL 4'-9 1/2
HIGH WINDOW
JR MASTER
98'-2 (EL: 6018.25') T.O. PLY -IN BUILTEN OP VES SHEL
4'-1
CARPET
5'-1
CL
CL
17'-6
TH HEAR
LAKE TAHOE, CALIFORNIA
5. MAX. HOT WATER TEMP. DISCHARGE FROM BATHTUB AND WHIRLPOOL TUB FILTERS SHALL BE
K J
13'-5 1/2 13'-5 1/2
17'-9
FIREPLACE WALL VENT
114
+18
2'-0
4
8'-6
CL
120
W
113
8'-9
0 33'-
OW 4'-0 IND HW HIG
FACE OF BOARD FORM CONCRETE WALL TO BE 2 FURRED OUTSIDE GRID LINE
108
-IN BUILTEN OP VES SHEL
H
13'-5 1/2
FIREPLACE WALL VENT CL HEAT N GLO EVEREST DIRECT VENT GAS 115 ABOVE FIREPLACE WITH T.V,
4
5'-0
CL
INDO HW HIG
0 33'-
8'-9
123
54'-9
G
4'-1
9'-1 1/4
VEST
J
MARTIS CAMP LOT 443 CAMP MARTIS PLACER COUNTY, LOT 443CA
1/8 22'-
8'-6 HB
4'-0
1/2 5'-6
9'-0
123
124
5
3 A3.3
4
DESK
ART
124
DIRECT VENT GAS TH 1 FIREPLACEHEAT N GLO LUX 36 DIRECT VENT HEAR A8.1 +18 GAS FIREPLACE W/ T.V. ABOVE
F
1 A3.2
17'-9 13'-8 HEAT N GLO EVEREST DIRECT VENT GAS FIREPLACE
5'-0
-IN BULIT
MASTER SUITE
4
9'-0
5'-1
CL
125
H
54'-9
SK DEVEST
VEST
G
13'-8
CL
112
110
FREEG TUB DIN STAN
113
1/2 3'-5
1/2 15'-6 5'-6
9'-0
-IN BULIT
G]
MASTER SUITE
4
E 3
3 A3.3
[KIN
F
1 A3.2
125
3
1 A3.3
3
126
VEST
] [KING
1 A3.3
1/8 22'-
W.I.C.
UP KE MA UNTER CO
3 A4.3
3
D
E
3 A4.3
Architecture Planning Interiors
STEAMBOAT SPRINGS, COLORADO
3. SEE WALL SECTIONS FOR WALL, FLOOR, AND ROOF ASSEMBLY CALLOUTS
CL
8'-10
MASTER
ISLAN
STUBR FO KED STAC/D W 18 X24 109 CRAWLSPACE ACCESS D BATH WOO TILE 109 H BENC
3'-0
112 114
WEATHER STRIPPING, AND A PAINTED FINISH
2. THE REFUSE ENCLOSURE IS BUILT ON A CONCRETE SLAB AND WILL BE ACCESSED VIA A DOORSECTIONS WITH ACCOMPANYING METAL FRAME AND LATCH WITH CALLOUTS A YEAR ROUND DOOR 3.METAL SEE WALL FOR WALL, FLOOR, AND ROOF ASSEMBLY KNOB WITH SECONDARY LATCH. THE INTERIOR MUST BE FINISHED WITH SHEETROCK, INSIDE STRIPPING, ANDCALCULATION A PAINTED FINISH REPORT ISSUED BY WOODS ENERGY CONSULTANTS FOR 4.WEATHER SEE TITLE 24 ENERGY
2
MINIMUM R-VALUE AND U-VALUE REQUIREMENTS FOR CONSTRUCTION ASSEMBLIES.
119 S OW IND HW HIG
6'-8
1/2 110 7'-11
DRAIN
H BENC
115
111
127
1 A4.1
2
9'-0
126
W/D
128
129
MASTER BATH
127
CL
15'-6
2
W.C.
SHOWER
CL
1/2 3'-5
5 6'-610
1
2
R/S
W.I.C. H BENC
112
3'-6
3'-0
6'-6
106
118
D
6'-3 111
CH TREN
H BENC
107
2'-0
ISLAN
116
129
CL
WINDOWS TTS @ CORNER
117
128
4'-0
SHOWER 3'-0
3'-6
1
W.C. 4'-10
CL 5'-0
1
FURRED OUTSIDE GRID LINE
1/2 6'-9
WINE CAB. CLOSET WINE CAB.102 CLOSET
A
3'-0 2'-0
4'-0
CL
4'-6
12'-10
1/2 3'-4
CL
CL
108
2'-0
4'-0
WINDOWS TTS @ CORNER CONCRETE WALL TO BE 2
2 10'-
110
0 28'-
111 WS INDO HW HIG
5'-0
FACE OF BOARD FORM
1/2 3'-4
CL 1/2 6'-9
109
4'-6
CL 1 A4.3 4'-4
AGREE TO BY THE PCAPCD AND WITH THE MARTISSHALL VALLEY AIR QUALITY 1. THE CONDITIONS OF APPROVAL ANDCONSISTENT THE CC&R'S FOR THE PROJECT EXPLICITLY FORBID ORDINANCE. SOLID FUELNON-EPA BURNING APPLIANCES/FIREPLACES ARE PROHIBITED IN MULTI-FAMILY THE INSTALLATION OF ANY PHASE 2 CERTIFIED WOOD BURNING DEVICES OR LAND USES. THE MAXIMUM EMISSION POTENTIAL FROM EACH RESIDENCE SHALL NOT EXCEED MASONRY FIREPLACES THAT DO NOT HAVE A UL APPROVED DECORATIVE GAS BURNING 7.5 GRAMSTHAT PERUSES HOUREITHER A DIRECT VENT OR BE VENT FLUE SYSTEM, UNLESS OTHERWISE APPLIANCE AGREE TO BY THE PCAPCD AND CONSISTENT WITH THE MARTIS VALLEY AIR QUALITY 2.ORDINANCE. THE REFUSESOLID ENCLOSURE IS BUILT ON A CONCRETE SLAB ARE ANDPROHIBITED WILL BE ACCESSED VIA A FUEL BURNING APPLIANCES/FIREPLACES IN MULTI-FAMILY METAL DOOR WITH ACCOMPANYING METAL FRAME AND LATCH WITH A YEAR ROUND DOOR LAND USES. THE MAXIMUM EMISSION POTENTIAL FROM EACH RESIDENCE SHALL NOT EXCEED KNOB WITH SECONDARY LATCH. THE INTERIOR MUST BE FINISHED WITH SHEETROCK, INSIDE 7.5 GRAMS PER HOUR
2'-7
C 2 6 4'-A3.3
12'-10 CL
B
PLANAPPLIANCE NOTES: THAT USES EITHER A DIRECT VENT OR BE VENT FLUE SYSTEM, UNLESS OTHERWISE
1
WINDOWS TTS
2'-0
0 28'-
B A
D
2 10'-
MARTIS CAMP LOT 443
C 2 A3.3
103
111'-0 (EL 6031') UPPER LEVEL T.O. PLY EL 6029.5' 111'-0 (EL 6031') T.O. PLATE UPPER LEVEL T.O. PLY
EL 6029.5' T.O. PLATE 129
128
127
EXISTING GRADE
PRELIMINARY SUBMITTAL
DATE: 11.07.2013 11.15.2013 12.16.2013
12.19.2013
120
115
20
8
3
18
16
19
7
1
CUSTOM STEEL CHIMNEY SHROUD
EL 6044.25' T.O. RIDGE
3
9
14
CUSTOM 9'-0 STEEL CHIMNEY SHROUD
21'-4 1/2
6
5'-6
5
11
7'-4
10
2
9'-7 1/2
11'-4 1/2
1
AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING
14'-0
MATERIAL (ROOF/SIDING). 13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS 3 4" CAST CONCRETE CAP AT STONE VENEER (U.O.N) STEAMBOAT SPRINGS, 5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER Architecture COLORADO 3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO MUST THATOCCUR A 4 SPHERE Planning 14 2X2 STEEL SQ WINDOW TAHOE, " DRYSTACK STONE VENEERTRIM AT VERTICAL 4LAKEWRAPPED 6 FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF CANNOT PASS THROUGH THE OPENING. Interiors MATERIALS. SIDING CALIFORNIA
EL 6045.5' T.O. RIDGE
EL 6045.25' T.O. RIDGE
2
4
5
BATTER 1/2 PER FT
17
18
11
4
3
7
2
5
20
8
1
EAST ELEVATION 4. SKYLIGHTS MUST HAVE TINTED, FLAT GLAZING THAT PROJECTS
2
METAL CRICKET TO MATCH METAL ROOFING
16
15
6
14
10
12
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
EL 6047' T.O. CAP 207 EL 6048' T.O. CAP
CUSTOM STEEL CHIMNEY SURROUND
EL 6035' T.O. RIDGE
9
2
EL 6046.25 T.O. RIDGE
206
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
ELEC METER
130
128
127
208
17 EXISTING GRADE SHOWN AS DASHED
105 21'-4 1/2
9'-0
18
11
4
3
7
PROPOSED GRADE
2
20
8
1
16
15
6
14
100'-0 (E 12 L 6020') MAIN LEVEL T.O. PLY
10
9'-7 1/2
11'-4 1/2
14'-0
EL 6045.5 T.O. RIDGE
EL 6045.25 T.O. RIDGE
EAST ELEVATION
2
128SCALE: 3/16 =
1'-0
0
4'
8'
7)COMPOSITE ELECTRIC METER CLOSET TO CONFORM TO LIBERTY REQ'S, DOOR SHINGLE ROOF CLADDING TO MATCH COLOR AND PATTERN OF ADJACENT METAL 19 PANEL
HORIZONTAL WOOD SIDING
8) TRASH ROOM TO MEET ALL PALCER COUNTY REQUIRMENTS
9
11
103
14 2X2 STEEL WRAPPED SQ WINDOW TRIM AT VERTICAL ENGINEERING SIDING
1
16 VENEERED BOARD FORMED WALLS AT ENTRY
SUBMITTAL PROGRESS &
13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS
11
20 BREAK METAL TRIM AT WINDOW WALLS
PROJECT NUMBER:
METAL RIDGE CAP TO MATCH METAL ROOFING
11
4
3
7
2
5
20
8
1
16
13 WOOD WINDOW TRIM AT HORIZONTAL SIDING PER DTLS
15
6
14
10
12
SCALE: 3/16 =
1'-0
9
A3.1
EXISTING GRADE SHOWN AS DASHED
100'-0 (E L 6020')
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
C
16 VENEERED BOARD FORMED WALLS AT ENTRY CUSTOM STEEL CHIMNEY SURROUND
17 STEEL COLUMNS PER STRUCTURAL
EL 6048' T.O. CAP
18 EXPOSED STEEL BEAMS PER STRUCTURAL EL 6045.5 T.O. RIDGE
EL 6045.25 T.O. RIDGE
19 CORNER TRIM AT HORIZONTAL WOOD SIDING SOUTH ELEVATION 20 BREAK METAL TRIM AT WINDOW WALLS
1
SCALE: 3/16 =
1'-0
0
4'
8'
12'
ISSUE:
DATE:
PROGRESS SET CONCEPTUAL SUBMITTAL PROGRESS & ENGINEERING PROPOSAL SET
208 209
PRELIMINARY SUBMITTAL 105
104
11.07.2013 11.15.2013 12.16.2013
12.19.2013
103
111'-0 (EL 6031') UPPER LEVEL T.O. PLY EL 6029.5' T.O. PLATE
129
128
127 EXISTING GRADE SHOWN AS DASHED
PROJECT NUMBER:
#Pln
SHEET TITLE:
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
BATTER FIREPLACE 1/2 PER FT
ELEVATIONS SHEET NUMBER:
1
SOUTH ELEVATION SCALE: 3/16 =
1'-0
0
4'
8'
PROGRESS 11.07.2013 SET CONCEPTUAL 11.15.2013 SUBMITTAL PROGRESS & 12.16.2013 PROJECT NUMBER: ENGINEERING PROPOSAL SET
SHEET TITLE:
PRELIMINARY SUBMITTAL
12.19.2013
A3.1
12'
#Pln
ELEVATIONS
SHEET NUMBER:
14 2X2 SQ WINDOW TRIM AT VERTICAL 4' STEEL WRAPPED 8' 12' SIDING
0 4' 8' 12' MAIN LEVEL T.O. PLY 15 BOARD FORMED CONCRETE SITE WALLS W/ 8 BOARDS AND 1/2 GAPS (SAMPLE REQ'D FOR OWNER/ARCHITECT APPROVAL PRIOR TO EXCAVATION)
2 4
20
8
#Pln
SHEET TITLE:
ELEVATIONS SHEET NUMBER: C COPYRIGHT
1
18
16
EL 6044.25' T.O. RIDGE
7
1
EL 6046.25 T.O. RIDGE
9
14
6
5
11
CUSTOM STEEL CHIMNEY SHROUD
10
2
EL 6045' T.O. RIDGE
EL 6045.5' T.O. RIDGE
EL 6045.25' T.O. RIDGE
EL 6044.25' T.O. RIDGE
REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
3 19
EL 6045.25' T.O. RIDGE
204 REVERSE BATTER STONE 1/2 PER FT AT SOUTH AND EAST WALLS
207
206
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
133
8 4 3 9
101
132
8 4 3 9
101
131
130
ELEC METER 128
127
120
100'-0 (E L 6020') MAIN LEVEL T.O. PLY EXISTING GRADE SHOWN AS DASHED
9'-0
21'-4 1/2
ELECTRIC METER CLOSET TO CONFORM TO LIBERTY PROPOSED REQ'S, DOOR CLADDIGN TO MATCH COLOR AND GRADEPATTERN OF ADJACENT METAL PANEL
EXISTING GRADE SHOWN AS DASHED
5'-6
7'-4
9'-0
9'-7 1/2 7'-4
5'-6
C
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
TRASH ROOM TO MEET ALL PLACER COUNTY REQ'S
9'-711'-4 1/2 1/2
11'-4 1/2
14'-0
14'-0
EAST ELEVATION EAST ELEVATION
2
2
0 3/16 = 4' 1'-0 1'-0 SCALE:
SCALE: 3/16 =
KS|a INC. DO YOUR PART PLEASE RECYCLE
A3.1
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
119
115
21'-4 1/2
A3.1
PROJECT NUMBER:
5
3
08'
12' 4'
8'
12'
ELEVATION NOTES: 1. ALL EXTERIOR MATERIALS TO COMPLY WITH 2010 CRC SECTION 5327 2. ALL EXPOSED MECHANICAL AND PLUMBING VENTING LOCATIONS TO BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING MATERIAL (ROOF/SIDING).
