scott smith, aia, leed ga professional work samples
evergrande 707m tower HOK | 2014 | Wuhan, CN | Project Designer
Evergrande, a chinese developer, contacted our Hong Kong office for this tower proposal in Wuhan, China. Our New York office was requested to complete the concept design package because of previous working relationships and experience. Evergrande is attempting to purchase a site in a newly masterplanned area of Wuhan. In order to bid for the site they must submit a proposed design to the local goverment for what they would build if given the rights to the site. My role on this project was lead designer. I lead a team of architects and engineers on this 5 week effort to design, client review and document the proposal. The first two weeks of the project were dedicated to massing studies for an interim meeting with the client. We submitted 6 massing ideas ranging from the extreme exploratory to elegant and conservative. The client ultimately picked the design shown based on the chairman’s preference. The remaning 3 weeks we modeled and detailed the design while working with our in house structural team to ensure the building was structurally viable. Ultimately, even with the short time period, the proposal had to be proven through the eyes of the developer. I lead a small team of architects and engineers throughout the project, modeling, rendering, drawing, interacting with client, rendering company, consultants and various hok offices, and putting together the final design document.
wuhan evergrande tower HOK 2014
The basis of the design is a pure square at the base to a circle at the crown. There is an ancient chinese belief that the earth was square the heavens a circle. This tower symbolizes that belief honoring the modern chinese boom while respecting it’s long and cherished history. The reveals help appropriate the floorplates and are crucial to the design by correcting the enclosure geometry as the tower rises. This tower design is simple, responsible and elegant.
wuhan evergrande tower HOK 2014
wuhan evergrande tower HOK 2014
4.2
247.8
96
4.2
53
4.2
252
97
4.2
462
54
4.2
256.2
98
4.2
466.2
55
4.2
260.4
99
4.2
470.4
56
4.2
264.6
100
4.2
474.6
57
4.2
268.8
101
4.2
478.8
58
4.2
273
102
4.2
483
59
4.2
277.2
103
4.2
487.2
60
4.2
281.4
104
4.2
491.4
61
4.2
285.6
105
4.2
495.6
106
4.2
499.8
107
4.2
504
设备/避难层 MECH
108
8.4
508.2
酒店1
1
6.3
0
2
6.3
6.3
酒店大堂 HOTEL
3
12.6
12.6
4
4.2
25.2
5
4.2
29.4
6
4.2
33.6
7
4.2
37.8
办公1
OFFICE 1
8 is organized 4.2 42 a Vertical transportation around 9 4.2 46.2 principle of maximizing the building efficiency 10 50.4 by minimizing core size, which4.2 is enabled by 11 4.2 54.6 the use of double deck large capacity shuttles 12 4.2 58.8 to sky lobbies and the13use of double deck local 4.2 63 cars in the office areas. dispatch 14 A destination 4.2 67.2 system will further improve efficiency. Below 15 4.2 71.4 16 and how 4.2it is serviced, 75.6 is a list of each program 17 4.2 79.8 reflecting the adjacent diagram.
111 层 FLOORS
525.0 M
12 公寓空中大堂 APARTMENT SKY LOBBY 95 层 FLOORS
设备/避难层 MECH 449.4 M
1. Office: 13
办公2
OFFICE 2
315.0 M
OFFICE 3
办公3
4
Express Lifts 高速电梯
Local Lifts 内部电梯
Service Lifts服务电梯
首层
GROUND
0M
The analysis shown was needed to ensure viability of the building. Elevatoring diagrams, program analysis charts and planning all were key aspects to the design. The design is elegant and simple in that is semetrical on all sides. The core walls remain in place throughout the height of the tower creating 功能组成与建筑高度的关系 PROGRAM STACK DIAGRAM HEIGHTinward RELATIONSHIP a strong and simple structural solution to the tower and each of the 4 sides of the tower are the same. The core fuctions -transition as needed as the tower rises in height. The structural core walls then become the corridor barrier for apartments and hotel rooms on the upper most floors.
4.2
541.8 546
88.2
72
4.2
344.4
116
4.2
550.2
20
4.2
96.6
73
4.2
348.6
117
4.2
554.4
21
4.2
100.8
74
4.2
352.8
4.2
558.6
22
4.2
75
4.2
280,000 m² 357
118 119
4.2
562.8
23
4.2
109.2
76
4.2
361.2
120
4.2
567
24
4.2
113.4
77
4.2
365.4
121
4.2
571.2
25
4.2
117.6
78
4.2
369.6
122
4.2
575.4
123
4.2
579.6
124
8.4
583.8
280,000 m² 105
28
4.2
130.2
29
4.2
134.4
31
4.2
142.8
32
4.2
33
4.2
34
4.2
35
8.4
1. 办公:
8台双层轿箱电梯往低区办公楼层
8台双层轿箱高速电梯往中区办公空中大堂 79 4.2 373.8 80 4.2 8台双层轿箱内部电梯往中区办公楼层
设备/避难层 MECH
设备/避难层 MECH
378
81
8.4
382.2
125
4.2
592.2
82
4.2
390.6
126
4.2
596.4
394.8
127
4.2
600.6
128
4.2
604.8
129
4.2
609
130
4.2
613.2
84
4.2
399
147
85
4.2
403.2
151.2
86
4.2
407.4
87
4.2
131
4.2
617.4
88
4.2
415.8
132
4.2
621.6
89
4.2
420
133
4.2
625.8
90
4.2
424.2
设备/避难层 MECH
134
8.4
630
4.2
428.4
设备 MECH
135
8.4
638.4
30,000 m² 155.4 159.6 168 180.6
38
4.2
184.8
39
4.2
189
40
4.2
193.2
41
4.2
42
4.2
43
4.2
197.4
50,000 m² 201.6
2. 公寓:
2台高速电梯往空中大堂 3台内部电梯往公寓楼层 91 1 台服务电梯 设备/避难层 MECH
3. 酒店: 空中大堂
SKY LOBBY
30,000 411.6 m²
92
4.2
432.6
设备 MECH
136
4.2
646.8
93
4.2
436.8
屋顶 ROOF
137
--
651
94
8.4
441
95
8.4
50,000 m² 449.4
205.8
4 Single Deck express to hotel floors
设备/避难层 MECH
537.6
114
8.4
4 台服务电梯
15
533.4
4.2
19
4 Service lifts
3 Service lifts
4.2
113
4.2
8台双层轿箱电梯往高区办公楼层 83 4.2
3. Hotel:
112
115
37 3 Local lifts to apartment floors4.2
168.0 M
525
340.2
8 Double Deck local to office floors 30high rise4.2 138.6
1 Service lift
8.4
4.2
36 12.6 SKY LOBBY express to sky lobby 2 Single Deck
OFFICE SKY LOBBY 36 层 FLOORS
327.6
111
71
空中大堂
办公空中大堂
4.2
8台双层轿箱高速电梯往高区办公空中大堂
设备/避难层 MECH
15
68
520.8
空中大堂 SKY LOBBY
下面的列表与左图反映了各功能的垂直交通组 69 4.2 331.8 织。 70 4.2 336
8 Double Deck express to high rise sky lobby
2. Apartment:
14
315
84
27mid rise 4.2 126 8 Double Deck local to office floors
OFFICE SKY LOBBY 67 层 FLOORS
12.6
516.6
4.2
4.2
8 Double Deck express 26 to mid rise 4.2 sky lobby 121.8
办公空中大堂
SKY LOBBY
67
4.2
110
18
8 Single Deck to low rise office floors
14
空中大堂
109
酒店2
酒店空中大堂
HOTEL SKY LOBBY
457.8
HOTEL 1
HOTEL 2
12
垂直交通系统的设计以减小核心筒面积和最大 62 4.2 289.8 化得房率为大原则。63 设计使用了大载重的双 4.2 294 层轿箱高速电梯以连接底层大堂与空中大堂, 64 4.2 298.2 并以双层轿箱电梯以服务各办公楼层。派梯系 65 4.2 302.4 66 8.4 306.6 设备/避难层 MECH 统能进一步改善垂直交通总体的效率。
酒店3 HOTEL 3
12
地上垂直交通
公寓
大堂1 LOBBY 1
APARTMENT
52
FLOOR ELEVATION
大堂2 LOBBY 2
651.0 M
2
建筑高度
办公4
ROOF 137 层 FLOORS
层高
FLOOR-TOFLOOR HEIGHT
OFFICE 4
屋顶
楼层
STORY
办公5
8
Above Grade Vertical Transportation
OFFICE 5
707 M
办公6
BUILDING TOP 150 层 FLOORS
OFFICE 6
塔顶
44
4.2
210
45
4.2
214.2
46
4.2
218.4
47
4.2
222.6
48
4.2
226.8
49
4.2
231
50
4.2
235.2
51
8.4
4台高速电梯往空中大堂 3 台服务电梯
LEGEND 图示: 办公
公寓
AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL 239.4 OFFICE APARTMENT 2014年8月26日 | 武汉B1-01地块707米超高层项目
酒店 HOTEL
设备/避难层 MEP/REFUGE
空中大堂 SKY LOBBY
06 AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL 2014年8月26日 | 武汉B1-01地块707米超高层项目 05 wuhan evergrande tower HOK 2014
大堂
咖啡厅/餐厅
大堂
设施 设施
空中大堂 空中大堂
咖啡厅/餐厅 咖啡厅/餐厅
设施 设施
咖啡厅/餐厅
设施 设施
LEGEND 图示:
E
E
高速电梯
LEGEND 图示:ELEVATOR EXPRESS
L LOCAL E EXPRESS ELEVATOR ELEVATOR 办公空中大堂层平面图-36层 OFFICE SKY LOBBY PLAN内部电梯 - LEVEL 36 办公空中大堂层平面图-36层 高速电梯 内部电梯
L LOCAL ELEVATOR
OFFICE SKY LOBBY PLAN - LEVEL 36
高速电梯
LEGEND 图示: LEGEND 图示: EXPRESS ELEVATOR
LEGEND 图示: 强/弱电间/电讯机房 S 服务电梯 SERVICE ELEVATOR E/T ELECTRICAL/TELECOM 服务间 垃圾房 强/弱电间/电讯机房 收发室 服务电梯 E/T ELECTRICAL/TELECOM S STORAGE STO MAID MAIL SERVICE ELEVATOR TRASH
STO
垃圾房 TRASH
收发室 MAIL
服务间 MAID
LS LOCAL SERVICE ELEVATOR 内部服务电梯
厨房 KITCHEN
茶水间 PANTRY
服务电梯 内部电梯 内部服务电梯 设备用房 服务间茶水间 服务间 卫生间 厨房 内部服务电梯 EE EXPRESS LS KITCHEN SERVICE PANTRY MAID SERVICE ELEVATOR ROOM MECHANICAL L LOCAL MER WCELEVATOR SS SERVICE ELEVATOR LSLOCAL KITCHEN PANTRY ELEVATOR LOCAL SERVICE ELEVATOR 设备用房 服务间 服务间 卫生间 高速电梯 高速电梯 内部电梯 厨房 厨房 茶水间 茶水间 服务电梯 服务电梯 内部服务电梯 内部服务电梯 贮藏室 设备用房 服务间 服务间 卫生间 内部电梯 MECHANICAL ROOM LS MAID EWC EEXPRESS SERVICE WATER CLOSET WC LS LSLOCAL EXPRESS ELEVATOR ELEVATOR LOCAL ELEVATOR KITCHEN KITCHEN PANTRY SERVICE ELEVATOR ELEVATOR MER LOCAL SERVICE SERVICE ELEVATOR ELEVATOR STORAGE S STO MECHANICAL ROOM LSERVICE MAID SERVICE PANTRY MER WATER CLOSET LOCAL ELEVATOR 公寓空中大堂层平面图-95层 高速电梯
高速电梯 服务电梯 LEGEND LEGEND 图示: 图示: EXPRESS ELEVATOR WATER CLOSETSERVICE ELEVATOR
贮藏室
贮藏室 STORAGE
S 服务电梯 SERVICE ELEVATOR
办公标准层平面图-37层 TYPICAL OFFICE PLAN - LEVEL 37 办公标准层平面图-37层
贮藏室 设备用房 设备用房 卫生间 卫生间 内部电梯 APARTMENT SKY LOBBY内部电梯 PLAN - LEVEL 95 贮藏室 STORAGE 公寓空中大堂层平面图-95层 STO MECHANICAL ROOM ROOM LLLOCAL MER MERMECHANICAL WATER CLOSET CLOSET WC WCWATER LOCAL ELEVATOR ELEVATOR STORAGE STO APARTMENT SKY LOBBY PLAN - LEVEL 95 贮藏室 贮藏室
最大楼层面积 LARGEST FLOOR AREA: 3,400 M² TYPICAL OFFICE PLAN - LEVEL 37 最小楼层面积 FLOOR AREA:3,400 2,580 M² 最大楼层面积 SMALLEST LARGEST FLOOR AREA: M²
厨房
茶水间
服务间 服务间 服务间 服务间 MAID SERVICE SERVICE MAID
STORAGE STO STOSTORAGE
最小楼层面积 SMALLEST FLOOR AREA: 2,580 M²
总面积 TOTAL AREA: 280,000 M²
总面积 TOTAL AREA: 280,000 M² AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL
2014年8月26日 | 武汉B1-01地块707米超高层项目 AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL 2014年8月26日 | 武汉B1-01地块707米超高层项目 10
办公平面图 OFFICE FLOOR PLANS 办公平面图 OFFICE FLOOR PLANS
10
公寓标准层平面图-96层 TYPICAL APARTMENT FLOOR PLAN - LEVEL 96 最大楼层面积 LARGEST FLOOR AREA: 2,540 M² 公寓标准层平面图-96层 最小楼层面积APARTMENT SMALLEST FLOOR AREA: 2,450 M² TYPICAL FLOOR PLAN - LEVEL 96 最大楼层面积 LARGEST FLOOR AREA: 2,540 M² 最小楼层面积 SMALLEST AREA: 总面积 TOTAL AREA: FLOOR 30,000 M² 2,450 M²
AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL
酒店空中大堂层平面图-111层 HOTEL SKY LOBBY PLAN - LEVEL 111 酒店空中大堂层平面图-111层 酒店空中大堂层平面图-111层 HOTEL HOTELSKY SKYLOBBY LOBBYPLAN PLAN- LEVEL - LEVEL111 111 酒店空中大堂层平面图-111层 酒店空中大堂层平面图-111层 HOTEL HOTELSKY SKYLOBBY LOBBYPLAN PLAN- LEVEL - LEVEL111 111
酒店平面图
公寓平面图 APARTMENT FLOOR PLANS 公寓平面图 APARTMENT FLOOR PLANS
酒店标准层平面图-112层 TYPICAL GUEST ROOM HOTEL PLAN - LEVEL 112 酒店标准层平面图-112层 最大楼层面积 LARGEST FLOOR AREA: 2,400 M² 酒店标准层平面图-112层 TYPICAL GUEST PLAN - LEVEL 112 最小楼层面积 SMALLEST FLOOR AREA: M² TYPICAL GUESTROOM ROOMHOTEL HOTEL PLAN -2,200 LEVEL 112 最大楼层面积 LARGEST FLOOR AREA: M² 酒店标准层平面图-112层 酒店标准层平面图-112层 最大楼层面积 LARGEST FLOOR AREA:2,400 2,400 M² 最小楼层面积 SMALLEST FLOOR AREA: 2,200 TYPICAL TYPICAL GUEST GUEST ROOM ROOM HOTEL HOTEL PLAN PLAN LEVEL -M² LEVEL112 112 最小楼层面积 SMALLEST FLOOR AREA: 2,200 总面积 TOTAL AREA: 50,000 M²-M²
最大楼层面积 最大楼层面积LARGEST LARGEST FLOOR FLOOR AREA: AREA:2,400 2,400 M² M² 最小楼层面积 最小楼层面积 SMALLEST SMALLEST FLOOR FLOOR AREA: AREA: 2,200 2,200 M² M²AUGUST 26, 2014 | WUHAN B1-1 707M TOWER PROPOSAL 总面积 TOTAL AREA: 50,000 M² 总面积 TOTAL AREA: 50,000 M² 2014年8月26日 | 武汉B1-01地块707米超高层项目 26, TOWER 总面积 总面积TOTAL TOTALAREA: AREA:50,000 50,000M² M² AUGUST AUGUST 26,2014 2014| WUHAN | WUHANB1-1 B1-1707M 707M TOWERPROPOSAL PROPOSAL
harlem boys & girls club
HOK | 2014 | New York, NY | Project Designer
Project Description - This pro-bono opportunity between HOK and the Madison Square Boys & Girls Club was established through a personal relationship. The Boys & Girls Club have purchased a Harlem site at W 155th Street and Bradhurst Ave. After extensive studies they came recognize the need for young people in this area to have guidance and place. The building program and small site inform the design as a stacked building. Working together, the Club and HOK developed the plans through desired adjacencies and separations providing the children of the Club with a unique and special experience, one of comfort and belonging. The 95,000 SF Club design highlights include a split-level basement pool with natural daylight, gymnasium, teen center, dance studio, performing arts auditorium and the New York Headquarters for the Madison Boys and Girls Club. The efficient use of site includes an expansive rooftop area with a learning garden, covered play area and patio event space.
