Portfolio Simon Scheepens

Page 1

sA che_ h

on

PORTFOLIO

_k tc r itec ture

SIMON SCHEEPENS

Phone nr. 0031 [0]6 26034500 E-mail: simon.scheepens@gmail.com


January 2010 - present

September 2009- January 2010

January - June 2009

January - June 2008

November 2010 October - December 2010 September 2009 - September 2010 September - November 2008 Februari - September 2008 September 2006 - September 2007 January - June 2006 September 2005 - January 2006

PORTFOLIO

SIMON SCHEEPENS

IJsselsteinlaan 13-3 3525 ET Utrecht Phone nr. 0031 [0]6 26034500 E-mail: simon.scheepens@gmail.com Website: scheepens.wordpress.com Student Delft University of Technology

January - June 2005

September 2004 - January 2005

January - june 2004

* For my complete CV see letter of application


CURRICULUM VITEA*

SIMON SCHEEPENS

SPACE OF FLOWS, ®MIT GRADUATION PROJECT Page 05 Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

REVIVAL OF THE ELSEVIER BUILDING, MASTER 2 ®MIT PROJECT Page 09 Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

BINNENGASTHUIS AREA AMSTERDAM, MASTER 1 HYBRID BUILDING PROJECT Page 13 Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

LIBRARY THE LOOP, HBO PRE-MASTER PROJECT

Page 17

Faculty of Architecture, TU Delft

PART-TIME JOBS AT THE FACULTY OF ARCHITECTURE, TU DELFT Page 21 Organized Workshop Section Modeling for Management Team [three weeks] Member editorial staff B_Nieuws [three months] Student member Management Team [twelve months] Mentoring first year students [two months]

TER BRAAK ARCHITECTEN, UTRECHT Page 23 CHAIRMAN OF THE BOARD A.U.S.R ORCA, STUDENT ROWING SOCIETY UTRECHT

Page 25

JO COENEN & CO ARCHITEKTEN, AMSTERDAM Page 27 JOOP VAN DEN ENDE MUSICAL THEATER, GRADUATION INTERNSHIP HU Page 29 Jo Coenen & Co Architekten, Amsterdam

SERVAASBOLWERK, SEMESTER 7 PROJECT Page 33 Bachelor Architecture [HBO] University of Applied Sciences Utrecht [HvU]

AAUC CONGO SPC, POINT NOIR, REPUBLIC CONGO, AFRICA [INTERNSHIP]

Page 35

Atelier d’Architecture et d’Urbanisme – Conseils Congo “société professionnelle civile” Bachelor of Architecture [HBO] University of Applied Sciences Utrecht [HvU]

BUILDING A MUSEUM , SEMESTER 5 PROJECT Page 39 Bachelor of Architecture [HBO] University of Applied Sciences Utrecht


SPACE OF FLOWS, 速MIT GRADUATION PROJECT Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

KEJETIA LORRY STATION Studio Ghana is a graduate studio of R-MIT [Renovation, modification, intervention, transformation]. The project is situated in Kumasi, Ghana. The goal of the studio is towards spatial and architectural interventions in Kumasi. FLOW OF PEOPLE My analysis is that the character of the city is movement or mobile. I came to this conclusion because all of the facilities and markets are located in the city cernter. The current situation is that the city centre is reaching a deadlock. The flow of people is stagnating. THE SPACE OF FLOWS An attempt to capture the movement of the city to create a momentum. The chosen Case Study is not a destination in itself; instead you are passing by or going through, like a bus station. The project is an attempt to re-create a space for the flows.

This diagram symbolizes the attempt to capture the movement in space. It shows the different movements in the city and the tension between rust (building) and the unpredictability (movement).


5


Bus station and suroundings

PRECONDITION 1 - Finishing ring

City centre reaching a deadlock

PRECONDITION 2 - Adding BRT system

PRECONDITION 3 - Adding extra ring and Tro.Tro system

Current situation

PRECONDITION 4 - Regulation

Masterplan bus station

Masterplan city size

Tro.Tro - small person van

Potention bus station

Section platform


KEJETIA LORRY STATION

Flow of people between bus station and market

Section city square

7


REVIVAL OF THE ELSEVIER BUILDING, MASTER 2 ®MIT PROJECT Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

Concept of the Facade The concept of the facade leans heavily on the analysis of the facade of the old building. The vertical elements are made even more important in the appearance of the new facade. Furthermore the vertical elements made of steel IPE-s have different end highs. Just the vertical movement doesn’t stops but merges into the sky. This effect is enforced by the slanting of the upper floors. These floors are added to give the building more height, like W. M. Dudok’s intention, and accommodate the leisure functions. In addition each function has its own expression. The connection with the park has a recessed facade, behind the construction and the vertical elements. This facade also has a flowing design over 3 floors. The houses are defined in the facade with balconies in front of the vertical elements and the leisure functions are behind the vertical elements in the form of boxes. The facade consists of a double wall to give the possibility to ventilate the houses in a natural way.