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST OCCUR FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING OF MATERIALS. 4. SKYLIGHTS MUST HAVE TINTED, FLAT GLAZING THAT PROJECTS ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL. FRAMES SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE THE LEAST CONTRAST POSSIBLE
17
3
18
11
1
4
3
7
2
2
5
20 5
4
8
1
16
15
6
14
10
12
5) AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOT PASS THROUGH THE OPENING.
9
CUSTOM STEEL CHIMNEY SURROUND
EL 6048' T.O. CAP
EL 6047' T.O. CAP
EL 6046.25 T.O. RIDGE
EL 6045.5 T.O. RIDGE
EL 6045.25 T.O. RIDGE
EL 6045.25 T.O. RIDGE
1
VERTICAL WOOD SIDING
2
METAL PANEL
3
BOARD FORM CONCRETE
4
STONE VENEER
5
COMPOSITE SHINGLE ROOF
6
HORIZONTAL WOOD SIDING
208 209
C
COPYRIGHT KS|a INC. DO YOUR PART PLEASE RECYCLE
105
104
103
111'-0 (EL 6031') UPPER LEVEL T.O. PLY EL 6029.5' 111'-0 (EL 6031') T.O. PLATE UPPER LEVEL T.O. PLY
EL 6029.5' T.O. PLATE 129
128
127
EXISTING GRADE SHOWN AS DASHED
A3.1 ELEVATIONS : Printed on 1/3/2014 at 4:34 PM
A3.1 ELEVATIONS : Printed on 2/24/2014 at 9:03 AM
BATTER FIREPLACE 1/2 PER FT
18
#Pln
ELEVATIONS
DATE:
SHEET NUMBER:
12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT
0
12.19.2013
107'-6 ISSUE:T.O. CAP
SHEET TITLE:
127
1 1
PROGRESS SET CONCEPTUAL 11.15.2013 CHIMNEY CURB AND FLASHING AS SUBMITTAL REQ'D PROGRESS & 12.16.2013 EL 6035' ENGINEERING RIDGE PROPOSALT.O. SET
19 CORNER TRIM AT HORIZONTAL WOOD SIDING
EL 6029.5' 10 HEAVY TIMBER BEAMT.O. W/PLATE CAP FLASHING PER DETAIL
128
BATTER 1/2 11.07.2013 PER FT
18 EXPOSED STEEL BEAMS PER STRUCTURAL
METAL WRAPPED FASCIA W/ METAL DRIP EDGE FLASHING 111'-0 (EL 6031') TO MATCH METAL ROOFING UPPER LEVEL T.O. PLY
SOUTH ELEVATION ELEVATION SCALE:SOUTH 3/16 = 1'-0
METAL CRICKET TO
MATCH METAL ROOFING ISSUE: DATE:
PRELIMINARY SUBMITTAL
17 STEEL COLUMNS PER STRUCTURAL
SHOWN AS DASHED
HORIZONTAL WOOD SIDING, SPECIES TBD
EL 6035'
SUBMITTAL
EXISTING GRADE VENEER 6" DRYSTACK STONE
CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR APP'D EQUIVALENT
12.16.2013
PROPOSAL SET
15 BOARD FORMED CONCRETE SITE WALLS W/ 8 T.O. BOARDS RIDGE AND 1/2 GAPSPRELIMINARY (SAMPLE REQ'D FOR OWNER/ARCHITECT 12.19.2013 APPROVAL PRIOR TO EXCAVATION)
SQ EDGE 6 SHIP LAP VERTICAL BARN WOOD SIDING W/ 1/4 REVEALS
6
9
129
11.07.2013PER FT
METAL RIDGE SET CAP TO MATCH METAL ROOFING
** SOLID SAWN TOUNGE & GROOVE (1/8 SQ EDGE REVEAL) WOOD SIDING W/ NO THROUGH HOLES OR LOOSE KNOTS, INSTALLED OVER STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN ACCORDANCE WITH THE WUI PRODUCTS GUIDE DATED JULY 11, 2011
5
CUSTOM STEEL CHIMNEY SHROUD
DATE:
10 HEAVY TIMBER BEAM W/ CAP FLASHING PER DETAIL BATTER 1/2
GRADE PAINTED METALEXISTING CLAD WOOD WINDOWS, TYP. TEMPERED 100'-0 (E L 6020') SHOWN AS DASHED GLAZING AS REQ' D BY CODE, MAX AVG AS MAIN LEVEL T.O. U-FACTOR PLY REQ'D PER TITLE 24 100'-0 (E L 6020') MAIN FASCIA LEVEL W/ T.O.METAL PLY DRIP EDGE 8 2X STAINED CLEAR CEDAR FLASHING TO MATCH METAL ROOFING
BATTER FIREPLACE 1/2 PER FT
17
METAL WRAPPED FASCIA W/ METAL DRIP EDGE FLASHING TO MATCH METAL ROOFING
ISSUE:WOOD SIDING CORNER TRIM AT HORIZONTAL
7
209
104
EXPOSED STEEL BEAMS PER STRUCTURAL
PROGRESS 20 BREAK METAL TRIM AT WINDOW WALLS
15
EL 6048' T.O. CAP
T.O. CAP
12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT CONCEPTUAL 11.15.2013
12'
127 208
BATTER FIREPLACE 1/2 PER FT
105
REQ'D PER TITLE 24
9) GAS METER TO CONFORM TO ALL SOUTHWEST GAS SNOWLOAD REQ'S. FOOTINGS FOR GAS METER NOT TO BE SONOTUBE PER MARTIS CAMP REQ'S
4
129
PAINTED METAL CLAD WOOD WINDOWS, TYP. TEMPERED
FLASHING TO MATCH METAL ROOFING
111'-0 (EL 6031') 2 BLACKENED HEAT PATINA CLADDING W/ 1/2 UPPERSTEEL LEVELPANEL T.O. PLY SQUARE HEAD EXPOSED FASTNERS W/ NEOPRENE EL 6029.5' WASHERS 111'-0 (EL 6031') T.O. PLATE UPPER LEVEL T.O. PLY EL 6029.5' 3 4" CAST CONCRETE CAP AT STONE VENEER (U.O.N) T.O. PLATE
EL 6048' T.O. CAP
103 7'-4
4
CLASS A-RATED ASPHALT SHINGLE ROOFING BY GAF OR
17 STEEL COLUMNS PER CLEAR STRUCTURAL 8 2X STAINED CEDAR FASCIA W/ METAL DRIP EDGE
9
CUSTOM STEEL CHIMNEY SURROUND
104 5'-6
5
6) ADDRESS NUMBERS TO BE MIN 4 IN HEIGHT, ILLUMINATE AT NIGHT, STONE VENEER MUST MEET CRCR319.1 18
7
GLAZINGFORMED AS REQ'D BY CODE,AT MAX AVG U-FACTOR AS VENEERED BOARD WALLS ENTRY EL 6047'
120
115
209
4
6
119 131
3
PANEL 5)METAL AWNING WINDOWS AT GREAT ROOM WINDOW 103 AND MASTER 16 BDRM WINDOW 105 MUST OPEN MAX OF 4 , SO THAT A 4 SPHERE CANNOTFORM PASS THROUGH THE OPENING. BOARD CONCRETE
5
EL 6045.25 T.O. RIDGE
132
8 4 3 9
101
EL 6045.25 T.O. RIDGE
EL 6045.5 T.O. RIDGE
133
101
107'-6 T.O. CAP
5
www.ksaarch.com 855.415.4093
APP'D EQUIVALENT 15 BOARD FORMED CONCRETE SITE WALLS W/ 8 BOARDS AND 1/2 GAPS (SAMPLE REQ'D FOR OWNER/ARCHITECT Kelly Stone Architects, Inc.SIDING, 6 & HORIZONTAL WOOD SPECIES TBD APPROVAL PRIOR TO EXCAVATION)
8' 12' ABOVE PRACTICAL. FRAMES SCALE: 3/16 = THE 1'-0 ROOF0PLANE THE4' LEAST AMOUNT SHALL COMPLIMENT THE HUE OF THE ROOFING, SO AS TO PROVIDE 1 VERTICAL WOOD SIDING THE LEAST CONTRAST POSSIBLE
204
CHIMNEY CURB AND FLASHING AS REQ'D
CLADDING TO MATCH COLOR AND PATTERN OF ADJACENT METAL
HORIZONTAL WOOD SIDING, SPECIES TBD PANEL
A3.1 ELEVATIONS : Printed on 2/24/2014 at 9:03 AM
4
PROPOSED GRADE
6
MARTIS CAMP LOT 443 PLACER COUNTY, CA
15
EL 6048' T.O. CAP
EXISTING GRADE SHOWN AS DASHED
111'-0 (EL 6031') UPPER LEVEL T.O. PLY
TRASHCLAD ROOM TO MEET WINDOWS, ALL PALCER COUNTY REQUIRMENTS 1. ALL EXTERIOR MATERIALS TO COMPLY WITH 2010 CRC SECTION 7 PAINTED 8)METAL WOOD TYP. TEMPERED 5327 GLAZING9)AS REQ'D MAX U-FACTOR GAS AS SNOWLOAD 119 GAS METERBY TOCODE, CONFORM TOAVG ALL SOUTHWEST REQ'D PER TITLE REQ'S. 24 FOOTINGS FOR GAS METER NOT TO BE SONOTUBE PER 2. ALL EXPOSED MECHANICAL AND PLUMBING VENTING LOCATIONS MARTIS CAMP REQ'S 8 2X STAINED CLEAR CEDAR FASCIA W/ METAL DRIP EDGE TO BE APPROVED BY ARCHITECTURAL REVIEW PRIOR TO INSTALLATION SAWN TOUNGE & GROOVE (1/8 SQ EDGE REVEAL) WOOD FLASHING** SOLID TO MATCH METAL ROOFING AND PAINTED A COLOR THAT COMPLEMENTS THE SURROUNDING SIDING W/ NO THROUGH HOLES OR LOOSE KNOTS, INSTALLED OVER MATERIAL (ROOF/SIDING). STRUCTURAL PLYWOOD OR OSB W/ MIN 7/16 THICKNESS. IN ACCORDANCE WITH WUI PRODUCTS GUIDE DATED JULY 11, 2011 9 METAL WRAPPED FASCIA W/THE METAL DRIP EDGE FLASHING MATCH METAL ROOFING 3. AN ON-SITE MOCK-UP OF ALL EXTERIOR MATERIALS MUST TO OCCUR 100'-0 (E L 6020')OF MATERIALS. FOR MARTIS CAMP APPROVAL PRIOR TO THE ORDERING MAIN LEVEL T.O. PLY 10 HEAVY TIMBER BEAM W/ CAP FLASHING PER DETAIL ELEVATION NOTES: 1 SQ EDGE 6 SHIP LAP VERTICAL BARN WOOD SIDING W/ 1/4 REVEALS 4. SKYLIGHTS MUST HAVE TO TINTED, FLAT THAT PROJECTS 1. ALL EXTERIOR MATERIALS COMPLY WITHGLAZING 2010 CRC SECTION 5327 METAL RIDGE CAP TO MATCH METAL ROOFING ABOVE THE ROOF PLANE THE LEAST AMOUNT PRACTICAL.11FRAMES 2 BLACKENED HEAT PATINA STEEL PANEL CLADDING W/ 1/2 2. ALL EXPOSED MECHANICAL VENTINGSO LOCATIONS SHALL COMPLIMENT THE HUEAND OFPLUMBING THE ROOFING, AS TO TO PROVIDE SQUARE HEAD EXPOSED FASTNERS W/ NEOPRENE 12 EXT LIGHT FIXTURE PER OWNER/ARCHITECT BE APPROVED BY ARCHITECTURAL WASHERS THE LEAST CONTRAST POSSIBLE REVIEW PRIOR TO INSTALLATION
PRELIMINARY - NOT FOR CONSTRUCTION
127
PRELIMINARY - NOT FOR CONSTRUCTION
128
MARTIS C LOT 44 PLACER COU
ELEVATION NOTES:
ELEC METER
130
PRELIMINARY - NOT FOR CONSTRUCTION
131
MARTIS CAMP LOT 443 PLACER COUNTY, CA
1'-0
132
8 4 3 9
101
MAR L
SCALE: 3/16 =
133
101
107'-6 T.O. CAP
BATTER FIREPLACE 1/2 PER FT
This project is being built as a speculative project in the Martis Camp development. My role in this project has been to collaborate with the project manager on the programming, and then create the 3D model and the construction documents. The project is finishing the construction document phase and will begin construction May 1st.
