1 minute read

—ROAD CLOSURE—Road 10 closing for two weeks

KINGSVILLE — In advance of Road 10 resurfacing later this year, Shepley Road Maintenance will begin replacing culvert road crossings the week of March 28 (weather permitting).

As a result, Road 10 between County Road 27 and Graham Sideroad will be closed for up to two weeks.

Residents and property owners along this section will have access to their property, but no through traffic will be allowed.

The road will be closed entirely at each culvert location during replacement. Drivers should anticipate delays to traffic from time to time.

This article is from: