45 provided in Table 11. This information would be relevant for the solar suppliers or developers at the state or national level who might assess their

business potential if they intervene in the identified clusters.

TABLE 11: Solar potential in the studied clusters in Jharkhand

Cluster

District

Total number of units

Daily electricity consumption (kWh)/unit

Solar capacity for individual units (kWp)

Small 100 Medium 200 Large 50

Small 0.71 kW

Small 0.15 kW

Medium – 1.42 kW Large 2.12 kW

Medium 0.3 kW Large 0.45 kW

98

5.232 kW

2.2 kW

66

Small 3.074 kW

Small 1.0 kW

Medium 9.096 kW

Medium 2.0 kW

Large 12.08 kW

Large 5.0 kW

Maganpur Tailoring Cluster

Ramgarh

Kharsawan Silk Reeling Cluster

Seraikela 30 Kharsawan

Bishnugarh Brass Cluster

Small 35 Medium Hazaribagh 150 Large 35

Total solar potential in the cluster (kWp)

500