South Fayette Connect - Summer 2020 - Volume 5, Issue 4

Page 8

DRY RUN Less water will puddle on the Panhandle Trail thanks to a project by South Fayette Township Public Works.

The department has been using a Gradall wheeled excavator to create slopes and dig drainage ditches along the South Fayette portion of the trail, from the Sturgeon station to the Mill Street crossing. The work will help divert water off the gravel trail and into stormwater drains. Pictured, below: Lou Quattro operates the excavator in Sturgeon in May as Warren Dalla Piazza prepares to let cyclists safely pass. Above: Work pauses to allow cyclists to pass. Right: Lou Quattro operates the machinery. —Photo & text by Andrea Iglar

6|

SouthFayettePA.com

@SouthFayetteTownship

@SouthFayetteTwp

South Fayette Township

@SouthFayettePA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.