9

9


Location: Bos en Lommer, Amsterdam

New situation


11


BINNENGASTHUIS AREA AMSTERDAM, MASTER 1 HYBRID BUILDING PROJECT

Master of Science and Education: Architecture, Urbanism Msc and Buuilding Sciences, TU Delft 1 Hybrid Building;

concept Tree garden

Filtered from the historical analyse why used the tree garden from the old monastry to give the meeting place character. The trees are high fruit trees.

Informal routing

Determined from the entrances of the differend functions (University new building and Library special collection) why difind the routing. These two main routes are pressed in the landscape. The rest follows it. The landscape therefore creats a informal routing. Also by strategic use of hills.

Landscape

opment area

Whe used the landscape to created a garden. The garden connects the urban context whit is buildings to one place. Also it creats the possibility to diffen sub-places like the inner-garden, amphitheatre, meetingplace and lecture rooms. The hils amplify the perspective and use.

Restaurant

Taking the restaurant and placinged in the garden with two extra paviljoens gave our the possibility to structur this. The restaurant lays in the sight of the two main entrances to the area.

Inner-garden

The inner-garden is by nice weater for studying purpos and ase terras for the restaurant.

Building

The building is placed one the border of the site to closed it of. Further to amplify the urban situation. It also creates a new Amsterdam building block. The Nieuwe Doelenstraat gets also more elan whit stores one the ground floor.

Tree Garden Filtered from the historical analyze we used the tree garden from the old monastery to give the meeting place a sense of character. The trees are high fruit trees. Informal routing Determined from the entrances of the different functions (University new building and Special collection Library) we defined the routing. These two main routes are present in the landscape, the other routes follow from these two. The landscape therefore creates an informal routing, also by a strategic use of teh surrounding hills. Landscape We used the landscape to create a garden. The garden merges the urban context with its buildings into one place. In addition, it creates the possibility to define sub-places like the innergarden, the Amphitheatre, meeting place and lecture rooms. The hills reinforce the perspective and use. Restaurant Taking the restaurant and placing it in the garden with two extra pavilions gave us the possibility to give the garden a function. The restaurant is situated in sight of the two main entrances to the area. Inner-garden In nice weather the inner-garden can by used for studying and as a terrace for the restaurant. Building The building is placed on the edge of the site to close it off and to reinforce the urban situation. It also creates a new Amsterdam building block. The Nieuwe Doelenstraat also obtains more elan with stores on the ground floor.

N

Binnengasthuisterrein A


13


Facade 1:50

Facade section 1:50

Section AA


BINNENGASTHUIS AMSTERDAM

Project designed together with Lucas Francken

Section CC

15


LIBRARY THE LOOP, HBO PRE-MASTER PROJECT

Master of Science and Education: Architecture, Urbanism and Building Sciences, TU Delft

Neighbourhood library with 50 starter houses on the Javaplein, heart of Amsterdam-East. The building serves as an urban accelerator which works by deceleration. The neighborhood must acquire a spot where people come together and meet. A meeting place, however, can only by created if you offer people a place to slow down, to take a rest from the everyday, urban hectic. I interpret the design assignment therefore as a paradox. The most important additive to the urban context are the two squares. The first is the Javaplein that passes into my building and serves as the entrances of the library. The second is the entrance to the apartments. The two squares are framed white gateways. The most important and largest gateway is situated at the Javaplein side. The second is situated at the Molukkenstraat. The gateway to the apartments has the same architectural language as the gateways of the Javaplein, such as the altitude, but is more intimate.


17


LIBRARY The library itself has been designed as a loop (no end). In addition, the continuity in the design is symbolical for timelessness, a theme that every library contains. The entrance to the library is situated on the corner of the Javaplein and the Molukkenstraat and is also the reading-cafe where it’s possible to organize lectures and exhibitions.

The concept for the division of the library contains two routes. The first is the public and fast route, a clear vision is important. The route runs at the street side and has a clear (open) relation with the surroundings. The second route is the concentration and slow route. This route characterises itself by quiet study and reading places. Using this route people go on an adventure through the library which has been subdivided by different altitudes, walking bridge, stages and stairs. The bookcase separates the two routes.

Because of the enormous overpressure of the gateways (+/- 40m) I have chosen to overstrain the construction whit a bridge construction. They also define the facade.

