1 minute read

SRQ MAGAZINE | DECEMBER 2020 | 4WALLS VISIONARY DESIGN COMPETITION

GOLD WINNER

WESTCOAST BLACK THEATRE TROUPE-LIVE THEATER AND ADMINISTRATION BUILDING

WILLIS A. SMITH CONSTRUCTION

The renovations for the Westcoast Black Theatre Troupe began with the renovation and restoration of the historic 18,000-squarefoot Binz Building. The WBTT wanted to preserve the historical aspects of the exterior of the building while modernizing the interior to create space for on-site education, an entertainment space and administration offices. The rooftop can be utilized for group events. The second phase of the project included the entire renovation of the theatre building. The Donelly Theatre is the mainstage for the company with cushioned, fixed seating to accommodate 205, and the smaller Howard J. Millman Theatre, which will be used for rehearsals and special-event programs. The new stage is wider and deeper with extra height allowing more room for sets and drops to be raised and lowered. In addition, the project featured a new lobby entrance, concession area, larger restrooms, upgraded dressing rooms and rehearsal space for cast members, and improved parking facilities for all. New HVAC, lighting and sound equipment was included, as well as renovations to the stage areas. These renovations enhance patrons’ theatergoing experience and actors’ working conditions.

Architect: C. Alan Anderson Architect, P.A. Contractor: Willis A. Smith Construction, Inc. Interior Design: C. Alan Anderson Architect, P.A. Structural Engineer: Wilson Structural Consultants, Inc. Mechanical Engineer: ATP Engineering South, PL. Flooring: Floor Source of Florida, LLC. Photographer: Odell Photos

This article is from: