Name : Mubarak Aldosseri Independent Consultant With 18 Years Experience in system operation & data center
Efficiency in general. Data Center Efficiency. Efficiency Metrics. Data Center Design Considerations. Optimizing your site and facilities. New update of the efficiency in computer centers. Increasing Data Center Efficiency. IT Operation & Facilities Management. Monitoring Systems.
Term "efficiency“..!! -Effectiveness. -
1.
2.
3. 4. 5.
Facility used to house computer systems.
Includes redundant of power or backup power supplies. Includes redundant data Communications. Includes Environmental Controls. Security Devices.
The efficiency of Data center starting from the first day through: Assessment & Planning Design Architecture / Engineering Equipment Sourcing & Scheduling Construction / Installation / Integration Commissioning Operations & Maintenance Monitoring
DCIE >> is a Metrics of power energy.
ďƒ˜The Green Grid
The formula for CADE is:
CADE = Facility Efficiency (FE) x Asset Efficiency (AE) Facility Efficiency (FE) is equal to (Facility Energy Efficiency) x (Facility Utilization) Asset Efficiency (AE) is equal to (IT Energy Efficiency) x (IT utilization)
ď ˝
http://www.42u.com/measurement/pue-dcie.htm
Upfront design effort. And Data Center tiers
1. 2. 3. 4.
5.
Data Center cooling. Heating, ventilation, and air conditioning (HVAC). Uninterruptible power supply (UPS). Power. Standby generator or alternative power sources.
1. 2.
3. 4.
5. 6. 7.
Kill unused servers. Use Virtualization of servers. Buy more energy efficient hardware. Measure site infrastructure energy efficiency a 12 month period. Correctly set cooling unit set points. Implement hot/cold aisle concepts. Turn off unneeded cooling units.
1. 2.
3. 4. 5. 6. 7.
8. 9. 10.
Sensing temperatures. Monitoring power. Monitoring rack conditions. Detecting fluid leaks. Intelligent control of precision cooling. Intelligent control of critical power. Managing alerts and alarms. Monitoring energy efficiency. Monitoring batteries. Monitoring and managing remotely.
-IT
Operations Control Process Objective -Facilities Management Process Objective
BMS Building Management System.
Email: msdosseri@gmail.com Mobile: +966505482833 Twitter: msdosseri1