harlem boys & girls club HOK 2014
The design pushes and pulls the program allowing for visual connection throughout the building into key areas while keeping others more exclusive. The building facade responds in a similar manner inviting the community in at the ground level highlighting the open circulation, while providing a sustainable filtered approach above in the western facade. The building aesthetic ditches the traditional academic brick and mortar with slick modern lines and materials providing a new icon and bright future for the boys, girls and surrounding community of Harlem.
harlem boys & girls club HOK 2014
1
JOEL E. SMILOW TEEN CENTER ENTRANCE
4
5
26'-0"
6
76'-0"
7
23'-0"
4
1
5
26'-0"
FACADE INTEGRATED GARAGE DOOR
6
76'-0"
7
23'-0"
A.5
A
A
CIRCULATION 900 SF
22'-0"
MECH 90 SF
ELEV. 2
SHAFT OPEN TO POOL BELOW
MENS 100 SF
24'-0"
CLUB MANAGER 150 SF
CANOPY ABOVE
DONOR GARDEN 520 SF
MAIN LOBBY 910 SF
CUST. 50 SF
ELEV. 1
ASST. DIRECTORS OFFICE 110 SF
WOMENS 100 SF
ELEV. 2 SHAFT
C
SHAFT
MAIN ENTRANCE
STORAGE 130 SF
SHAFT MENS 150 SF
BOYS LOCKERS 440 SF
TABLE STORAGE 170 SF
24'-0"
ELEV. 1
CIRCULATION UP STAIR 250 SF
PARKING SPACE
CHECK-IN DESK 130 SF
UP CIRCULATION STAIR 250 SF
C
FITNESS CENTER GYMNASIUM 6680 SF
WOMENS 190 SF
D
OFFICE 120 SF
D
WAITING AND DISPLAY 150 SF
COAT STORAGE 190 SF
CORRIDOR 140 SF
Name
E
25'-0"
PARKING GARAGE 4070 SF
20'-6"
PARKING SPACE
12'-2"
SNOW AND EXTERIOR STORAGE 270 SF
STAIR TOWER 260 SF
PARKING SPACE
PARKING SPACE
PARKING SPACE
F Graphic Scale
0
8'
16'
24'
Area
CORRIDOR ELEVATOR LOBBY MAIN LOBBY OPEN TO POOL BELOW DONOR GARDEN MECH MECH ASST. DIRECTORS OFFICE CHECK-IN DESK CLUB MANAGER DIRECTORS OFFICE PARKING GARAGE WAITING AND DISPLAY COAT STORAGE CUST. STO. MENS SNOW AND EXTERIOR STORAGE WOMENS CIRCULATION STAIR Grand total: 19
MECH
FACADE INTEGRATED GARAGE DOOR
Department
Level
510 SF 110 SF 910 SF 4490 SF 520 SF 70 SF 90 SF 110 SF
CIRCULATION CIRCULATION CIRCULATION DOUBLE HEIGHT SPACE GREEN MEP MEP OFFICE
LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G
130 SF 150 SF 120 SF 4070 SF 150 SF 190 SF 90 SF 100 SF 270 SF
OFFICE OFFICE OFFICE PARKING PUBLIC SUPPORT SUPPORT SUPPORT SUPPORT
LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G LEVEL G
100 SF 250 SF 12430 SF
SUPPORT VERTICAL CIRCULATION
LEVEL G LEVEL G
DINING 910 SF
GIRLS LOCKERS 370 SF
E SNACK BAR AND KITCHEN 340 SF
STORAGE 450 SF
COLD STO. 110 SF
STAIR TOWER 260 SF
4
1
5
26'-0"
Area
D
CIRCULATION CORRIDOR OFFICE DINING SNACK BAR AND KITCHEN FITNESS CENTER GYMNASIUM BOYS LOCKERS COLD STO. CUST. GIRLS LOCKERS GYM SEATING MENS STORAGE STORAGE STORAGE TABLE STORAGE WOMENS MEZZ STAIR
900 SF 140 SF 120 SF 910 SF 340 SF 6680 SF
CIRCU CIRCU OFFIC PUBLI PUBLI RECR
440 SF 110 SF 50 SF 370 SF 960 SF 150 SF 130 SF 130 SF 450 SF 170 SF 190 SF 160 SF
SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO SUPPO VERTI CIRCU
Grand total
12410 SF
Graphic Scale
32'
0
8'
16'
24'
32'
AREA LEGEND
CIRCULATION
MEP
PUBLIC
DOUBLE HEIGHT SPACE
OFFICE
SUPPORT
GREEN
PARKING
VERTICAL CIRCULATION
6
76'-0"
MEZZ STAIR 160 SF
UP
F
AREA LEGEND
G
LEVEL 01 ROOM SCHED Name
LEVEL G ROOM SCHEDULE 24'-0"
CORRIDOR 510 SF
GYM SEATING 960 SF
25'-0"
24'-0"
BUILDING ABOVE
PARKING SPACE
CUST. STO. 90 SF
DIRECTORS OFFICE 120 SF
STAIR TOWER 210 SF
B
STORAGE 130 SF
24'-0"
ELEVATOR LOBBY 110 SF
24'-0"
B
STAIR TOWER 210 SF
UP
1
7
23'-0"
4
1
5
26'-0"
CIRCULATION
PUBLIC
MEP
RECREATIONAL
OFFICE
SUPPORT
6
76'-0"
VERTICAL CIRCULATION
7
23'-0"
A.5 A
A
client logo placed here
0002
OFFICE 130 SF
ELEV. 1
C
ELEV. 2
CIRCULATION STAIR 250 SF
MECH 80 SF
OFFICE 140 SF
C
SHAFT
24'-0"
OFFICE 150 SF
MENS 120 SF
WOMENS 120 SF
MTG RM 2 410 SF
MTG RM 3 410 SF
MTG RM 4 400 SF
CUST. 90 SF
OFFICE 160 SF
CUST. 110 SF
ELEV. 1
ELEV. 2
0004
SHAFT
OFFICE ENTRY
RECEPTION 140 SF
PANTRY 160 SF
DINING 160 SF
SHAFT
CONFERENCE 1 500 SF
OFFICE 160 SF
LEVEL 04 ROOM SCHED
24'-0"
MTG RM 1 400 SF
1/8" = 1'-0"
client logo placed here
OFFICE 110 SF
PRIVATE CORRIDOR 2100 SF
PUBLIC CORRIDOR 1040 SF
GROUND LEVEL PLAN
SHAFT
STAIR TOWER 210 SF
24'-0"
CIRCULATION STAIR 250 SF
A.5
B 24'-0"
CORRIDOR 2410 SF
B
DINING 370 SF
STAIR TOWER 210 SF
9'-6"
FLEX SPACE 390 SF
TECH CENTER 500 SF
OFFICE 150 SF
Name
MAIL COPYING ROOM 270 SF
PRIVATE CORRIDOR FINE ARTS STUDIO TECH CENTER CONFERENCE 1 CONFERENCE 2 MEETING 1 MEETING 2 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICES RECEPTION PUBLIC CORRIDOR CONF CUST. DINING DINING EVENT STORAGE FILE ROOM IT SPACE MAIL COPYING ROOM MENS PANTRY WOMENS Grand total: 30
OFFICE 160 SF
D
D LEVEL 03 ROOM SCHEDULE
24'-0"
EXPLORERS CENTER 1140 SF
E PERFORMING ARTS STUDIO / AUDITORIUM 1970 SF
JUNIORS CENTER 1250 SF
STAGE 800 SF
25'-0"
LEARNING CENTER 960 SF
STAIR TOWER 260 SF F
Department
Level
2410 SF 1140 SF 1250 SF 960 SF 80 SF 400 SF 410 SF 410 SF 400 SF 110 SF 130 SF 140 SF 150 SF 150 SF 160 SF 1970 SF
CIRCULATION CLASSROOM CLASSROOM CLASSROOM MEP OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RECREATIONAL
LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3
800 SF 90 SF 390 SF 120 SF 120 SF 11790 SF
RECREATIONAL SUPPORT SUPPORT SUPPORT SUPPORT
LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3
FILE ROOM 200 SF
FINE ARTS STUDIO 690 SF
client logo placed here
0006
EVENT STORAGE 420 SF
OFFICE 200 SF MENS 130 SF
WOMENS 130 SF CONF 140 SF
PRIVATE CORRIDOR
STAIR TOWER 260 SF
IT SPACE 170 SF
MEETING 1 200 SF
MEETING 2 200 SF
OFFICE 150 SF
OFFICE 130 SF
OFFICE 130 SF
OFFICE 160 SF
OFFICE 150 SF
F Graphic Scale
8'
16'
24'
0
32'
8'
16'
24'
32'
AREA LEGEND
AREA LEGEND
3
OFFICE 160 SF
E
Graphic Scale
0
OPEN OFFICES 2200 SF
CONFERENCE 2 500 SF
24'-0"
CORRIDOR EXPLORERS CENTER JUNIORS CENTER LEARNING CENTER MECH MTG RM 1 MTG RM 2 MTG RM 3 MTG RM 4 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE PERFORMING ARTS STUDIO / AUDITORIUM STAGE CUST. FLEX SPACE MENS WOMENS Grand total: 21
Area
25'-0"
Name
CIRCULATION
OFFICE
CLASSROOM
RECREATIONAL
MEP
SUPPORT
VERTICAL CIRCULATION
4
1/8" = 1'-0"
OFFICE
CLASSROOM
PUBLIC
MEP
SUPPORT
VERTICAL CIRCULATION
harlem boys & girls club HOK 2014
LEVEL 03 PLAN client logo placed here
CIRCULATION
0007
Area 2100 SF 690 SF 500 SF 500 SF 500 SF 200 SF 200 SF 130 SF 130 SF 150 SF 150 SF 160 SF 160 SF 160 SF 160 SF 200 SF 2200 SF 140 SF 1040 SF 140 SF 110 SF 160 SF 370 SF 420 SF 200 SF 170 SF 270 SF 130 SF 160 SF 130 SF 11720 SF
C C C O O O O O O O O O O O O O O O P S S S S S S S S S S S
mercedes benz dealership HOK | 2013 | Los Angeles, CA | Project Designer
I was given full design control for this mercedes-benz ground up dealership in the city of Arcadia, CA. The design process for the project was very fast and client site very difficult. Working on the project alone I was able to use the program and design the plan and building to accomodate the client, produce renderings, drawings and revit model all in two weeks. Once presented to the client they approved the design A-103and the project is now moving forward into construction documents as a design build collaboration.
A- 13
RUSNAK ARCADIA MERCEDES BENZ VIEW - SHOWROOM LEVEL 01 Unnamed mercedes benz dealership HOK 2013
Z
A14 A-103
RUSNAK ARCADIA MERCEDES BENZ STREET VIEW - SOUTHUnnamed WEST A12 A-103
RUSNAK ARCADIA MERCEDES BENZ BUILDING ENTRANCE Unnamed
RUSNAK ARCADIA MERCEDES BENZ VIEW - SHOWROOM - LEVEL 02 Unnamed mercedes benz dealership HOK 2013
ventura medical center HOK | 2013 | Los Angeles, CA | Project Designer
This was my first project at HOK and first healthcare project. This is a very complicated project because topography, existing structures and a strong community. Our client is Clark Construction whose client is the hospital client rep. This is a fast-track project that is being constructed and packaged during documentation. I began working on this project after the competition completed and our studio was awarded the project. We had 90 days to complete SD and it was my responsibility to solve a number of lingering design issues ranging from exterior details to re-designing the entrance of the building.
ventura county medical center HOK 2013
J
J
J T.O.MECH T.O.MECH T.O.MECH ENCLOSURE ENCLOSURE ENCLOSURE 217' - 6" 217' - 6" 217' - 6"
J
12' - 0"
12' - 0"
J
3' - 6"
3' - 6"
3' - 6"
12' - 0"
J
ROOFROOFROOF 205' - 6" 205' - 6" 205' - 6"
ROOF ROOF ROOF 205' - 6" 205' - 6" 205' - 6"
5' - 0"
5' - 0"
9' - 0"
9' - 0"
9' - 0"
5' - 0"
5' - 0"
7
7
16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
7
2' - 0" 2" 5'
2' - 2"
2' - 2"
LEVEL LEVEL 3 LEVEL 3 3 6" - 6" 189' - 189' 6" - 189'
5' - 0"
PAINTEDPAINTED METAL "BROW" PAINTED METAL "BROW" METAL "BROW"
LEVELLEVEL 3 LEVEL 3 3 189' - 6" 189' - 6" 189' - 6"
LEVELLEVEL 3 LEVEL 3 3 189' - 6" 189' - 6" 189' - 6"
16' - 0"
16' - 0"
17' - 0"
17' - 0"
17' - 0" 16' - 0"
16' - 0"
16' - 0" 11' - 0"
PROTECTIVE BOLLARD PROTECTIVE PROTECTIVE BOLLARDBOLLARD 3' - 0"
3' - 0"
3' - 0"
12' - 0" CLEAR 12' - 0"ACC. CLEAR 12'PATH - 0"ACC. CLEAR PATH ACC. PATH
LEVELLEVEL 1 LEVEL 1 1 157' - 6" 157' - 6" 157' - 6"
SECTION SECTION SECTION @ ENTRY @ ENTRY @ ENTRY SCREEN SCREEN SCREEN
16' - 0"
CENTERLINE OF VEHICLE CENTERLINE CENTERLINE OF VEHICLE OF VEHICLE
16' - 0"
PAINTEDPAINTED METAL CANOPY PAINTED METAL CANOPY METAL CANOPY
16' - 0"
13' - 6" CLEAR HEIGHT PER VENTURA FIRE CODE
16' - 0"
16' - 0"
16' - 0"
29' - 8" METAL SCREEN HEIGHT
29' - 8" METAL SCREEN HEIGHT
29' - 8" METAL SCREEN HEIGHT
LAMINATED GLASS SKYLIGHT(S) LAMINATED LAMINATED GLASS SKYLIGHT(S) GLASS SKYLIGHT(S)
LANDSCAPED LANDSCAPED LANDSCAPED AREA AREA AREA
LEVELLEVEL 1 LEVEL 1 1 157' - 6" 157' - 6" 157' - 6"
SECTION SECTION SECTION @ LOBBY @ LOBBY @ LOBBY
LEVEL LEVEL 2 LEVEL 2 2 173' - 173' 6" - 173' 6" - 6" LEVELLEVEL 2 LEVEL 2 2 173' - 6" 173' - 6" 173' - 6"
13' - 6" CLEAR HEIGHT PER VENTURA FIRE CODE
GLASS GLASS GLASS STOREFRONT STOREFRONT STOREFRONT SYSTEM SYSTEM SYSTEM
4' - 0" SKYLIGHT 4' - 0" SKYLIGHT 4' - 0" SKYLIGHT
16' - 0"
16' - 0"
16' - 0"
27' - 0" LOBBY CEILING
27' - 0" LOBBY CEILING 16' - 0"
LEVELLEVEL 2 LEVEL 2 2 173' - 6" 173' - 6" 173' - 6"
PERFORATED METAL PERFORATED PERFORATED METAL METAL SCREENSCREEN SYSTEMSCREEN SYSTEM SYSTEM 19' - 6" CANOPY 19' - 6" CANOPY DEPTH DEPTH 19' - 6" CANOPY DEPTH
13' - 6" CLEAR HEIGHT PER VENTURA FIRE CODE
10' - 0"
10' - 0"
10' - 0"
LAMINATED LAMINATED LAMINATED GLASS SKYLIGHT GLASS SKYLIGHT GLASS SKYLIGHT
16' - 0"
PERFORATED PERFORATED PERFORATEDPAINTED METAL PAINTED METAL PAINTED METAL METAL SCREEN METAL SCREEN METAL SCREEN ENTRY CANOPY ENTRY CANOPY ENTRY CANOPY
16' - 0"
27' - 0" LOBBY CEILING
11' - 0"
11' - 0"
16' - 0"
16' - 0"
16' - 0"
CURTAINWALL BEHIND CURTAINWALL CURTAINWALL BEHIND BEHIND
16' - 0"
PAINTED METAL CAP PAINTED METAL CAP PAINTED METAL CAP METAL SCREENING METAL SCREENING METAL SYSTEM SCREENING SYSTEM SYSTEM W/ BUILDING W/ BUILDING SIGNAGE W/ BUILDING SIGNAGE SIGNAGE
LEVEL LEVEL 1 LEVEL 1 1 6" - 6" 157' - 157' 6" - 157'
SECTION SECTION SECTION @ TYP @ TYP @CANOPY TYP CANOPY CANOPY CONDITION CONDITION CONDITION
CANOPY CANOPY CANOPY SECTIONS SECTIONS SECTIONS
June June June 06,06, 2013 06, 2013 2013 - VCMC - VCMC - VCMC Design Design Design Document Document Document
10 10 10
Through 6 months of design review meetings while concurrently progressing the drawing set I worked with the client rep and design build contractor closely. I quickly became the point person for design on this project and was given a high level of responsibility through client rep presentations and design build contractor meetings, drawings, renderings, designing, detailing and material selection as well as coordinating and directing technical staff. This project is currently in the CD phase while portions of the work are currently under construction.