EXISTING GRADE SHOWN AS DASHED
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
BATTER FIREPLACE 1/2 PER FT
100'-0 (E L 6020') MAIN LEVEL T.O. PLY
1 SOUTH ELEVATION SOUTH ELEVATION SCALE: 3/16 =
1
SCALE: 3/16 =
1'-0
0
0
1'-0
4'
8'
4'
12'
8'
12'
04
Piper Residence with Fergus Garber Young Architects
Site: single family home remodel in Menlo Park, California Programs: ArchiCAD, Permit and Construction Document Sets
42"
2
42"
PANEL P-A
PANEL P-B
27"
PANEL P-C
2
ADDITION
27"
EXISTING
ADDITION & REMODEL CARPORT
W1 A4.1 B3
N2
(N) 2x4 WALL WITH EXTERIOR STUCCO FINISH
27 1/2"
B3
N2
(N) 6:12 COMP SHINGLE ROOF
(E) SPARK ARRESTOR
(E) CHIMNEY
(N) COMP SHINGLE ROOF
RANGE HOOD VENT
(N) GATE
CONCRETE STEPS
(N) VELUX SKYLIGHT
(E) 4:12 CARPORT ROOF
(N)COMP SHINGLE ROOF
2
81 ENCINA AVE. PALO ALTO, CA 94301 t: 650.473.0400 | f: 650.473.0410 www.fgg-arch.com
3"
TOE KICK
TOE KICK 24"
18"
21"
21"
18" a
LEG L-1
3"
3" LEG L-1
22"
24"
27"
LEG L-1
LIC
3"
3"
18"
21"
21"
18"
a
LEG L-2
22"
3" LEG L-1 PANEL P-D
S
3"
3"
2
TOE KICK
27"
3"
22"
3" LEG L-1
KITCHEN ISLAND ELEVATIONS
PANEL P-G
L
2
24"
18"
U2
4"
24"
U
Q
24"
24"
PAINTED WALL
1'-3"
96"
96"
18"
Q
24"TILE 12" X 24"
Q
24"
LIGHT FIXTURES, BY
OUTLET FOR OWNER. T.V. VERIFY HEIGHT
AND LOCATION IN TV NOOK ELEVATION
24"
18"
BUILT-IN BOOKCASE
7
GUEST BATHROOM LINEN
8 72"
1/2" THICK PAINTED WOOD SHELF
b 30"
HALLWAY LINEN
AND LOCATION IN MIRROR, BY OWNER. FIELD WITH OWNER & VERIFY HEIGHT IN FIELD WITH OWNER &ARCHITECT ARCHITECT
COAT HOOKS
9" 1 1/4" THICK PAINTED WOOD SEAT
WITH OWNER & ARCHITECT
COAT HOOKS
10
41"
19 1/2"
56 1/2"
b-b
b
REAR ENTRY ELEVATIONR R
TOE KICK 36" 6'-1" CLR - MIN. TO FINISHES
MASTER BATHROOM ELEVATION
36"
12"
b-b
b
10
REAR ENTRY ELEVATION
NI A
7'-0"
EX'G NON-CONFORMING ROOF IN DAYLIGHT PLANE
5
2
T.O. RIDGE: 13'-0" AFF
T.O. PLATE: 12'-0" AFF
(N) STUCCO TO MATCH (E) PROVIDE MIN. 3 LAYERS STUCCO (7/8" MIN) OVER 2 LAYERS GRADE 'D' BUILDING PAPER OVER EXTERIOR PLYWOOD
205
206
207
208
107
108
109
110
(N) VELUX SKYLIGHT T.O. PLATE: 8'-0" AFF
(N) GATE
(N) DS. (N) DS.
(E) DS. NEW STUCCO OVER OLD WINDOW HOLES TO MATCH EXISTING
111
E
112
113
(E) FENCE
E
T.O. TOP OF TRIM: 2'-9" AFF 5/16" X 6.25" SELECT CEDARMILL EVENING BLUE COLORPLUS HARDIE BOARD SIDING
T.O. F.F.: 0'-0"
MAIN LEVEL FF
T.O. FF: 0'-0"
T.O. GRADE: -1'-6"
1/06/11
E3
CONSTRUCTION
T.O. RIDGE: 13'-10" AFF
ADDITION
EXISTING
EAST "REAR" ELEVATION
ADDITION & REMODEL
COPYRIGHT: F G G 2010
A5.1
CARPORT
W1 A4.1 (N) 2x4 WALL WITH EXTERIOR STUCCO FINISH
(N) 6:12 COMP SHINGLE ROOF
(E) SPARK ARRESTOR
(E) CHIMNEY
(N) COMP SHINGLE ROOF
RANGE HOOD VENT
(N) GATE
CONCRETE STEPS
(N) VELUX SKYLIGHT
(N)COMP SHINGLE ROOF
(E) 4:12 CARPORT ROOF
2 T.O. RIDGE: ±16'-7" AFF
ISSUE DATE DATE
12
A5.1
6
9/02/10
(N) VENT MATCH (E)
1
T.O. RIDGE: 13'-0" AFF
DESCRIPTION PERMIT
10/07/10 PERMIT REVISION 10/15/10 CONSTRUCTION
T.O. PLATE: 12'-0" AFF
(N) 6:12 PORCH ROOF
2
1/06/11
CONSTRUCTION
A2 A4.1
PAINTED BEAM WITH T&G UNDERNEATH AT FLAT CEILING
201
202
203
204
12
T.O. PLATE: 8'-3 1/2"
45°
8"
PAINTED KNEE BRACES, SSD
2
3'-1"
(E) FENCE (N) DS.
105
PAINTED COLUMN, SSD PAINTED WOOD TRIM
106
101
103
104
N
(N) DS. (N) DS.
T.O. TOP OF TRIM: 2'-9" AFF HARDIE BOARD SIDING T.O. FF: 0'-0"
CONCRETE STEPS
(N) DS. MAIN LEVEL FF
MAIN LEVEL FF
(N) VENT
T.O. FF: 0'-0"
COPYRIGHT: F G G 2010
T.O. GRADE: 1'-0" 1/6/11 at 5:31 PM
9
2 T.O. RIDGE: ±16'-7" AFF
12
12 3.75 V.I.F.
10/07/10 PERMIT REVISION
INTERIOR ELEVATIONS
12" 19 1/2"
36"
PERMIT
03-31-2011
OF CA LIFOR
2
2 (N) GABLE VENT 12" X 24"
INTERIOR ELEVATIONS
41"
36"
18"
R
60 1/2"
4'-0"
R
TAMBOUR CABINETS 1'-6"
MASTER BATHROOM ELEVATION 39"
9
BUILT-IN BENCH
1 1/4" THICK PAINTED WOOD SEAT
18"
1'-6"
39" 6'-1" CLR - MIN. TO FINISHES
FREE STANDING VANITY BY OWNER
1
DESCRIPTION
DANIEL MASON GARBER C-28915
EXISTING
COPYRIGHT: F G G 2010
10"
TAMBOUR CABINETS PAINTED WALL C L
TOE KICK 3'-0"
MIRROR, BY OWNER.
BUILT-IN BENCHVERIFY HEIGHT IN FIELD
A1 A4.1 ADDITION & REMODEL
10"
B6
WOOD SHELF
41"
6'-8" 4'-0"
C L
W2 A4.1
CONSTRUCTION
DATE 9/02/10
SED ARCHITE EN
AT E
ISSUE DATE
2
12"
60 1/2"
1'-3" 1'-3" 1'-3"
C L OPEN SHELF
1/2" THICK PAINTED PAINTED WALL
PERMIT
6) ROOF COVERING MATERIAL SHALL BE MINIMUM CLASS C PER CBC 503.1, 1507
10/15/10 CONSTRUCTION
b
B6
FRAMELESS TEMPERED GLASS SHOWER DOOR
FREE STANDING&VANITY WINDOW BY OWNER
DESCRIPTION
1/06/11
2
12"
GUEST BATHROOM LINEN
8 B6 72"
OWNER. VERIFY HEIGHT
C L
DATE
9/02/10
SOUTH ELEVATION
5) NEW ADDRESS SIGNAGE SHALL BE A MINIMUM OF 4" HIGH, AND SHALL CONTRAST WITH THE BACKGROUND PER CBC 501.2.
10/07/10 PERMIT REVISION
1
81 ENCINA AVE. PALO ALTO, CA 94301
| f: 650.473.0410 E4t: 650.473.0400 www.fgg-arch.com
4) BEFORE CONSTRUCTION, VERIFY (E) ROOF PITCHES
10/15/10 CONSTRUCTION
B6 FRAMELESS TEMPERED 12"DOOR X 24" TILE GLASS SHOWER LIGHT FIXTURES, BY & WINDOW
ISSUE DATE
30"
HALLWAY LINEN
FIELD WITH OWNER & ARCHITECT
C L
1'-6 1/2"
Q
7
Piper Residence_CD_110105.pln
1'-3"
18"
1 1/2"
TOE KICK
24"
PANEL P-H
6
1'-3"
24" BUILT-IN BOOKCASE
41"
Q
1'-9" (V.I.F.)
3'-0"
24"
30"
Q
C L 1'-6 1/2"
24"
LINEN CAB.
