EMEA
DESIGN & BUILD
OFFER Tetris offers a range of interior it out related services, delivering a “turnkey” lump sum or “open book” solution. The Tetris model provides a dedicated single point
RESULTS
of contact for the Client who will drive the completion of the project, simplifying
The results oriented culture in Tetris is based
the administrative process, optimising
upon long term partnerships with reliable
the timeline and value for money offering.
contractors and suppliers who are selected
The interior design / space planning can
using rigorous criteria and then continuously
be produced in house – ensuring speed
monitored. In particular, the Tetris team ensures
and control of the process.
that each project is designed and constructed in accordance with current best practices and in compliance with statutory obligations and landlord requirements, ensuring peace of mind from the project’s inception to its completion and beyond. The Client beneits from the reduced time input required and hassle free delivery of the refurbishment / it out project.
KEY FACTS Countries
10
Offices
13
Employees
165
Projects in 2012
510
Turnover ($M) 2012
138
AMAZON
Location Mission Area Duration Delivery Other Locations
Madrid | Spain Refurbishment of Headquarters 3 500 sqm 3 months 2012 Milan | Italy Clichy | France
AUTODESK
Location Mission Area Duration Delivery
Milan | Italy Refurbishment of Headquarters 750 sqm 4 months June 2012
ASTELLAS
Location Mission Area Duration Delivery
Lisbon | Portugal Design and it-out works of an innovative space 900 sqm 3 months May 2012
ATRADIUS
Location Mission Area Duration Delivery
Antwerp | Belgium Fit-out works 900 sqm 9 weeks November 2012
BRIGHTPOINT
Location Mission Area Duration Delivery
Barcelona | Spain Design and it-out works 1 474 sqm 3 months 2010
BUREAU VERITAS
Location Mission Area Duration Delivery
Milan | Italy Fit-out works 4 000 sqm 2 months January 2013
CAUDEX MEDICAL
Location Mission Area Duration Delivery
Oxford | United Kingdom Complete design & it-out 680 sqm 6 weeks January 2012
CHARTIS
Location Mission Area Duration Delivery
Paris-La Defense | France General contractor for building services and architectural works 5 900 sqm 4 months June 2012
DOC GENERICI
Location Mission Area Duration Delivery
Milan | Italy Fit-out works of their new premises 1 200 sqm 4 months September 2012
EPTISA
Location Mission Area Duration Delivery
Madrid | Spain Fit-out of their Headquarters 12 500 sqm 3 months 2010
FUJITSU
Location Mission Area Duration Delivery
Milan | Italy Design and Fit-out works 1 900 sqm 2 months November 2012
HEINEKEN
Location Mission Area Duration Delivery
Rueil-Malmaison | France Fit-out of the new Headquarters 9 000 sqm 6 months September 2011
IHS
Location Mission Area Duration Delivery
Paris | France Fit-out of the new Headquarters 1 350 sqm 2 months January 2011
INTEL
Location Mission Area Duration Delivery Other Locations
London | United Kingdom Complete design & it-out 1 300 sqm 3 months April 2012 Bucarest | Romania Moscow | Russia Madrid | Spain Nantes, Nice, Toulouse | France
JLL
Location Mission Area Duration Delivery Other Locations
Moscow | Russia Interior it-out of Headquarters 2 500 sqm 5 months August 2012 Lyon, Paris | France Madrid | Spain London | United Kingdom
LAVINIA
Location Mission Area Time Delivery Other Locations
Paris La Defense | France Fit-out of a store 235 sqm 3 months March 2011 Paris | France Madrid | Spain
LEASEPLAN
Location Mission Area Duration Delivery
Lisbon | Portugal Refurbishment of the cafeteria in their Headquarters 3 700 sqm 5 months July 2012
MARS
Location Mission Area Duration Delivery
Casablanca | Morocco Fit-out of their new Headquarters 200 sqm 6 weeks December 2012
MULTIOPTICAS
Location Mission Area Duration Delivery Other Locations
Sintra | Portugal Refurbishment of a store 200 sqm 1 month second quarter of 2011 7 stores in Portugal
NAPAPIJRI
Location Mission Area Duration Delivery
Paris | France Full renovation of the store according to the new concept 250 sqm 2 weeks August 2012
NVIDIA
Location Mission Area Duration Delivery
Cambridge | United Kingdom Fit-out works 580 sqm 7 weeks September 2012
PANASONIC
Location Mission Area Duration Delivery
Gennevilliers | France Design and Construction works 3 470 sqm 3 months August 2011
PUIG
Location Mission Area Duration Delivery
Milan | Italy Refurbishment of Headquarters 380 sqm 2 months June 2011
ROBERT WALTERS
Location Mission Area Duration Delivery
Brussels | Belgium Fit-out 550 sqm 6 weeks October 2012
SAP
Location Mission Area Duration Delivery Other Locations
Lisbon | Portugal Design and interior it-out works 1 000 sqm 8 weeks May 2012 Hulpe | Belgium Moscow | Russia Paris | France
SCHWEPPES
Location Mission Area Duration Delivery
Mardrid | Spain Design of a new concept for its ofices and it-out works 3 500 sqm 2 months September 2012
SONY FRANCE
Location Mission Area Duration Delivery
Puteaux | France Full interior Fit-out of Headquarters 8 900 sqm 3 months July 2011
STANLEY BLACK & DECKER
Location Mission Area Duration Delivery Other Locations
Lisbon | Portugal Refurbishment of Headquarters 1 058 sqm 3 months September 2012 Diegem, Mechelen | Belgium Dijon, Lyon, Paris, Strasbourg | France Spennymoor | United Kingdom Moscow | Russia
TORONTO STOCK EXCHANGE
Location Mission Area Duration Delivery
London | United Kingdom Complete design & it-out 510 sqm 9 weeks April 2012
TUI
Location Mission Area Duration Delivery
Levallois-Perret | France Fit-out works of their new Headquarters 6 000 sqm 2 months December 2012
Photos : Spaces and Places, Daniel Runacher, Alexis Paoli
CONTACT US
Belgium +32 495 582 552
Luxembourg +32 495 582 552
Portugal +351 91 035 53 50
France +33 611 42 27 13
Morocco +212 679 77 63 63
Russia +7 495 739 2000
Italy +39 393 53 84 145
Netherlands +31 20 541 00 50
Spain +34 649 817 303
United Kingdom +44 0207 852 4050