ventura county medical center HOK 2013
June 06, 2013
utah jazz stadium addition
AECOM | 2012 | Salt Lake City, UT | Project Designer
Our studio was asked to assist the San Francisco team with what began as a planning study for the existing Energy Solutions Arena. After speaking with the client and evaluating their wants and needs, it was determined a renovation and addition would be required to fulfill their requests. The client requested a stronger street presence, private access for VIPs, and a media wall for advertising and financial return as well as other programmatic additions. During this two-week exercise, working closely with a colleague under senior leadership, we designed, modeled, and rendered the addition and site updates. The exterior shell is a mostly transparent skin and roof that yields to the inner media wall wrapping around two facades of the existing building creating the requested advertising and graphics potential. The form gives the requested street presence and creates multiple plazas and entry ways into the new atrium space opening the building to the existing urban fabric beyond in one fluid move.
utah jazz stadium addition aecom | 2012
utah jazz stadium addition aecom | 2012
utah jazz stadium addition aecom | 2012
utah jazz stadium addition aecom | 2012
lax tom bradley international expansion
AECOM | 2012 | Los Angeles, CA | Design Team Member
I was a part of a small team tackling a very complicated design problem. The goal was to provide a cohesive design aesthetic for the central terminal arrival and departure loops at LAX, TBIT being the catalyst of the retrofit. My project role focused heavily on the “light band� connecting the user experience in one stroke. I began in the schematic design phase continued throughout and am now helping facilitate the construction of the project. My early phase contributions were design and digital modeling of complicated elements as well as visualization. Due to the vast impact the project would have on the various areas of the built environment, we decided a medium of on-site photography and image matched rendering was the most accurate way to show the opening day product. This project has completed construction and revitalized an old airport with a fresh new look.
los angeles international airport - new face of the CTA aecom | 2012
los angeles international airport - new face of the CTA aecom | 2012
PROJECT ADDRESS: 380 WORLD WAY LOS ANGELES, CA 90045
OWNER INFORMATION: LOS ANGELES WORLD AIRPORTS 7301 WORLD WAY WEST 10TH FLOOR ADG LOS ANGELES, CA 90045 T. 424.646.7136
ARCHITECTURE: AECOM 515 S. FLOWER ST. 8TH FLOOR LOS ANGELES, CA 90071 T. 213.593.8100
CIVIL: VCA ENGINEERS, INC. 3951 MEDFORD ST. LOS ANGELES, CA 90063 T. 323.729.6098
STRUCTURAL: KPFF 301 N. LAKE AVENUE SUITE 550 PASADENA, CA 91101 T. 626.578.9121
ELECTRICAL/PLUMBING: PBS ENGINEERS, INC. 2100 E. ROUTE 66 SUITE 101 GLENDORA, CA 91740 T. 626.650.0350
PROJECT ADDRESS: 380 WORLD WAY LOS ANGELES, CA 90045
OWNER INFORMATION: LOS ANGELES WORLD AIRPORTS 7301 WORLD WAY WEST 10TH FLOOR ADG LOS ANGELES, CA 90045 T. 424.646.7136
ARCHITECTURE: AECOM 515 S. FLOWER ST. 8TH FLOOR LOS ANGELES, CA 90071 T. 213.593.8100
CIVIL: VCA ENGINEERS, INC. 3951 MEDFORD ST. LOS ANGELES, CA 90063 T. 323.729.6098
STRUCTURAL: KPFF 301 N. LAKE AVENUE SUITE 550 PASADENA, CA 91101 T. 626.578.9121
PROJECT ADDRESS: PROJECT ADDRESS: OWNER INFORMATION: OWNER INFORMATION: ARCHITECTURE: ARCHITECTURE: CIVIL: CIVIL: STRUCTURAL: STRUCTURAL: ELECTRICAL/PLUMBING: ELECTRICAL/PLUMBING: KPFF INC. KPFF AECOM AECOM VCA ENGINEERS, INC. VCA ENGINEERS, PBS ENGINEERS, INC. PBS ENGINEERS, INC. 380 WORLD WAY 380 WORLDLOS WAY ANGELES WORLD LOS ANGELES WORLD 301 N. LAKE AVENUE 301 N. LAKE AVENUE LOS ANGELES, CA LOS 90045 ANGELES, AIRPORTS CA 90045 AIRPORTS 515 S. FLOWER ST.515 S. FLOWER 3951ST. MEDFORD ST.3951 MEDFORD ST. 2100 E. ROUTE 66 2100 E. ROUTE 66 SUITE SUITE 550 8TH FLOOR 8TH FLOORLOS ANGELES, CA LOS 90063 ANGELES, CA550 90063 SUITE 101 SUITE 101 7301 WORLD WAY WEST 7301 WORLD WAY WEST PASADENA, CA 91101 PASADENA, CA 91101 CA 91740 T. 323.729.6098 T. 323.729.6098 10TH FLOOR ADG 10TH FLOOR LOS ADG ANGELES, CA LOS 90071 ANGELES, CA 90071 GLENDORA, GLENDORA, CA 91740 T. 626.578.9121 T. 626.578.9121 T. 213.593.8100 T. 213.593.8100 T. 626.650.0350 T. 626.650.0350 LOS ANGELES, CA LOS 90045 ANGELES, CA 90045 ELECTRICAL/PLUMBING: T. 424.646.7136 T. 424.646.7136 PBS ENGINEERS, INC. 2100 E. ROUTE 66 SUITE 101 GLENDORA, CA 91740 T. 626.650.0350
PROJECT ADDRESS: 380 WORLD WAY LOS ANGELES, CA 90045
OWNER INFORMATION: LOS ANGELES WORLD AIRPORTS 7301 WORLD WAY WEST 10TH FLOOR ADG LOS ANGELES, CA 90045 T. 424.646.7136
ARCHITECTURE: AECOM 515 S. FLOWER ST. 8TH FLOOR LOS ANGELES, CA 90071 T. 213.593.8100
CIVIL: VCA ENGINEERS, INC. 3951 MEDFORD ST. LOS ANGELES, CA 90063 T. 323.729.6098
STRUCTURAL: KPFF 301 N. LAKE AVENUE SUITE 550 PASADENA, CA 91101 T. 626.578.9121
ELECTRICAL/PLUMBING: PBS ENGINEERS, INC. 2100 E. ROUTE 66 SUITE 101 GLENDORA, CA 91740 T. 626.650.0350
Los Angeles World Airports
NEW FACE OF THE CTA
TBIT ARRIVAL LEVEL DETAILS Los Angeles World Airports
NEW FACE OF THE CTA
TBIT ARRIVAL LEVEL DETAILS
TA A4-50
20120017
los angeles international airport - new face of the CTA aecom | 2012 TA A4-50
20120017
los angeles international airport - new face of the CTA aecom | 2012
cbre metropointe lobby renovation
AECOM | 2012 | Denver, CO | Project Designer
A quick lobby renovation project for an outdated corporate office building in Denver, Colorado. The client, building owner, was looking to update and re-energize the lobby. After several studies I pitched a scripted vertical scrim to hide two stories of glass looking into a dark parking garage and match the verticality of the lighting consultants design. The scrim was coordinated with a metal fabricator and is now completed. Shown above are conceptual renderings and fabrication mock ups.
cbre lobby renovation aecom | 2011
cbre lobby renovation aecom | 2011
confidential theme park hotels AECOM | 2011 | Shanghai, CN | BIM Captain
I was placed in our Shanghai office for three months to help with a BIM delivery package that would end the design development phase for this project. This was a truly international effort working with consultants from all over the world. My initial role in the project was BIM delivery and supervision of an entry CD level Revit model for two hotels. Once it became clear how useful the models were in this process our team quickly became a vital part of weekly coordination efforts and my role expanded from just modeling to coordination and team training. The drawings shown are all taken directly from a Revit model produced over two months.
shanghai hotels aecom | 2011
21
37
62
3
4
1 5
2
2/20
22
1/20
425 625
F
84
5 9
6 10
7
2/20
3/20
21
22 425 625
PARAPET AND STRUCTURAL BEAM CONFLICT
3/20
PARAPET AND STRUCTURAL BEAM CONFLICT
22 22
22
2850
F
DESCRIPTION OF REVISIONS
3/20
425 625
PARAPET AND STRUCTURAL BEAM CONFLICT
425 625
1
3/20
21
22
A8 A-462
WW F
VV
VARIES
2100 20.000
LEVEL 07 七层
A10 A-462
TT
DATE
SS
20.000
LEVEL 07 七层
LEVEL 06 六层
SCALE:
LEVEL 06 六层
DATE
3/20
21 22
555
A8 A-462
3100
2100
LEVEL 07 七层
2100
SOFFIT DETAIL TYP.
