Energy Storage at the Distribution Level – Technologies, Costs and Applications
3000000 2700000 2400000 2100000 1800000 1500000 1200000 900000 600000 300000 0 -300000 -600000
07.04.2019
06.04.2019
05.04.2019
04.04.2019
03.04.2019
02.04.2019
01.04.2019
31.03.2019
30.03.2019
29.03.2019
28.03.2019
27.03.2019
26.03.2019
25.03.2019
24.03.2019
23.03.2019
22.03.2019
21.03.2019
20.03.2019
19.03.2019
18.03.2019
17.03.2019
16.03.2019
15.03.2019
14.03.2019
13.03.2019
12.03.2019
Penalty for cont. one dir. Dev. (`) Addl. Charge of Dev. (`) Charge of Dev. (`)
11.03.2019
DSM Penal es(`)
Daily DSM payable/receivable by CESC
FIGURE 35: The bifurcated DSM account penalties
Control Logic for Operating Battery Energy Storage System to Reduce Deviation Settlement Mechanism Penalties To analyse the BESS action on the impact on DSM penalties, a BESS was assumed to act in realtime block-wise. The constraints such as forecasted demand regulations as per CERC Fourth and Fifth amendments of DSM which mention frequency-related dynamic slope for the discovery of daily block-wise DSM penalty price are being considered while arriving at idle operations of BESS. Overdrawl: As mentioned in Table 18, assumed mandatory discharging time blocks are the instances where the DSM penalties are higher either due to prevailing grid frequency (C1), due to the case of sign reversal (C9), or a violation occurring below 49.85 Hz frequency (C3). This ensures that most of the penalties are reduced in such periods. However, C9 and C3 are given much higher preference. C3 condition ensures partial discharging. Underdrawl: In the case of underdrawl, CERC mentions a cap on rebate in the operating frequency range of 49.85–50 Hz at 12% of the scheduled demand for the time block. Hence C5 and C7 are those instances where no rebate is provided which are assumed for mandatory charging. C10 time block again follows continuous power under drawl which is given a higher preference, hence associated with a mandatory charging. Further C8 is associated with a high penalty for underdrawing above 50.05 Hz. Hence C8 & C10 get first preference in charging. C4 and C6 are associated with Idle SOC to avail rebate in operating range of 12% of the scheduled demand.