OPEN SHELF
U
3) NEW STUCCO TO MATCH (E). PROVIDE MIN. 3 LAYERS, 7/8" MIN., STUCCO OVER 2 LAYERS GRADE 'D' BUILDING PAPER OVER NO.15 ASPHALT FELT, COMPLYING WITH ASTM D 226, OVER EXTERIOR PLYWOOD WITH A MIN. 26GA GALVANIZED WEEP SCREED 4" ABOVE GRADE OR 2" ABOVE CONCRETE PER CBC 2510.6, 2512, AND 1404.1 AT ALL EXTERIOR STUCCO WALLS, TYP
30"
24" OUTLET FOR T.V.
TV NOOK ELEVATION
6
a-a
DINING ROOM ELEVATION
U2
9"
24"
Q
56 1/2"
34 1/2"
LINEN CAB.
a
5
24" PAINTED WALL
3"
3"
30"
PANEL P-H
Q
TOE KICK
24"
PANEL P-H
1'-9" (V.I.F.)
30"
Q
18"
24"
a-a
J2
Q
6'-8"
30" a
Q
78"
3" J2
1 1/2" Q
36"
PANEL P-H
NG ROOM ELEVATION
L
42"
34 1/2"
L
B9 96"
J2
36"
B9
66"
60"
78"
96"
42"
L 4"
K3
96"
30"
12"
B9
14"
LEGS L-2
LEG L-2
1) PATCH AND REPAIR FINISHES AS REQUIRED FOR NEW WINDOWS AND DOORS
LIC
53"
P-E
OPEN
14"
T.O. FF: 0'-0"
BUILDING ELEVATION NOTES
NI A
27"
6'-8"
23 1/2" 96"
TOE KICK
3"
KITCHEN ISLAND ELEVATIONS PANEL
OPEN 4"
3"
LEGS L-2
66"
60"
a
96"
14"
3" LEGS L-2
4
PANEL P-F
(N) VENT
MAIN LEVEL FF
450 BLAKE STREET, MENLO PARK, CALIFORNIA
3" LEG L-2
D
4 PANEL P-G
20"
OPEN
18"
FILLER
D
ISLAND "LEFT"
DRAWER 74"
MAIN LEVEL FF
PIPER RESIDENCE
21"
PANEL P-F
PANEL
S
(N) DS.
CONCRETE STEPS
A REMODEL AND ADDITION TO THE
21" a
(N) DS.
HARDIE BOARD SIDING
6'-8"
18"
(E) FENCE
N
(N) DS.
104
7'-0"
3" LEG L-2 PANEL P-E
15" PULL-OUT PANTRY
PANEL
DRAWER
3" LEG L-1
K3
36" REFRIGERATOR
1/6/11 at 5:31 PM
6"
27"
86" 84"
3"
103
2) EGRESS WINDOWS INDICATED BY AN 'E', TYP. MIN. ONE EGRESS WINDOW PER BEDROOM WITH 44" MAX SILL HEIGHT ABOVE FLOOR, 5.7 SF MIN OPERABLE AREA, 24" CLEAN OPENABLE HEIGHT 20" CLEAR OPENABLE WIDTH PER CBC 1026
KITCHEN ELEVATION AT STOVE WALLP-D P-E
ISLAND "REAR"
101
PAINTED WOOD TRIM
OF CA LIFOR
2
(N) DS.
105
PAINTED COLUMN, SSD
450 BLAKE STREET, MENLO PARK, CALIFORNIA 450 BLAKE STREET, MENLO PARK, CALIFORNIA
J4
12
106
T.O. GRADE: 1'-0"
A REMODEL AND ADDITION TO THE
14"
3
53"
TOE KICK
30" RANGE
PANEL P-F
34 1/2" 42"
24"
D
20"
OPEN
3"
BUILT-IN BOOKSHELVES
ISLAND "LEFT"
74"
3"
D a
LEGS L-2 PANEL P-D
204
3'-1"
8"
PIPER RESIDENCE PIPER RESIDENCE
24"
K3
18"
24"
27"
LEG L-1
D3
4" 3" LEG L-2
22"
D2
AT E
A REMODEL AND ADDITION TO THE
LEG L-1
KITCHEN ELEVATION AT STOVE WALL
3
DANIEL MASON GARBER C-28915
T.O. FF: 0'-0"
E
34 1/2"
34 1/2"
WINE FRIDGE
PANEL P-G
30"
53"
TOE KICK
3"
3"
45°
Piper Residence_CD_110105.pln
18" a
42"
12"
42"
3"
12"
21"
203
ST
a
PANEL P-G
21"
LEG L-1
PANEL P-F
ISLAND "RIGHT"
34 1/2"
18"
6"
3" LEG L-1
202
CT
3"
60"
36" 34 1/2" PANEL
15" PULL-OUT PANTRY
20"
74"
12" KICK TOE
24"
PANEL P-E
J3
36" REFRIGERATOR
86" 84" 12" FILLER
a
201
T.O. TOP OF TRIM: 2'-9" AFF 03-31-2011
27"
F ISLAND "REAR"
a
12"
BUILT-IN BOOKSHELVES
86"
24"
30" RANGE
6"
ISLAND "FRONT"
22" 18"
D2
TOE KICK
24"
20"
KITCHEN ELEVATION AT SINK WALL P-D P-E
2
J4
18"
PANEL
T.O. PLATE: 12'-0" AFF
PAINTED BEAM WITH T&G
PAINTED KNEE BRACES, SSD
SED ARCHITE EN
LIGHT SHELF AND TRIM ALIGN
12"
3"
42"
E
E
B4
34 1/2" 42"
24" DISHWASHER
21"
D3
34 1/2"
6"
WINE FRIDGE
WITH TRASH AND RECYCLING BINS
53" TOE KICK
21"
34 1/2"
42"
F ISLAND "RIGHT" PULL-OUT CABINET
74"
OUTLET IN CABINET
ISLAND SECTION a-a
G
H
a
12"
SWITCH, G PLAN
EL
12"
86"
12"
Y WALL
A
KITCHEN ELEVATION AT SINK WALL
2
J
ISLAND "FRONT"
18"
18"
18"
J
34 1/2"
36"
ISLAND SECTION a-a
42"
NI A
96"
18" 24" K DISHWASHER
21"
B4
J3
F
3"
TOE KICK
21"
8103-31-2011 ENCINA AVE.
A2 A4.1
www.fgg-arch.com T.O. PLATE: 8'-3 1/2"
36" 34 1/2"
42" 60"
PULL-OUT CABINET WITH TRASH AND RECYCLING BINS
T.O. RIDGE: 13'-0" AFF (N) 6:12 PORCH ROOF
ATPALO ALTO, CA 94301 UNDERNEATH AT FLAT CEILING R EO t: 650.473.0400 | f: 650.473.0410 F C A L IF O
ST
96"
36"
34 1/2"
F
DANIEL MASON GARBER C-28915
CT
G
H
(N) VENT MATCH (E)
SED ARCHITE EN
TRIM ALIGN
N3 B2
J
6 T.O. RIDGE: 13'-10" AFF
N2 LIGHT SHELF AND
K2
J
OUTLET IN CABINET
2
E 27"
N2
ALIGN LIGHT SHELF AND ROOM TRIM
3"
27"
N3 B4
A
LIC
42"
B4
60"
42" 60"
K
18"
96"
PANEL P-C
2
CT
27 1/2"
PANEL P-B
ST
2
PANEL P-A
B3
23 1/2"
42"
B2 B3
T.O. RIDGE: ±16'-7" AFF 12
2
27 1/2"
42"
K2
34 1/2"
ALIGN LIGHT SHELF AND ROOM TRIM
BUILDING ELEVATIONS E4
SOUTH ELEVATION SCALE:1/4" =
1'-0"
A3.2
SCALE:1/4" =
1'-0"
2'-3"
70 TYP
T.O. LIGHTSHELF T&G: 8'-0" AFF
2X FRAMING, SSD
(N) ROOF RAFTERS
1/2" BACKER BOARD
(E) WALL, RESURFACED W/ STUCCO (ALL SIDES)
PLY, SSD T.O.EXTERIOR PLATE: 8'-3 1/2"
LINE OF WEEP SCREED
2X4 WALL FRAMING 105 103
102
1/2" GYP. BD, PAINTED
FRONT PORCH
CRAWLSPACE
ROOF PLY, SSD
3) ALL DIMENSIONS TO EXISTING WALLS TAKEN FROM FACE OF FINISH, U.O.N.
81 ENCINA AVE. PALO ALTO,AIR CA SPACE 94301 GAP 6" LINEAR t: 650.473.0400 | f: 650.473.0410 @16" O.C. (E) FIREPLACE www.fgg-arch.com
(E) CHIMNEY
7) CONTRACTOR TO VERIFY W/ MANUFACTURER AND PROVIDE ALL CLEARANCES, PLUMBING, ELECTRICAL, AND MECHANICAL REQUIRED. 8) COORDINATE LOCATION FOR COOK TOP HOOD HEIGHT WITH ARCHITECT AND/OR OWNER PRIOR TO INSTALLATION.
6 9) COORDINATE INSTALLATION OF ALL LIGHT FIXTURES, ELECTRICAL OUTLETS AND TELEPHONE JACKS WITH ARCHITECT AND/OR OWNER PRIOR TO INSTALLATION. SEE A2.3 FOR MORE INFORMATION.
11) ALL NEW WALLS SHALL HAVE MINIMUM 2x4 NOM WOOD STUDS AT 16" O.C. U.O.N.
S EN
LIC
12) PATCH AND REPAIR ALL DEMOLITION SCARS. ALL NEW AND PATCHED SURFACES SHALL BE SMOOTH CONTINUOUS AND IN PROPER CONDITION TO RECEIVE NEW FINISHES AS SPECIFIED. IN PATCHED AREAS OR ATTIC STORAGE HEAT REGISTER (TOE KICK) T.O. FINISH CLG: 11'-2" AFFWHERE WORK JOINS EXISTING, TRANSITIONS SHALL NOT BE VISIBLE. ATTIC 13) ALL NEW FLOOR MOUNTED HVAC GRILLES ARE TO BE FLUSH WITH FINISHED FLOOR. IF WOOD, GRILLES TO BE STAINED TO MATCH THE FLOOR, SEE A2.3 FOR LOCATION
118
117
EQ
MORTAR TRIM AROUND VENT OPENING
DN
STONE TILE SURROUND
11'-8"
2X4
1"
BATHROOM
5'-0" SETBACK
CARRERA SLAB, BY OWNER
PAINTED TRIM BD SIDING, SEE ELEVATIONS
E4
EXTERIOR PLYWOOD, SSD
CLEAVAGE 2X MEMBRANE FRAMING, SSD 1/6/11 at 5:31 PM
(E) GAS METER
2X4
2"
A3.2 2 LAYERS GRADE 'D' BLDG PAPER 3/4" MORTAR
(N) GAS RANGE AND VENT. HOOD
(N) 8'-0" x 4'-0" GATE STONE TILE FLOORING
SCALE: 1 1/2"=
1'-0"
Piper Residence_CD_110105.pln
EAVE VENT DETAIL
PAINTED STUCCO NOTE:ASPHALT SEE EAVE VENTING NO.15 BLDG.DETAIL MORE INFORMATION FELTFORO/ PLYWD. 18"
50'-0"
EXTERIOR PLY, SSD 2X FRAMING, SSD R-13 MIN. BATT INSULATION
12
2
SHT. MTL. FLASHING O/ ALL VERTICAL TO MIN 1/2" GYP BD HORIZONTAL CONNECTIONS, INCLUDING PAINTED STUCCO WINDOW HEADS NO.15 ASPHALT BLDG. FELT O/ PLYWD. EXTERIOR PLY, SSD 2X FRAMING, SSD 2
R-13 MIN. BATT INSULATION
12
HARDIE-BOARD LAP SIDING NO.15 ASPHALT BLDG. FELT SHT.O/ MTL.PLYWD. FLASHING O/ ALL VERTICAL TO
T.O. EXTERIOR LIGHTSHELF T&G: 7'-10" AFF
ISSUE DATE
1
HORIZONTAL CONNECTIONS, INCLUDING WINDOW HEADS FLOOR FRAMING, SSD
DESCRIPTION
ISSU DATE
10/07/10 PERMIT REVISION
9/02/10
SHT. MTL. TERMITE SHIELD. 1
HARDIE-BOARD LAP SIDING
CONSTRUCTION
1 x 4 T&G DECKING, PAINTED
FLOOR FRAMING, SSD
1X PAINTED TRIM SIMPSON 1616HL at ±48", BEYOND
SHT. MTL. TERMITE SHIELD.