20.000
3100
2100
1 : 50
WW
SOFFIT DETAIL TYP.
LEVEL 07 七层
2/20
ISSUE APPR. BY NO.
2100 16.900
500 500
3100
16.900
20.000
3100
3100
2100
3100
LEVEL 08 八层
SOFFIT DETAIL TYP.
D
2100
3100
23.100
500 500
LEVEL 06 六层 SOFFIT DETAIL TYP.
2100
3100
2100
3100 16.900
SOFFIT DETAIL TYP.
D
LEVEL 08 八层
500 500
LEVEL 06 六层
SS
A-462
23.100
3100
16.900
500 500
2100
3100
500 500
2100
3100 LEVEL 06 六层
TT E
E3 STAIR 03 LEVEL 03-06
A8 A-462
16.900
A10 A-462
500
ISSUED FOR
UU
2100
VV
3100
WW
2100
21
3100
3/20
UU
2%
LEVEL 08 八层
500 500
LEVEL 07 七层
2/20
500 500
500
20.000
20 1/20
PARAPET AND STRUCTURAL BEAM CONFLICT
MASONRY WALL BUILT-UP ROOFING SYSTEM 23.100
500 500
LEVEL 07 七层
LEVEL 08 八层
2600
3100
2100
3100 20.000
500 500
LEVEL 07 七层
500 500
2100
3100
E
20.000
23.100
LEVEL 08 八层
E
CONTINOUS CONCRETE BEAM
2%
2%
23.100
500 500
LEVEL 08 八层
500 500
23.100
VARIES
2100
VARIES 2%
500 500
LEVEL 08 八层
BLOCK WALL AND BEAM INTERSECTING
REV. APPR. BY NO.
1000
2%
23.100
CONTINUOUS ALUM. COPING
PARAPET AND STRUCTURAL BEAM CONFLICT
2100
VARIES
BLOCK WALL AND BEAM INTERSECTING
2100
VARIES
1000
425 625
D
3100
13.800
LEVEL 05 五层
LEVEL 05 五层
13.800
LEVEL 05 五层
500 500
500
13.800
500 500
LEVEL 05 五层
3100
13.800
500 500
LEVEL 05 五层
500 500
VV 13.800
SLAB EDGE LOCATION 4.500
LEVEL 02 二层
LEVEL 02 二层
3100
LEVEL 03 三层
B 1.400
LEVEL 01.5 一层
LEVEL 01.5 一层
LEVEL 01.5 一层
LEVEL 01.5 一层
A10 WALL SECTION SCALE:
A-511
10
9
A8 WALL SECTION 1 : 50
A-511
8
7
SCALE:
INITIALS:
VV
APPROVAL SIGNATURE:
APPROVED BY: Approver
E.F.No.
20 1/20
2/20
3/20
21 22
A8 A-462
UU
A10 A-462
SS
A10 A-462
LEVEL 01.5 一层
LEVEL B1 负一层
LEVEL B1 负一层
TT
-4.000
LEVEL B1 负一层
0.000
SS
LEVEL 01 一层
SHEET TITLE:
-4.000
WALL SECTIONS
3100
4000
UU
1.400
LEVEL 01.5 一层
LEVEL 01 一层
1 : 50
TT
-4.000
0.000
SCALE:
A-462
22
B
LEVEL 01 一层
LEVEL 02 二层
C3 STAIR 03 LEVEL 02 SCALE:
WW
0.000
4.500
SS
A8 A-462 CLEAR IUG W/ VERTICAL STEEL SUPPORT SYSTEM CONCRETE SLAB CONCRETE FOUNDATION WALL - REFER TO STRUCTURAL
1400
1400 4000
3100
4000
LEVEL 01 一层
1.400
A
21
UNIT NAME:
LEVEL B1 负一层
LEVEL 01.5 一层
1400
LEVEL B1 负一层
0.000
4.500
1400
-4.000
C:\Users\Scott\Documents\H02_CS_A12_CENTRAL_shou scott.rvt
LEVEL 01 LEVEL 02 一层 二层
6/24/2012 5:01:49 PM
A
1400
1400
0.000
LEVEL 01 一层
4000
0.000
LEVEL 01 一层
4000
0.000
-4.000
1.400
3100
1.400
3100
1.400
1400
1.400
3/20
PROJECT AREA:
B
LEVEL 03 三层
2/20
LEVEL 02 二层
7.600
3100
3100
3100
7.600
A-462
4.500
3100
4.500
LEVEL 02 二层
3100
4.500
LEVEL 02 二层
3100
4.500
C5 STAIR 03 AXONOMETRIC
SUSPENDED CEILING SYSTEM
USE DATE
STEEL MULLION
A10 A-462
TT C
DATE:
LEVEL 04 四层
SOFFIT DETAIL TYP.
500 500
3100
10.700
UNITIZED ALUM CURTAINWALL SYSTEM
UU
PROJECT DESIGNED FOR:
LEVEL 04 四层
LEVEL 03 三层
2600
10.700
300 500
LEVEL 03 三层
7.600
3100
3100
3100
LEVEL 03 三层
3100
LEVEL 03 三层 BEAM INTERSECTS CURTAINWALL
7.600
3100
LEVEL 03 三层
SOFFIT DETAIL TYP.
7.600
3100
BEAM INTERSECTS CURTAINWALL
7.600
2100
LEVEL 05 五层
SOFFIT DETAIL TYP. 7.600
3100
2100
LEVEL 05 五层
C
13.800
3100
3100
3100
3100
C
13.800
CHECKED: Checker
IGU VISION PANEL
SOFFIT DETAIL TYP. SOFFIT DETAIL TYP.
APPROVAL SIGNATURE:
INSULATION / FIRE PROOFING
DRAWN: Designer
LEVEL 04 四层
KEY PERSONS AND APPROVALS
2100 10.700
CONCRETE SLAB GLAZED SPANDREL PANEL
ARCHITECTURAL LEAD
LEVEL 04 四层
30 MM SCREED
A/E MANAGER:
10.700
500 500
3100
2100
3100
LEVEL 06 六层
3100
LEVEL 04 四层
500 500
LEVEL 06 六层
10.700
LEVEL 04 四层
16.900
500 500
2600
3100
2100
3100 10.700
16.900
3100
LEVEL 04 四层
500
10.700
500 500
2100
3100
20 MM FINISH
C:\Users\Scott\Documents\H02_CS_A12_CENTRAL_shou scott.rvt
6/24/2012 5:02:18 PM
8
9
10
A
PHASE: PROJECT NO./PKG. CODE:
USE ddd
STAIR 03 E/W SECTION A10WALL SECTION A6 1 : 50
SCALE: 1 : 50 SCALE: 1 : 50
A-462 A-511
6 10
5 9
03 N/S SECTION A8 STAIR SECTION A4 WALL A-511
SCALE:
A-462
48
3 7
SCALE: 1 : 50
CD DRAWING NO.:
A2 WALL SECTION A5 STAIR 03 LEVEL 07 1 : 50 A-511
SCALE:
A-462
62
1 5
1 : 50
A-511
REVISION NO:
SCALE:
4
A3 STAIR 03 LEVEL 01 1 : 50
AO
SCALE:
A-462
3
1 : 50
2
1
shanghai hotels aecom | 2011
long beach courthouse
AECOM | 2012 | Denver, CO | Designer I - large BIM role
I began working on this project immediately after starting at AECOM. My role as an entry level design team member quickly evolved into a type of BIM captain. I helped drive the quality and level of detail in the revit model, pushing the studio into nfamiliar software territory. This was a fast paced design build project with weekly deliverables and BIM calculated take offs for constant pricing updates. This project is built and now operational.
