' n i h c t a P ' n i w o M &
South Fayette Township Public Works worked on Marshall Road in May, patching potholes and mowing grass.
Top: John "JB" Barrett rakes hot asphalt over a pothole. Behind him, Ryan Tropeck and John Selva shovel blacktop from a propane-fueled hot box, which keeps the material extremely hot at 315 degrees. Middle: Greg Totin operates a sidearm mower to cut grass along the road, just below Union Avenue. Bottom: Alan Desmet pulls a roller over hot asphalt to compact it over a pothole. (Photos by Andrea Iglar)
South Fayette Connect | Summer 2021 | 5