KITCHEN COUNTERTOP
RETAIN (E) WALL
A2 A4.1
NOTE: REFERENCE STRUCTURAL DRAWINGS FOR FOUNDATION CONC. FDN, SSD AND FRAMING CONDITIONS AND DETAILS
CLEAVAGE MEMBRANE
COPYRIGHT
NOTE: REFERENCE STRUCTURAL DRAWINGS FOR FOUNDATION AND FRAMING CONDITIONS AND DETAILS
SITE PLAN & FLOOR PLAN
SLOPE 1/4" / FOOT
BUILDIN DE SECT
(E) FLOOR PLY
2
EAVE VENT DETAIL SCALE: 1 1/2"=
4
1'-0"
N SHOWER CURB DETAIL FLOOR PLAN SCALE: 3"
=
1'-0"
W2
SHOWER CURB DETAIL 1'-0"
SCALE:41/4" =
SCALE: 3"
KITCHEN LIGHT SHELF WALL SECTION =
1'-0"
A2.1 W2
1/06/11
CONC. FDN, SSD
COPYRIGHT: F G G 2010 RETAIN (E) WALL
10/07/10
10/15/10 2
NO.15 ASPHALT BLDG. FELT O/ PLYWD.
4X10 HEADER, SSD
(E) NON-CONFORMING
SLOPE 1/4" / FOOT
3/4" MORTAR
MIN. R-13 BATT INSULATION
(E) FLOOR PLY INT. GYP. BD.
5" SHT. MTL. GUTTER W/ 3" D.S.DISCHARGE ONTO SPLASHBLOCK
DS
CURB STEP, MATCH LOW WALL DECORATIVE STONE (CARRERA - VERIFY WITH OWNER)
STONE TILE FLOORING PAINTED STUCCO EXTERIOR
103'-0"
SHOWER
TEMP'D GLASS SHOWER DOOR
1 3/8"
2 LAYERS GRADE 'D' BLDG PAPER
10'-6 1/2"1"
CURB STEP, MATCH LOW WALL DECORATIVE PAINTED ALUMINUM GUTTER STONE (CARRERA - VERIFY WITH OWNER)
PAINTED STUCCO EXTERIOR SIDING, SEE ELEVATIONS
1'-0"
SCA
MIN 1/2" GYP BD
T.O. INTERIOR LIGHTSHELF T&G: 8'-0" AFF
2X BLOCKING, SSD 1/06/11 2
COVERED CARPORT
ROOF RAFTER, SSD
2"
PAINTED TRIM BD
SCALE: 1/4" =
SHOWER CURB DETA
1 x 4 T&G DECKING, PAINTED PERMIT 9/02/10
KITCHEN COUNTERTOP
(E) 19'-8" 1'-5"
W1 A4.1
A
4
2 -- SIM.
ASPHALT COMP. SHINGLES
BUILDING SECTION A
4" HALF-ROUND PAINTED GUTTER
HANGER, SSD DATE
1'-0"
1'-0"
HANGER, SSD10/15/10 CONSTRUCTION
10'-11"
24'-3"
DS
SIMPSON 1616HL at ±48", BEYOND
106
@16" O.C.
16'-3 1/2"
1X PAINTED TRIM
4'-0"
PROVIDE MIN. 1" AIR SPACE 105PLY FOR VENTING BELOW ROOF
33'-8"
1 x 4 T&G DECKING, PAINTED
SHOWER
1'-0"
SCALE: 1/4" =
8"
(N) CAB BATHROOM
TEMP'D GLASS SHOWER DOOR 6" LINEAR AIR SPACE GAP
EQ
(E) DRIVEWAY
2
13'-1 1/2"
FF = -0'-6"
107
=
1 3/8"
ROOF PLY, SSD DS
CONCRETE STEP DOWN TO GRADE
8'-7"
4X10 HEADER, SSD
10'-0"
(N) CAB
FRIDGE
PANTRY
2'-6"
COMP. ROOF5 SHINGLES, SEE ELEVATIONS
1"
104
SCALE: 3"
WALL, REMOVED
N 56∘ 37' 00" W
109
SCALE: 1 1/2"=
2 1/2" X 12" TAPERED BEAM 24" O.C. 4x8 WOOD BEAM, SSD
SHOWER SILL DETAIL
3 LINE OF 2X BLOCKING, SSD (E) GARAGE
WIRE MESH
NEW ADDRESS SHALL BE MIN. R-13 SIGNAGE BATT INSULATION A MINIMUM OF 4" HIGH, AND SHALL CONTRAST WITH THE INT. GYP. BD. BACKGROUND PER CBC 501.2.
21'-8 1/2"
EGRESS
EQ.
3'-6"
W2 A4.1
HANGER, SSD
03
OF
SLOPE 1/4
BUILDING SECTION B
(E) FLOOR PLY
EAVE VENT DETAIL
COMPOSITE SHINGLES ON PLYWOOD
R 10'-0"
BACK PORCH
CORROSION-RESISTANT CARRERA SLAB, BY OWNER 59'-4 1/2"
EXTERIOR PLYWOOD, SSD S 33∘ 24' 17" W 2X FRAMING, SSD
HANGER, SSD
CLEARANCE TO CARPORT
2
T.O. FINISH CLG: 11'-2" AFF
1 x 4 T&G DECKING, PAINTED
1/2"DN GYP. BD, PAINTED 3R @ 6"
G
1"
103
7'-0"
1/6/11 at 5:31 PM
SCALE: 1 1/2"=SINK1'-0"
(N) KITCHEN
C
EQ
HB
DS
108
PAINTED ALUMINUM GUTTER
T.O. EXTERIOR LIGHTSHELF T&G: 7'-10" AFF
A5.1
(E) FP DS
T.O. INTERIOR LIGHTSHELF T&G: 8'-0" AFF
A1 A4.1
E3 A3.2
2X4 WALL FRAMING
110
FOUNDATION VENT DETAIL MW
STONE TILE SURROUND
4" HALF-ROUND PAINTED GUTTER
1'-0"
SKYLT ABOVE
SLOPE 1/8":1'-0"
DW
13'-8"
2'-0"
FF = -0'-1"
ROOF RAFTER, SSD
Piper Residence_CD_110105.pln
4'-11 3/4"
14'-6"
2'-0"
CORROSION-RESISTANT WIRE MESH
N
3
1
DN 2R @ 6"
6" LINEAR AIR SPACE GAP @16" O.C.
1 4 A5.1 2
(N) DINING ROOM
4'-0"
(N) PORCH 102
PROVIDE MIN. 1" AIR SPACE BELOW ROOF PLY FOR VENTING 10'-3"
50'-0"
MORTAR SKYLT ABOVE
=
A5.1 1/2"10BACKER BOARD
(E) LIVING ROOM
SLOPE 1/8":1'-0"
ROOF PLY, SSD
PROVIDE 36" SQUARE CLEAR LEVEL LANDING AT EXTERIOR DOORS, TYP.
VESTIBULE
EXTERIOR PLY, SSD
COMP. ROOF SHINGLES, 2'-1" SEE ELEVATIONS E1 A3.1
SCALE: 3"
M
2X FRAMING, SSD
DS A3
2'-0"
BROOM SHOWER SILL DETAIL CLOSET CLOSET TILE, BY OWNER
3'-1"
TRIM AROUND VENT OPENING
4x8 WOOD BEAM, SSD
10'-3/4"
8'-9 1/2"
21'-1/2"
30" MIN DEPTH, WIDTH AND HEIGHT OF WORKING SPACE IN FRONT OF WATER HEATER
2 1/2" X 12" TAPERED BEAM 24" O.C.
11'-11 1/2"
8'-7"
A5.1
J
3
G
FF = 0'-0"
5"
(E) NON-CONFORMING
1'-0"
H
W/D FD 5" STORAGE HIGH FOUNDATION VENT
CLOSET
COMPOSITE SHINGLES ON PLYWOOD
MARBLE SILL, MATCH LAVATORY COUNTERTOP
GALV. METAL FLASHING
F
6 3/4"
111
B
CLEAVAGE MEMBRANE
T.O. FF: 0'-0" T.O. GROUND LEVEL: -1'-0"
A REMODEL AND ADDITION TO THE
EQ. 7 LINEN
BENCH & CUBBIES
DN 1"
10'-6"
HARDIE BOARD LAP SIDING
E
A5.1
3'-6"
A
DN 2R @ 6"
13'-6"
3'-6"
SCALE: 16 1/2"=
3/8' FRAMELESS GLASS
6'-7"
1/2" GYP. BD, PAINTED
FOUNDATION VENT DETAIL (N) ENTRY
2
L
10'-0"
EGRESS
(N) ATTIC ACCESS ABOVE
2X4 WALL FRAMING
(E) HALL
(N) BUILT-INS
7'-6 1/2"
8'-1 1/2"
± 31'-2"
A1 A4.1
S 56∘ 37' 00" E
BLAKE STREET
B
112
M. BATH VAPOR BARRIER
AT E
NOTE: SEE EAVE VENTING DETAIL FOR MORE INFORMATION
3/4" MORTAR
18"
ENTRY
MASTER BEDROOM
DANIE GA C-
LINE OF WEEP SCREED
STONE TILE FLOORING
INT. GYP. BD.
T.O. FINISH CLG: 11'-2" AFF
113
2X4
FRONT PORCH
MIN. R-13 BATT FRONTINSULATION
2
SED EN
(E) WALL, RESURFACED W/ STUCCO (ALL SIDES)
2X FRAMING, SSD
2 EGRESS
9 A5.1 SKYLT ABOVE K
(E) BEDROOM #1
D
DS
1
6'-9"
DN 6"
CLOSET
EGRESS
1/2" BACKER BOARD
C
EXTERIOR PLY, (E) SSD BEDROOM #2
BENCH & CUBBIES
DS
6'-9"
EQ
A5.1 8
(E) MAILBOX
114
115
DS
EGRESS
102
(E) BATHRM
2X FRAMING, SSD
122
20'-0" SETBACK
116
EGRESS
2 LAYERS GRADE 'D' BLDG PAPER EXTERIOR PLYWOOD, SSD
(N) ROOF RAFTERS
18" MIN.
119
EGRESS
103
t: 650.473.0400 SHOWER www.fgg
1 X 4 T&G DECKING, PAINTED
CARRERA SLAB, BY OWNER CURB STEP, MATCH LOW WALL DECORATIVE STONE (CARRERA - VERIFY WITH OWNER)
T.O. PLATE: 8'-3 1/2"
8"
TILE, BY OWNER
5'-0"
SEE A7.1 FOR ENLARGED PLAN
57'-2 1/2"
DS
121
CRAWLSPACE
59'-2 3/4"
5" HIGH FOUNDATION VENT
SETBACK LINE
ROOF OUTLINE
(N) SKYLIGHT ABOVE, TYP
OR
Piper Residence_CD_110105.pln
GALV. METAL FLASHING
120
SLOPE FLOOR TO DRAIN AT LAUNDRY ROOM
LAVATORY COUNTERTOP
2'-0" 20'-0" SETBACK
N
5" (N) TANKLESS W.H. SEE SHEET NOTE #16
(N) BUILT-IN LINEN POCKET DOOR MARBLE SILL, MATCH CABINET
6'-4"
16" DIA MUNICIPAL SYCAMORE
SETBACK LINE
(E) LIVING ROOM
104
DINING ROOM
1/6/11 at 5:31 PM
3/8' FRAMELESS GLASS
HARDIE BOARD LAP SIDING S 33∘ 24' 17" W 103'-0"
105
KITCHEN
SETBACK
VAPOR BARRIER
HARDSCAPED STEPS AT GRADE
REAR ENTRY
1'-0"
81 ENC PALO ALT
(E) ROOF RAFTERS T.O. PLATE: 7'-9 3/4" AFF
ST
MASTER CLOSET
4
3 1/2" X 11 7/8" PLM RIDGE BEAM, SSD
03-31-2011
ST
6 3/4"
17) NEW FORCED AIR UNIT (FAU) IN CRAWLSPACE TO REPLACE (E). PROVIDE CONCRETE SLAB MIN. 3" ABOVE GRADE IF NONE EXISTS. 18) NEW FLOOR HEAT REGISTERS AS SHOWN, PROVIDE DUCTWORK AS REQUIRED
E2 A3.1
(E)
5" SHT. MTL. GUTTER W/ 3" D.S.TEMP'D GLASS SHOWER DOOR DISCHARGE ONTO SPLASHBLOCK
PAINTED STUCCO EXTERIOR SIDING, SEE ELEVATIONS
16) TANKLESS WATER HEATER BY TAKAGI T-K3. PROVIDE MIN 3" COMBUSTION AIR FEED PER MANUFACTURER SPEC
TREE PROTECTION ZONE EQUAL TO 10 TIMES THE DIAMETER, SEE TPZ FILED WITH CITY OF MENLO PARK
T.O. (N) RIDGE: 13'-10" AFF
SCALE: 1/4" =
T.O. PLATE: 10'-3/8" AFF
12
BATHROOM
BUILDING SECTION A
OF C PAINTED TRIM A LIFBD
15) PROVIDE A (N) CODE COMPLIANT VAPOR RETARDER ON GROUND SURFACE IN ALL CRAWLSPACE AREAS PER CBC 1203.3.2.2, IF NONE CURRENTLY EXISTS, VIF
36" DIA FIR
ITE
DANIEL MASON GARBER C-28915
AT E
70 TYP
14) WATER HEATER TO HAVE SEISMIC STRAPS WITHIN UPPER THIRD AND LOWER THIRD OF UNIT, 4" MIN ABOVE CONTROLS. T.O. LIGHTSHELF T&G: 8'-0" AFF
A
12 4 (N)
PAINTED ALUMINUM GUTTER
ATTIC
2 -- SIM.