long beach courthouse aecom | 2011
349 FOR WALL AND GLASS TYPES
349 FOR WALL AND GLASS TYPES PROJECT
27' - 6"
B B.1 B.2 MAGNOLIA AVENUE LONG BEACH, CA 90802
8' - 0" A2 A480
C7
084413 - GLAZED ALUMINUM SYSTEM FINISH TYPE AL1
OWNER
A480 T.O. CORNICE 85' - 3"
16' - 0"
LEVEL 5 60' - 0" 15' - 0"
A7 A480
SIM
LEVEL 4 45' - 0"
D
D.7
E
E.7
F
F.5
F.8
G.2
G.8
H.2
H.8
J
K
L
M
N
P
P.4
Q
R
S
S.2
S.3
T
U
V
MAGNOLIA AV LONG BEACH
15' - 0" NARROW STYLE GLASS DOOR INTEGRATED WITH CURTAINWALL
21' - 6"
8' - 0"
14' - 0"
22' - 0"
22' - 0"
455 GOLDEN GATE AVENUE SAN FRANCISCO, CA 94102
074120 - PENTHOUSE ENCLOSURE AL10
PROJECT COMPANY
C7 A302
14' - 0"
D7
C5
A310
A480
22' - 0"
14' - 0"
22' - 0"
8' - 0" 6' - 0" 8' - 0"
10' - 0" 4' - 0" 8' - 0"
16' - 0"
22' - 0"
36' - 0"
36' - 0"
22' - 0"
36' - 0"
14' - 0"
22' - 0"
22' - 0"
36' - 0"
8' - 0" 6' - 0"
36' - 0"
22' - 0"
OWNER
36' - 0"
JUDICIAL CALIFOR ADMINIST OFFICE O
SIM
C2 A480
Sim
12' - 0"
455 GOLDEN G SAN FRANCIS
044200 - EXTERIOR STONE CLADDING TYPE - ST1
C3
GLAZED ACCESS PANEL
PROJECT CO
A486 T.O. CORNICE 85' - 3" 095117 - COMPOSITE CEILING SYSTEM Level R1 76' - 0"
444 WEST OCEAN BLVD., SUITE 1530 BEACH, CA 90802
057300 - GLASS-SUPPORTED LONG ORNAMENTAL RAILING 15' - 0"
089000 - OPERABLE LOUVER
6' - 6"
LONG BEACH JUDICIAL PARTNERS LLC
LEVEL 3 30' - 0"
E DESIGN BUILDER
LEVEL 2 15' - 0" 15' - 0"
OPEN BEYOND
CLARK DESIGN/BUILD OF CALIFORNIA, INC.
LEVEL 4 45' - 0" SECTION 057000 - DECORATIVE METAL
074150 - ALUMINUM WALL PANEL AL1
575 ANTON BOULEVARD, SUITE 100 COSTA MESA, CA 92626
COURTS BUILDING PARTIAL D2 WEST ELEVATION
CONSULTANTS
1/16" = 1'-0"
A3
A5
A7
A442
A442
A442
A3
074150 - ALUMINUM PANEL CANOPY
A443
074150 - ALUMINUM PANEL CANOPY
A2
076200 - PARAPET SCUPPER , TYP.
A7
LEVEL 3 30' - 0"
SIM
A454
A454
LEVEL 2 15' - 0"
STRUCTURAL
NE1
NABIH YOUSSEF & ASSOCIATES 800 WILSHIRE BLVD., SUITE 200 LOS ANGELES, CA 90017
GROUND LEVEL 0" SITE -4' - 0"
MPE/F P/DATA TELECOM SYSKA HENNESSEY GROUP 11500 W. OLYMPIC BLVD., SUITE 680 LOS ANGELES, CA 90064 SHOWN GLASS GUARDRAIL
042000 - MASONRY UNIT MA1
A302
SCALE:
REGISTRATION B
057300 - GLASS-SUPPORTED ORNAMENTAL RAILING
B.1
6' - 6"
B.2
F.8 B.8
C.5
8' - 0"
14' - 0"
D
D.7
22' - 0"
22' - 0"
E
E.7
14' - 0"
22' - 0"
F
F.5
14' - 0"
22' - 0"
G.2 G
G.7
8' - 0" 6' - 0" 8' - 0"
G.8
10' - 0"
H.2
15' - 0"
42"
A7 A480
SIM
D7
C5
A310
A480
C2 A480
9' - 3"
15' - 0"
T.O. CORNICE 85' - 3" Level R1 76' - 0"
16' - 0"
15' - 0" 15' - 0"
10' - 0" 084413 - GLAZED ALUMINUM SYSTEM FINISH TYPE AL1 GLASS GUARDRAIL SHOWN DASHED FOR CLARITY
A302
SCALE:
ISSUE
LEVEL 5 60' - 0"
GLAZED ACCESS PANEL HORIZONTAL SEISMIC JOINT
UNDER DEVELOPMENT
NORTH BUILDING NORTH C7 ELEVATION ABOVE ROOF
GROUND LEVEL 0" SITE -4' - 0"
1/16" = 1'-0"
B.8 B
B.1
B.2
C.5
D
D.7
E
E.7
F
F.5
F.8
G
ISSUE
H
G.2 C
B.6
G.7
G.8
H.2
H.8
J
K
L
M
N
P
P.4
Q
R
S
SIM
09.08.11
8
08.26.11
7
06.30.11
6
06.28.11
5
04.19.11
4
B
04.19.11
21' - 6"
8' - 0"
03.08.11
BID PACKAGE NO. 2
2
03.01.11
BID PACKAGE NO. 1
1
03.01.11
DATE
22' - 0"
95% CD COURT BLDG EXTERIOR GLAZING . SYSTEMS - 95% CD TIER 2 REVIEW SET COURT BUILDING, EARLY WORK . PACKAGE - 100% CD CONFORMED SET 50% CD Sim BID PACKAGE NO. 4C7 A410 100% DD
3
MARK
14' - 0"
22' - 0"
14' - 0"
D7
22' - 0"
A7 A321
A310
14' - 0"
22' - 0"
SIM C3 A476
8' - 0" 6' - 0" 8' - 0"
10' - 0" 4' - 0" 8' - 0"
16' - 0"
12' - 0"
22' - 0"
36' - 0"
SIM
36' - 0"
22' - 0"
36' - 0"
14' - 0"
22' - 0"
22' - 0"
36' - 0"
8' - 0" 6' - 0"
U
V
5.6
5.2
5
3.8
3.7
22' - 0"
36' - 0"
9
074150 - ALUMINUM WALL PANEL AL1
A5
C3 A411
A475
C7 A480
SIM
50% DD
08.26.11
06.30.11
6
06.28.11
5
04.19.11
4
095117 - COMPOSITE CEILING SYSTEM T.O. CORNICE 85' - 3"
C3 A486
Level R1 76' - 0"
DESCRIPTION 084413 - GLAZED ALUMINUM SYSTEM FINISH TYPE AL1
LEVEL 5 60' - 0"
3.6
09.08.11
8 7
04.19.11
3
03.08.11
2
03.01.11
1
MARK
03.01.11
DATE
KEY PLAN
15' - 0"
6
36' - 0"
A7 044200 - EXTERIOR STONE CLADDING TYPE - ST1 SIM C2 A480
KEY PLAN 6.8
T
A311 074120 - PENTHOUSE ENCLOSURE AL10
4 7
S.3
16' - 0"
A7 A480
7.3
S.2
1/16" = 1'-0"
9
8
SYSKA HENNESSE 11500 W. OLYMPIC LOS ANGELES, CA
SIM
A486
057300 - GLASS-SUPPORTED ORNAMENTAL RAILING
C
6' - 6"
8.1
MPE/F P/DATA
10' - 0"
E7
074150 - ALUMINUM WALL PANEL AL1
LEVEL 2 15' - 0"
8.7
NABIH YOUSSEF & 800 WILSHIRE BLV LOS ANGELES, CA
REGISTRATIO
H.8
LEVEL 3 30' - 0"
9.3
CONSULTANT
STRUCTURAL
H
LEVEL 4 45' - 0"
SCALE:
575 ANTON BO COSTA MESA
2' - 9"
21' - 6"
C
LEVEL 5 60' - 0" OPEN BEYOND, REFER TO SHEET A304 FOR PATIO ELEVATIONS
A303
DESIGN BUIL
CLARK D OF CALIF
1/16" = 1'-0"
B.6
NORTH BUILDING EAST C2 ELEVATION
444 WEST OC LONG BEACH
NORTH BUILDING NORTH D7 ELEVATION
D
042000 - MASONRY UNIT MA1
081113 - HOLLOW METAL DOORS AND FRAMES
055000 - STEEL BAR GRATING
RE: LANDSCAPE DRAWINGS
C7 A411
DASHED FOR CLARITY
+/- 54 ' - 0"
LONG BE PARTNER
LEVEL 5 60' - 0"
GROUND LEVEL 0"
SCALE:
C.5
JUDICIAL COUNCIL OF CALIFORNIA ADMINISTRATIVE OFFICE OF THE COURTS
Level R1 76' - 0" 095117 - COMPOSITE CEILING SYSTEM 057300 - GLASS-SUPPORTED ORNAMENTAL RAILING
A303
C
B.8
SIM
16' - 0"
36' - 0"
13
NEW LON COURT B
15' - 0"
6' - 0"
12.8
H
15' - 0"
26' - 0"
12
A310
G.7
15' - 0"
14' - 0"
A7
11.2
G
B.6
15' - 0"
11
9' - 3"
10
PROJECT
NEW LONG BEACH COURT BUILDING
23' - 0"
11' - 6"
32' - 0"
12' - 0"
20' - 0"
LEVEL 4 45' - 0"
11' - 0"
15' - 0"
11' - 6"
074150 - ALUMINUM PANEL CANOPY LEVEL 2 15' - 0"
044200 - EXTERIOR STONE CLADDING TYPE - ST1
044200 - EXTERIOR STONE CLADDING TYPE - ST1G
GROUND LEVEL 0"
COURTYARD WEST A2 ELEVATION A303
3
SCALE:
2