Entrance and readingcafe Section adults

Section communication and language Section travelling Section adolescent Lounch bar and mediatheek

Entrance maquette

Section youth


LIBRARY THE LOOP

Plan of the thirt floor

Section

19


PART-TIME JOBS AT THE FACULTY OF ARCHITECTURE, TU DELFT

During my studies on the TU Delft I did some additional jobs. Student member Management Team My role was to represent the interests of all students at the Faculty of Architecture within the Management Team. It included reviewing the policy and financial documents and thinking about the future of the faculty. Member editorial staff B Nieuws B_Nieuws is an independent threeweekly periodical that serves as a platform for discussion, opinion making and information exchange for TU Delft Faculty of Architecture. B_Nieuws is made by students for all of the Faculty members and everyone else who is interested. Workshop for the Management Team Preparation and organization of workshops as part of the review of the faculty. The aim was to reform the organization of the departments.

By Roberto Rocco

INTERVIEUW B Nieuws 25 mei 2010

First year student mentor Part of the job was to assist the design tutor, making the students familiar with the basic knowledge of the course (for example architectural drawing and model building) and introducing them to Delft, the TU, and the faculty.


21


TER BRAAK ARCHITECTEN, UTRECHT

Ter Braak Architecten is located in the center of Utrecht. Two days [16 hours] a week I assisted the director and architect Mr ter Braak. My work consisted primarily of creating technical drawings and some design assignments.

Rebuilding villa Lindenlaan at Zeist Re-development Zonstraat at Driebergen

Soundwall dwelling Engelbrecht Rotterdam


23


CHAIRMAN OF THE BOARD A.U.S.R. ORCA, STUDENT ROWING SOCIETY UTRECHT

As the chairman I was involved in development of a new society building. My study came in handy by the composition of a program and the writing of a briefing for the architectural competition. After the selection process, where I was part of the selection commission, we choose NL architects as design partner. For financing the project I made Mitros [housing cooperation] part of the partners involved in the project. I also independently coordinate the commission, the design process, the finance and the contractor for the indoor rowing installation.

Indoor rowing installation design


Indoor rowing installation

Rowing club building

The rowing club is situated in the Liesbosch park

Design of NL Architects

25


JO COENEN & CO ARCHITEKTEN, AMSTERDAM

After my internship I worked two days a week by the bureau Coenen. I mainly assisted a project architect by projects such as the Joop van den Ende Musical Theatre, model urban plan Leidsche Rijn in Utrecht, a situation model of the Amicital building in Leeuwarden and technical drawings for the corner building Smalle Haven in Eindhoven.

Leidse Rijn in Utrecht

Smalle Haven in Eindhoven

Joop van den Ende Musical Theatre


27


JOOP VAN DEN ENDE MUSICAL THEATER, GRADUATION INTERNSHIP HU Jo Coenen & Co Architekten, Amsterdam

My graduation internship I did at the office of Jo Coenen & Co in Amsterdam. The main focus was the Joop van den Ende Musical Theatre. I worked on the project as well as created an internal design. I designed the wardrobe, thought of a material for the foyer wall and the design of the main stairs. In addition, I also did internship hands on work for the office.


29



JOOP VAN DEN ENDE MUSICAL THEATER, GRADUATION INTERNSHIP HU

31


SERVAASBOLWERK, SEMESTER 7 PROJECT Bachelor Architecture [HBO] University of Applied Sciences Utrecht [HvU]

These pictures and drawings are from block 1. De assignment consisted of a design competition within the students group. As a group we chose a location in Utrecht. After that we individually came up with a program and then a design. My building reacts on the history of the place [former location of a bunker], the existing buildings and the adjacent park [Servaasbolwerk].


Plan ground floor

Section

33


AAUC CONGO SPC, POINT NOIR, REPUBLIC CONGO, AFRICA [INTERNSHIP] Atelier d’Architecture et d’Urbanisme – Conseils Congo “société professionnelle civile” Bachelor Architecture [HBO] University of Applied Sciences Utrecht [HvU]

The location of the office is in PointNoir, Republic Congo, Africa. During the internship I assisted the owner and architect Michel van den Nieuwenhof as assistant designer. The two building which you see here are designed under supervision. One is a series of apartments near the beach. The other is a shop for electronic appliances.

Electronic shop

A building site, me as toerist and the office building


35


Electronic store


AAUC CONGO SPC, POINT NOIR INTERNSHIP Beach apartments

37


BUILDING A MUSEUM , SEMESTER 5 PROJECT Bachelor Architecture [HBO] University of Applied Sciences Utrecht

The design assignment for this semester was twofold. The first assignment was to draw up the renovation of a fifteen age Gothic house with new function as a museum . Secondly the extension of the museum the project needed a big hall of a column free 300m2. The detail on this page is from my own design.


39


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.