(N) COMPOSITION SHINGLE ROOFING
ASPHALT COMP. SHINGLES
2'-3"
10) PROVIDE ALL NECESSARY BLOCKING FOR ALL WALL MOUNTED ITEMS.
HEAT REGISTER (FLOOR)
ROOF ERAFTER, D ARCH SSD
CT
DOWNSPOUT
STONE TILE SURROUND
CORROSION-RESISTANT WIRE MESH
12
NI A
T.O. RIDGE: ±16'-7" AFF
NEW FLOOR AREA DS
CENTERLINE OF WALL AT (E) BEDROOM #1
450 BLAKE STREET, MENLO PARK, CALIFORNIA
(E) FENCE
LIGHTSHELF WITH 3 1/2"x3/4" T&G DECKING
VELUX SKYLIGHTS
A REMODEL AND ADDITION TO THE
2 6) PULL-DOWN STAIR SHALL PROVIDE MINIMUM 22"x30" CLEAR OPENING WITH 30" CLEAR HEADROOM ABOVE OPENING.
1 3/8"
5) ARCHITECTURAL LAYOUT TAKES PRECEDENCE OVER STRUCTURAL LAYOUTS. NOTIFY ARCHITECT IMMEDIATELY FOR RESOLUTION IF ANY CONFLICTS ARE FOUND.
BUILDING SETBACK
1'-0"
PROVIDE MIN. 1"ADDITION AIR SPACE BELOW ROOF PLY FOR VENTING
EXISTING
PROPERTY LINE
2"
ADDITION
4) ALL DIMENSIONS TO NEW WALLS TAKEN FROM FRAMING, U.O.N.
SCALE: 1/4" =
4'-0"
PIPER RESIDENCE
DEMOLISHED (E) WALL
B
T.O. FF: 0'-0"
SCA
BUILDING SECTION B
COMP. ROOF SHINGLES, SEE ELEVATIONS
2) CONTRACTOR MUST REFERENCE ARBORIST REPORT FOR HERITAGE TREE PROTECTION PLAN FOR THE 16" SYCAMORE ON MUNICIPAL GROUND AND THE 36" DOUGLAS FIR IN FRONT YARD. THERE WILL BE NO ROOT REMOVAL WITHIN THE DRIP LINE OF EITHER TREE.
NEW (N) WALL
SHOWER SILL DETAIL
3
1'-0"
T.O. GROUND LEVEL: -1'-0"
1) DURING CONSTRUCTION, PROTECT ALL EXISTING STRUCTURES, TREES, AND LANDSCAPING NOT IN CONTRACT.
EXISTING (E) WALL
SCALE: 1 1/2"=
FRONT ENTRY
SHEET NOTES
SYMBOL LEGEND
FOUNDATION VENT DETAIL
1
LIC
(E) LIVING ROOM
104
DINING ROOM
18" MIN.
KITCHEN
N
1"
REAR ENTRY
1"
MASTER CLOSET
KITCHEN LIGHT SHELF WALL SECTION SCALE: 3/4" = 1'-0" SCALE: 3/4" =
W1W1
WALL SECTION
WALL SECTION
1'-0"
This is one of the first projects I did while working for Fergus Garber Young in Palo Alto, California. It was a remodel of the living room, dining room, kitchen and master suite. For this project, I made most of the permit and construction documents sets, including the images shown above from the sets. I worked on everything from the floor plans and required notes, to the kitchen elevations and window details. I developed the detail for the light shelf and exterior overhang on my own. The building was modeled in ArchiCAD, where the drawings were also produced. The images are of the final interior space after opening many of the interior walls.
SCALE: 3/4" =
SCALE: 3/4" = 1'-0"
A4 1'-0"
05
Oregon BILDS with Professor Rob Thallon
Site: Abandoned house on University of Oregon property two blocks West of campus Programs: ArchiCAD, Passive House Planning Package, Ecotect, Indesign, Illustrator, Photoshop, hand-built models
1
ECONOMY
REUSE
ENERGY
MARKETABLE
Efficient appliances and ready to install photovoltaic roof saves energy
2
•Plenty of entertainment space indoors and out •A design that maintains the neighborhood aesthetic •Flexible space for growing families •An office space •A garage •Space for a rentable Accessory dwelling unit
2
3
Intentional flexibility of spaces creates low cost opportunities to change living environmentsallowing for the home to expand or shrink with the user’s needs
Rainwater is harvested from roof and distributed to household and irrigation uses.
3
WATER MANAGMENT
$
ACCESSORY DWELLING UNIT
RESIDENTIAL
• HOME OFFICE
OFFICE 180 S.F.
Thermal mass, high R-value wall, high performance windows, etc.
Bioswales collect water and plants filter harmful pollutants
SPECIFICATIONS
DESIRED FEATURES 12% 8 out of 68
$
• CLOSE TO UNIVERSITY OF OREGON KITCHEN FOCUS • 2 STORY
CAMPUS
CIRCULATION DINING 128 S.F.
BEDROOM 90 S.F.
SPECIFICATIONS STAIRS
63% 75% 85% 76% 43 out of 68 51 out of 68 52 out of 68 58 out of 68
BREAKDOWN BY SPACE
COVERED PORCH
DEN
MUD ROOM BATH 60 S.F. 12 S.F.
•
GREEN FEATURES
GARAGE
ENERGY LOCATION IN SPECIFIC EFFICIENCY SCHOOL DISTRICT
HOME OFFICE
12% 8 out of 68
56% 54% 29% 44% 63% 24% 16 out of 68 20 out of 68 30 out of 68 37 out of 68 38 out of 68 43 out of 68
63% 75% 85% 76% 43 out of 68 51 out of 68 52 out of 68 58 out of 68
• CLOSE TO UNIVERSITY OF OREGON
CIRCULATION • 2 STORY prevents mitigation into the ENTRY 33 S.F. land. Bioswales help to control water POTENTIAL and filter it through bioremediation. DINING • 2 BEDROOMS, KITCHEN
BATH 43 S.F.
128 S.F.
BEDROOM
S.F. low maintence, native Planted 90 with plantings RESIDENTIAL
FOR 3
S.F. • 2.5195 BATHS
N
• 1 CAR GARAGE, POTENTIAL FOR ACCESSORY DWELLING UNIT • HOME OFFICE
CAPTURE SUNLIGHT GREEN
GARAGE COVERED DEN MAXIMIZE SOUTHERN EDGE INLOCATION FEATURES PORCH OUTDOOR SPECIFIC
CARPORT
ENERGY EFFICIENCY
VILLARD ST
COOL FRESH AIR DRAWN INTO HRV
WARM STALE AIR FROM HOME DRAWIN INTO HRV
EXTERIOR WALLS ROOF SLAB WINDOWS & DOORS 12%
8
DESIRED FEATURES 8 out of 68
56% 54% 29% 44% 63% 24% 16 out of 68 20 out of 68 30 out of 68 37 out of 68 38 out of 68 43 out of 68
sola
r pa nels
• CLOSE TO UNIVERSITY OF OREGON
ENHANCED INSULATION VS. CODE Enhanced Insulation
485
70
SHEEP
60 50 40
30 (we currently are running at 5.66 kBTU/SF/YEAR 20 with American windows, or 3.75 with $ 10 European.) HEATING 0
CARPORT
DEN
GOAL: 4.75 kBTU/ SF/ YEAR
JAN
FEB MAR
APR MAY JUN JUL AUG SEPT OCT NOV DEC
COVERED PORCH
GREEN FEATURES
GARAGE
ENERGY LOCATION IN SPECIFIC EFFICIENCY SCHOOL DISTRICT
80 s.f. providing 74% of hot water demand Cost: approx. $4,000
CAMPUS/ WORK
WATER MANAGMENT - Rainwater catchment - Bioswales
GREYWATER SYSTEM : QUICK FACTS
Catchment Yield : 20,931 gallons Cistern Size : 792 gallons
POTENTIAL FOR 3
FOR 80 ACCESSORY DWELLING UNIT
YARD GUEST PROXIMITY LONG VIEWS EXPAND SITE BEDROOM TO
Eugene Annual Rainfall: 36 in/year Rainwater catchment area : 1264 sq. ft. Adjusted Catchment Ratio : 16 gallons/ sq. ft.
Heat Recovery Unit provide fresh air and climate control
WE USE APPROXIMATELY 3-5 TIMES 100 LESS ENERGY IF WE BUILT TO •THAN 1 CAR GARAGE, POTENTIAL 90 CODE
UNFOLDING LANDSCAPES
HEAT FROM INDOOR AIR IS TRANSFERRED TO INCOMING FRESH AIR
63% 75% 85% 76% 43 out of 68 51 out of 68 52 out of 68 58 out of 68
COOL STALE AIR IS RELEASED OUTSIDE
1.72 kW proving 32 % of Electricity Usage Cost: approx. $1,900
PASSIVE HOUSE • 2 STORY
HOME OFFICE
HOME OFFICE
YARD
GUEST BEDROOM
Wool Insulation: 11.5” walls, 18” roof Cost: approx. $6,500
PROXIMITY TO CAMPUS/ WORK
YARD
SITE SECTION
DESIRED FEATURES
LIVING 1462.5111 SQ S.F.FT
TRANSMISSION HEAT LOSS BY BUILDING
Code
ENTRY 33 S.F.
KITCHEN 195 S.F.
• HOME OFFICE
BREAKDOWN BY SPACE
• 1462.5 SQ FT
ENERGY LOCATION IN SPECIFIC EFFICIENCY SCHOOL DISTRICT
SQUARE FOOTAGE
CARPORT
SQUARE FOOTAGE
SPECIFICATIONS
GARAGE
LIVING 111 S.F.
• 1 CAR GARAGE, POTENTIAL FOR ACCESSORY DWELLING UNIT
RESIDENTIAL
HIGH DENSITY
CODE INSULATION WITH STANDARD DOUBLE-PANE WINDOWS
PER MONTH
BATH 43 S.F.
56% 54% 29% 44% 63% 24% 16 out of 68 20 out of 68 30 out of 68 37 out of 68 38 out of 68 43 out of 68
SCHOOL DISTRICT
•Student labor •Efficient circulation/use of space •Low operating costs
ALL HEAT PROVIDED BY AN IN-LINE • NO HOME OFFICE DUCT HEATER. COOLING EQUIPTMENT
OFFICE 180 S.F.
GREEN FEATURES
• 2.5 BATHS
HIGH DENSITY
CAMPUS
INTEGRATES ROOMS THROUGH FOCUS POINT
• 2.5 BATHS
BEDROOM 125 S.F.
COVERED
DEN
STAIRS PORCH MUD ROOM BATH 60 S.F. 12 S.F.