1/16" = 1'-0"
1
PROJECT
LEVEL 2 15' - 0"
60190993
A7 A454
SHEET TITLE A
RE: LANDSCAPE DRAWINGS 033300 - ARCHITECTURAL CONCRETE
B2
B2 A412
SIM
A412 BUILDING ELEVATIONS
SIM
084229 - SLIDING AUTOMATIC ENTRANCE
033300 - ARCHITECTURAL CONCRETE
A303
c 2011 AECOM TECHNICAL 7 SERVICES, INC. PRINTED ON RECYCLED CONTENT
SCALE:
SHEET TITLE
BUILDIN
COURTS BUILDING NORTH SHEET NUMBER B7 ELEVATION A302
PROJECT 60190993
GROUND LEVEL 0"
074150 - ALUMINUM WALL PANEL AL1 074160 - STAINLESS STEEL PANEL ENTRANCE CANOPY
SIM
15' - 0"
10/12/2011 4:17:49 PM C:\BIM Projects\LBC_CS_A11_CENTRAL_lelieurn.rvt
074150 - ALUMINUM PANEL CANOPY
15' - 0"
E3 A440
LEVEL 3 30' - 0" 084413 - GLAZED ALUMINUM SYSTEM AT CLERESTORY BEYOND
15' - 0"
A6 A454
SECTION 084413 - GLAZED ALUMINUM SYSTEMS
15' - 0"
LEVEL 3 30' - 0" D7 A457
SHEET NUMB
1/16" = 1'-0"
A302 6
5
4
3
2
1
c 2011 AECOM TEC
long beach courthouse aecom | 2011
san angelo community center Lehrer Architects | 2010 | Los Angeles, CA | Project Designer
San Angelo Community Center is located in an existing neighborhood park in East Los Angeles. As the only day-to-day team member on the project, it was my responsibility to model, draw, and coordinate the project. It was an invaluable experience to be involved in all facets of all phases. This is scheduled to be the first net zero public building in LA. This was possible through close coordination with the client and consultants using a BIM delivery process.
san angelo community center lehrer architects | 2010
A A
B B
C C
D D
16' - 10 1/2"
8' - 3 1/2"
27' - 7 1/2"
16' - 10 1/2"
8' - 3 1/2"
27' - 7 1/2" 4
1
A-7.0 4
A-4.0 1
A-7.0
A-4.0
HIGH ROOF TRELLIS RIDGE 32' - 2" HIGH ROOF TRELLIS RIDGE 32' - 2"
12 12
LOW ROOF HIGH POINT 22' - 6" LOW ROOF HIGH POINT 22' - 6"
7 7 6 6 9 1
9
1
LOW ROOF LOW POINT 10' - 6" LOW ROOF LOW POINT 10' - 6" 6'-10 1/2" T.O. DOORS/WINDOWS 6'-10 1/2" T.O. 7' - 4 1/2" DOORS/WINDOWS 7' - 4 1/2"
11
10
11
10
OPEN BEYOND OPEN BEYOND
7 7
4 4
15
1
15
1
WEST PATIO
MULTI-PURPOSE
EAST PATIO
WESTP1 PATIO 2552 P1SF
100 MULTI-PURPOSE 1764 100SF
EASTP2 PATIO 3684 P2SF
1
2552 SF
2
1764 SF
1
3684 SF
2 1
F.F. 0' - 6" F.F. 0' - 6"
4
8
4
8
1
1 A-7.0 1 A-7.0
BUILDING SECTION D BUILDING SECTION D 10 10
13' - 7" 13' - 7"
HIGH ROOF TRELLIS RIDGE 32' - 2" HIGH ROOF TRELLIS RIDGE 32' - 2"
9 9
8 8
9' - 7"
8' - 7 1/2"
9' - 7"
8' - 7 1/2"
7 7
6 6
8' - 7 1/2"
8' - 7"
8' - 7 1/2"
8' - 7"
5 5
10' - 5"
4 4
3 3
10' - 5"
10' - 5"
7' - 10 1/2"
10' - 5"
7' - 10 1/2"
2 2
SCALE: 1/4" SCALE: 1/4"
1 1
7' - 10 1/2" 7' - 10 1/2"
3
1
1
2
A-7.0 3
A-7.1 1
A-7.0 1
A-7.0 2
A-7.0
A-7.1
A-7.0
A-7.0
6 6
LOW ROOF HIGH POINT 22' - 6" LOW ROOF HIGH POINT 22' - 6"
7 7 9
9
9
9
LOW ROOF LOW POINT 10' - 6" LOW ROOF LOW POINT 10' - 6" 6'-10 1/2" T.O. DOORS/WINDOWS 6'-10 1/2" T.O. 7' - 4 1/2" DOORS/WINDOWS 7' - 4 1/2"
4
10
4 14
10
14 7 7
8 8
F.F. 0' - 6" F.F. 0' - 6"
IF THIS SHEET IS SMALLER THAN 42"W X 30"H THEN IT HAS BEEN REDUCED
1
9 9
15 15 1
16 16
1
1
MULTI-PURPOSE
MENS RR
100 MULTI-PURPOSE 1764 100SF
102 RR MENS 148 102SF
1764 SF
148 SF
BUILDING SECTION B BUILDING SECTION B
IF THIS SHEET IS SMALLER THAN 42"W X 30"H THEN IT HAS BEEN REDUCED
san angelo community center lehrer architects | 2011
SCALE: 1/4" SCALE: 1/4"
morphosis internship
2009 | Los Angeles, CA | Intern (modelshop, graphics) The skillset, relationships and design I was exposed to during this time have propelled my abilities to a level beyond previous comprehension. The program, composed of four simultaneous interns, is focused mainly inside of the model shop with varying opportunities to work inside the office on: presentation drawings, books, archiving, digital modeling, competition work etc. The model shop is responsible for digital and physical fabrication of models that range from quick studies to presentation quality for clients and competition entries. While some models are still built by hand, most are assembled using 3D printing and laser cutting technologies often combining the two. Exposure to their design workflow has influenced and improved my own process. Digital prepping and assembling models often relied on a method of reverse engineering or “dumbing� down of the projects in order to ensure a certain printed physical strength and quality. This method of model construction gave me a greater sense of how buildings are made and reasoning behind design decisions.
dallas museum of nature and science morphosis | 2009
Each intern is assigned to a specific job while he or she is there, I was assigned to Emerson College in Hollywood, CA. During this time I went to design meetings, worked as a member of the team, prepped and fabricated models. This award winning project is now complete and operational.
emerson college morphosis | 2009
AREA DISTRIBUTION RESIDENTIAL: 2,274,000 FT2 1 40-STOREY TOWER @ 920,000 FT2 3
2
2 28-STOREY TOWER @ 644,000 FT2
5
3 28-STOREY TOWER @ 500,000 FT2
4
4 28-STOREY TOWER @ 210,000 FT2
1
38%
COMMERCIAL: 463,040 FT2
7.7%
1-STOREY RETAIL WITH STOREFRONT ALONG EXTERIOR ARCADES OFFICE: 1,280,000 FT2 5 64-STOREY TOWER @ 1,280,000 FT2
21.3%
GREEN SPACE: 1,800,000 FT2
30% 1
3%
2
INFRASTRUCTURE: 168,000 TOTAL BUILT AREA:
83% OPEN
BUILT
4,017,040 FT2 (373,195 M2) TOTAL OPEN AREA: 1,968,000 FT2 (182,833 M2) TOTAL SITE AREA:
combinatory urbanism work samples morphosis | 2009
thank you scott smith aia, leed ga NY License #036967 | LEED #10235793
159 Kane St, Apt 3B Brooklyn, NY 11231 713 550 2417 scottsmith.arc@gmail.com