Clay soil CIRCULATION
AFFORDABLE KITCHEN FOCUS
WINDOWS BECOME A DECIDING 2 BEDROOMS, FACTOR ON• WHETHER OR NOT THE DESIGN MEETS STANDARD
CARPORT
BATH 46 S.F.
STAIRS
• 2 BEDROOMS, POTENTIAL FOR 3
$
floors for thermal mass, super-insulated construction, 7:12 roof pitch for optimal CatchmentPVYield : 20,931 gallons panel efficiency, solar water heater, Cistern Sizeand : 792 gallons heat recovery ventilation
3
• 1 CAR GARAGE, POTENTIAL FOR BIOREMEDIATION
INTEGRATES ROOMS THROUGH FOCUS POINT
BATH •Student labor STAIRS BIOSWALE : QUICK FACTS BEDROOM 46 S.F. •Efficient circulation/use of space 125 S.F. Three separate bioswales •Low operating costs
shape Rainfall: 36 in/year Eugene Annual •Controlling water--water catchment Rainwater catchment and bioswales area : 1264 sq. ft. Adjusted Catchment Ratiousage--concrete : 16 gallons/ sq. ft. •Minimizing energy
windows, etc.
• 2.5 BATHS
• 1462.5 SQ FT
•Student labor •Efficient circulation/use of space •Low operating costs
THE GRACEFUL EDGE GREYWATER •Saving SYSTEM : QUICK FACTS materials--small building, simple
Thermal mass, high R-value Bioswales collect water and • 2 BEDROOMS, POTENTIAL FOR 3 wall, high performance plants filter harmful pollutants
HRV, solar hot water, etc.
CIRCULATION
HRV, solar hot water, etc.
THE GRACEFUL EDGE
AFFORDABLE
- Rainwater catchment - Bioswales
• 2 STORY Flexible garden area is given for owners to supply their own food sources
INFRASTRUCTURE
HIGH DENSITY
CAMPUS
AFFORDABLE
Flexible garden area is given for owners to supply their own food sources
•Saving materials--small building, simple shape •Controlling water--water catchment and bioswales •Minimizing energy usage--concrete floors for thermal mass, super-insulated construction, 7:12 roof pitch for optimal PV panel efficiency, solar water heater, and heat recovery ventilation
SUSTAINABLE
SUSTAINABLE TECHNOLOGY
AGRICULTURE
SUSTAINABLE
• CLOSE TO UNIVERSITY OF OREGON Rainwater is harvested from roof and distributed to household and irrigation uses.
Intentional flexibility of spaces creates low cost opportunities to change living environmentsallowing for the home to expand or shrink with the user’s needs
VILLARD ST
3
DESIGN TENETS
• 1462.5 SQ FT
•Saving materials--small building, simple shape •Controlling water--water catchment and bioswales •Minimizing energy usage--concrete floors for thermal mass, super-insulated Efficient appliances and ready construction, 7:12 roof pitch for optimal to install photovoltaic roof saves PV panel efficiency, solar energy water heater, and heat recovery ventilation
VILLARD ST
2
and out •A design that maintains the neighborhood aesthetic •Flexible space for growing families •An office space •A garage •Space for a rentable Accessory dwelling unit
GUEST BEDROOM
PROXIMITY TO CAMPUS/ WORK
HO OF
DESIGN TENETS ENERGY
3
Efficient appliances and ready to install photovoltaic roof saves energy
ECONOMY
REUSE
Rainwater is harvested from roof and distributed to household and irrigation uses.
SUSTAINABLE TECHNOLOGY
AGRICULTURE
Intentional flexibility of spaces creates low cost opportunities to change living environmentsallowing for the home to expand or shrink with the user’s needs
Flexible garden area is given for owners to supply their own food sources
HRV, solar hot water, etc.
BIOREMEDIATION
INFRASTRUCTURE
Thermal mass, high R-value wall, high performance windows, etc.
Bioswales collect water and plants filter harmful pollutants
E
doors
es
VILLARD ST
E
THE GRACEFUL EDGE
SPECIFICATIONS • 1462.5 SQ FT
simple
12% 8 out of 68
56% 54% 29% 44% 63% 24% 16 out of 68 20 out of 68 30 out of 68 37 out of 68 38 out of 68 43 out of 68
63% 75% 85% 76% 43 out of 68 51 out of 68 52 out of 68 58 out of 68
• CLOSE TO UNIVERSITY OF OREGON
ent
• 2 STORY
ete ated ptimal eater,
E
DESIRED FEATURES
CAMPUS
HIGH DENSITY
RESIDENTIAL
As a class, our• 2goal was to design one sustainable, affordable single family residence for BEDROOMS, POTENTIAL FOR 3 • 2.5 BATHS new faculty at• 1the University of Oregon CAR GARAGE, POTENTIAL FOR ACCESSORY DWELLING we UNIT began our design process doing a charettee and each Since this is a group studio, • HOME OFFICE generating a design for the site, then combining them into two designs which were developed simultaneously. After a week of group development, we combined the best aspects of each design into one site strategy and as a group developed the project from there. CARPORT
DEN
COVERED PORCH
GREEN FEATURES
GARAGE
ENERGY LOCATION IN SPECIFIC EFFICIENCY SCHOOL DISTRICT
HOME OFFICE
YARD
GUEST BEDROOM
PROXIMITY TO CAMPUS/ WORK
���������������������������� ��������
������ ����������
6 6
������������������������ ����������
��
��
������������
�
�
����������������������
������ ����������
��������������������� ������������������� ������������
TOP PLATE 469.5'
TOP PLATE 469.5'
���������������� �����
�����������
�����
������������
���
������
������������������ ������������
��������
�������������
�����
UPPER LEVEL F.F 461.5'
������ ������ ����
UPPER LEVEL F.F 461.5'
������������ ���
�������� ������� ������ ��� �������
������
MAIN LEVEL F.F 451.5'
SCALE: 1/4" =
1'-0"
���������
4
SCALE: 1/4" =
1'-0"
2
�� �
5 4
6
TOP PLATE 469.5'
TOP PLATE 469.5' ��������
UPPER LEVEL F.F 461.5'
����������� ���� �������� ������
MAIN LEVEL F.F 451.5'
3 4
���������
HEAD
���� ����
WINDOW HEADER SCALE: 3"
����������������� �����������
���������������
�������������������
����������������
������������������� ���������
���������������� ��������������
������������������������������������� ������������������� ������������ ������������
����������������������������������������� ������������
������������
������������������������������������� ���
���������������������������������������� ����������� ���� �������� ������
��������������������������
WINDOW JAMB SCALE: 3"
=
1'-0"
2
����������� ���� �������� ������
������������������
SILL
����������������
BUILDING SECTIONS
��������������
�����
������
��������������
�������������������
�������
MAIN LEVEL F.F 451.5' PORCH F.F 451.0'
5
��������� SCALE: 1/4" =
1'-0"
3
��������� SCALE: 1/4" =
1'-0"
������������
�����������
�������������� ���������� ������������ ����������������
������������
EAST ELEVATION
1
�������
WINDOW DETAILS
�������������������
MAIN LEVEL F.F 451.5'
1'-0"
3
���
UPPER LEVEL F.F 461.5'
SCALE: 1/2" =
1'-0"
��������������������������������������
2 2
�����������������
=
����������������
����
����������������
������
����������������
6
1'-0"
����������������
SCALE: 1 1/2"=
10'-0"
����������
�������������� ���������� ������������ ����������������
WINDOW SILL SCALE: 3"
=
1'-0"
1
�������
SOUTH ELEVATION SITE SECTION
��
��
��
��
��
�
GARAGE FLOOR PLAN SCALE: 1/4" =
OPERATION
(2) CASEMENT FIXED FIXED (4) CASEMENT (2) CASEMENT CASEMENT FIXED (2) CASEMENT CASEMENT CASEMENT (3) CASEMENT AWNING (3) CASEMENT CASEMENT (2) CASEMENT AWNING
L, R
L,R,L,R L,R
L,R
L,F,R L,F,R L,R
MFR NO. CA1 0918 CA1 0508 CA1 0508 CA1 0815 CUSTOM CA1 0712 CA1 0712 CA1 0918 CA1 0712 CA1 0712 CA1 0712 AW1 0704 CA1 0712 CA1 0712 CA1 0712 AW1 0704
WINDOW SCHEDULE FRAME SIZE R. O. WIDTH HEIGHT WIDTH HEIGHT 2'-11 7/16" 5'-10 7/8" 5'-10 7/8" 5'-11 5/8" 1'-11 5/8" 2'-7 1/2" 2'-0 3/8" 2'-8 1/4" 1'-11 5/8" 2'-7 1/2" 2'-0 3/8" 2'-8 1/4" 2'-7 1/2" 4'-11 1/16" 10'-6" 4'-11 13/16" 3'-3 3/8" 6'-6" 3'-4 1/8" 6'-6 3/4" 2'-3 9/16" 3'-11 1/4" 2'-4 5/16" 4'-0" 2'-3 9/16" 3'-11 1/4" 2'-4 5/16" 4'-0" 2'-11 7/16" 5'-10 7/8" 5'-10 7/8" 5'-11 5/8" 2'-3 9/16" 3'-11 1/4" 2'-4 5/16" 4'-0" 2'-3 9/16" 3'-11 1/4" 2'-4 5/16" 4'-0" 2'-3 9/16" 3'-11 1/4" 7'-2 13/16" 4'-0" 2'-3 9/16" 1'-3 3/4" 2'-4 5/16" 1'-4 1/2" 2'-3 9/16" 3'-11 1/4" 7'-2 13/16" 4'-0" 2'-3 9/16" 3'-11 1/4" 2'-4 5/16" 4'-0" 2'-3 9/16" 3'-11 1/4" 4'-9 7/8" 4'-0" 2'-3 9/16" 1'-3 3/4" 2'-4 5/16" 1'-4 1/2"
SCALE: 1/4" =
4 6
HEAD HT. 8'-6" 7'-0" 7'-0" 8'-6" 8'-6" 8'-6" 13'-0" 8'-5 3/8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8"
SDL
2 6
NOTES
3
2 4
������
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y
1'-0"
U9
W/D 2F
������
SILL TO MATCH U2 EGRESS EGRESS
2A
��������� ���������������
U1 ATTIC ACCESS U8
������
TYPE
M1 M2 M3 M4 M5 M6 M7 U1 U2 U3 U4 U5 U6 U7 U8 U9
��
������
NO.
PROPOSED 2nd FLOOR GARAGE PLAN
4
1'-0"
2B
2E
2C
1 6
U2
DOOR SCHEDULE EXTERIOR DOORS NO. TYPE 1 2 3
ENTRY FRENCH ENTRY
INTERIOR DOORS 1A SINGLE 1B FRENCH 1C CASED OPENING 1D SINGLE 2A SINGLE 2B SINGLE 2C SINGLE 2D BIFOLD 2E SINGLE 2F SINGLE
OPERATION L L,R L L N/A N/A R R R R N/A L L
MFR. NO. BLT-680-010-4 FD4 3070 BLT-160-010-2 D80-06 D80-06
D80-06 D80-06 D80-06 D80-06 D80-06 D80-06
FRAME SIZE WIDTH HEIGHT 3'-0" 7'-0" 9'-9 3/8" 7'-2" 3'-0" 7'-0" 2'-4" 2'-6" 3'-0" 2'-0" 2'-6" 2'-6" 2'-6" 4'-6" 2'-6" 3'-0"
7'-0" 7'-0" 7'-0" 3'-0" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8"
������
ROUGH OPENING WIDTH HEIGHT 3'-1/2" 7'-1/2" 9'-9 7/8" 7'-2 1/2" 3'-1/2" 7'-1/2" 2'-5" 2'-7"
7'-1" 7'-1"
2'-1" 2'-7" 2'-7" 2'-7" 4'-7" 2'-7" 3'-1"
3'-1" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9"
HEAD HT. 7'-0" 7'-2" 7'-0" 7'-0" 7'-0" 7'-0" 4'-0" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8"
���������
������
NOTES
����������������������
U7
U3
2D
UNDER STAIRS
U6
U4
U5
������
UNDER STAIR STORAGE 4 6
2 6
2 4
���������������������� SCALE: 1/4" =
NOTES 1. SEE FRAMING PLAN FOR STUD LOCATIONS AND HEADER SIZES 2. ALL WINDOWS TO BE ZOLA TRIPLE PANE WOOD/CLAD 3. CENTER OF HORIZONTAL WINDOW SDLS TO BE LOCATED 1'-7" BELOW TOP OF FRAME; VERTICAL SDLS TO BE CENTERED ON GLASS 4. ALL EXTERIOR DOORS TO BE MASONITE WOOD/CLAD 5. ALL INTERIOR DOORS TO BE MASONITE RIVERSIDE ANNIVERSARY COLLECTION
4 6
2 6
������
��
�
��
2 4
����� ����� �������� ������� ������
��
��
������
����
��� �� ������
��
��
�����
������������ ����������������
������
��
1 6
�������
F
�
�
��
��
�� ������
4 6
SCALE: 1/4" =
1'-0"
4
PROPOSED 2nd FLOOR GARAGE PLAN
EAST ELEVATION SCALE: 1/4" =
1'-0"
�����
�� �
�
GARAGE FLOOR PLAN
2
��
� ������
1'-0"
3
Since this was a group studio, we each had a role. I led one of the two groups during small group development. Once one design was seleced, I led the plan development team and assisted with elevation development. I managed class task groups and communication between groups, trying to keep track of changes to make sure the necessary people were updated. Another student and I created all the permit documents in ArchiCAD. Ths studio required a lot of coordiantion, which was a great learning experience for me. Also as a gradaute student, I spend a great deal of time teaching my undergraduate studiomates about permit sets and creating drawings beyond those for typical final reviews.
�����
2 6
2 4
��������������������� SCALE: 1/4" =
1'-0"
1
06
The Secret Garden with Professors Brad Khouri and Rick Mohler
Site: In-fill lot in the Capital Hill neighborhood of Seattle with alley access Programs: Revit, Indesign, Illustrator, Photoshop, hand-built models
To the left and right are sun diagrams showing the shadows cast onto the town home complex by its neighbors to the South as well as shadows the complex casts on its neighbors to the North. To the left is a cool Spring afternoon in March, during which the Northern town homes have warm Southern light pouring into their windows, due to the two story Southern units. To the right, during winter, the shadows that are cast onto the town homes by its neighbor to the South are minimal. However, the single family home to the North is cast into partial shade.
THIRD FLOOR PLAN
SECOND FLOOR PLAN
1/10” = 1’-0”
SECTION A-A
1/10” = 1’-0”
SECTION C-C
1/10” = 1’-0”
SECTION B-B
1/10” = 1’-0” GREEN FACTOR GREEN FACTOR LANDSCAPE ELEMENT LANDSCAPED AREA W/ SOIL DEPTH LESS THAN 24" LANDSCAPED AREA W/ 24" OF SOIL OR GREATER BIORETENTION FACILITIES GROUND COVERS OR PLANTS LESS THAN 2' AT MATURITY SHRUBS OR PERENINIALS 2'+ AT MATURITY NUMBER OF SMALL TREES NUMBER OF SMALL/MEDIUM TREES NUMBER OF MEDIUM/LARGE TREES NUMBER OF LARGE TREES NUMBER OF LARGE TREES PRESERVED GREEN ROOF BETWEEN 2" AND 4" OF GROWTH MEDIUM GREEN ROOF OF AT LEAST 4" OF GROWTH MEDIUM VEGETATED WALLS APPROVED WATER FEATURES PERMEABLE PAVING OVER BETWEEN 6" AND 24" OF SOIL OR GRAVEL PERMEABLE PAVING OVER AT LEAST 24" OF SOIL OR GRAVEL STRUCTURAL SOIL SYSTEMS BONUS DROUGHT TOLERANT OR NATIVE PLANT SPECIES LANDSCAPED AREA AT LEAST 50% ANNUAL IRRIGATION BY HARVESTED RAINWATER LANDSCAPING VISIBLE FROM RIGHT OF WAY OR PUBLIC OPEN SPACES LANDSCAPING IN FOOD CULTIVATION TOTAL GREEN FACTOR
B
C
COMPONENT LOT SIZE FAR NUMBER OF UNITS TOTAL GROSS SQUARE FOOTAGE NUMBER OF PARKING STALLS TYPE OF PARKING OPEN SPACE TOTAL OPEN SPACE AT GRADE OPEN SPACE ABOVE GRADE AMENITY SPACE SQUARE FOOTAGE GREEN FACTOR
AREA 0.00 940.50 0.00 500.00 158.40 3.00 5.00 4.00 0.00 0.00 0.00 2395.00 890.00 0.00 0.00 2214.00 0.00 847.00 224.00 0.00 247.00 376.00 0.64
C
Vegetated Roofs
A
A Community P-Patch 2
FIRST FLOOR PLAN
Vegetated Wall
1/10” = 1’-0” B
PLANTING PLAN
1/20” = 1’-0”
East 1/8" = 1'-0"
AMOUNT 7200.00 1.36 8.00 9742.25 8.00 AT GRADE 2193.00 1608.00 585.00 1608.00 0.64
1/10” = 1’-0”
SITE PLAN
1/20” = 1’-0”
Using the proposed changes to the Seattle building code and the new green point system, I designed a multi-family housing complex addressing community needs on an urban in-fill site with alley access. After exploring multiple massing options on the site with an FAR of 1.4, the option I chose, based on the solar analysis and number of units, was an L-shape of town homes, with additional smaller units on the south side, to not block the sunlight on the complex. EAST ELEVATION
1
East 1/8" = 1'-0"
The concept is a central courtyard parti which fosters resident interactions achieved by moving the parking to the exterior, leaving the interior, normally reserved for parking, to the residents as community space. The entrances of the eight-home development all reside on the central court, which has space for a barbecue area and a community garden.
1/10” = 1’-0”
NORTH ELEVATION
1/10” = 1’-0”
08
Ribbon Chair
09
Maple and Steel Table
3
Furniture
08
Ribbon Chair with Professor NIls-Ole Zib Copenhagen, Denmark
Programs: full scale mock-up and full-scale prototype
Given 10m2 of veneer, I designed a chair inspired from Scandinavian designs. Given the flexible ribbon-like quality of veneer, this design stands to mimic a ribbon, something that cannot be constructed of solid wood. I have worked with solid wood many times, and wanted to create something that was inconceivable in anything but veneer, a highly flexible material. Although the design appears simple, the construction method was rather complicated, requiring approximately 240 hours of time in the wood shop, because a mold made of steel was first created over which the veneer could be vacuum formed.
Given the ribbon concept, the entire chair excluding the seat piece is made from one long piece of veneer. The difficulty in construction came once the veneer was vacuum formed, the mold had to be extracted from the veneer, rather then the veneer removed from the mold as is typically done.
09
Maple and Steel Table
Programs: full scale mock-ups and full scale prototype
This table was created as an intersection between an organic, live edge slab of maple, and 1/4� steel plate. Every piece of the table, including the connectors between the steel and wood were fabricated by myself utilizing the range of tools in our workshop. The live edge in the middle creates a small slit with which to see the metal below, then the two pieces join together to cascade over the miter joint. I welded plate steel to create the chevron below, designed to angle in at the base to prevent toe-stubbing. The metal connectors were created on the metal lathe and milling machines to my table’s specifications.
10
Published Research Papers
3
Research
decoupled and largely invisible within the classrooms.
9. How often since November 1st 2011 have you felt there is toolittle air movement in the primary living area? (Please select one) Never
Figure 4: Mechanical mode
Rarely Sometimes
Compared to typical North American residential construction, the Passive House standard provides homes that reduce energy use by 90%, create consistent thermally comfortable homes and provides healthy air quality. In the U.S., twenty-five houses have received Passive House certification since 2003. Verification of performance aspects of the Passive House standard will inform the community of designers about post occupancy success of such construction. Our study compares the actual performance of Passive Houses to their modeled criteria by evaluating energy bills, surveying occupants about their thermal comfort and perceived indoor air quality, and measuring on site physical conditions.
Lillis Business Complex classrooms provide 100% outside air via mechanical and mixed-mode ventilation. Recently, CO2 sensors were installed in the exhaust ducts to tie ventilation rates to room occupancy for additional energy savings. This study describes and illustrates the hybrid ventilation system and compares ventilation rates before and after the CO2 demand controlled ventilation (DCV) regime was implemented. We hypothesized that the preDCV classrooms were overventilated during occupied periods and that the DCV system provides the designed ventilation rate of 15cfm/person. Our research methods included: physical Figure 5: Mixed mode measurements, review of design/operations documents, analysis Controlled Ventilation 2 Demandautomatic of CO building system(DCV) (BAS) data, and discussions with engineers and technicians. Results suggest the DCVlevels regime CO2 is not generally considered to be dangerous to humans atthat the concentration found in most buildings (typically rates 400-2,000 PPM) (Schell, 2001). In fact the National provides ventilation that are more consistent withInstitute the for Safety and Health in the United States sets CO2 exposure limits of 5,000 PPM and 30,000 mechanical design intentions thanASHRAE the pre-DCV However, PPM for short-term exposure (NIOSH, 2010). Standard 62 regime. recommendations have changed over BAS time with respect CO2 and DCV. versions of the standard inconsistent data andtopossible CO2Previous sensor malfunctions established an indoor limit of 1,000 PPM. However, more recently the standard has focused limit the ability for facilities managers to validate performance on differentials between outdoor ambient conditions and indoor measurements to indicate enhancements and analyze energy conservation.
Comfort and Indoor Air Quality in Passive Houses in the U.S
Visible Ventilation: Validating & Illustrating the Performance of a Hybrid Ventilation System in the United States
Beamer, Mike, D. Bisers, S. Duluk, D. Hogard, A. Kwok Proceedings of World Renewable Energy Forum 2012, Denver, CO, May 13 - 17, 2012
Collins, Thomas, S. Duluk, A. Kwok Proceedings of Indoor Air 2014 Conference, Hong Kong, China, July 7-12, 2014
Usually Always 0
1
2
3
4
5
Honorable mention best Conference Paper at the American Solar Energy Conference 2012
Solar Transit
In 2007, the University of Oregon signed the Presidents Climate Commitment to take steps toward becoming a carbon neutral campus. For our case study, we selected Pacific Hall, a double-loaded corridor building, which relies solely on mechanical cooling, because of its orientation and potential for passive cooling.. Due to its north-south orientation, occupants on the east and west sides often complain of thermal discomfort in the morning and the afternoon. Our approach to determining the passive cooling potential includes: 1) climate analysis, 2) building analysis, 3) measure of base case conditions, and 4) development of appropriate climate-responsive renovation strategies. We evaluated the effectiveness of these strategies through 5) prediction of comfort using the ASHRAE Standard 55-2010, 6) manual calculations using passive cooling guidelines and computer simulations to examine energy use comparisons. Based on our research, Pacific Hall has the potential to rely on passive cooling for at least 5 months of the year with minor interior renovations.
Solar PathďŹ nder
Solmetric HORIcatcher Sun Seeker SunEye app
Solmetric iPV app
A number of solar tools assist designers in evaluating a site for shading, solar access, daylighting design, photovoltaic placement, and passive solar heating potential. In the last ten years, handheld equipment and their software capabilities have evolved; coupled with the existing manual tools, we now have a wide range of tools available for solar analysis. This paper presents a comparative evaluation of solar site analysis tools from the perspective design inputs needed for Passive House certification. Two locations (Eugene, Oregon and Palo Alto, California) are used as base cases for evaluation. We present the results from onsite measurements, software predictions, output accuracy, ease of use, and other criteria to discuss the capabilities of the tools in education and in architectural design practice.
Visible Ventilation: A Return to Passive Cooling
Comparison of Solar Evaluation Tools: From Learning to Practice
Duluk, Sophia, A. Kwok, W. Thompson, T. Woudenberg, Proceedings of Architectural Research Cetners Consortium 2013 Conference, Charlotte, NC, March 27 - 30, 2013
Duluk, Sophia, A. Kwok, H. Nelson Proceedings of American Solar Energy Society, Solar Conference 2013, Baltimore, MD, April 16 - 20, 2013
Received Anthony Wong Scholarship for Research in Sustainable Design to present and attend ARCC 2013
Honorable mention best Conference Paper at the American Solar Energy Conference 2012